test 4
![]() |
![]() |
![]() |
Title of test:![]() test 4 Description: test 4. Creation Date: 2023/10/25 Category: Others Number of questions: 30
|




New Comment |
---|
NO RECORDS |
The production order default storage location for components can be defined in which of the following master data objects? There are 2 correct answers to this question. Routing, in the component allocation. Material master of components. BOM item details. Location field maintained in the work center. With reference to archiving and deletion, which statements are correct? There are 2 correct answers to this question. Setting the deletion flag (DLFL) is the first step. The prerequisite for setting the deletion flag is to have closed (CLSD) status. It's not possible to display the orders after they are archived and deleted. Residence time 2 should have passed after setting the deletion indicator to archive the orders. The only restriction for setting the deletion indicator (DLT) is to have the order with DLFL. To view alerts in PP/DS, what setup needs to be created? There are 2 correct answers to this question. Create an application-specific profile. Configure alerts in the core interface. Select material-specific alerts in the product master. Assign an alert profile to the planning tool. What are the possible results of a production planning run in Advanced Planning (PP/OS)? There are 3 correct answers to this question. Response: Stock transport order. Purchase requisition. Production order. Planned order. Scheduling agreement schedule line. BOM information is also used in what other activities in an organization? There are 3 correct answers to this question. Response: Material master maintenance. Reservations and goods issue. Sales orders. Product costing. Which of the following functions can be performed with a REM planning table? There are 3 correct answers to this question. Planned order quantities can be dispatched. Production orders can be created. Component backflush can be performed. Planned orders can be created. Final confirmations can be performed. Which of the following are forecasting tools in SAP Supply Chain Management? There are 2 correct answers to this question. Response: Standard SOP. Demand Management. Capacity Planning. Flexible Planning. In which data objects do you maintain the production in as the work center for repetitive manufacturing? There are 2 correct answers to this question. Repetitive manufacturing profile. Routing. Production version. Production cost collector. Which of following cannot be changed in embedded PP-DS? There are 2 correct answers to this question. Response: Stocks. Purchase requisitions. Stock transfer reservations. Sales orders. Planned orders. Your production planners must execute planning only for specific resources. How can you achieve this in Advanced Planning (PP/OS)? Please choose the correct answer. Use a heuristic. Use a resource group. Use a planning group. Use a Propagation range. Which of the following functions can be performed with a REM planning table? There are 3 correct answers to this question. Response: Planned order quantities can be dispatched. Production orders can be created. Component backflush can be performed. Planned orders can be created. Final confirmations can be performed. Question: With reference to confirmations, which statements are correct? There are 3 correct answers to this question. By default, you can perform only partial confirmation while performing milestone confirmation. Capacity requirements will be completely reduced when you perform final confirmation. With milestone confirmation, the preceding operations and suboperations will be confirmed until the next milestone operation. The standard value key maintained in the work center determines whether an operation is relevant for confirmation or not. For progressive confirmation, you can perform confirmation at the end of the day. What are benefits of the Engineering Workbench? There are 2 correct answers to this question. Response: Detailed selection of bill of materials (BOM)items and operations. Simultaneous processing of different bill of materials (BOM) items and operations. Simulation of planned changes for costing and mater all requirements planning. Undo/redo functionality of planned changes. Which of the following statements apply to planning at assembly level? There are 2 correct answers to this question. Consumption only takes place on the level of the finished product. You can use any planning strategy for the finished product. Consumption is triggered by the MRP run. Forecast is done for the assembly/assemblies. What are some benefits of planning with planned independent requirements? There are 2 correct answers to this question. Response: Option to forecast planning for production resources. Reduced delivery times. Option to use make-to-order production. Reduced production times. Which of the following are master data objects for kanban? There are 2 correct answers to this question. Production supply area (PSA). Product cost collector (PCC). Control cycle. Storage location. Which statements are correct with reference to the Schedule Production app? There are 3 correct answers to this question. Response: You can have more than one work center as a bottleneck work center. This app is applicable only for pacemaker or bottleneck work center. Only the Chart view is available for this app. Planning Mode can be selected flexibly between Bucket and Sequence. You can perform dispatch, deallocate, and reschedule of operations. You want to represent setup time as a graphical object in the Detailed Scheduling Planning Board. Which actions are needed? There are 2 correct answers to this question. Create and assign setup group/setup keys in the production data structure. Run setup minimization heuristics or optimizer. Create and assign a setup matrix with setup transition time to the resource. Create and assign a new graphical object for setup time in the planning board. During the greenfield implementation of SAP S/4HANA 2020, your key user informed you of the business requirement to capture electricity and water consumption confirmation of operations in the order, apart from setup, machine, and labor time. Which master data object will you set up for this pur-pose? Please choose the correct answer. Response: The electricity and water consumption costs can be captured as overheads with the management accounting component. Work Center - Capacity categories for electricity and water consumption. Work Center - Default values. Work Center - Standard value with appropriate keys. You are creating a production order manually. What activities are involved in this process? There are 3 correct answers to this question. Response: Master data selection. Order type determination. Planning selection. Actual cost calculation. Capacity requirements determination. Which of the following statements are true for make-to-order production? 2 an. Planning assemblies can be combined with the Make-to-Order concept. Sales orders are fulfilled by anonymous warehouse stock. Planned independent requirements always trigger final assembly. Sales orders always trigger production. Where can you maintain consumption mode and consumption periods for planning strategies? There are 2 correct answers to this question. In the MRP group. In the material master. In the requirements class. In the plant parameters. Which time elements are relevant for lead time scheduling of a production order? There are 2 correct answers to this question. Response: Total replenishment lead time. Float after production. Planned delivery time. Setup time. Which SAP solutions can be used for forecasting in Supply Chain Planning? There are 2 correct answers to this question. Capacity Requirements Planning (CRP). Material Requirements Planning (MRP). Integrated Business Planning (IBP). Supply Chain Management (SCM). Question: You want to insert an operation at a certain time on a work center. The planning direction is forward. The desired dispatching time coincides with an operation that has previously been dispatched. How does the insertion take place? Please choose the correct answer. The previously dispatched operation stays as is the new operation is inserted after the dispatched operation. The previously dispatched operation stays assist the new operation is inserted before the dispatched operation. The new operation is inserted at the desired time the previously dispatched operation is moved backward. The new operation is inserted at the desired time; the previously dispatched operation is moved forward. For which categories can you define bills of materials (BOMs) in SAP S/4HANA? There are 2 correct answers to this question. Response: Work Center. Sales Order. Document Structure. Class. You can trigger which of the following business functions using the production scheduling profile? There are 2 correct answers to this question. Response: Activate back flushing. Assign a default inspection type. Generate control recipe at release. Confirm available partial quantity. Which statements are correct with reference to the Monitor Work Center Schedules app? There are 3 correct answers to this question. Response: Planning Mode is both Bucket and Sequence. This app is applicable only for pacemaker or bottleneck work centers. This app is available only in chart format. Only pacemaker work centers are displayed as default, but you can select all the work centers with this app. You can perform dispatch, deallocate, and reschedule of operations. Which of following cannot be changed in embedded PP-DS? There are 2 correct answers to this question. Response: Stocks. Purchase requisitions. Sales orders. Stock transfer reservations. Planned orders. You want to create a production order from a planned order. What methods could you use? There are 2 correct answers to this question. Response: Individual conversion. Partial conversion. Order release. Full conversion. |