Questions
ayuda
option
My Daypo

ERASED TEST, YOU MAY BE INTERESTED ON errores 5

COMMENTS STATISTICS RECORDS
TAKE THE TEST
Title of test:
errores 5

Description:
universidad

Author:
mexican
(Other tests from this author)

Creation Date:
23/12/2020

Category:
Others

Number of questions: 15
Share the Test:
Facebook
Twitter
Whatsapp
Share the Test:
Facebook
Twitter
Whatsapp
Last comments
No comments about this test.
Content:
What can you do with a storage group? There are 2 correct answers to this question Use it to define a logical or physical breakdown of a storage type Assign it as an intermediate storage group Assign it to multiple storage bins Use it in process and layout oriented storage control.
What is the document that begins the outbound process in the EWM system? Choose the correct answer(s). Transfer requirement Material document Outbound delivery document in ERP Outbound delivery request.
To which of the following elements can you assign a storage process? There are 2 correct answers to this question. Warehouse process type Activity area Warehouse order creation rule Storage group.
Which options are available in the packaging profile that is assigned to the warehouse order creation rule? There are 3 correct answers to this question Skip a warehouse task that no longer fits into the pick handling unit Limit the number of items to be packed in the pick handling unit Create items in the outbound delivery for the packaging material Use a simple algorithm, a complex algorithm, or a BAdI Consider length, width, and height.
Which structure objects do you have to maintain to integrate Dock Appointment scheduling into EWM? There are 2 correct answers to this question. Staging areas Docking locations Loading points Yard.
In pick, pack, and pass, warehouse workers pass the product from activity area to activity area until it arrives at the actual destination storage bin. In which setting, the system specifies the sequence for processing the warehouse orders and corresponding pick HUs. Please choose the correct answer. System-controlled pick, pack, and pass function Machine controlled pick, pack, and pass function Automated pick, pack, and pass function User-controlled pick, pack, and pass function.
Which of the following actions are possible based on a value-added service(VAS)order? There are 3 correct answers to this question. Perform quality inspection Assemble a kit Capture time required Consume auxiliary products Capture costs.
Delivery Based Production integration supports which of the following process? Please select all the correct answers that apply. Repetitive Manufacturing Kanban Production orders Process orders.
Each client in an SAP server is assigned a unique name that is used in ALE communucations. What is the name of the field? Choose the correct answer(s). Logical System Client System ID Logical Server Server-ID.
Which parameters indicates the type of goods movement when you define a new warehouse process type? Please choose the correct answer availability group activity storage process warehouse process category.
Which physical inventory procedure is storage-bin-specific only? There are 2 correct answers to this question. Ad hoc physical inventory procedure Zero stock physical inventory procedure Low stock physical inventory procedure Period physical inventory procedure.
An Inspection lot summery can be done for which of the following? There are 2 correct answers to this question. Product/Batch Product/Batch/Reference Document Product/Batch/Vendor.
System can perform staging area and door determination in the background, you must define determination rules. When doing this, you first specify which values the system is to compare with the values in the delivery. Which values can be used for the determination of inbound delivery process? There are 2 correct answers to this question. Routes Departure calendar Warehouse process type Staging area / door determination group.
Your customer wants to implement the material flow system(MFS)to connect the conveyors and automated high track, how do you connect SAP Extended warehouse management to communicate with the programmable logic controllers(PLC)? There are 2 correct answers to this question. Directly integrate to the PLC using ABAP Push channels Send an IDoc through a post processing Framework action to the PLC Use SAP Plant connectivity to connect with the TCP/IP socket server of the PLC. Activate the link to the subsystems using the ALF interface on the warehouse number.
Sometimes it is required to include the actual invoice in the shipment when it leaves the warehouse. For a direct outbound delivery, especially for a pickup process where you want the buyer to pay immediately, you might want to issue the invoice before you post the goods issue (which would normally trigger the invoice print). For these cases, you can use the “invoice before goods issue” process to create and print the invoice before the goods issue is posted. Which statements are not correct given below. There are 2 correct answers to this question. For single requests from EWM, CRM billing or ERP billing directly creates single invoices that you cannot change If you want to print invoices for the contents of a vehicle or transportation unit, EWM triggers the invoice printout in CRM billing or ERP billing by sending the message Print Invoice Document. If you want to print invoices for the contents of a vehicle or transportation unit, EWM triggers the invoice printout in CRM billing or ERP billing by sending the message Print Billing Document. For single requests from EWM, CRM billing or ERP billing directly creates single invoices that you can change.
Report abuse Consent Terms of use