Questions
ayuda
option
My Daypo

ERASED TEST, YOU MAY BE INTERESTED ONSAP CON

COMMENTS STATISTICS RECORDS
TAKE THE TEST
Title of test:
SAP CON

Description:
SAP CON1

Author:
AVATAR

Creation Date:
20/06/2022

Category:
Others

Number of questions: 20
Share the Test:
Facebook
Twitter
Whatsapp
Share the Test:
Facebook
Twitter
Whatsapp
Last comments
No comments about this test.
Content:
You are performing an SAP S/4HANA conversion with DMO as an in-place migration. How does SUM transfer the data by default from the source database to the target database during the migration? A. Using R3load and memory pipes B. Using work processes and network socket connection C. Using R3load and file transfer D. Using R3load and network socket connection.
In which case can you use near-Zero Downtime Maintenance (nZDM)? Note: There are 2 correct answers to this question. A. When upgrading an SAP S/4HANA Server system B. When performing an SAP S/4HANA conversion with DMO C. When upgrading an SAP ECC system with DMO D. When performing an SAP S/4HANA conversion without DMO.
You are performing an SAP S/4HANA conversion with DMO. You entered a specific number of R3load processes during the Extraction Roadmap step. Where can you change this during the migration via the Utilities option of the SUM UI? Note: There are 2 correct answers to this question. A. In DMO Migration Preparation B. In SUM Parameters C. In SUM Phaselist D. In Process Control Center.
You are performing an SAP S/4HANA conversion. When does the silent data migration (SDM) take place? A. During the Execution roadmap step B. During the SUM technical downtime C. Before the start of the SUM technical downtime D. After SUM has ended .
What is the minimum SAP_BASIS release of an SAP ECC system that can be converted to an SAP S/4HANA Server? A. 731 B. 700 C. 740 D. 750 .
What is the benefit of using the UPGANA.XML file from a previous SUM run? A. To make the progress information within SUM UI more accurate B. To skip selected phases during the SUM run C. To repeat specific phases during the SUM run D. To auto-fill specific fields on selected screens on the SUM UI.
You are running an SAP ECC system. For which of the following activities does SUM allow you to use the near-Zero Downtime Maintenance (nZDM) capabilities? Note: There are 3 correct answers to this question. A. Use DMO for SUM. B. Perform an SAP S/4HANA conversion without DMO. C. Perform an SAP S/4HANA conversion including DMO. D. Upgrade the SAP system. E. Apply SAP support packages.
Which preparational steps must be performed for an SAP S/4HANA conversion? Note: There are 2 correct answers to this question. A. Uninstall industry extensions NOT supported by SAP S/4HANA. B. Delete client 066 (Early-Watch client). C. Uninstall Fiori apps NOT released for SAP_UI 7.50. D. Install add-on SAP Gateway 7.50. .
What is the main purpose of performing benchmark runs for an SAP S/4HANA conversion? A. To optimize the conversion B. To optimize the main import C. To optimize the migration D. To optimize the activation .
When using the DMO of SUM, which files can be handled by SUM in the download directory? Note: There are 2 correct answers to this question. A. Breakpoint configuration file SAPUPPHAS.BRK B. Parameter file SAPup_add.par C. MIGRATE_DT_DUR.XML file from a previous run D. Stack XML file calculated by the maintenance planner.
What do you need to consider when performing the SI checks for an SAP S/4HANA conversion? Note: There are 2 correct answers to this question. A. You need to build up an SI check framework by applying SAP Notes. B. The errors from the SI checks must be solved; otherwise, SUM will report an error. C. You need an SAP system based on AS ABAP 7.50 or above for the SI check framework. D. The SI checks are executed in the development system and the results are transported into the subsequent systems. .
You performed a custom code check for an SAP S/4HANA conversion. In which transactions can you review the results? Note: There are 2 correct answers to this question. A. SYCM (Simplification Database Content) B. ATC (ABAP Test Cockpit) C. SE80 (Object Navigator) D. SAT (Runtime Analysis) .
You are planning an SAP S/4HANA conversion. Which conversion-specific tasks need to be performed during the preparation phase? A. Perform the migration of data to the new data structure. B. Run the database migration to the SAP HANA database. C. Check the compatibility of custom code with SAP S/4HANA. D. Solve problems from the simplification item (SI) checks.
You are executing a standard SUM procedure to update an SAP system. You did NOT select the nZDM feature. When will the shadow system be stopped for the last time? A. At the end of the downtime B. As part of the cleanup process C. Before the downtime starts D. Early in the downtime.
Which of the following SUM activities require a stack XML file calculated by the maintenance planner? Note: There are 3 correct answers to this question. A. DMO without system update B. SAP S/4HANA conversion without DMO C. Prerequisite check D. Benchmark tool E. SAP S/4HANA conversion including DMO.
You are performing an SAP S/4HANA conversion. You are in the BIND_PATCH phase of the Configuration roadmap step. For some software components, you find entries in the Calculated level column. What does the Calculated level indicate for those software components? A. The SAP support packages of the support package stack, calculated by the maintenance planner B. The SAP support packages contained in the upgrade media, calculated by the maintenance planner C. The SAP support packages in the download directory that are newer than the selected support package stack .
You are performing an SAP S/4HANA conversion with DMO. You are using the downtime- optimized data conversion (DoC). Which steps can partially be moved to uptime processing? Note: There are 2 correct answers to this question. A. Software update B. Main import C. Migration D. Conversion.
During the upgrade of your development system, you run into the adjustment of non- dictionary objects, handled by transaction SPAU. There you find programs that are shown in status "automatic adjustment" (green traffic light). What will happen with these programs when you continue with your upgrade without performing any other actions inside your SAP system? A. SUM continues with the next phase and your modifications are kept as in the start release. B. SUM refuses to continue unless you have marked a transport request as modification adjustment transport. C. SUM continues with the next phase, and your modified objects are set to the new SAP standard. D. Before continuing with the next phase, SUM asks for a modification adjustment transport.
What SAP systems can you use for the ABAP Test Cockpit (ATC) to perform the custom code analysis for an SAP S/4HANA conversion? Note: There are 2 correct answers to this question. A. SAP ECC system from SAP ERP 6.0 EHP 8 B. Standalone AS ABAP with SAP_BASIS 752 and above C. SAP Solution Manager 7.2 D. SAP S/4HANA Server 1809 and above.
What are the benefits of using the benchmarking option of the DMO for SUM? Note: There are 2 correct answers to this question. A. You can find the optimal number of parallel R3load processes by monitoring host performance. B. You can record the modification adjustment during migration and use the transports in the next runs. C. You can verify that the content of the download directory matches the stack.XML file. D. You can obtain migration duration files from a previous benchmark run that can be used to optimize the next runs. .
Report abuse Consent Terms of use