option
Questions
ayuda
daypo
search.php

SAP PP Mfg Test Your Knowledge

COMMENTS STATISTICS RECORDS
TAKE THE TEST
Title of test:
SAP PP Mfg Test Your Knowledge

Description:
SAP Basic Data_Bills of Materials

Creation Date: 2025/11/27

Category: Computers

Number of questions: 11

Rating:(0)
Share the Test:
Nuevo ComentarioNuevo Comentario
New Comment
NO RECORDS
Content:

A bill of material is a complete, formally structured list of components that make up a product or assembly. Determine whether this statement is true or false. True. False.

All of the components are stored in a multilevel bill of material for the finished goods. Determine whether this statement is true or false.. True. False.

A material BOM is the only BOM category that can be created in the SAP ECC system. Determine whether this statement is true or false. True. False.

A material BOM can have many different usages for specific departments within a company. Determine whether this statement is true or false. True. False.

Each material BOM is material and plant unique and each material plant combination BOM has a separate internal number assigned to it. Determine whether this statement is true or false. True. False.

At minimum a basic data view of a material master record must exist before you can create a BOM for that material. Determine whether this statement is true or false. True. False.

The base unit of measure defaults into the BOM item but can be overridden with the issue unit of measure from the work scheduling view if it is populated. Determine whether this statement is true or false. True. False.

Each time a BOM is saved the system calculates the low level code which is used for planning. Determine whether this statement is true or false. True. False.

Which report would you use to determine which BOMs will be affected by a component change? Choose the correct answer(s). A BOM comparison. B Level by level BOM explosion. C Multilevel BOM explosion. D Material where-used list.

Which report would you use to see an overview of all the necessary parts and materials? Choose the correct answer(s). A BOM comparison. B Level by level BOM explosion. C Multilevel BOM explosion. D Material where-used list.

Which report would you use to see the differences between two BOMs with different change statuses? Choose the correct answer(s). A BOM comparison. B Level by level BOM explosion. C Multilevel BOM explosion. D Material where-used list.

Report abuse