Questions
ayuda
option
My Daypo

ERASED TEST, YOU MAY BE INTERESTED ONEWM 201-220

COMMENTS STATISTICS RECORDS
TAKE THE TEST
Title of test:
EWM 201-220

Description:
EWM cert test

Author:
ekiernicka
(Other tests from this author)

Creation Date:
14/11/2022

Category:
Others

Number of questions: 20
Share the Test:
Facebook
Twitter
Whatsapp
Share the Test:
Facebook
Twitter
Whatsapp
Last comments
No comments about this test.
Content:
You are using delivery-based production integration. Which of the following are created for the outbound delivery in ERP for staging? There are 2 correct answers to this question. An outbound delivery order in EWM when the supplying storage location is connected to EWM and the receiving storage location has NO warehouse management. A posting change document in EWM when the supplying and receiving storage locations are a assigned to the same warehouse number An inbound delivery in the receiving warehouse when the supplying and the receiving storage locations are assigned to different warehouse numbers An internal stock transfer in EWM when the supplying and the receiving storage locations are the same.
Networks define the valid routes (streets) in the warehouse on which the resources move. Which statement is correct regarding Global Networks. There are 2 correct answers to this question. If no storage-type-specific networks are defined, the network connects the storage bins to each other directly. The global network connects the defined, storage-type-specific networks to each other. You assign storage bins of a storage type to an edge A node that matches your X and Y coordinates, if you have not assigned an edge.
EWM uses which document type to differentiate that an EWM inbound delivery from production takes place Please choose the correct answer. Inbound Delivery from Production Outbound Delivery from Production Inbound Process from Production Inbound Delivery from Warehouse.
Physical inventories can be carried out for the following stock types: There are 4 correct answers to this question. Quality inspection stock in putaway Unrestricted stock in putaway Production stock Blocked stock in putaway Unrestricted stock in the warehouse Project stock.
Which statement is true about relationship between Activity Area and Storage Type? Please choose the correct answer Multiple storage type is assign to One activity area One storage type is assign to only one activity area One storage type is assign to multiple activity area Multiple storage type is assign to multiple activity area.
What putaway parameters can the slotting process determine? There are 3 correct answers to this question. Storage section Activity area Activity type Bin type Storage type.
You define new SAP Extended warehouse management (SAP EWM) delivery document types for outbound delivery process. Which additional customizing step is required in SAP EWM? Please choose the correct answer. Create a new system profile for the field control. Map an SAP ERP document type to the delivery document type. Define a delivery item type for the outbound process. Define a document category for the outbound process.
In the executed workload process, the planned and executed duration can be compared for which of the following? There are 3 correct answers to this question. Warehouse tasks Warehouse orders Outbound delivery orders VAS orders Inbound deliveries QI documents.
In EWM Travel Distance Calculation, When calculating the distance while creating the warehouse order, the system estimates the following values There are 3 correct answers to this question. For the speed, the system uses the speed of the fastest resource (Optimistic approach). The route network used (if available) contains all defined routes with resource type restrictions The route network used (if available) contains all defined routes without resource type restrictions For the speed, the system uses the speed of the slowest resource (pessimistic approach). Instead of the known position of the resource, a default distance to be covered to reach the first position in a storage type is specified.
What can you do with a storage group? There are 2 correct answers to this question. Assign it to multiple storage bins Use it in process and layout oriented storage control Use it to define a logical or physical breakdown of a storage type Assign it as an intermediate storage group.
To which of the following objects can you assign external process steps? There are 2 correct answers to this question. Work center Packaging specification Delivery item type Handling unit type.
Inspection rules contain which of the following parameters? There are 3 correct answers to this question. Type of inspection Checking criteria Possible decision, Finding and follow up action Preliminary inspection.
What is the document that begins the outbound process in the EWM system? Please choose the correct answer. Outbound delivery request Material document Transfer requirement Outbound delivery document in ERP.
What is required to perform explicit counting using the Quality Inspection Engine? There are 2 correct answers to this question. Resource Sampling procedure Work Center Inspection rule.
Which of the following objects exist at the item level within a delivery document in SAP Extended Warehouse Management? There are 2 correct answers to this question. Goods receiving or shipping office Ship-from or ship-to party Over-delivery and under-delivery quantity tolerance Delivery quantity.
Which document is created in SAP Extended warehouse management when you use advanced production integration? Please choose the correct answer. Production material request Outbound delivery Outbound delivery request Production order.
For the Preliminary inspection handling unit, which of the following is true? Please choose the correct answer. Firstly, Move the HU's to a work center As the first person for HU, decide if it is "good" or "bad" Need the integration with SAP ERP QM.
With integration SAP QM, Which of the following statement is true in relation to sample size? Please choose the correct answer. A sample size is always calculated in SAP EWM and used for deconsolidation. It is not possible to use sample size. A sample size is calculated in SAP ERP and displayed as information in the work center.
How many screen sections make up the warehouse monitor display? Please choose the correct answer. Two Three Four One.
Which scenario uses layout-oriented storage control? Please choose the correct answer. Staging before loading Unloading before counting Value-added service before putaway Dimension check before moving to high-rack storage area.