Where can you define the default storage location for the material component of a production order? (Choose three) A. Routing B. Production supply area of a work center C. BOM header (product) D. Production version (product) E. Material master (component).
Which issue can occur if the lot size-dependent in-house production time in the material master is not updated after changing the routing? A. Lead time scheduling cannot take place. B. Dependent requirements request the components from the bill of materials at wrong times when using basic dates scheduling C. Requirements planning creates an appropriate exception message in basic dates scheduling. D. Subsequent capacity planning is no longer possible due to the obsolete scheduling parameters.
The company you advise wants to control the availability check in so that when a production and/or process order is created, the following receipts or issues are taken into account: planned orders, purchase orders, production orders, reservations, dependent requirements. When the production and/or process order is released, only the stock that is currently freely usable should be taken into consideration. How can you fulfill this request? A. Differentiated assignment of two different checking rules in check control. B. Activate the freely usable stock in the scope of check. C. Enter an appropriate availability checking group in the material master. Enter an appropriate availability checking rule in the order type.
In what sequence are the steps of material requirements planning performed in SAP ECC? A. 1. Net requirements calculation 2. Lot sizing 3. Determination of the procurement type 4. Scheduling B. 1. Calculation of safety stock 2. Lot sizing 3. Scheduling 4. Determination of the procurement type C. 1. Availability check 2. Lot sizing 3. Determination of the procurement type 4. Scheduling D. 1. Net requirements calculation 2. Lot sizing 3. Scheduling 4. Determination of the procurement type .
For which of the following objects can you enter a confirmation? (Choose two) A. Work Center B. Production order operation C. Production order D. Trigger Point.
When modeling in-house production using SAP ECC, on which business levels can you create a bill of material (BOM)? (Choose two) A. At the company code level B. At the plant level C. At the business area level D. At the client level.
What data can be posted directly via the Plant Data Collection (PP-PDC) interface? A. Goods receipts B. Maintenance notifications C. Confirmations D. Goods issues.
Where can you define the valid receivers for production order costs? A. In the costing variant B. In the settlement profile C. In the valuation variant D. In the production scheduling profile.
Your customer tests the firming options for planned orders in SAP ECC using a test material. Therefore, the customer sets a firming date in the stock/requirements list manually. Additionally, the customer sets a planning time fence with firming type 1 in the material master. How is the resulting firming interval specified in this scenario? A. By the planning time fence from the material master B. By the firming mechanism with the longer firming interval C. By the manual firming date D. It is predefined in Customizing.
A user you advise wishes to transfer variable process instructions for automated processing directly to certain work centers and machines in the production department (for example, feed speed, pressing pressure, dry temperature). The user also wishes to receive variable as-is messages (such as actual quantities, actual times) from these work centers and machines and to process these messages for feedback concerning production orders. Which of the following options would you recommend to implement these requirements? A. Execution Steps (XSteps) and process messages B. SAP Business Intelligence (BI) C. Plant data collection (PP-PDC) interface D. SAP Application Link Enabling (ALE).
In your company planning strategies are used in the SAP-ECC demand management that are based on consumption. Which of the following statements about consumption is true? (Choose two. A. A consumption situation is dynamic and is always restructured with the planning run. B. Consumption can also take place between order reservations and planned independent requirements, depending on the strategy. Consumption always takes place on the material level between the planned independent requirements and the planned orders. D. The consumption parameters (consumption mode and consumption interval) can be set in the material master or in the MRP group.
The final assembly of a finished product should only be triggered when a customer order arrives. Which planning strategy for the finished product do you use? A. Planning with make-to-stock (strategy 10) B. Planning at the assembly level (strategy 70) C. Planning without final assembly (strategy 50) D. Planning with final assembly (strategy 40).
Which property applies for consumption with planning strategy 40 (planning with final assembly)? A. Consumption creates a static and binding assignment between the planned independent requirements and the customer requirements for the entire procurement process. B. Consumption takes place with the planning material. C. Consumption can reduce the total originally planned production quantity. D. Consumption can increase the total originally planned production quantity.
Which of the following features are offered by MRP areas in SAP ECC? (Choose two) A. A storage location may be assigned to different MRP areas. B. An MRP area may include different storage locations. C. Make-to-order production is supported by storage location MRP areas. D. Subcontracting is supported by MRP areas.
When analyzing the SAP ECC order report for a planned order for a finished product, you discover that one of the assemblies will not be available in time for the scheduled final assembly because of automatic forward scheduling. Which planning procedure do you use to create a feasible production plan from a requirements planning perspective? A. Total planning online B. Multi-level single-item planning with the "display material list" option C. Interactive single-item planning for the delayed assembly D. Multi-level single-item planning with the "simulation mode" option.
Which of the following properties applies to multi-site planning in SAP ECC? A. When using one-step stock transfer posting, transfer stock is created in the receiving plant. B. Multi-site planning can be activated using the corresponding planning strategy. C. Both withdrawal from an alternative plant and stock transfer from another plant are deC. Both withdrawal from an alternative plant and stock transfer from another plant are defined via special procurement keys.fined via special procurement keys. D. The use of "scope of planning" is always mandatory for multi-site planning.
In which scenario will the error message shown in the attached screenshot occur? Exhibit: A. A valid routing exists, but the material master is set to manual routing selection. B. A valid routing exists, but the Customizing for the order type is set to manual routing selection C. The routing is not valid at the explosion date. D. The selection method is set to "selection only by production version" in the material master.
Which of the following functions does SAP Supply Chain Management (SCM) offer? A. Product development, safety, quality, and maintenance B. Planning of supply chains across company boundaries C. Communication with customers through different interaction channels D. Optimization of the procurement strategy with the supplier pool.
You use a planning time fence and fixing type 1. You receive a customer order with a material availability date within the planning time fence. What do you have to consider in this scenario? A. Requirements planning considers only changes that are relevant for scheduling within the planning time fence. B. Planned orders are created within the planning time fence and automatically firmed by requirements planning. C. The MRP controller cannot create planned orders within the planning time fence. D. Planned orders that are created by requirements planning are shifted to the end of the planning time fence.
What sequence do you follow in master data maintenance to define the production of a material? A. Create work centers -> Create routing -> Create BOM -> Carry out component assignment in work B. Create routing -> Create work centers -> Create BOM -> Carry out component assignment in BOM or routing C. Create BOM -> Create work centers -> Create routing -> Carry out component assignment in work center D. Create BOM -> Create work centers -> Create routing -> Carry out component assignment in BOM or routing.
You want to plan a finished material using material requirements planning in an SAP ECC system. The resulting planned orders should be scheduled using basic date scheduling (not lead-time scheduling). Which of the following properties for the resulting dependent requirements applies? A. In multi-level backward scheduling, dependent requirements are calculated to the exact second. B. If the individual material components are explicitly assigned to the operations of a routing, the requirement dates of the dependent requirements are scheduled at each start date of the operations. C. When a customer order is created for the finished material, the dependent requirements are automatically triggered for the components in the bill of material without a planning run. D. In multi-level backward scheduling, dependent requirements are triggered at the start date for the planned order of the finished material.
In the SAP ECC system, a material is produced using production orders. The planning table for repetitive manufacturing should be used to plan line loading for this material. On the initial screen of the planning table, you select this material and then receive a message informing you that you cannot use the planning table for this material (see attached screenshot). What could be the reason? A. There are no planned orders or production orders present. B. The repetitive manufacturing indicator has been set. C. There is no valid production version for this material. D. There are no requirements present.
An enterprise wants to use SAP ECC requirements planning together with the NETPL procedure (net change planning in the planning horizon). The planning horizon is to be set equally for all materials by default. However, some materials are to be given a different planning horizon. What procedure would you recommend to the project team for setting the planning horizon on the system side? A. The planning horizon is set in the MRP groups in Customizing and variant entries are assigned via the plant parameter settings. B. The planning horizon is set in Customizing using the plant parameter setting and variant entries are assigned via the MRP groups for the materials in question. C. The planning horizon is set in the MRP groups in Customizing and the variant values are stored in the material masters for the materials in question. D. The planning horizon is set in the plant parameters in Customizing and variant entries are stored in the material masters for the materials in question.
Which of the following requirements is supported by using process orders? A. Linkage of documents to orders B. Use of production/resource tools C. Documentation of the production using an electronic batch record D. Use of reference operation sets.
An enterprise wants to use SAP ECC requirements planning together with the NETPL procedure (net change planning in the planning horizon). The planning horizon should be set equally for all materials by default. However, some materials need to have a different planning horizon. Which procedure do you recommend for setting the planning horizon? A. Set the planning horizon in the MRP groups in Customizing and store deviant entries in the material masters for the corresponding materials. B. Set the planning horizon in the plant parameters in Customizing and store deviant entries in the material masters for corresponding materials. C. Set the planning horizon in the MRP groups and assign deviant entries via the plant parameter settings in Customizing. D. Set the planning horizon in the plant parameters in Customizing and assign deviant entries via the MRP groups for the corresponding materials.
What functions can you use for sub operations? (Choose two) A. Costing B. Material component allocation C. Production/Resource tools allocation D. Capacity planning.
In SAP ECC, you calculate the standard available capacity for a work center capacity using the following data: - Start: 7:00:00 a.m. - End: 3:00:00 p.m. - Break duration: 1 hour - Rate of utilization: 80% - Overload: 110% - Number of individual capacities: 1 How large is the standard available capacity? A. 8 hours B. 5.6 hours C. 6.16 hours D. 7 hours.
What do you have to consider regarding ATP checks in SAP ECC that are triggered from customer orders? A. If the ATP check determines non-availability, it then checks in the next step whether timely procurement or production is possible. B. The ATP quantity is the available quantity that can be used to confirm incoming customer orders. C. An ATP check creates fixed links between customer orders and their confirmed receipts. D. The ATP check does not take stocks and receipts into account. It checks consumption of planned independent requirements.
Which of the following elements can be used in a process order? (Choose three) A. Process instructions B. Parallel sequences C. Relationships D. Suboperations E. Phases.
Which of the following are characteristics of ECC master production scheduling (MPS)? (Choose three) A. MPS items are planned in a standard MRP run. B. The planning of MPS and non-MPS items is always carried out in one planning run. C. Non-MPS items can be taken into consideration by an MPS run. D. MPS items can be defined on plant level E. MPS items can be defined on MRP area level.
Which of the following activities within the KANBAN procedure normally triggers subsequent stock posting of the goods receipt? A. Set "Container in process" B. Set "Container empty" C. Set "Container in transport" D. Set "Container full".
Which of the following items of master data are needed for repetitive manufacturing? (Choose three) A. Production supply area B. Repetitive manufacturing profile C. Production version D. Master record for serial numbers E. Product cost collector.
You want to use the different options for planning in SAP ECC. What is the correct sequence of the planning procedures? A. Sales and operations planning -> Demand management -> Long-term planning -> Material requirements planning -> Capacity planning B. Demand management -> Sales and operations planning -> Capacity planning -> Long-term planning -> Material requirements planning C. Material requirements planning -> Demand management -> Sales and operations planning -> Long-term planning -> Capacity planning D. Long-term planning -> Sales and operations planning -> Demand management -> Material requirements planning -> Capacity planning.
Which objects can affect the calculation of capacity requirements for an operation? (Choose three) A. Standard values (routing B. In-house production time (material master) C. Transport time (routing) D. Formulas (work center) E. Operation control key (routing).
Which function is supported by production orders? A. Automatic selection of a work center at order release B. Automatic creation of transfer orders at order release C. Automatic reading of PP master data at order release D. Automatic printing of order documents at order creation.
An enterprise based in the US produces an end product that is used with the unit of measure "pound" (LB). The material is now to be marketed in the EU. A prerequisite for this is that the material can be sold with the unit "kilogram" (KG). What is the easiest way to fulfill this requirement? A. Define a unit of measure group that converts pounds to kilograms in the basic data customizing and assign it to the material master on basic data view 1. B. Add a conversion factor for converting pounds to kilograms on basic data view 1 in the material master. C. Create a new material with a reference to the original material and assign the metric unit of measure to the new material master. D. There is no need to take any action. In this scenario, the conversion of units of measurements is done automatically.
What do you have to consider, when you use the ATP (Available To Promise) checks for material? (Choose two A. ATP checks can be carried out automatically when releasing a production order. B. ATP checks are automatically performed during Material Requirements Planning (MRP) runs. C. ATP checks are used to evaluate the free capacity on a certain work center. D. ATP checks are mandatory for lead-time scheduling. E. ATP checks can be adjusted to also consider future requirements and receipts.
With which functions of the process order can you fulfill the requirements of the Good Manufacturing Practices (GMP) standard? (Choose three.) A. Material identification and reconciliation B. Availability check C. Batch record D. Resource selection E. Digital signature.
You want to enhance the system statuses of a production order with user statuses. How do you do this? A. Define the user statuses in the order type-dependent parameters. B. Define a status profile in Customizing and assign it to the production scheduling profile. C. Define a status profile in Customizing and assign it to the order type. D. Define the user statuses in the Customizing table of the system statuses.
Which of the following are properties of ECC Multi-Site Planning? (Choose two.) A. Both withdrawal from alternative plant and withdrawal from another plant are defined via special procurement keys B. The use of scope of planning (cross-plant total planning) is mandatory for Multi-Site Planning. C. When using one-step stock transfer posting, transfer stock is created in the receiving plant. D. When using two-step stock transport order with delivery, the receiving plant is defined as a customer.
Which Customizing element controls the determination of planned costs in production orders? A. Accounting type B. Costing variant C. Calculation procedure D. Settlement profile.
You have maintained planning strategy group 10 (make-to-stock production) in the material master (SAP ECC) of a material. For the coming months, you have planned requirements with requirement type LSF (derived from main strategy 10). Now, you want to change the requirement type from LSF to VSF (in accordance with planning strategy 40, planning with final assembly) for requirements in the existing production plan. Which of the following scenarios are applicable in this case? (Choose two) A. You can enter the strategy group 40 in the material master, but the requirement type is not changed automatically for existing requirements B. You must change the requirement type for planning strategy 10 to VSF in Customizing. The requirement type for all existing requirements is then changed by the next planning run. C. You can change the strategy group from 10 to 40 for the existing production plan in the material master, and the requirement type for all requirements is changed automatically. D. You can enter the strategy group 40 in the material master and change the present requirement for the product manually in the production plan.
In the Customizing for requirements planning, a project team notices that the alternatives P1, P2, P3 and P4 are also delivered as standard in addition to MRP type PD. The number in each of these alternatives represents a firming type. What does a firming type define? (Choose two) A. Handling existing procurement proposals outside the planning time fence. B. Handling existing procurement proposals within a planning time fence. C. Handling new requirements within the planning time fence. D. Handling new procurement proposals that need to be created due to new requirements within the planning time fence.
The stock/requirements list for a finished product contains only one sales order and one fixed planned order with the same quantity. The availability dates for both MRP elements are on working days. The availability date for the fixed planned order is set to a later date than the one for the sales order. However, a corresponding rescheduling exception message does not appear. What could be the reasons? (Choose two) A. The delta between the availability dates falls within the tolerance window defined in Customizing. B. The fixed planned order is outside the rescheduling horizon. C. Requirements planning has not been carried out. D. The MRP elements are linked via fixed pegging.
What are the consequences of setting a production order to Technically Complete (TECO)? (Choose three) A. The order is no longer relevant for material requirements planning. B. Capacity requirements are set to null. C. Confirmations are no longer possible. D. Reservations are no longer relevant for material requirements planning. E. The order and its operations receive the system status Locked (LKD).
Which repetitive manufacturing options can you use to carry out line loading in the SAP ECC system, and thus generate run schedule quantities (RSQ) from normal planned orders? (Choose three) A. Automatic selection of the production line assigned to the MRP group used during material requirements planning (MRP) B. Automatic selection of the production version in material requirements planning (MRP) using the selection methods setting C. Automatic selection of the production version by applying quota arrangement records in material requirements planning (MRP) D. A planning algorithm from capacity planning E. Manual assignment of planned production quantities in a planning table.
Which of the following statements about the SAP Solution Manager listed is correct? A. Solution Manager is part of the SAP ECC System B. Solution Manager is an add-on industry solution C. Solution Manager is a stand-alone system that communicates with other systems in a system landscape. D. Solution Manager is a satellite system in a system landscape.
Which data forms the basis for calculating the capacity requirement for an operation? (Choose three.) A. Standard values (routing) B. In-house production time (material master) C. Transport time (routing) D. Formulas (work center) E. Operation control key (routing).
In which of the following objects can you activate backflushing of components if you want to use this functionality during order confirmation? (Choose three.) A. Work Center B. Production Scheduling Profile C. Material Master (Finished Product) D. Routing E. Material Master (Component).
Which statements are true for ECC Long-Term Planning (LTP)? (Choose two.) A. Reorder point planned materials can be included in long-term planning. B. In case of external procurement, long-term planning creates purchase requisitions. C. A planning scenario must be released to use it in long-term planning. D. Long-term planning generally is operational planning of important components.
The company you advise wants to carry out the material availability check automatically in the production order at various points in time. Which of the following options would you recommend? (Choose two.) A. Goods receipt for the product produced with the order B. Creation of the production order C. Confirmation of the operation that the materials being checked are assigned to D. Release of the production order E. Goods receipt for a missing part.
What are the names of the objects for process integration of production orders? (Choose two) A. Control recipes B. Work instructions C. PI sheets D. Control instructions.
From what point can you no longer use the Read PP master data in the production order? A. After printing the order papers. B. After the first posting of goods movements or confirmation. C. From the release of the production order. D. After assigning the confirmed quantity of a material component due to carrying out a material availability check.
You want to create a new material that - is kept in stock- is externally procured- is used as a component in the bills of material for various final products- must not be sold directly Which standard SAP material type do you use? A. NLAG (non-stock material) B. FERT (finished product C. ROH (raw material) D. HAWA (trading good).
What could be a consequence of confirming an operation? A. The planned costs are updated B. The capacity requirements are updated C. The production order is rescheduled D. The actual costs are settled.
The availability check during production order creation should use a different scope of check than during order release. How can you fulfill this requirement? A. Maintain appropriate checking rules in checking control for order creation and order release. B. Maintain appropriate availability checking rules in the order type-dependent parameters. C. Maintain an appropriate availability checking group in the material master. D. Maintain appropriate availability checking rules in the production scheduling profile.
During a project phase, your customer raises some questions concerning parameters of the procurement type in the material master in the SAP ECC system. Which of the following procurement type properties are valid? (Choose two) A. If both procurement types are allowed with entry X (both procurement types), requirements planning assumes in-house production B. Procurement types E (in-house production) and F (external procurement) always have to be further refined with special procurement types. C. Procurement types E (in-house production), F (external procurement), or X (both procurement types) can be selected for a material independent of the material type D. If procurement type E (in-house production) is set, external procurement may still be possible, depending on the material type.
Which functions can be triggered before releasing a production order? (Choose three) A. Selection of a routing B. Selection of a BOM C. Stock determination D. Confirmation E. Scheduling.
Which of the following elements do you have to prepare for costing of a production order to function without errors? (Choose three.) A. Assign costing variants to order type. B. Propose a standard text key in work center. C. Assign a production scheduling profile to the material master (product D. Enter formulas for costing in the work center. E. Use an operation control key with the indicator costing-relevant.
The master data for an in-house production process is to be set up in the SAP ECC system. To do this, you should create a suitable routing that plans for five operations in an initial sequence (10, 20, 30, 40, 50). There should be an option of relocating operations 30 and 40 to a second sequence on other work centers if there are capacity bottlenecks. What sequence type would you use to create the second sequence in the system? A. Substitute sequence B. Alternative sequence C. Parallel sequence D. Standard sequence.
Where in the SAP ECC system can you define production versions? A. In the material master B. In the routing C. In the bill of material D. In the work center.
Which of the following master data is necessary for the creation of material reservations for production orders? A. Material master records B. Production/resource tools C. Routings D. Production versions.
You want to reduce the uncertainty caused by fluctuating requirements for a finished product by using a dynamic safety stock in SAP ECC. On which specifications is the dynamic safety stock calculation based? A. The static safety stock and the material forecast B. The average daily demand and the safety time C. The average daily demand and the desired range of coverage D. The static safety stock per day and the safety time.
Which of the following scheduling types can only be used in capacity planning? A. Midpoint B. Forward C. Only capacity requirements D. Backward.
What do you have to consider regarding consumption? (Choose two A. Consumption takes place on the material level between the planned independent requirements and the planned orders. B. Consumption is restructured with the planning run. C. Consumption can take place between order reservations and planned independent requirements, depending on the strategy. D. Consumption parameters (consumption mode and consumption interval) can be set in the material master or in the MRP group.
Which activity can trigger an automatic availability check for the components of a production order? A. Material staging B. Order rescheduling C. Order release D. Goods receipt for a missing part.
Which of the following statements is true for the ATP (available to promise) availability check in SAP ECC that is triggered from a customer order? A. The ATP check does not confirm against stocks and receipts, it checks consumption against planning requirements. B. An availability check by means of ATP creates fixed links between customer orders and their confirmed receipts. C. The ATP quantity is the quantity still available that can be used to confirm incoming customer orders. D. If the ATP check establishes non-availability, it checks whether it is still possible to procure or produce in time.
Which of the following activities is necessary for the capacity availability check that can be carried out automatically when a production order is released? A. Set the finite scheduling indicator and assign a checking rule in the work center for the operation to be checked. B. Activate the availability check and assign an overall profile in the checking control of the order type / plant combination. C. Assign an appropriate availability checking rule to the material master for the product. D. Activate the availability check and assign an overall profile in the production scheduling profile.
What are characteristics of repetitive manufacturing? (Choose three) A. Production without using production orders and without status management B. Shop fabrication C. Automatic line loading based on capacity limits across all production lines D. Continuous material consumption, production flow and output E. Period-based planning of the quantities to be produced.
What master data do you need for material replenishment using the KANBAN procedure? (Choose two) A. Production supply area B. Rate routing C. Product cost collector D. Control cycle E. Production version.
In which master data object do you set the standard values for an operation A. Material Master B. Work Center C. Routing D. Production Resource/Tool (PRT).
Which of the following organizational efforts can be minimized using the KANBAN procedure? A. Effort for material staging B. Effort for capacity planning C. Effort for Sales and Operations Planning (SOP) D. Effort for master data maintenance.
During the processing of production orders planned and actual costs are determined. On which of the following objects can you collect these costs? (Choose two) A. Production order B. Product cost collector C. Work center D. Planned order.
Which types of objects can be changed with Engineering Change Management (ECM)? (Choose three) A. Task list B. Work center C. Production version D. Bill of material E. Material master.
You select the master data for production orders via production versions. Which information is contained in a production version? A. The explosion dates for the routing and BOM B. The routing and BOM alternatives to be used C. The default order type to be used D. The control parameters for selecting routings and BOM.
When maintaining a work center, formulas can be assigned in the scheduling view. Formulas use formula parameters for calculation. What can be the origin of the formula parameters used for scheduling? (Choose three) A. User-defined fields in the operation of routings B. General operation values of routings C. General item values of bill of materials D. General values from work scheduling view of the material master E. Standard values in the operations of routings.
Which of the following statements about the planning functions available in SAP ECC is correct? A. Master production scheduling (MPS) refers to preferred planning of important materials. B. Material requirements planning (MRP) includes automatic capacity leveling. C. Long-term planning (LTP) is a long-term form of forecast planning. D. In demand management (DM) material shortage situations are identified and corresponding receipt elements are created.
Which property applies for consumption with planning strategy 40 (planning with final assembly)? A. Consumption can result in subsequent adjustments of planned receipts. B. Consumption can reduce the originally planned production quantity. C. Consumption takes place with the planning material. D. Consumption creates a static and binding assignment between the planned independent requirements and the customer requirements for the entire procurement process.
A material was planned in the context of SAP ECC material requirements planning. The MRP controller subsequently processed the material by manually converting a specific planned order into a production order. The MRP controller now accesses the current stock/requirements list and the MRP list for this material and compares these two lists. What do you have to consider for the two lists at this stage? (Choose two) A. The stock/requirements list was updated the moment it was accessed. B. The MRP list displays the production order. C. The MRP list has the status "processed". D. The stock/requirements list displays the production order.
Which options can you offer someone who uses the SAP ECC system for production orders and requires support for material supply in production? (Choose three.) A. Automatic generation of a transport order B. Material directory C. Pull list D. Pick list E. Logistics Information System (LIS).
Which of the following requirements for a manufacturing plant can be supported by using process manufacturing? (Choose three.) A. Master recipe-based manufacturing. B. Material requirements planning for production resources. C. Manufacturing without orders. D. Variable calculation of material quantities (product output, material usage). E. Manufacturing in charge quantities.
What could be a consequence of the confirmation of an operation? A. Settlement of the actual costs B. Reduction of capacity requirements C. Rescheduling of the production order D. Update of the planned costs.
What do you have to consider regarding lot size procedures? A. The procurement quantity of a lot size procedure can be specified using a safety time period profile. B. If a long-term lot size is used, procurement is conducted with a long-term perspective. C. The lot size quantity can be influenced using a minimum lot size and the rounding profile. D. If a make-to-order production strategy is used, only the lot-for-lot (exact) lot size can be applied.
You want to produce a finished product only when it is requested by a customer order in make-to-order production. However, all assemblies need to be procured beforehand. How can you fulfill these requirements in SAP ECC? (Choose two A. Use strategy 50 (planning without final assembly) for the finished product and no strategy for all assemblies in the bill of material. B. Use strategy 30 (production by lots) for the finished product and strategy 70 (planning at the assembly level) for all assemblies in the bill of material. C. Use strategy 20 (make-to-order production) for the finished product and strategy 70 (planning at the assembly level) for all assemblies in the bill of material. D. Use strategy 40 (planning with final assembly) for the finished product and strategy 70 (planning at the assembly level) for all assemblies in the bill of material.
What features related to process orders can be used to fulfill Good Manufacturing Practices (GMP) requirements? (Choose three) A. Approved master recipes B. Digital signature C. Electronic batch record D. Availability check E. Resource selection.
Which activities lead to a reduction of the capacity requirements for an operation? (Choose three) A. Rescheduling the operation B. Posting the goods receipt for the production order C. Confirming the operation D. Setting the status technically complete (TECO) E. Reducing the order quantity.
Which of the following statements about consumption are correct? (Choose two) A. Consumption takes place on the material level between the planned independent requirements and the planned orders. B. Consumption parameters (consumption mode and consumption interval) can be set in the material master or in the MRP group. C. Consumption is restructured with the planning run. D. Consumption can take place between order reservations and planned independent requirements, depending on the strategy.
Which of the following statements best defines SAP ERP? A. SAP ERP is an application that supports all processes involving direct customer contact throughout the entire customer relationship life cycle. B. SAP ERP is an application that a company can use to manage its business processes efficiently. C. SAP ERP is a system in which advanced planning and optimization processes can be mapped. D. SAP ERP is a system hardware that includes components such as Purchasing, Sales and Distribution, Materials Management, and Production.
Which option for selecting a routing exists when you create a production order? A. Automatic selection of a reference operation set B. Manual selection based on settings in the order type-dependent parameters C. Automatic selection based on the selection ID in the material master D. Manual selection based on the list of routings maintained in the material master.
Your customer does not want to manage value-intensive materials in the warehouse. These materials should be procured directly for the production order. Which BOM item category must you set to fulfill this requirement? A. D (document item) B. E (external procurement) C. M (phantom material) D. N (non-stock item).
Which of the following structural elements does a process order have? (Choose three.) A. Item data B. Parallel sequences C. Relationships D. Phases E. Characteristic-based process instructions.
In SAP ECC, you want to map an in-house production process for general warehouse production. The fields in the area of the lot size-dependent in-house production time are to be populated when the material master for the final product is created. These fields can be maintained by updating from the scheduling result for the associated routing. You now think that there could be significant changes to the production times in the routing and decide against updating the material master. What problem could this lead to? A. Subsequent capacity planning is no longer possible due to the obsolete scheduling parameters. B. Requirements planning runs up against an exception message in basic dates scheduling because the material master parameters do not match the scheduling result from the routing. C. In the course of basic dates scheduling with requirements planning, dependent requirements request the components from the bill of materials at the wrong times. D. Lead time scheduling, which occurs by the time that a planned order is converted into a production order (at the latest), cannot take place on the basis of incorrect basic dates.
Which of the following functions are available in SAP ECC when using capacity leveling? (Choose three) A. Batch size optimization B. Midpoint scheduling C. Lot size optimization D. Finite capacity scheduling E. Setup time reduction.
Which of the following master data can be used with process orders? (Choose three) A. Serial numbers B. Master recipes C. Resources D. Production/resource tools E. Production versions.
When testing requirements planning in plant 1000, you receive the error message displayed below. Large numbers of materials are already available in plant 1000. As a first step in solving the problem, you activate requirements planning in the Customizing for plant 1000. What further tasks do you perform before you can use requirements planning in plant 1000 in SAP ECC? A. Set up the planning file in Customizing and specify the plant parameters for plant 1000 in Customizing. B. Set up the planning files in Customizing and specify the plant parameters for plant 1000 in Customizing of the MRP group. C. Set up the planning file in Customizing and specify the plant parameters for plant 1000 in the MRP views in material master. D. Activate requirements planning in Customizing for MRP areas in plant 1000 and specify the plant parameters for plant 1000 in the MRP views in material master.
You want to use the function "Read PP master data" in the production order. However, while calling the function you receive an error message. What could be the reason? A. The material availability check has been performed. B. Goods movements have been posted C. The production order has been released. D. Order papers have been printed.
After a material has been included in a NETCH material requirements planning run you change its BOM (bill of materials). Which of the following planning file entries for this material are set by the system? A. The BOM explosion and the NETPL planning indicator B. The BOM explosion indicator C. The BOM explosion, the NETCH, and the NETPL planning indicators D. The NETCH and NETPL planning indicators.
Which of the following situations occur when a production order is set to Technically Complete (TECO)? (Choose three.) A. The order and its operations receive the system status Locked (LKD). B. Reservations are deleted. C. Purchase orders for external operations or non-stock materials are deleted. D. The order is no longer relevant for Material Requirements Planning. E. Capacity requirements are deleted.
In which of the following objects can you activate back flushing for production orders? (Choose three) A. Work center B. Routing C. Material master (finished product) D. Material master (component) E. Production scheduling profile.
What can you use to organize material staging for production orders? (Choose three) A. Material documents B. Transfer orders C. KANBAN D. Pull list E. Logistics Information System (LIS).
You create a routing that includes five operations in an initial sequence (10, 20, 30, 40, 50). When capacity bottlenecks occur, you want to use a second sequence on other work centers for operations 30 and 40. Which sequence category do you use to create the second sequence in the system? A. Finish-start relationship B. Standard sequence C. Parallel sequence D. Alternative sequence.
What is a feature of the simu-lation mode for material requirements planning in SAP ECC? A. It calculates the delay time which may occur in planning. B. It triggers multilevel bottom-up scheduling. C. It propagates exception messages from a component to the finished product. D. It posts planning results to the database automatically.
When maintaining a work center, formulas can be assigned in the scheduling view. Formulas use formula parameters for calculation. What can be the origin of the formula parameters used for scheduling? (Choose three.) A. General values from work scheduling view in the material master B. Standard value from operation in task list C. User-defined field from operation in task list D. General operation values in task list E. General item values in bill of materials.
What do you have to consider when you use SAP ECC long-term planning (LTP)? (Choose two) A. A planning scenario must be released before it can be used in LTP. B. Reorder point planned materials can be included in LTP. C. LTP focuses on the operational planning of important components. D. LTP creates purchase requisitions for external procurement.
Which of the following properties about the planning functions available in SAP ECC applies? A. Long-term planning (LTP) is a long-term form of forecasting. B. In demand management (DM) material shortage situations are identified and corresponding receipt elements are created. C. Material requirements planning (MRP) includes automatic capacity leveling. D. Master production scheduling (MPS) refers to preferred planning of important materials.