Questions
ayuda
option
My Daypo

ERASED TEST, YOU MAY BE INTERESTED ONAP_S1-S9_AM

COMMENTS STATISTICS RECORDS
TAKE THE TEST
Title of test:
AP_S1-S9_AM

Description:
Reviewer

Author:
AVATAR

Creation Date:
26/09/2022

Category:
Others

Number of questions: 377
Share the Test:
Facebook
Twitter
Whatsapp
Share the Test:
Facebook
Twitter
Whatsapp
Last comments
No comments about this test.
Content:
Binary of 7 ÷ 32 A B C D.
Non-Zero int D or B A B C D.
n-bit binary integer... 1's & 2's Complements A B C D.
- Add hexadecimals "45B"F0000 and 41300000 - (mantissa) Radix point to the leftmost digit of the fraction. Exponent has a bias of 64. A B C D.
Result of √151 - √150 A B C D.
- A & B have 6 & 2 Significant digits (4) Arithmetic operations A B C D.
Subsets A & B in universal set S, equivalent to: "not_A intersection not_B" A B C D.
Rep. SHADED Area A B C D.
Number of students: studying "ALL 3 Languages" A B C D.
Truth table: f(x,y,z) A B C D.
A, B, C, D Karnaugh map A B C D.
- Weather conditions - using Markov process. Probability of a clear day, k2) days after a rainy day? A B C D.
(2) Unevenly weighted DICE A & B. 3/10 & 3/5 Probability it is die A. A B C D.
- Factory produces product - "STANDARD NORMAL DISTRIBUTION TABLE" - Rejected by Internal Inspection What percentage of the products manufactured is rejected? A B C D.
Least # of Multiplication operations "Y = X^5 + aX^4 + bX^3 + cX^2 + dX +e" A B C D.
- "Server" in a queuing sys. - "M/M/1" queuing model 6 transactions & seconds ave. response time. A B C D.
- (2) "Branch Offices" - "ATM" "M/M/1" queuing model A B C D.
shortest paths P, R, Q A B C D.
encoded bit string char 0-9 A B C D.
To encode msg's 4 letters ABCD A B C D.
Finite Automaton A B C D.
<S> :: = 01 | 0 <S> 1 BNF A B C D.
- Reverse Polish Notation (RPN) AB - CA -* BA /- A B C D.
Collision is Negligible (sharing of identical values) A B C D.
PCM transmission A B C D.
1-bit even parity 7-bit char codes A B C D.
Hamming Code A B C D.
Feedback Control A B C D.
Least effort to insert to queue A B C D.
Empty queue Empty stack A B C D.
[Tokyo, Shinagawa, Nagoya, s-Osaka, s-Yokohama] A B C D.
Heap constructed array A B C D.
Binary Tree - Same depth k of 2 A B C D.
Binary tree - Traversed A B C D.
Flowchart Positive integers A B C D.
Data Sorting A B C D.
Insertion algo Doubled A B C D.
In SORTING Methods: - nlogn & "stable" - nlogn & "NOT stable" - n^2 & "stable" A B C D.
searching: Specific & "Unordered" data A B C D.
"n" pairs of employee #s ... A B C D.
array sorted Ascending A(1) .... A(n) - "A(m) = k" A B C D.
"remainder of key value / 97" A B C D.
Hash table - NO Synonyms occur A B C D.
Non-negative int x F(10) print(x mod 8) A B C D.
Non-negative int n f(n) A B C D.
Flowchart - Mid-flow - Parallel processing A B C D.
Reg. Expression "[A-Z] + [0-9] *" A B C D.
Standardization of Programming A B C D.
Prog. Structure *combo A B C D.
func "add" - [Main prog] [Func add] - "CALL BY: Value & Reference" A B C D.
PROGRAMMING Language & Paradigm *combo A B C D.
Java A B C D.
XML A B C D.
Computer Language A B C D.
Supercomputer A B C D.
Instruction Execution Cycle A B C D.
RISC vs CISC A B C D.
Pipeline processing on CPUs A B C D.
Multiprocessor Systems A B C D.
External Interrupt A B C D.
"CLOCK FREQUENCY" in PC A B C D.
VLIW A B C D.
DDR-SDRAM A B C D.
Cache Memory Access Time & Hit Ratio A B C D.
"Write Back" method A B C D.
Memory Interleaving A B C D.
increasing "I/O Speed" A B C D.
RAID5 (Hot-spare Disk) A B C D.
Optical disk - "Organic Dye" A B C D.
System Bus A B C D.
USB transfer mode - "Joysticks" A B C D.
Interface Specialized in HIGH-SPEED Transfer Large Image data A B C D.
DMA A B C D.
Image: - w: 25.4cm - h: 38.1cm - resolution: 600dpi - color: 24-bit A B C D.
not need BackLIGHT Emits light itself A B C D.
Vertical Distribution Sys A B C D.
Grid Computing A B C D.
3-Tier Client/Server sys A B C D.
RPC in Client/Server sys A B C D.
Adopting "Thin Client" A B C D.
Computer Sys Config + its Config Diagram *combo A B C D.
Tech to Increase Reliability of Computer Systems A B C D.
Benefit of NAS A B C D.
Load Balancer A B C D.
BENCHMARKs computer performance A B C D.
Computer Sys Performance Eval: Simulations - CSPES A B C D.
800 Steps 20MIPS A B C D.
Speed-up Ratio E r= 0.9 r= 0.3 A B C D.
indicates a State of CONTENTATION ... A B C D.
MTBF & MTTR 1.5 times Longer A B C D.
MTBF: 1,500 hrs MTTR: 500 hrs 1.25x increase A B C D.
Fukuoka & Tokyo Nekwork Diagram Adjacent nodes (all) = 0.9 A B C D.
[Drawing]: Devices connected in "SERIES or PARALLEL" A B C D.
(Rate of Failure Occurrence) # of Failures in Sys per unit time MTTR < MTBF A B C D.
Failure rate of Hardware Prod. A B C D.
UNIX A B C D.
Virtual Memory Sys: - Overhead: increases - Processor Utilization: decreases A B C D.
Virtual Memory Sys: Paging FIFO & LRU 1-4-2-3-4-1-2-4-3 A B C D.
Job & Job Step A B C D.
Job Scheduling A B C D.
SPTF Turnaround time of Job B A B C D.
Task Scheduling Method to Continue waiting for CPU allocation A B C D.
State Transition of Task A B C D.
Peemptive & Non-Peemptive A B C D.
[Table]: - Priorities: "3" tasks A - C How many milliseconds after start of any 1 of the 3 tasks does task C start A B C D.
Semaphore A B C D.
Threads & Processes A B C D.
Processes may cause Deadlock A B C D.
API in OS A B C D.
Files allocated: 3 media A - C "DESCENDING" A B C D.
I/O Mgm't Func A B C D.
Memory Mgm't: Executing Prog A B C D.
Memory Leak A B C D.
OS Memory Mgm't Func *combo A B C D.
Handling Multiple Interrupts A B C D.
Role of "Shell" in OS A B C D.
Path Specification in File Sys Dir A B C D.
[Dir Specification Method] "\B\A\B" A B C D.
Development Tool A B C D.
Language Processing Prog Generates an Object prog A B C D.
Upper CASE Tools A B C D.
OSS in OSI A B C D.
OSS Point Consideration A B C D.
Semiconductor uses FLIP-FLOP A B C D.
System LSI A B C D.
Power-Saving tech in Microprocessors A B C D.
Truth Table [Logical Circuit X,Y,Z] A B C D.
Circuit w/ 4-bits input data AND, OR, XOR Gate A B C D.
Web Content: USABILITY A B C D.
ACCESSIBILITY A B C D.
Pull-down Menus & Pop-up Menus A B C D.
HID: CONSISTENCY A B C D.
Output Form Design A B C D.
Code Sys. - Data contents is desired. A B C D.
- Compression "Method" orig. data may NOT fully recovered A B C D.
- Compression Standard transmitting VIDEO A B C D.
Character Code in computer A B C D.
Virtual Reality A B C D.
step-like Roughness A B C D.
Three-Schema Structure A B C D.
relation "order" PK A B C D.
Appropriate data model for [Business Rules] - Sells Language teaching prod. A B C D.
ACID: Atomacity A B C D.
LIBRARY Reservation Sys. [Data Model] A B C D.
3rd Normal Form A B C D.
Relational DB Index A B C D.
View can be updated A B C D.
Derived table in SQL A B C D.
SQL statement: Search - same First & Last names A B C D.
SELECT statement derive the same SELECT statement A B C D.
Exclusive Control of DB A B C D.
T1, T2, T3 Deadlock A B C D.
DB: "Failure Recovery" A B C D.
DBMS restarted after failure rollback & forward A B C D.
Concurrency Control "Lost Update" A B C D.
Data Mining A B C D.
Metadata A B C D.
Recall & Precision Ratios A B C D.
Connectionless Communication A B C D.
Packet Switching A B C D.
ADSL A B C D.
VPN (IP layer) A B C D.
Four nodes (A, B, C, & D) A B C D.
FTTH connection - 540MB A B C D.
- CSMA/CD-based Broadcasting data A B C D.
FDDI A B C D.
Devices "MAKE UP" Networks A B C D.
Switching Hub (layer 2 switch) A B C D.
ATM Switches A B C D.
OSI basic ... called "FRAMES" A B C D.
LAN environment A B C D.
Private Addr. TCP/IP A B C D.
IP addr: 202.16.0.180 Subnet mask: 255.255.255.224 A B C D.
255.255.0.0 Proxy ARP A B C D.
auto assign IP addr on Startup A B C D.
Email from Email + 2 characteristics A B C D.
PING check connectivity w/ Devices A B C D.
Not SNMP A B C D.
Server X - detect Abnormal termination A B C D.
Cryptography A B C D.
Cryptography: Concerns A B C D.
Internal Security Policy Storing Private keys A B C D.
Procedure of Digital signature & HASH A B C D.
SECURITY: Related Protocol A B C D.
Authentication Technology A B C D.
Party's Public key CA (Certification Authority) A B C D.
Risk Mgm't for IS A B C D.
Done in Risk Mgm't A B C D.
ISMS Confidentiality & Integrity A B C D.
TEMPEST A B C D.
CC integrates TCSEC & "ITSEC" A B C D.
Viruses & identifying their "Types" A B C D.
Web Beacon A B C D.
Install Software Accepting License Agreement A B C D.
Computer Crime Technique A B C D.
Packet Filtering Firewall [Rule List] [Packet A] A B C D.
S/MIME A B C D.
SECURITY: for Browser A B C D.
Threatens Integrity A B C D.
SAML A B C D.
SSH A B C D.
"PREVENTING": SQL Injection A B C D.
Activity in External Design Phase A B C D.
Techniques in Analysis & Design Software A B C D.
sys suitable for "State Transition Diagram" A B C D.
Analysis in Dev't of Event Driven Prog A B C D.
Top-down & Bottom-up A B C D.
DFD A B C D.
Hierarchical DFD A B C D.
E-R Diagram A B C D.
UML Msgs. SENT A B C D.
ISO/IEC 9126 A B C D.
DATA-Oriented Design vs PROCESS-Oriented Design A B C D.
Structured Charts A B C D.
Life Cycle of Sys Dev't Prog - by DeMarco - STRUCTURED Specs. A B C D.
- Collective Term Obj-Oriented A B C D.
Combo of Basic Obj-Oriented A B C D.
HIERARCHICAL Classes in Obj-Oriented A B C D.
Relationship bet BASE & DERIVED Classes A B C D.
DELEGATION in Obj-Oriented A B C D.
Highest Module Strength (COHESION) A B C D.
Module Coupling A B C D.
Module Partitioning Technique A B C D.
Design Review A B C D.
Design Review Act. *combo A B C D.
Structured Programming A B C D.
Black Box Test A B C D.
- Equivalence Partitioning least test data A B C D.
White Box Test A B C D.
- Decision Condition Coverage (BRANCH Coverage) Test data Flowchart to use: "Multiple Condition Coverage" A B C D.
Test & Act *combo A B C D.
Bottom-up Testing A B C D.
Full Operation After minor changes A B C D.
Software Delivered item to Check A B C D.
Education Technique A B C D.
Result of Correction/Mod A B C D.
Improves Completion Level: Dev't Cycle A B C D.
CMMI A B C D.
Common Frame 2007 (SLCP-JCF2007) A B C D.
Software Reuse A B C D.
Reverse Engineering A B C D.
supported by Soft. Config Mgm't Tools A B C D.
Role of PM A B C D.
Key to Success Sys Dev't Proj A B C D.
Option PM should Choose A B C D.
5 Process Groups in Proj Mgm't bank_B A B C D.
Table of Content: Proj Plan Mid-term plan A B C D.
Proj Mgmt: "Scope" A B C D.
Diagram BREAKDOWN of Spec. Prog. Act. A B C D.
interpretation: "Arrow Diagram" A B C D.
Gantt Chart A B C D.
- Work Distribution Model 288 days 2000 prog 1000 prog A B C D.
Func Point Method A B C D.
Estimating Person-Hours method A B C D.
"# of Prog's & Days" required for Coding 95 days A B C D.
Expression: Productivity of Entire Process - X, Y, Z Steps per person-month A B C D.
EVM A B C D.
QA in Quality Mgm't A B C D.
Quality Control Chart of Test Processes A B C D.
[Bug Detection Diagram] of (2) Subsystems Same Level of Complexity A B C D.
Org. of Soft Dev't Team A B C D.
Risk Mgm't Plan for Sys Dev't Proj A B C D.
do 1st: Ops Manager A B C D.
Procedure: IT Service Mgm't A B C D.
Sys Ops Manager A B C D.
Hardware Maintenance work A B C D.
Not: SLM JIS Q 20000-2:2007 A B C D.
SLA A B C D.
8:00 to 24:00 "illness." A B C D.
Sys Migration Test A B C D.
SLA ITIL A B C D.
Incident Mgm't A B C D.
Service Desk A B C D.
Change Mgm't "Failure Rate" A B C D.
Cost: Computer Sys Initial & Running costs A B C D.
Service Level Mgm't ITIL A B C D.
ITIL Accidents & Problems A B C D.
Operator Mgm't A B C D.
MTBF in Sys Maintenance A B C D.
Data Backups A B C D.
Ops Mgm't: "Sys Failures" A B C D.
CounterMeasure: Loss of Power A B C D.
Scope: Facility Mgm't A B C D.
Sys Audits A B C D.
Sys Auditor A B C D.
Auditability of IS A B C D.
Sys Audit Procedures A B C D.
Sys Audit Procedure: "PRELIMINARY Audit" A B C D.
PREAMBLE: "Sys Audit STANDARDS" A B C D.
Sys Audit Technique: Validity of "MID-PROCESS" results A B C D.
Audit Trails A B C D.
Sys Audits: "Audit EVIDENCE" A B C D.
Audit WORKING PAPER A B C D.
Internal Control A B C D.
- Financial Services Agency Gen. Control in IT A B C D.
Info Strategy A B C D.
Bus. Ops. model: Company Level A B C D.
Index: Supply Chain Mgm't A B C D.
Bus. Ops. model: Total OPTIMIZATION Planning phase A B C D.
EA A B C D.
KPI & KGI A B C D.
PDCA Cycle A B C D.
Contact Mgm't SFA A B C D.
IaaS A B C D.
SOA A B C D.
BPO A B C D.
Modeling Bus Ops ... IS A B C D.
Staff Member USER Dep't A B C D.
INTERVIEW: Pts. Remember A B C D.
RFP A B C D.
Parties in RFP A B C D.
Core Competency Mgm't A B C D.
M&A A B C D.
Importance of STAKEHOLDERS A B C D.
Analysis Technique: PLANNING BUS. STRATEGIES A B C D.
Mgm't Principles A B C D.
DIFFERENTIATION Strategy A B C D.
Marketing Mix A B C D.
RFM Analysis Prime customers "R" (Recency) "F" (Frequency) A B C D.
CSF Analysis A B C D.
BENCHMARKING A B C D.
Balanced Score Card A B C D.
ERP A B C D.
CRM A B C D.
"Valley of Death" A B C D.
TLO Law A B C D.
Control: "Optimum Production Vol" A B C D.
Calculation procedure: MRP A B C D.
Cell Production Sys: Advantage A B C D.
Req'd #: Component C - 5 Units A B C D.
G to B in e-Municipality A B C D.
Credit Card - Credit Limit On-Line Basis A B C D.
RFID A B C D.
Corporate Governance A B C D.
Method: Dev. PROBLEM-SOLVING Skills A B C D.
Proj Org A B C D.
CIO A B C D.
BCP Bus "Impact Analysis" A B C D.
Leadership Styles A B C D.
Factory Manufactures ... Linear Programming Prob Mat'l P, Q 4 tons A B C D.
Relationship bet Order Qty & Total Cost A B C D.
Fixed Order Qty sys vs Periodic Ordering sys A B C D.
Critical Path A B C D.
Arrow Diagram: Activity D Shortened to 6 days from 10 A B C D.
Decision Making: Investment Plans A B C D.
WORK SAMPLING Method A B C D.
OC A B C D.
method: RANDOM SAMPLING A B C D.
Result: Pareto Chart A B C D.
"Association" Diagram method A B C D.
2 Control Charts A B C D.
FInancial Statement A B C D.
Financial Indicators/Indexes A B C D.
Gross Profit in thousand Yen A B C D.
ABC (Activity Based Costing) A B C D.
Income Statement: Break-even point A B C D.
Comparison Chart of "company A & B" A B C D.
ROE A B C D.
Amortization method Intangible A B C D.
MA method A B C D.
Cost of Sales w/ 1st-in 1st-out method A B C D.
Copyright: Web Pages A B C D.
Copyright Law A B C D.
Copyrighted Work Computer Prog A B C D.
Unfair Competition Prevention Act A B C D.
Software X: 100 PCs A B C D.
Penalty: Unauthorized Computer Access A B C D.
Annex A: JIS Q 27001:2006 (ISO/IEC 27001:2005) A B C D.
Act: on Electronic Signature A B C D.
PM Mr. P Dispatched Workers A B C D.
Contract: Satisfies all 3 Conditions A B C D.
company responsible: ... "Prod Liability Act" A B C D.
Act on Protection of Personal Info A B C D.
"Software Mgm't Guidelines" A B C D.
JISC A B C D.
UCS-2 A B C D.
QR Codes A B C D.
Report abuse Consent Terms of use