1-What sequence do you follow in master data maintenance to define the production of a material? Create BOM -> Create work centers -> Create routing -> Carry out component assignment in BOM or routing
Create BOM -> Create work centers -> Create routing -> Carry out component assignment in work center
Create routing -> Create work centers -> Create BOM -> Carry out component assignment in BOM or routing
Create work centers -> Create routing -> Create BOM -> Carry out component assignment in work center
. 2- Which BOM selection possibilities are available for opening a production order?
Selection by BOM number in the material master of the material to be produced
Selection using a production version
Manual selection
Automatic selection controlled by Customizing settings
. 3-Which of the following functions does SAP Supply Chain Management (SCM) offer?
Planning and optimization of supply chains across company boundaries.
Optimization of the procurement strategy with the supplier pool.
Product development, safety, quality, and maintenance.
Communication to customers through different interaction channels.
. 4-Which of the following organizational units can be used for planning and manufacturing in an SAP ECC system?
Distribution channel
MRP Area
Sales Area
Storgae Location
. 5-Where can you maintain available capacities in an SAP ECC system?
Routing
Production supply area
Pooled Capacity
Work Centre
. 6-Which functions can be triggered before releasing a production order?
Confirmation
Selection of a routing
Stock determination
Selection of BOM
. 7-Which SAP NetWeaver component realizes cross-system application processes?
SAP Business Warehouse (SAP BW)
SAP Enterprise Portal (SAP EP)
SAP Master Data Management (SAP MDM)
SAP Exchange Infrastructure (SAP XI) / SAP Process Integration (SAP PI)
. 8-You are using MRP controllers in an SAP ECC system. Which of the following statements concerning MRP controllers are correct?
The MRP controller is maintained in production versions.
In multilevel single-item planning, materials are selected using the MRP controller.
An employee responsible for the planning of materials can be assigned to multiple MRP controllers.
The MRP controller is a central selection criterion for evaluating material requirements planning.
. 9-For which of the following objects can you enter a confirmation?
Production order
Production order operation
Trigger point
Work Center
. 10-What is the Process Industry Master data?
Material Master, BOM, Resource, Master Recipe, Production Version
Material Master, BOM, Resource, Routing, Production Version
Material Master, BOM, Work centre, Master Recipe, Production Version
Material Master, BOM, Rate Routing, Production Version
. 11-What is Repetitive Manufacturing Master Data?
Material Master, BOM, Resource, Routing, Production Version
Material Master, BOM, Work centre, Master Recipe, Production Version
Material Master, BOM, Work centre, Rate Routing, Production Version
Material Master, BOM, Resource, Rate Routing, Production Version
. 12-What is COGI?
Goods with error
Goods with Control Error
Goods Movement Errors
Goods Receipt Movement
. 13-Which is using in Repetitive Manufacturing?
Production Order
Engineer order
Process Order
Planned Order
. 14-What is the T-code of Production Version and Display Master recipe?
C234 and C202
CS01 and C201
CRC1 and CR02
C223 and C203
. 15-What is ATP stands for?
Available to Provide
Acceptable to provide
Available to Promise
Acceptable to Promise
.
|