Title of test:
ACtivate Project Manager 13

Description:
SAP Activate Project Manager

Author:
AVATAR

Creation Date:
31/03/2021

Category:
Others

Number of questions: 79
Share the Test:
Facebook
Twitter
Whatsapp
Share the Test:
Facebook
Twitter
Whatsapp
Last comments
Hemaprasad ( uploaded 1 year )
What is the answer for Question : Preliminary strategy developed by the customer to approach the project in a specific workstream ? I see the correct answer in your questionnaire is option with same statement : "Preliminary strategy developed by the customer to approach the project in a specific workstream" Would like to know what is the correct answer. Please let me know
Answer
Content:
What is the key characteristics of the agile project approach Frequent and detailed project scheduling Frequent Quality Gates Iterative build with frequent inspections Formal and detailed documentation.
How do you setup scrum teams. There are 2 correct answers to this By type of work, like configuration scrum, documentation scrum and testing scrum. As a cross- functional team covering multiple functions, like configuration, data loads and Testing Based on end-to-end processes like order-to-cash Based on group size, but a minimum of 12 people.
What is the purpose of the scrum board? To document the results of the integration test To visualize team progress To show the functional breakdown of the solution scope To manage the resource load.
How do you achieve frequent checkpoints with the end user in an Agile delivery approach? There are 2 correct answers to this question. Solution demo for sprints Demo the SAP model company User acceptance test Solution review for waves.
Which new role is introduced in the SAP activate methodology in a full scrum team? Application consultant Project manager System administrator Product owner.
What criterion does the product owner use to sequence the product backlog? Complexity Resource availability Business priority Relative effort.
According to the definition of done, which activity must be completed for each sprint? The solution must be built and configured in the development system (DEV) End-user training must be delivered Functionality must be released to the business Functionality must be tested in the quality system (QAS).
When does the scrum team receive formal confirmation that the user stories are completed to the satisfaction of the product owner? Response: During the daily scrum meeting During the sprint review During the sprint retrospective During the user acceptance test.
What is the objective of a sprint retrospective meeting? Provide formal feedback to the project manager Improve the scrum process Define the stakeholder management approach Review and prioritize the backlog.
What is the purpose of a firm-up sprint? To run an end-to-end integration test To revise the release plan and sprint plan To demonstrate functionality from previous sprints To perform string test.
What are some of the key topics covered in the customer team enablement workshops?There are 3 correct answers to this question. Planning skills Project sourcing approach Technical expertise Solution expertise Project management.
Which of the following tools are specific to the data management workstream? There are 3 correct answers to this question. SAP roadmap viewer SAP data services SAP S/4HANA Migration cockpit (for both SAP S/4HANA CLOUD & SAP S/4 HANA EDITIONS) SAP solution manager SAP landscape transformation.
What is the order of artifacts within the technical architecture and infrastructure workstream In the prepare phase? Technical strategy>parameter’s hardware>seizing calculation>hardware seizing results>Hardware specification from hardware vendor Technical strategy>hardware specification from hardware vendor>parameters hardware seizing Calculation>hardware seizing work Hardware specification from hardware vendor>technical strategy>parameter’s hardware seizing Calculation>hardware seizing work Hardware specification from hardware vendor>parameter’s hardware seizing calculation>hardware seizing result>technical strategy.
In which phase do you execute the user acceptance test? Build and test Deploy Final preparation Realize.
In SAP activate, what tool is used in the agile delivery approach during the realize phase. Project plan Release plan Product Increment Burndown chart.
What sprint types are part of the SAP activate methodology There are 3 correct answers to this question. Firm-up Build Foundational Initial Daily.
What term is used for a ready-to-run SAP S/4HANA system with pre-built solution Documentation SAP cloud appliance library Best practice system Fully activated appliance SAP model company.
In which phase will the customer develop a preliminary strategy for building A target operation and support organisational model? Prepare phase Run phase Discover phase Explore phase.
What does the side-by-side extensibility option mean? Extensibility based on the SAP cloud platform and published APls Transfer reporting to BW/4HANA Context-aware SAP S/4HANA extensions, focused on tight integration Have two SAP S/4HANA instances-one for standard code, and another for customer developments.
Which artifacts are part of the solution adoption workstream? There are 3 correct answers to this question Business transformation review (point of view) Project plan System go live announcement(order) Detailed design-business process.
Which of the following are levels in the structure of an SAP Best practices solution package? There are 2 correct answers to this question Scope items Building blocks Configuration guides Business process scenarios.
Which of the following content best outlines the sequence of testing within the application Design and configuration workstream in the realize phase? string test Integration test User acceptance test data migration String test User acceptance test integration test User acceptance test String test string test User acceptance test Integration test .
In which phase do you create “an ordered list of everything that is known to be needed in the Product? Deploy Realize Prepare Explore.
Which of the following are components of SAP Model company? There are 3 correct answers to this question. areBusiness process content for SAP solution manger Preconfigured solution Accelerators Business-driven configuration questionnaire Quality gate checklist.
What is the most granular level of the methodology you can view in the SAP roadmap viewer? Task Phase Scenario Deliverables.
Which collaboration features can SAP jam users access in the SAP methodology Jam group? There are 2 correct answers to this question. Tweet questions Comment on key deliverables Ask questions Update key deliverables wikis.
What tool would you use for managing project tasks and solution documentation Who implementing SAP S/4HANA SAP roadmap viewer SAP support marketplace SAP transformation Navigator Implementation portal for SAP S/4HANA cloud.
Which estimation technique can be used in agile delivery approach to size the user Stories during sprint planning? Product owners relative estimate of the effort that will be needed to implement the user story Detailed bottom-up effort estimate that breaks each user story up into hours or shorter tasks Relative estimate in ideal person days that reflects the best estimate provided By the project team Detailed bottom-up effort estimate by the scrum master in story points based on the User story complexity.
What is scrum of scrum? Alternative to regular scrum process for smaller teams Mechanism for gathering and validating requirements Integration meeting between the various project teams Frequent inspections of code and configuration prior to quality gates.
What are the responsibilities of the product owner in release and sprint planning? NOTE: There are 2 correct answers to this question. Prioritize backing user stories by business priority Estimate the backing user stories Define objectives for each release Analyse the functional and technical dependencies between user stories.
Which new project roles are introduced with the SAP Activate methodology for the Agile delivery approach? There are 2 correct answers to this question. Scrum master Integration lead Design thinking coach Product owner.
Which activity helps the project team add user stories to the product backing? Conducting the solution validation workshop Planning the user acceptance test Preparing a project schedule Assessing project risks.
What technique helps a scrum team to prioritize a large, flat backlog? Fit/gap analysis User story mapping Retrospective Planning poker.
Working in an Agile approach, what should your planning look like at the Beginning of the realize phase? Go-live scope is fixed on the first of January the following year Timelines of the sprint may differ due to the workload Project scope and planning are completed and final User stories are in a ready state for NO more than the first three sprints.
What information does the project team need before they can. Overall project schedule Available project resources Test strategy Definition of done.
Which of the following will help you avoid modification of standard functionality in SAP S/4HANA cloud single edition. There are 3 correct answers to this question. The side-by-side extensibility option (such as SAP cloud platform) A developer key Contract restrictions in SAP HANA enterprise cloud and SAP S/4HANA cloud single tenant edition SAP code inspector The 5 golden rules.
Which accelerators support the Fit-to-standard workshop in the explore phase? There are 2 correct answers to this question Test strategy Backing template Business-Driven configuration Questionnaire Quality gate checklist.
Why is there NO sandbox system in the “New Implementation of SAP S/4HANA cloud Single Tenant? Because the project team uses the DEV system to confirm solution fit Because the fit-to-standard workshop is conducted using the Q system Because the customer may use the SAP model company Because SAP S/4HANA cloud, single tenant edition, contains predefined business.
What accelerator can help you document the configuration definition in the explore Phase? Change request template Test strategy Backlog template Data definition.
Which statement are part of the 5 golden rules for SAP S/4HANA Cloud single tenant edition? There are 2 correct answers to this question. Stick to the security standard of the customer organisation Foster cloud mindset and adherence to the fit to standard approach Use SAP solution manager 7.2 with focused build Document deviations from golden rules for transparency and future use in upgrade.
What is the difference between the “new implementation of SAP S/4HANA Cloud” And the “new implementation of SAP S/4HANA transition path? There are 2 correct answers to this question. Different sets of workstreams are used for these transition paths Upgrade of SAP S/4HANA cloud are managed by SAP, and upgrades of SAP S/4HANA are managed by the customer X`There are different roles in the application design and configuration workstream SAP S/4HANA uses the implementation guide (IMG) and the in-app extensibility option for Configuration and development, and SAP S/4HANA Cloud uses SSCUs and the side-by-side Extensibility option.
Which artifacts in the testing workstream are created within the realize phase for the “new implementation of SAP S/4HANA Cloud” transition path? There are 2 correct answers to this question. Functional test scenarios Functional specifications Reporting functional specifications User acceptance test-plan.
Which of the following belong to the application design and configuration workstream for SAP S/4HANA cloud in the explore phase? There are 2 correct answers to this question Integration prerequisites confirmation Kick-off workshop Configuration definition Fit-to-standard workshop.
How would you describe the explore phase in the “new implementation Of SAP S/4HANA cloud” transition path? Fit-to-standard Solution validation and delta design Simplification and custom code impact analysis Setup and enablement.
How does the provisioning of SAP S/4HANA cloud differ from the setup of SAP S/4HANA Note:There are 2 correct answers to this question To start a Solution Validation workshop, a DEV system is available for SAP S/4HANA, while a Starter system is required for Fit-to-standard for SAP S/4HANA Cloud. There is a Preset phase for Q-system. which is unique for SAP S/4HANA Cloud. SAP S/4HANA systems take less time to provision than SAP S/4HANA Cloud systems. In SAP S/4HANA Cloud, decommissioning/shutdown of the Starter system is initiated automatically after the P-system is requested through the Manage Your Solution app, whereas in an SAP S/4HANA system, the DEV system persists.
Where can you find Data Migration templates? SAP cloud appliance library SAP roadmap viewer SAP best practices explorer SAP S/4HANA Migration cockpit.
Which end-to-end turn-key application lifecycle management (ALM) solution can support You in managing requirements and software development for large Agile project. Solution manager test suite Requirement management Change request management Focused build.
Which of the following are benefits of using ready-to-use content? There are 2 correct answers to this question Predictable results Run SAP like a factory Minimized total cost of ownership Fast time-to-value.
Preliminary strategy developed by the customer to approach the project in a specific workstream Approach document that is developed by a united project team (partner+ customer) Project result that is developed solely by the partner Preliminary strategy developed by the customer to approach the project in a specific workstream Optional information that is NOT important for project activities.
Where can you find the integration content? There are 3 correct answers SAP Best practices explorer SAP Solution manger SAP cloud appliance library SAP API business hub Cloud integration automatic service.
Which of the following are examples of ready-to-run SAP S/4HANA system? There are 2 correct answers to this question SAP Mission control centre SAP best practices explorer SAP model company Fully activated appliance.
Which value chains does SAP solution manager 7.2 deliver? There are 3 correct answers to this question. Detect-to-correct Requirements-to-deploy Hire-to-retire Cash-to-order Request-to-fulfil.
What does the content element of SAP activate provide? There are 3 correct answers to this question. End-user guides Integration content Migration content Functional specifications for WRICEF development Business processes content.
Who determines the tasks that are required to complete the committed backlog items in a sprint? Project manager Scrum master Project team Product owner.
Ready-to-use Content in SAP Activate incudes which of the following There are 2 correct answers to this question SAP Best Practices Project Accelerators Business Models from leading companies in each industry sector Courses delivered by SAP Education.
Which of the following are part of the 10 SAP quality principle? There are 2 correct answers to this question Achieve production readiness Start scoping early Use standard functionality optionally Plan1 phase at a time.
In which phase do you verify that the SAP best practices content meets the customer’s Business needs? Realize Prepare Deploy Explore.
What are two important approaches, based on the control centre concept, that SAP Proposes to use for streamlined implementation and operations? There are 2 correct answers to this question Build SAP like a factory Always connected Run SAP like a factory Intelligent enterprise.
What is SAP activate? A methodology for each of the deployment modes (cloud, on premise, hybrid) A bundle of ASAP, SAP launch, and rapid deployment solutions Step-by-step instructions on how to move from SAP best practices to your custom solutions A solution adoption framework.
What solution operation framework can customers use to create a joint business and IT organisation that will secure transparency and efficiency of SAP implementation. SAP Activate SAP operations control centre Business transformation management methodology Customer centre of expertise.
What is the purpose of the solution validation activity in the explore phase? There are 3 correct answers to this question Response: Educate project participate Identify gaps Verify technical installation Log additional scope items Challenge changes to standard.
What are some of the key characteristics of the implementation approach in SAP Activate methodology? There are 3 correct answers to this question. Based on ready-to-use content Cloud ready On premise only Fixed scope ActivaDelta-based.
What is the basis for approving work results (singing act of acceptance) on a project phase level? Agreed and met acceptance criteria within quality gate Definition of ready for sprint Scrum of scrums meeting decision Definition of done for user story.
What is the Primary Purpose of the SAP Activate Methodology ? To Provide the Sequence of actions in the project To enable access to the SAP ecosystem To manage solution documentation To provide end-to-end Application Lifecycle Management.
Which tool can you use to collaborate with other SAP activate methodology practitioners? SAP Jam SAP Roadmap viewer SAP solution manager SAP implementation Assistant.
How often will an upgrade be performed on an SAP S/4HANA cloud single tenant edition environment? Every year Schedule is defined by service level agreement for SAP HANA enterprise cloud and SAP S/4HANA Cloud single tenant edition services. One upgrade and two feature packs per year Every quarter.
What is the difference between the “system conversion” and the “new implementation OF SAP S/4HANA transaction path. There are 2 correct option to this question. In the realize phase, custom code is adjusted rather than developed for system conversion There are different upgrade cycles SSCUI’s are used in system conversion for configuring SAP S/4HANA through the manage Your solution app In the realize phase, data is converted and not migrated for system conversion.
What tool provides guidance on replacing custom code developed for SAP ERP with SAP S/4HANA functionality for the system conversion? Simplification item check (SI-check) Software update manager with database migration option SAP code inspector Software provisioning manager.
What is the best target deployment option of SAP S/4HANA for the “system conversion” transition path? SAP C/4HANA SAP S/4HANA Cloud Hybrid of SAP S/4HANA cloud and SAP S/4HANA SAP S/4HANA.
What tool provides sizing estimators for the “system conversion” transition path? SAP Transformation navigator SAP best practices explorer Scope and effort analyser SAP readiness check.
What tool is used to synchronize changes between SAP ERP and SAP S/4HANA maintenance tracks? SAP code vulnerability analyser SAP code inspector Business process change analyser Retrofit.
Which of the following scenarios are enabled for the “selective data transition” Transition Path with the SAP landscape transformation tool? There are 3 correct answers to this question System consolidation Consolidation through online data replication Security migration System upgrade Extraction of business units.
In which phase should you first run the SAP readiness check for SAP S/4HANA In a “selective data transition” transition path, in a system consolidation scenario That includes conversions from SAP ERP? Prepare Discover Realize Explore.
In which phase should you create a data migration strategy (L0) during a selective data transition? Realise Deploy Discover Explore.
What is the term used for workshops, which are intended to set value targets, Validate SAP standard. Solution validation Delta design Design thinking Fit-to-standard.
Which artifacts are created within application design and configuration workstream in the explore Phase of the “New implementation of SAP S/4HANA” There are 3 correct answers to this question Detailed design-business process Delta requirements list-register Organisation structure specification Project procedure-mock-up modelling Roles and authorizations management concept.
Via which media does SAP provide ready-to-run systems for SAP S/4HANA deployment? There are 2 correct answers to this question SAP Solution Builder tool Blu-ray disks SAP App centre SAP cloud appliance library.
In the “new implementation of SAP S/4HANA” transition path, which systems are part of the project system landscape? There are 2 correct answers to this question. Starter system DEV P-system QAS.
How would you describe the realise phase in the “new implementation of SAP S/4HANA” transition path? Configure Configure and adjust custom code Configure and develop Configuration copy.