Questions
ayuda
option
My Daypo

ERASED TEST, YOU MAY BE INTERESTED ONAs P&M3

COMMENTS STATISTICS RECORDS
TAKE THE TEST
Title of test:
As P&M3

Description:
As P&M 23

Author:
Marianeck
(Other tests from this author)

Creation Date:
03/11/2022

Category:
Others

Number of questions: 60
Share the Test:
Facebook
Twitter
Whatsapp
Share the Test:
Facebook
Twitter
Whatsapp
Last comments
No comments about this test.
Content:
Which statement is correct about the SAP Fiori tile group? Note: There are 2 correct Answers to this question. It is based on an SAP Fiori tile catalog. It can be assigned directly to the user via personalization. It is assigned via a portal role. It provides only SAPUI5-based app.
You need to create a new functional location. Which actions can you perform with the SAP Fiori app "Create Technical Object"? Note: There are 3 correct Answers to this question. Edit classification data and characteristics. Assign a subordinate piece of equipment. Change a reference location. Create a task list for functional location. Assign documents.
You want to assign components to an equipment task list. There is no BOM assigned to the equipment. What is the prerequisite for using the free assignment of material? Note: There are 1 correct answer to this question. Assign the header material of a material BOM to the equipment task list header. Free assignment of material is always possible without any prerequisites. Assign the BOM usage for free assignment of material in Customizing. Assign the header material of a material BOM as assembly to a task list operation.
Where can the maintenance planner perform a material availability check? Note: There are 2 correct answers to this question. Via the multi-level order list (SAP GUI) Via the SAP Fiori app "Maintenance Scheduling Board" Within the SAP Fiori-based background job Via the SAP Fiori app "Manage Maintenance Order List".
How does a performance-based maintenance plan calculate the interval between start date and planned date? Note: There are 1 correct answer to this question. Cycle length divided by annual performance Cycle length divided by ((scheduling period) x (cycle modification factor)) Cycle length divided by (annual performance / 365) Cycle length divided by monthly performance.
Which statements related to the creation of maintenance orders are correct? Note: There are 2 correct answers to this question. The long text of the reference notification can be automatically copied as the long text of the order. The document within the document management system can be assigned only at operational level. The assignment of the header notification to an order CANNOT be deleted. When an order is created based on a single notification, this notification becomes the header notification.
You create a revision for a Maintenance Event Builder (MEB) scenario. Which of the following statements are correct? Note: There are 2 correct Answers to this question. You must use hierarchical task lists for the MEB scenario. You can assign a hierarchical task list to the revision. You must assign maintenance notifications to the revision. You can assign a network to a revision.
You require stock material to carry out maintenance tasks. Which of the following statements regarding material planning in the maintenance order are correct? Note: There are 3 correct Answers to this question. Material can be assigned at the order header level. Material can be assigned at the order operation level A goods receipt can be entered for a technically completed maintenance order. A control key for internal workforce is required when assigning stock material to an order operation. The pick list for materials can be printed before order release.
What is the goal of embedded analytics in SAP S/4HANA? Note: There are 1 correct answer to this question. To consolidate the HANA database with third party data. To integrate SAP BusinessObjects Business Intelligence into SAP S/4HANA. To combine transactional and analytical processing. To integrate SAP BW into SAP S/4HANA.
You want to create a maintenance order with an external order operation that includes service items. Which of the following statements are correct? Note: There are 3 correct Answers to this question. The usage of a model service specification is mandatory. The assignment of service master records to an order operation is optional. The actual value entry can be recorded only via the service entry sheet The assignment of a service master record is mandatory. The assignment of a control key with the service indicator set is mandatory.
You want to display vehicle-specific data for a piece of equipment. How do you proceed? Note: There are 1 correct answer to this question. Assign a view profile to an equipment category for fleet equipment. Define the field selection for the vehicle equipment master data. Assign a view profile to the combination of fleet object type and equipment category. Assign a view profile to the combination of equipment category and vehicle class.
You are analyzing the data transfer of the cost center of a piece of equipment. What are the possible data origins? Note: There are 2 correct Answers to this question. The cost center of the superior equipment The reference functional location of the superior functional location The individual maintenance of the cost center in the equipment master record The cost center of the related maintenance work center.
What can you assign in a notification item? Note: There are 2 correct Answers to this question. Only one cause of damage Only one object part One or more causes of damage One or more object parts.
Which functionalities belong to the current portfolio of SAP Business Objects Business Intelligence? Note: There are 2 correct Answers to this question. SAP Crystal Reports SAP QuickViewer SAP Lumira Plant Maintenance Information Systems (PMIS).
Which SAP UI technology is used for the Report and Repair Malfunction app? Note: There are 1 correct answer to this question. SAP GUI for Windows Web Dynpro SAPUI5 SAP GUI for HTML.
The planner adds non-stock material in a released maintenance order. Which of the following statements regarding the purchasing process are correct? Note: There are 3 correct Answers to this question. A goods receipt can ONLY be posted for a maintenance order with status REL. A goods receipt can be posted after the maintenance order is technically completed. A purchase requisition can be created automatically as soon as the order is saved. A purchase order is created automatically as soon as the order is saved. The maintenance order can be set to TECO before the invoice is created.
The maintenance technician wants to document work steps for a technical object in a notification. What are the best options to be used in regard to code-based reporting? Note: There are 1 correct answer to this question. A text in the subject long text screen A task in the notification item An entry in the object list An activity in the notification header.
Which of the following objects can you directly assign when you define the work center? Note: There are 2 correct Answers to this question. Calculation key Organizational unit (HR) Capacity category Fixed price of the activity type.
Which of the following statements about orders with operation account assignment (OAA) are correct? Note: There are 3 correct Answers to this question. Purchase requisitions have the operation as account assignment. A technical object must be assigned to an order operation. Costs are stored only for the operation object. Overall costs are dynamically summed up on the header level. The settlement rule is maintained on the header level.
Which scheduling parameters are used in a multiple-counter plan? Note: There are 2 correct Answers to this question. Scheduling period Start date Factory calendar Scheduling indicator.
You want to create a new functional location. Which configuration steps are required? Note: There are 2 correct Answers to this question. Define the functional location category. Define the number range for the functional location category. Define the structure indicator. Define the reference functional location.
Which activities can the planner perform by using the Maintenance Planning Overview app with the default filters? Note: There are 3 correct Answers to this question. Analyze overdue maintenance orders that have NOT been finally confirmed. Display approved purchase requisitions for which purchase orders have been generated. Analyze confirmed maintenance orders that have NOT been settled. Analyze maintenance orders that are still in planning and have NOT been released. Display approved purchase requisitions for which NO purchase orders have been generated.
Which statements regarding a maintenance order with status REL are correct? Note: There are 3 correct answers to this question. The planner can change estimated costs only at the header level. Goods receipts for external services can be entered. The planner can change planned costs at the operation level. The controller can determine actual cost surcharges. Shop papers can be printed only after the order release.
In which component do you have to perform most of the configuration to set up SAP Asset Manager? Note: There are 1 correct answer to this question. SAP BTP (formerly Cloud Platform) SAP ERP on HANA SAP Mobile Platform SAP S/4HANA.
How do you set up the visible tiles for a specific user in SAP Fiori launchpad? Note: There are 2 correct answers to this question. By assigning the tiles directly By assigning a portal role with an SAP Fiori catalog By assigning a PFCG role with an SAP Fiori tile group By assigning a PFCG role with an SAP Fiori catalog.
You want to assign your maintenance orders to a WBS element. Which of the following statements are correct? Note: There are 2 correct Answers to this question. The assignment always has to be made manually. The settlement receiver WBS element can be determined automatically. The assignment is always made to a network activity of the WBS element. The assignment can be made automatically.
In which cases are projects (PS) used in the area of SAP S/4HANA Asset Management? Note: There are 2 correct Answers to this question. Shutdowns and overhaul Investments External refurbishment Condition-based maintenance.
Which of the following statements are correct for SAP S/4HANA Cloud - Asset Management? Note: There are 2 correct Answers to this question. You can configure SAP S/4HANA Cloud via the SAP Asset Intelligence Network. You do NOT have access to the SAP S/4HANA back-end system. You have access to the SAP S/4HANA back-end system. You can configure SAP S/4HANA Cloud via the self-service configuration UI.
You want to view transactional and analytical processing data in the Technical Object Breakdowns app. What is the source of the information? Note: There are 1 correct answer to this question. BW InfoCube PMIS InfoSet SAP Query InfoSet Core Data Service View.
Which of the following are components of cloud-based SAP Intelligent Asset Management? Note: There are 2 correct Answers to this question. SAP Predictive Asset Insights Worker Safety applications SAP Asset Manager SAP Work Manager.
To which objects can a personnel number be directly assigned? Note: There are 2 correct Answers to this question. Equipment Work center Planner group Business partner.
What do you need to configure to enable entries in the action log of a piece of equipment? Note: There are 1 correct answer to this question. Define an additional business view for the equipment category. Select the time segment check box for the equipment category. Define the corresponding history-related field for the equipment reference category. Activate the change documents for the equipment category.
How do you map a counter replacement in SAP S/4HANA Asset Management? Note: There are 1 correct answer to this question. Deactivate the current counter and create a new counter. Create a new measurement document and assign a valuation code for counter replacement. Create a new measurement document marked as a counter replacement. Replace the defective piece of equipment to which a counter is assigned.
Which of the following are standard functionalities of SAP Asset Manager? Note: There are 3 correct answers to this question. ESRI maps Technical objects Breakdown analytics Work orders and operations Cost analytics.
Which operations can the responsible person perform after a maintenance order is technically completed? Note: There are 3 correct Answers to this question. Change the settlement rule. Lock or unlock the order. Change the planned costs. Create an invoice receipt for delivered materials. Update the estimated costs.
Which steps support the maintenance technician in the Report and Repair Malfunction app (3 tiles)? Note: There are 3 correct Answers to this question. Verify planned and actual costs. Assign a production resource tool (PRT) to the operation. Complete the malfunction report. Find malfunction records already created in a list. Plan repair work for the responsible work center.
Which material type is the best choice if you only want to create a structure element within the BOM? Note: There are 1 correct answer to this question. Maintenance Assembly (IBAU) Spare Part (ERSA) Manufacturer Part (HERS) Compatible Unit (CBAU).
Which objects can you use in the safety measure list? Note: There are 2 correct Answers to this question. Work approval Documents Work clearance documents Permits.
You create two maintenance packages and only one package should be executed at a time. Which parameter determines this? Note: There are 1 correct answer to this question. Hierarchy Cycle set sequence Package sequence Lead flow.
You want to have several plan dates calculated in a maintenance plan. Which scheduling parameter do you use? Note: There are 1 correct answer to this question. Scheduling period Call horizon Offset Scheduling indicator.
What is a valid partner type within the partner determination procedure? Note: There are 1 correct answer to this question. Planner group Vendor (external) Purchasing organization Business partner (gen.).
Which of the following statements about breakdown maintenance are correct? Note: There are 3 correct Answers to this question. Notifications are used for documentation of technical findings and activities performed. Orders always need to be combined with notifications. More than one operation must always be maintained in the maintenance order. Orders and notifications can be used in combination. Maintenance orders can be created as immediate orders without any planning.
What happens if you change the primary key of a functional location? Note: There are 1 correct answer to this question. The functional location is immediately assigned to a new superior functional location when the new label is entered. Changing the superior functional location via alternative labeling is not possible. The user must decide whether the functional location is assigned to a new superior functional The user must define a new labelling system for the new primary key.
Which activities can the technician perform with the Report and Repair Malfunction SAPUI5 app? Note: There are 2 correct Answers to this question. Complete Close Report Release Start Work Release Print Put in Process Schedule.
The technical completion of the current maintenance order was posted with a delay of 5 days. What happens to the next planned date if you set the shift factor for early completion to 100%? Note: There are 1 correct answer to this question. It is not shifted. It will be 5 days earlier. It is postponed by a full cycle (100%). It is postponed by 5 days.
Which parameter in a maintenance strategy do you use to set the start/end date of the maintenance order? Note: There are 1 correct answer to this question. Scheduling type Call horizon Package offset Initial/subsequent buffer.
Which of the following statements are correct regarding a cross-plant planning scenario? Note: There are 1 correct answer to this question. Multiple planning plants are assigned to a maintenance plant (m:1). It is not supported in SAP S/4HANA. Multiple maintenance plants are assigned to a planning plant (n:1). An n:m relationship between maintenance plant and planning plant can be maintained in SAP S/4HANA.
What is the correct receiver object type for the settlement of a refurbishment order? Note: There are 1 correct answer to this question. The fixed asset The cost center The material The WBS element.
What are the prerequisites for serializing a piece of equipment? Note: There are 3 correct answers to this question. Add a serialized material to the equipment serial data view. Maintain a serial number for an existing equipment master. Assign a serial number profile to the related material master. Add a serialized material to the construction type field of the equipment master. Assign a serial number profile to the equipment category.
Which functionalities are available in the SAP Asset Manager for a maintenance worker? Note: There are 2 correct answers to this question Confirm time sheets. Attach documents Change BOM. Create a work order on the ESRI map Schedule resources. Change task list Display maps. Display and maintain technical objects.
Which statements are correct about UI technologies in SAP S/4HANA Asset Management? Note: There are 2 correct answers to this question. SAP Fiori launchpad supports only SAPUI5 apps. The cloud version can also use SAP GUI for Windows. Web Dynpro apps can be used in the SAP Fiori launchpad. SAP GUI transactions can be used in the SAP Fiori launchpad.
Which valuation category do you use to refurbish a material? Note: There are 1 correct answer to this question. Origin In-house/external procurement Retail Condition-based.
Which statement is correct when planning maintenance work that is to be carried out by an external company? Note: There are 1 correct answer to this question. In the control key assigned to the order operation, the "Service" indicator must always be activated. A service master record must always be assigned to the external order operation. If you assign a control key with indicator "Service" for an external service, you have to enter the actual values via the service entry sheet. If you assign a control key for an external order operation, the actual values must always be entered as a goods receipt in the system.
You cancel the technical completion of a work order. What are the effects? Note: There are 2 correct answers to this question. Referenced notifications are put In Process again. Open purchase orders are recompiled. Open purchase requisitions are recompiled. Open reservations are recompiled.
Which of the following is a prerequisite for external refurbishment? Note: There are 1 correct answer to this question. Activate the subcontracting indicator in an external activity. Create the purchasing info record for the external provider. Define the order type for external refurbishment. Select the material group for externally refurbished materials.
During the implementation project you need to define the organizational units relevant for Plant Maintenance. Which of the following objects can you directly assign to a maintenance plant? Note: There are 2 correct answers to this question. Maintenance work center Organizational unit Storage location Maintenance planner group.
You want to set up a general maintenance task list for inspection rounds using the overall time confirmation as a simplified way to record measurement documents. What do you need to do? Note: There are 2 correct answers to this question. Assign an inspection document as a PRT to the task list operation. Assign a piece of equipment with an allocated measuring point to a task list operation. Assign a measuring point as a production resources/tools (PRT) to a task list operation. Assign an inspection lot to the task list header.
How does the work center influence cost calculation in the maintenance order? Note: There are 2 correct answers to this question. Via cost center and activity type Via business partner and hourly price Via activity type and hourly rate Via organizational unit and personal hourly rate.
Which operations are possible when you cancel the technical completion of a maintenance order? Note: There are 2 correct answers to this question Change the estimated costs. Change the priority. Book a goods receipt. Cancel status Released.
Which of the following statements about SAP Asset Manager are true? Note: There are 3 correct answers to this question. SAP Asset Manager provides single sign-on functionality. SAP Asset Manager can be used offline. SAP Asset Manager is available only for the iOS platform. SAP Asset Manager can run on smart watches. SAP Asset Manager is available for SAP S/4HANA and SAP ERP.
Report abuse Consent Terms of use