option
Questions
ayuda
daypo
search.php

20251229_61~70

COMMENTS STATISTICS RECORDS
TAKE THE TEST
Title of test:
20251229_61~70

Description:
sstests study

Creation Date: 2025/12/29

Category: Others

Number of questions: 10

Rating:(0)
Share the Test:
Nuevo ComentarioNuevo Comentario
New Comment
NO RECORDS
Content:

You want to determine which operations of the routing should be considered in a product cost calculation. How do you do this? Note: There are 2 correct answers to this question. By assigning a cost center to the work center in the operation. By defining a usage key in the header of the routing. By marking the cost indicator in the control key assigned to the operation. By marking the Relevance to Costing indicator in the operation.

Which model can be used for ABAP cloud-native development?. BAP RESTful Application Programming Model. The SAP S/4HANA Cloud Extensibility Model. The ABAP Cloud Development Model.

How does the system derive the requirement type from the material master data? Note: There are 2 correct answers to this question. Strategy group -> planning strategy -> requirements class -> requirements type. MRP group -> requirements class -> planning strategy -> requirements type. MRP group -> strategy group -> planning strategy -> requirements type. Strategy group -> planning strategy -> requirements type.

You have implemented Product Cost by Sales Order in conjunction with revenue-based results analysis in your organization. For a particular sales order item, you have the following: * Plan revenue = 3000 * Plan costs = 2000 * Actual revenue = 1200 * Actual costs = 1000 What data does the system calculate during results analysis?. Revenue = 1200; Cost of sales = 800; Reserve = 200. Revenue = 1200; Cost of sales = 1000; Reserve = 200. Revenue = 1200; Cost of sales = 800; WIP = 200. Revenue = 1200; Cost of sales = 1000; WIP = 200.

What can you do with statistical internal orders? Note: There are 2 correct answers to this question. Perform budget availability control. Settle to a CO-PA segment. Perform results analysis. Simultaneously post to a cost center.

From which tables does SAP S/4HANA select line items in costing-based Profitability Analysis reports? Note: There are 2 correct answers to this question. CE2XXXX. CE4XXXX_ACCT. CE4XXXX_ACCT. CE1XXXX.

Which parameters are controlled by the costing type in a costing variant? Note: There are 2 correct answers to this question. Costing sheet. Save with date key. Price updates. Price for materials.

Which processes split costs into their primary cost components? Note: There are 2 correct answers to this question. Top down distribution. Business process price calculation. Execution of the assessment cycles. Cost center/activity type price calculation.

Which setting in the cost center master data do you use to assign the same attributes to similar cost centers?. Cost center department. Cost center category. Standard hierarchy nod. Functional area.

Which of the following statements best describe Product Cost by Order? Note: There are 2 correct answers to this question. It is recommended for products with a long production time. It is used when full cost traceability is needed. It is used when controlling by individual production lots or discrete quantities is needed. It is used when you perform repetitive manufacturing.

Report abuse