ERASED TEST, YOU MAY BE INTERESTED ON lyj1
COMMENTS | STATISTICS | RECORDS |
---|
TAKE THE TEST
Title of test:
lyj1 Description: 테스트용으로 만든 나의 문제집 Author:
Creation Date: 21/11/2024 Category: Others Number of questions: 78 |
Share the Test:
New Comment
No comments about this test.
Content:
Which of these are layers in SAP Best Practice content?
Note: There are 3 correct answers to this question.
Configuration guides. Solution packages. Process diagrams. Scope items. Building blocks. . Which of the following elements does the MRP run take into account? Note: There are 2 correct answers to this question. Planned independent requirements. Shipments. Process diagrams. Sales orders. Material documents. . Your quality department detects a deviation in a raw material batch. Unfortunately, this batch has already been used in production. How can you identify all affected finished goods stocks Note: There are 2 correct answers to this question. Use batch derivation. Use the material where-used report. Use batch determination. Use the batch information cockpit. . What is the purpose of a reporting point confirmation in repetitive manufacturing? Note: There are 2 correct answers to this question. To reduce the total production lead time for along production line. To determine the work in progress along the production line. To provide timely updates of inventory management for the staged components. To stage different components for a production line simultaneously. . When can the material availability check occur automatically in a production order? Note: There are 2 correct answers to this question. At order settlement At order creation At order release At order confirmation . Your customer is using storage location is in SAP ECC and wants to switch to SAP S/4HANA. What do you have to consider? You have to set one MRP area for every storage location. Storage location MRP is replaced by MRP area functionality. Storage locations are NO longer supported. MRP Live does NOT support storage locations, but classic MRP still does. . MRP created a planned order for a material that has one single material from stock as a component. What happens to this dependent requirement when you convert the planned order into a production order? It is converted into a production order. It is converted into a planned order. It is converted into a schedule line. It is converted into a reservation. . Which technological advances enabled the development of SAP S/4HANA as the digital core? Note: There are 3 correct answers to this question. Big and affordable memory. Capability to add to server landscape and scale. Advances in the three-tier architecture approach. Multi core processors enabling parallelism of tasks. Wide adoption of web standards such as Service oriented architecture. . Which functional capabilities does the Detailed Scheduling Board have? Note: There are 2 correct answers to this question. Change planned order quantities. Undo for drag & Drop planning activities. Enter time-ticket confirmation for production orders. Change sales order quantities. . Which of the following is an advantage of MRP Live and NOT available in classical MRP? Note: There are 2 correct answers to this question. MRP Live can propose alternative solutions. MRP Live can create production orders automatically. MRP Live can plan materials with recursive BOMs. MRP Live can priorities demand from sales orders. . A material in your company is planned with planning strategy 70 (Planning at assembly level). The consumption mode has been set to backwards with a consumption period of 12 days. Starting from when are the 12 days counted backwards? From the planned independent requirement date of the material. From the requested delivery date of the related finished good. From the dependent requirement date of the material. From the availability date of the related finished good. . Before a user can add multiple production versions in a material master, what information should be collected? Note: There are 3 correct answers to this question. BOM status Task list group number Lot sizes Validity dates Work center hierarchy . Which warehouse management functions are available in SAP EWM but NOT in SAP WM? Note: There are 3 correct answers to this question. Yard Management. Slotting. Handling Unit Management. Labor Management. Expected goods receipt. . What are the possible categories for the Business Partner master data object in SAP S/4HANA? Note: There are 3 correct answers to this question. Person Vendor. Organization Group Customer . Where can you maintain consumption mode and consumption periods for planning strategies? Note: There are 2 correct answers to this question. In he plant parameters. In the MRP group. In the requirements class. In the material master. . In your plant, MRP is activated. Which options do you have to exclude a material from the MRP run? Note: There are 2 correct answers to this question. Use a specific material group Use a specific material status. Use a specific MRP type. Use a specific MRP controller. . For which categories can you define bills of materials (BOMs) in SAP S/4HANA? Note: There are 2 correct answers to this question. Document Structure Work Center Class Sales Order . In which data object is the production line (Repetitive manufacturing relevant work center) maintained? Bill of material. Production version. Repetitive manufacturing profile. Cost collector. . The production plan is being disrupted by last minute demands that are entered in the system. Which is the most efficient way to handle last minute demands and protect the current production plan? Note: There are 2 correct answers to this question. Manually firm all planned orders for materials within the replenishment lead time of the material. In the material master record, set MRP type to P4 and a planning time fence out of replenishment lead time of the material. In the material master record, set MRP type to Pl and a planning time fence on the replenishment lead time of the material. In the stock requirements list, set a manual firming fence for a date based on the replenishment lead time of the material. . How can you characterize dependent requirements in material requirements planning? Note: There are 2 correct answers to this question They are created with exact times in Advanced Planning They are created when an independent requirement is created for the finished product They are created on assembly level during the planning run They are only created for multilevel bill of material (BOM) structures. In documentation for MRP in Advanced Planning, you read that new orders are created through infinite planning. What does this mean for the capacity requirements of a new order? MRP creates the capacity requirements at the earliest possible time MRP assigns the capacity requirements automatically to work centers with the earliest available capacity MRP creates the capacity requirements without considering existing load on the work centers MRP assigns the capacity requirements automatically after the last scheduled operation for each work center. You want to reduce planning efforts for B and C materials. Which planning procedure do you recommend? Advanced Planning Material Requirements Planning Consumption-Based Planning Subassembly Planning. Which SAP applications can be used for forecasting in Supply Chain Planning? Note: There are 2 correct answers to this question Material Requirements Planning (MRP). Integrated Business Planning (IBP). Supply Chain Management (SCM). Capacity Requirements Planning (CRP). You want to use capacity availability checks for production orders. Which settings have to be made for this? Note : There are 2 correct answers to this question An overall profile must be assigned in the checking control The scope of check must be defined in Customizing The Relevant for Finite Scheduling indicator must be set A checking rule must be assigned to the work centers. You need to model goods receipt processing time in detailed scheduling. Which modeling options do you have? Note: There are 3 correct answers to this question. Define a transportation lane and carrier selection in the location master Define a goods receipt time in the material master Define a suitable process in the production data structure Define a separate inbound resource in the product master Define a handling resource in the location master Define a separate inbound resource in the product master. Your company produces a finished good based on a forecast and expects it to be in stock when customers order it. If customers order more than the forecasted quantity, this must NOT have any impact on the production program. Which planning strategy do you use? Make-to-order production Planning with final assembly Make-to-stock production Planning without final assembly. What is the difference between co-products and by-products? Note: There are 2 correct answers to this question Only co-products appear in the process or production order settlement rule Only co-products have a non-zero inventory valuation Only co-products have movement type 101 Only co-products have movement type 531. What are the key features of using a low level code? Note: There are 2 correct answers to this question To determine the use of subitems inside material BOM (bill of material) To determine how costs are rolled up by product costing To determine the sequence in which materials are planned in MRP To determine the priority of alternative components inside ATP. What information do you have to maintain to define the relationship between supply source and demand source in the Kanban process? Note: There are 2 correct answers to this question Work Center Replenishment strategy Routing Production supply area. Which time elements are part of a routing operation? Note: There are 3 correct answers to this question Processing time Pick time Setup time Wait time Float before production. Which of the following questions do you have to answer before you start creating a bill of material (BOM)? Note: There are 2 correct answers to this question Which base unit of measure does the material have? In which storage location is the BOM required? Is the material type allowed in the BOM? What status does the BOM have?. Your project uses process orders for the production of liquid chemicals. What can you define to ensure that production flow only happens in suitable and physically connected tanks? Note. There are 2 correct answers to this question Resource network Resource matrix Resource hierarchy Resource selection. You want to trigger in-house production of a semi-finished material before a sales order for the corresponding finished good is received. Which planning strategy supports the consumption of planned independent requirements for the semi-finished material? Planning with final assembly (40) Production by lot size (30) Planning at assembly level (70) Assembly processing with production orders (82). How can you limit the validity of a bill of material (BOM)? Note: There are 2 correct answers to this question By period By plant By material type By material status. Which of the following automation options can you use for production orders? Note: There are 2 correct answers to this question You can use mass processing to read PP master data for production orders You can use mass processing to set production orders to technically complete You can use the production scheduling profile to automatically set orders to technically You can use trigger points to automatically create rework orders via confirmations. How can you set up a material as a phantom assembly? Note: There are 2 correct answers to this question Use a special item category in your material BOM (bill of material) Select a special procurement type inside the material master Select a special MRP type inside the material master Define the special procurement type inside the material BOM (bill of material). What could be the reason for different combinations of components in a multiple bill of material (BOM)? Note: There are 2 correct answers to this question BOM component status Manufacturing date Lot size BOM header status. Where do you maintain data to determine the duration of an operation for production? Note: There are 2 correct answers to this question Material master Production version Work center Routing. Your company manufactures materials whose specifications differ for each manufacturing process. Which application do you have to use in SAP S/4HANA to be able to track and use this information in all areas of logistics? Process order management Quality management Batch management Engineering change management. What are the prerequisites for a reporting point confirmation in repetitive manufacturing? Note: There are 2 correct answers to this question Defining the relevant work centers in the routing Activating the reporting point backflush in the work centers Defining the operations as reporting points using the control key Activating the reporting point backflush in the order dependent parameters. How can you support a GMP (Good Manufacturing Practice)-compliant production process? Note: There are 3 correct answers to this question GMP-compliant flag signature Recipe approval Batch record Approved resources. Which actions does the system perform by default when you save a confirmation for a finished product in repetitive manufacturing? Note: There are 3 correct answers to this question. Update statistics for the Business Information Warehouse Reduce run schedule quantities Create associated capacity requirements Create a data entry document Post production costs to the planned order. Which chart types does the labular planning table for capacity planning provide in SAP S/4HANA? Note: There are 2 correct answers to this question Work center capacities chart Orders (dispatched) chart Capacity requirements chart Order (pool) chart. You want to insert an operation at a certain time on a work center in the graphical planning table. The planning direction is forward. The desired dispatching line coincides with an operation that has previously been dispatched. How does the insertion take place? The previously dispatched operation stays assist the new operation is inserted before the dispatched operation The new operation is inserted at the desired time the previously dispatched operation is moved backward The previously dispatched operation stays as is the new operation is inserted after the dispatched operation The new operation is inserted at the desired time; the previously dispatched operation is moved forward. Which information is required when you create a product master in SAP S/4HANA? Note: There are 2 correct answers to this question Industry sector Base unit of measure Product type Selection screen for views. What are some benefits of planning with planned independent requirements for finished materials? Note: There are 2 correct answers to this question Option to use make-to-order production Option to forecast planning for production resources Reduced delivery times Reduced times for final assembly. Which business processes are affected by settings in the order-type-dependent parameters? Note: There are 2 correct answers to this question Define integration with cost accounting Check material availability Select master data Schedule production orders. You are trying to create a production order and NO valid production version can be selected. What could be the reasons? Note: There are 2 correct answers to this question. The order lot size is NOT within the validity range of a production version All production versions for the material are locked NO production lines are assigned to the production versions NO bills of material (BOMs) are assigned to the production versions. How can you achieve a feasible production plan in case of capacity constraints? Note: There are 3 correct answers to this question Execute an infinite production planning run for the critical resources Form optimum sequences to reduce setup times Increase the capacity supply in a time-phased interval Reduce the planning time interval Determine a time period with available capacity on the planning board. Which alternative item strategies are available in bills of material (BOMs) in SAP S/4HANA? Note: There are 2 correct answers to this question Simultaneous 100% check Manual maintenance First in first out (FIFO) . Which of the following are possible configuration steps when setting up the alert monitor in Advanced Planning? Note: There are 2 correct answers to this question Assign the overall profile to the authorization profile. Create an object selection variant for production-planning-related alerts Assign the alert profile to the overall profile Create an object selection variant for priority-category-related alerts . You want to create a production order. What methods can you use? Note: There are 2 correct answers to this question Create in Kanban process Create by order release Convert a purchase requisition Create without material. In the Capacity Scheduling Table, which settings can you select for the planning strategy? Note: There are 3 correct answers to this question Direction Scheduling control Fixed pegging Finiteness level Planning mode. What time element of midpoint scheduled operations can be reduced by reduction strategy sellings while dispatching? Note: There are 2 correct answers to this question Setup time Move time Teardown time Queue time. Under what circumstances can you change the material type for a material if stocks, reservations, or purchasing documents exist? Note: There are 2 correct answers to this question The quantity and value updates are the same The same account category is used The same batch management level is used The same base unit of measure is used. Which standard item categories can you select inside a bill of material (BOM)? Note: There are 2 correct answers to this question WBS item Non-stock item Work item Variable-size item. Which master data fields can have an impact on whether MRP creates planned orders or purchase requisitions for a material? Note: There are 2 correct answers to this question MRP group Material type MRP type Procurement type. How would you define pegging in the context of Advanced Planning? An evaluation to identify material or capacity shortages in the bill-of-material structure after the An evaluation that is ordered according to the network structure of all related products and An evaluation to identify overstock situations in the balance between the receipt and the issue elements after the production planning run An evaluation that is ordered according to the bill-of-material structure of all related products and represents the relationship between the receipt and the issue elements. What are the options if the Dispatched operation status is set for a production order operation? Note: There are 2 correct answers to this question You can reschedule the operation in the Manage Work Center Capacity app You can reschedule the operation using finite scheduling in a planning table You can reschedule the operation using infinite scheduling in a planning table You can reschedule the operation using lead time scheduling. During production order creation, several valid production versions are found. How does the system choose the production version? Alphanumeric or quota arrangement Lot size or material cost Validity period or sales order Planned order or material number. What could be the reason for multiple commitments, where several operations have the same scheduled dates on a work center after dispatching? Note: There are 2 correct answers to this question The Finite Scheduling indicator is NOT set in the strategy profile Alternative work centers are fully occupied The work center has several individual capacities The Change Planning Direction indicator is set in the strategy profile. What could be the reason for multiple commitments, where several operations have the same scheduled dates on a work center after dispatching? Note: There are 2 correct answers to this question The Finite Scheduling indicator is NOT set in the strategy profile Alternative work centers are fully occupied The work center has several individual capacities The Change Planning Direction indicator is set in the strategy profile. Which time elements does MRP consider in backward scheduling to determine the basic dates for components from dependent requirements? Note: There are 2 correct answers to this question Total replenishment lead time Operation duration In-house production time Planned delivery time. Why do you use Engineering Change Management? Note: There are 2 correct answers to this question To save multiple changes for an object To enable integration into a sales order To monitor and document table changes To monitor and document object changes. What can you use standard heuristics in Advanced Planning (PP/DS) for? To optimize costs and times in production plans To set default values in production master data To automate material movements in material staging To solve planning problems for defined objects. What options does a planner have in the planning table for repetitive manufacturing? Note: There are 2 correct answers to this question Create new production quantities Dispatch operations to work centers Change the assignments of production quantities Reschedule and deallocate operations. For production orders, cost object controlling (COC) can be carried out on an order-related or productrelated basis. Which of the following do you have to consider? Note: There are 2 correct answers to this question In product-related COC, all costs are debited and credited to a product cost collector Order-related COC is beneficial in a flexible production environment Product-related COC is used in manufacturing for co-products In order-related COC, individual production orders do NOT have cost segments. Which of the following processes lead to an entry in the MRP planning file? Note: There are 2 correct answers to this question Changing the stock in inventory management Changing the delivery address in transportation management Changing the procurement type in the product master Changing the storage bin in warehouse management. How can you set up the supply source for the Kanban process in SAP S/4HANA? Note: There are 3 correct answers to this question. Change of the material's procurement type Creation of a purchasing contract Change of the storage bin Creation of dependent requirements Creation of a sales order. Your production planners are allowed to execute planning only for specific resources. How can you achieve this in Advanced Planning (PP/DS)? Use a planning area Use a resource group Use a propagation range Use a planning group. What are the advantages of collective orders? Note: There are 2 correct answers to this questio To post confirmations for the entire collective order To show the flow of batches across the entire collective order To perform availability checks across the entire collective order To coordinate orders in the planning board for a collective order. When can consumption of planned independent requirements take place for planning strategy 40 (Planning with final assembly)? When you create a sales order When MRP creates a planned order When MRP creates a dependent requirement When you deliver a sales order. What does the material type influence? Note: There are 2 correct answers to this Whether the material is produced in-house, procured externally, or both Which plant-specific and plant-independent statuses are allowed Which document types and class categories are allowed Which material master screens appear and in which sequence . Where do you maintain the work center that represents the production line for repetitive manufacturing? Note: There are 2 correct answers to this question Production cost collector Production version Repetitive manufacturing profile Routing. How can a material availability check be triggered automatically for a production order? Note: There are 2 correct answers to this question By order releas By capacity planning By mass processing By order confirmation. What determines whether the planned independent requirements in demand management are consumed by other requirements? Note: There are 2 correct answers to this question Requirements type Planning strategy Order type Requirements profile. What are the possible results of a production planning run in Advanced Planning (PP/DS)? Note: There are 2 correct answers to this question Scheduling agreement schedule line Purchase order Production order Planned order. What will happen in the MRP run if you have created a new MRP-relevant material that supports both in-house production and external procurement? The MRP run assumes in-house production The MRP run does NOT consider the material, it has to be planned interactively The MRP run assures external procurement The MRP run plans the material only if a quotation has been maintained. |
Report abuse