What does SAP Activate recommend to keep team members informed and aligned?. Daily progress review meeting with sponsor. Daily team stand-up meeting. Daily e-mail status updates to project manager. Daily status meeting with project manager.

Which activities are critical for delivering Agile projects? There are 2 correct answers to this question. Retrospective agenda creation. Sprint planning. Release planning. Blueprint scheduling.

What is the correct order of the SAP Activate Methodology phases?. Plan > Design > Build > Operate. Discover > Prepare > Explore > Realize > Deploy > Run. Plan > Build > Run > Sustain. Prepare > Discover > Explore > Realize > Deploy > Run.

Where can you find Project Library Accelerators?. SAP Best Practices Explorer. SAP Roadmap Viewer. Fully Activated Appliance. SAP Cloud Appliance Library.

What are the benefits of using SAP Activate? There are 3 correct answers to this question. Leveraging standard content. Guided methodology. Focused Build. Tools for assisted implementation. Focused Run.

What can you do in the SAP Roadmap Viewer tool?. Download full roadmap content for offline navigation. Navigate detailed Solution Implementation Roadmaps. Create a customer-specific version of a roadmap. Comment on Deliverables and Tasks within Roadmaps.

Who determines the priority of user stories in the backlog of an Agile project?. Product Owner. Scrum Master. Project Manager. Project Team.

What is the objective of using scaling Scrum techniques when coordinating large teams in complex projects?. To ensure alignment in architecture, configuration, and integration. To reallocate staff to skill-based teams such as developers in one single team. To bring all specialists, such as the company legal advisors, into the scrum team. To manage the flow of information between the project and stakeholders.

What transition scenarios are possible when adopting RISE with SAP? There are 3 correct answers to this question. System Conversion. New Implementation. Mix and Match. Shell Conversion. Lift and Shift.

From which platform are you able to deploy a trial system within a short timeframe?. SAP Cloud Appliance Library. SAP Support Portal. SAP Business Technology Platform. SAP Learning Hub.

In which workstream do you execute an organizational change impact analysis?. Application Design and Configuration. Data Management. Solution Adoption. Analytics.

You are implementing SAP S/4HANA Cloud, public edition for your customer. How are your customer systems activated?. Via the SAP Cloud ALM. Via the Central Business Configuration System. Via the SAP Business Technology Platform. Via the SAP Contact Center.

Which of the following characteristics relate to the Focused Build for SAP Solution Manager functionality? There are 2 correct answers to this question. SAP delivers all configuration activities within your project. SAP delivers all knowledge required with the solution. SAP delivers a standard solution without any additional coding required. SAP delivers a standard solution with its own separate license.

Which of the following steps are part of the fit-to-standard process? There are 2 correct answers to this question. Design to-be business process models. Enable customers on standard business processes. Document integration requirements. Review Best Practices process flow.

You are transitioning to SAP S/4HANA.In which phase do you adjust custom code?. Realize. Deploy. Discover. Explore.

What activity do you perform during the daily stand-up meeting?. Negotiate acceptance criteria. Report showstoppers. Provide end users with a demo of the new features. Re-baseline the release plan.

What information does the project team need before they can correctly estimate the relative size of backlog user stories?. Definition of Done. Overall project schedule. Available project resources. Test strategy.

Your customer is using a non-SAP ERP system and decides to implement SAP S/4HANA. Which of the following options are available to your customer? There are 3 correct answers to this question. System Conversion SAP S/4HANA Cloud, private edition. New Implementation SAP S/4HANA Cloud, private edition. New Implementation SAP S/4HANA. System Conversion SAP S/4HANA. New Implementation SAP S/4HANA Cloud, public edition.

What is the primary purpose of the SAP Activate methodology?. To provide end-to-end application lifecycle management. To manage solution documentation. To expedite all deployment options for SAP products. To enable access to the SAP ecosystem.

In which phase do you verify that the SAP Best Practices content meets the customer's business needs, and then capture gaps?. Deploy. Realize. Prepare. Explore.

When doing a new implementation on premise or private cloud, which system is recommended to demonstrate standard functionality in the Explore phase?. Development. Trial. Sandbox. Starter.

What criterion does the product owner use to sequence the product backlog?. Resource availability. Business priority. Complexity. Relative effort.

What is preferred when a customer wants to keep most of their original processes and migrate to SAP S/4HANA Cloud, private edition?. Mix and Match. System Conversion. Shell Conversion. Selective Data Transition.

You are defining the testing strategy for your project. What would you include in a Scope of Integration test?. The network communication. The functionality of modular processes. The functionality of end-to-end business processes. The connectivity between database and application servers.

Which of the following is a key characteristic of the Agile project approach?. Frequent and detailed project scheduling. Frequent quality gates. Iterative build with frequent inspections. Formal and detailed documentation.

Which additional scope option does the strategic advisory service for cloud analytics offer? There are 2 correct answers to this question. Extended package. SAP Activate methodology for the Intelligent Enterprise. Baseline package. SAP S/4HANA for central finance.

Which tool do you use to configure SAP S/4HANA Cloud, public edition?. SAP Solution Manager. SAP Cloud ALM. IMG (Implementation Guide). SAP Central Business Configuration.

According to the Definition of Done, which activity must be completed for each Sprint?. Functionality must be tested in the production system (PROD). The solution must be built and configured in the development system (DEV). Functionality must be released to the business. End-user training must be delivered.

Which of the following capabilities does SAP Solution Manager Test Suite support? There are 2 correct answers to this question. Load and volume testing. Multi-technology change impact analysis. Tests for SAP and non-SAP solutions. Manual and automated functional tests.

In which phase will the customer develop a preliminary strategy for building a target Operations and Support organizational model?. Discover phase. Run phase. Explore phase. Prepare phase.

Which of the following tools can support you in managing requirements and software development for implementation projects? There are 2 correct answers to this question. Focused Insights for SAP Solution Manager. Focused Build for SAP Solution Manager. SAP Cloud ALM. SAP Focused Run.

In which of the following do you use a work item in Focused Build?. Sprints. Waves. Epics. Releases.

When deploying a new implementation on-premise, which of the following is recommended when performing custom development?. SAP ABAP Workbench. SAP API Business Hub. SAP Best Practices. SAP Business Technology Platform.

When working with an Agile approach, what is the minimum planning requirement expected at the beginning of the Realize phase?. Release plan and sprint ceremony guidelines should be finalized. Realize phase scope, planning, and budget should be completed and final. User stories on product backlog should be in ready state for the first 2 to 3 sprints. Sprint planning and sprint durations should be defined for the first 2 to 3 sprints.

Which estimation technique can you use in an Agile delivery approach to size the user stories during sprint planning?. Detailed top-down effort estimate by the Scrum Master in story points, based on the user story complexity. Detailed bottom-up effort estimate by the product owner that breaks up each story into short tasks. Relative effort estimate in Ideal Person Days that reflects the best estimate by the project team. Project Manager's relative effort estimate that will be needed to implement and test the user story.

Which activity helps the project team identify and add user stories to the backlog?. Assessing project risks and issues. Preparing a project schedule and budget. Planning the User Acceptance Testing. Conducting the fit-to-standard workshop.

When conducting an upgrade of an SAP S/4HANA Cloud, public edition three system landscape, in which phase are the Business Roles updated?. Discover. Explore. Realize. Deploy.

What does the Side-by-Side extensibility option mean?. SAP S/4HANA extensions are context-aware and focused on tight integration. Extensibility is based on the SAP Business Transformation Platform (BTP) and published APIs. There are two SAP S/4HANA instances: one for standard code and another for custom developments. Reporting is transferred to an enterprise data warehoused based on SAP BW/4HANA.

Which of the following characteristics are unique to SAP S/4HANA Cloud, public edition? There are 3 correct answers to this question. Choice of hardware vendor. Customer data center deployment. Software upgrades performed by SAP. Mandatory upgrades. Optional 3-system landscape.

What tool would you use for managing project tasks and Solution Documentation when implementing SAP S/4HANA Cloud, public edition?. SAP Cloud ALM. SAP Roadmap Viewer. SAP Support Portal. SAP Transformation Navigator.

What findings do you document in the Explore Phase workshops? Note: There are 3 correct answers to this question. Business role mapping. Confirmation of scope. Key business decisions. Process models. Detailed design of extensions.

Which of the following tools are considered enablers for digital transformation? There are 3 correct answers to this question. SAP Roadmap Viewer. SAP Best Practices Explorer. SAP Activate Community. SAP Product Availability Matrix. Software Logistics Toolset.

What are the responsibilities of the product owner in release and sprint planning? There are 2 correct answers to this question. Prioritize backlog user stories by business priority. Analyze the functional and technical dependencies between user stories. Estimate the backlog user stories. Define objectives for each release.

Which of the following are workshop design principles/ guidelines? There are 2 correct answers to this question. Expert configuration definitions. Best Practices enablement. Fit-to-standard. Active participation.

A customer with an existing SAP S/4HANA solution is exploring the best approach to move their landscape into the cloud. Which is the most suitable option for the customer?. Lift and Shift. Mix and Match. System Conversion. Selective Data Transition.

You are transitioning to SAP S/4HANA.In which phase do you adjust custom code?. Explore. Realize. Discover. Deploy.

Which systems are part of the private cloud edition landscape? There are 2 correct answers to this question. Evaluation. Starter. Production. Sandbox.

For which of the following products do you find a specific set of best practices for the public sector?. SAP S/4HANA Cloud, public edition. SAP Marketing Cloud. SAP SuccessFactors Employee Central. SAP S/4HANA.

Which artifacts are created within Application Design and Configuration work stream in the Explore phase of the "New Implementation of SAP S/4HANA" transition path? There are 3 correct answers to this question. Organization Structure Specification. Project Procedure - Mock-up Modeling. Detailed Design - Business Process. Roles and Authorizations Management Concept. Delta Requirements List – Register.

Which collaboration features can SAP Activate Jam users’ access? There are 2 correct answers to this question. Update Key Deliverable wikis. Tweet questions. Comment on documents. Ask questions.

In which phase do you create an ordered list of everything that is known to be needed in the product? Please choose the correct answer. Prepare. Deploy. Explore. Realize.

In which phase do you execute the User Acceptance Test? Please choose the correct answer. Realize. Build and Test. Deploy. Final Preparation.

Which of the following is not correct about the REALIZE phase? There are 2 correct answers to this question. The project team ensures that the build is meeting the business requirements. Detailed design workshops are held. The beginning of the Realize phase the team prepares a list of all the requirements in a backlog. The team prepares for operations so that the functionality can be brought live.

What are two important approaches, based on the Control Center concept that SAP proposes to use for streamlined implementation and operations within Premium Engagements? There are 2 correct answers to this question. Always Connected. Build SAP Like a Factory. Run SAP Like a Factory. Intelligent Enterprise.

What accelerator can help you document the Configuration Definition in the Explore phase? Please choose the correct answer. Change Request template. Data Definition. Backlog template. Test Strategy.

Which tools does SAP Activate provide to support Guided Configuration? There are 3 correct answers to this question. Self Service Configuration. SAP Solution Composer. Model Company. Expert Configuration. Solution Builder.

How are the build and test tasks planned and executed in the Realize phase? Please choose the correct answer. With Q-Gates for sign off after each iteration. By executing regression tests after each iteration. By using incremental build in fixed-scope iteration. By using the sprint backlog list as input for each iteration.

What is the order of artifacts within the Technical Architecture and Infrastructure workstream in the Prepare phase? Please choose the correct answer. Hardware specification from Hardware Vendor-> Technical Strategy-> Parameters Hardware Sizing calculation-> Hardware Sizing results. Technical strategy-> Hardware specification from Hardware Vendor-> Parameters Hardware Sizing calculation-> Hardware Sizing results. Technical Strategy-> Parameters Hardware Sizing calculation-> Hardware Sizing results-> Hardware Specification from Hardware Vendor. Hardware specification from Hardware Vendor-> Parameters Hardware Sizing calculation-> Hardware Sizing results-> Technical Strategy.

What are deliverables of the Application: Integration work stream in the Prepare phase? There are 3 correct answers to this question. Network Connectivity Checks. Fit/Gap Analysis. Data Cleansing. Adaptation Specifications. Security Checks.

What is the most granular level of the methodology you can view in the SAP Roadmap Viewer? Please choose the correct answer: Task. Deliverables. Scenario. Phase.

Which navigation option do you use in the Roadmap Viewer to access the SAP Activate Methodology content? Please choose the correct answer. Navigate by assigned Delivery Mode. Navigate by work stream. Navigate by RACI matrix accountability. Navigate by Project Team Member Role.

In which phase of the SAP Activate Methodology does the team complete the System Assessment? Please choose the correct answer. Prepare. Explore. Deploy. Realize.

What is the best target environment for a System Conversion journey is as described in the SAP Activate Methodology? Please choose the correct answer. SAP S/4HANA On-Premise Edition. Hybrid of SAP S/4HANA Cloud Edition and SAP S/4HANA On-Premise Edition. SAP S/4HANA Cloud Edition. SAP Hybris.

Which of the following can be used to navigate through the Roadmap? There are 2 correct answers to this question. Deliverables. Workstreams. Tasks. Phases.

What structure level do you see when you access the Roadmap Viewer and chose work stream navigation ? Please choose the correct answer. Task. Deliverable. Scope Item. Scenario.

What is the purpose of the Solution Builder tool in the SAP Activate Guided Configuration? Please choose the correct answer. To activate the Best Practices content. To create customer-specific scope items. To personalize activated, ready-to run business processes. To create delta building blocks for complementary content.

Which of the following are the benefits of SAP JAM? There are 2 correct answers to this question. User collaboration. Easy to use. Reduced Recovery Time. Highly available.

In which phase do you verify that the SAP Best Practices content meets the customer's business needs, and then capture gaps?. Deploy. Realize. Explore. Prepare.

Which of the following tasks are required in the Prepare Phase? There are 3 correct answers to this question. Train the project team. Approve the test strategy. Identify relevant SAP Best Practices. Set up the infrastructure to support the project. Define the communication plan.

What are different approaches to transition to SAP S/4HANA? There are 3 correct answers to this question. Database Transition. System Conversion. New Implementation. Selective Data Transition.

In which phase should you first run the SAP Readiness Check for SAP S/4HANA in a "Selective Data Transition" transition path, in a System Consolidation scenario that includes conversion from SAP ERP? Please choose the correct answer. Discover. Explore. Prepare. Realize.

What is the best target deployment option of SAP S/4HANA for the "System Conversion" transition path? Please choose the correct answer. Hybrid of SAP S/4HANA Cloud and SAP S/4HANA. SAP C/4HANA. SAP S/4HANA. Cloud SAP S/4HANA.

What is the primary purpose of the SAP Activate Methodology? Please choose the correct answer. To manage solution documentation. To provide the sequence of actions in the project. To provide end-to-end Application Lifecycle Management. To enable access to the SAP ecosystem.

Which of the following are available in the initial SAP Methodologies JAM Page? There are 2 correct answers to this question. Accelerators. Roadmaps. Summary. Task description.

What is a deliverable of the Application Customer Team Enablement work stream in the Prepare phase of SAP Activate? Please choose the correct answer. Knowledge transfer to end users. Learning plan. Project Documentation. Project Charter.

What is the Methodology of SAP Activate? There are 4 correct answers. Phases. Tools. Workstreams. Deliverables, Tasks. Artifacts.

Which activities are part of the design and configuration application of the SAP Activate methodology? There are 2 correct answers to this question. Schedule kick-off workshop. Perform Fit/Gap Analysis. Confirm Integration prerequisites. Conduct Scope Validation.

How do you gain access to the SAP Activate Methodology JAM site? Please choose the correct answer. Join SAP S/4HANA group on SAP Community Network. Submit e-mail address via on-line form. Register on SAP Service Marketplace. Send e-mail to SAP contact address.

What can you do with Guided Configuration? There are 4 correct answers. System conversion. Initial configuration and recording of updates for continuous innovation. Test configured business processes. Data migration. Evaluate activated business processes and country versions.

In which SAP Activate Methodology phase does the team complete the Transformation Strategy? Please choose the correct answer. Explore. Prepare. Deploy. Realize.

What are key activities of the Prepare phase of the SAP Activate methodology? There are 3 answers for this Question. User training. Data migration. Customer self-enablement. System provisioning. Project setup.

In which of the following project phases is it important to plan and schedule data loads followed by load validation activities? Please choose the correct answer. Prepare. Realize. Deploy. Explore.

In which SAP Activate methodology phase does the team identify and design functional quick wins in scope of the conversion project ? Please choose the correct answer. Deploy. Prepare. Realize. Explore.

What are the three pillars of SAP Activate? There are 3 correct answers to this question. SAP Activate Methodology. Guided Configuration. SAP Best Practices. SAP Solution Manager. SAP S/4HANA in-memory database.

Which activity is part of the SAP Activate Methodology for a new implementation of SAP S/4HANA On-Premise Edition but NOT of the cloud edition? Please choose the correct answer. Technical System Test. Unit Test. User Acceptance Test. End-to-End Integration Test.

In Which phase does the Transition to Operations work stream start? Please choose the correct answer. Prepare. Explore. Deploy. Realize.

What is the hierarchy level under Phase in the SAP Jam space for SAP Activate On-Premise? Please choose the correct answer. Scenario. Work Stream. Task. Key Deliverable.

Which of the following is a Key Deliverable of the Prepare phase? Please choose the correct answer. Solution Scope and Value Determination. Release and Sprint Plan. Change Impact Analysis and Communication Plan. Baseline Build.

Which of the following Building Blocks are part of the SAP S/4HANA platform? There are 2 correct answers to this question. LOB Cloud Solution. SAP HANA in-memory database. SAP Fiori UX. SAP Solution Manager.

What technique helps a scrum team to prioritize a large, flat backlog?. User story mapping. Retrospective. Planning poker. Fit/gap analysis.

Where can you find Data Migration templates for both SAP S/4HANA On-Premise and Cloud Editions? Please choose the correct answer. SAP Best Practices Explorer. SAP Cloud Appliance Library. SAP Roadmap Viewer. SAP S/4 HANA Migration Cockpit.

In which phase will the customer develop a preliminary strategy for building a target Operations and Support organizational model? Please choose the correct answer. Explore phase. Prepare phase. Run phase. Discover phase.

Which accelerators support the Fit-to-standard workshop in the Explore phase? There are 2 correct answers to this question. Business-Driven Configuration Questionnaire. Quality Gate Checklist. Test Strategy. Backlog template.

Which of the following is part of the Explore phase in the "New Implementation of SAP S/4HANA Cloud' transition path? Please choose the correct answer. Fit-to-standard. Solution Validation and Delta Design. Setup and Enablement. Simplification and Custom Code Impact Analysis.

What is SAP Activate? Please choose the correct answer. A methodology for each of the deployment modes (Cloud, On-Premise, Hybrid). A step-by-step instruction on how to remove from SAP best practices to your custom solution. A combination of SAP Best practices, Methodology, and Guided configuration. A bundle of ASAP, SAP Launch, and Rapid Deployment Solutions.

What can you do in the SAP Roadmap Viewer tool? Please choose the correct answer. Navigate detailed Solution Implementation Roadmaps. Comment on Deliverables and Tasks within Roadmaps. Create a customer-specific version of a roadmap. Download full roadmap content for offline navigation.

In which SAP Activate Methodology phase does the team complete the Integration Validation? Please choose the correct answer. Realize. Deploy. Prepare. Explore.

Which activities are part of the Application: Solution Adaption work stream of SAP Activate for new implementations? There are 3 correct answers to this question. Value Audits. Value Determination. Change Management Plan. Production Support Plan Scope Validation.

What does the Content element of SAP Activate provide for S/4HANA? There are 4 correct answers to this question. Business processes Content (SAP Best Practices, Ready to run system). Project Library (Project Plan, Accelerators). Integration Content (System Content, Guidance). Migration Content (System Content, Guidance). Functional Specifications for WRICEF development.

Which tool can you use to collaborate with other SAP Activate Methodology practitioners? Please choose the correct answer. SAP Jam. Roadmap Viewer. SAP Solution Manager. SAP Implementation Assistant.

Which accelerations can you use during the Scope Validation/Fit-Gap Analysis activity in the Explore Phase? There are two correct answers to this question. Solution Validation Workshop. Sprint Backlog Template. RICEF Specification Template. Quality Gate Checklist.

Which artifacts in the Testing work stream are created within the Realize phase for the New Implementation of "SAP S/4 HANA Cloud" transition path? There are 2 correct answers to this question. Functional Specifications. Reporting Functional Specifications. User Acceptance Test – Plan. Functional Test Scenarios.

In which phase should you create a Data Migration Strategy (LO) during a Selective Data Transition? Please choose the correct answer. Discover. Explore. Realize. Deploy.

What is a key characteristic of SAP Activate for new implementations of S/4HANA cloud edition? Please choose the correct answer. Design-based. Start with executable content. Waterfall approach. Limited involvement of business stakeholders.

In which SAP Activate Methodology phase is the Experience Trial accessed by customers?. Prepare. Realize. Discover. Explore.

In which tools can the project team across the SAP Activate Methodology content including accelerators? There are 2 correct answers to this question. SAP Community Network. SAP Service Marketplace. Roadmap Viewer. SAP Jam.

What are key characteristics of the implementation approach in SAP Activate Methodology? There are 3 correct answers to this question. Fixed scope. Start with SAP Best Practices. On-premise only. Premium engagement ready. Validate solution.

Which of the following are not phases of the SAP Activate Methodology? There are 2 correct answers to this question. Prepare. Realize. Go-Live & Support. Preparation.

Identify the two-landscape transformation specific tasks in the Explore phase. There are 2 correct answers to this question. Run a Landscape Transformation Assessment. Setup Landscape Transformation Software. Perform Client transfer. Define the Data Migration Architecture.

Which key activities does the Guided Configuration support you with? There are 3 correct answers to this question. Train new users. Test configured processes. Manage roles of configuration users. Create test data. View solution scope.

What is a benefit of using Guided Configuration instead of the Implementation Guide ? Please choose the correct answer. It ensures configuration is done using SAP Solution Manager. It eliminates the need for Content Lifecycle Management. It ensures SAP updates do NOT conflict with customer configurations. It eliminates the need to generate transport requests for configuration settings.

Your project is preparing for the Fit/Gap analysis workshops. If you use the Agile approach, what sequence of activities do you perform in the Explore Phase? Please choose the correct answer. Set reference value->Prioritize initial backlog->Conduct Delta Design workshops->Conduct Solution Validation workshops. Conduct Solution Validation workshops-> Set reference value->Prioritize initial backlog-> Conduct Delta Design workshops. Conduct Solution Validation workshops->Conduct Delta Design workshops->Set reference value->Prioritize initial backlog. Set reference value->Conduct Solution Validation workshops->Prioritize initial backlog->Conduct Delta Design workshops.

In which phase do you create a prioritized list of user requirements? Please choose the correct answer. Realize. Explore. Deploy. Prepare.

Which of the following is not correct about Fit/Gap Analysis? There are 2 correct answers to this question. Minimize the needs for rework during realization. Validate pre-activate and pre-assembled solution in the development system. Drive towards adopting customers processes. Prioritize delta requirement and gaps.

Which of the following belong to the Application Design and Configuration work stream for SAP S/4HANA Cloud in the Explore phase? There are 2 correct answers to this question. Kick-off workshop. Fit-to-standard workshop. Configuration definition. Integration prerequisites confirmation.

How are the build and test tasks planned and executed in the Realize phase? Please choose the correct answer. With Q-Gates for sign off after each iteration. By executing regression tests after each iteration. By using incremental build in fixed-scope iteration. By using the sprint backlog list as input for each iteration.

What is the purpose of the Solution Validation activity in the Explore phase? There are 3 correct answers to this question. To challenge changes to standard. To log additional scope items. To verify technical installation. To identify gaps. To educate project participants.

Which of the following activities are performed in the Explore phase of SAP Activate in SAP S/4HANA Implementation? There are 3 correct answers to this question. Implementing best practices. Changing master data. Organizational structure. Adjusting custom code objects. Creating transactional data.

How many change projects can be active at a time? Please choose the correct answer. 3. 2. 4. 1.

How many countries can be activated at a time? Please choose the correct answer. 1. 2. 3. 4.

What are the key characteristics of the implementation approach in SAP Activate Methodology?. Ready to use content. Cloud Ready. Delta-based. Scalable, Modular, Agile. Quality Built-In. SAP Engagement Ready.

Ready-to-use Content in SAP Activate includes which of the following? There are 2 correct answers to this question. SAP Best Practices. Project Accelerators. Courses delivered by SAP Education. Business models from leading companies in each industry sector.

What can users do in the Roadmap Viewer tool? Please choose the correct answer. Display and navigate detailed SAP Activate methodology WBS. Download full SAP Activate methodology content for use off-line. Upload SAP Activate WBS into SAP Solution Manager7.1. Create a customer-specific version of SAP Activate Methodology.

What is the focus of a SCRUM of SCRUMS in an Agile context? Please choose the correct answer. Backlog management. Best Practice adoption. Integration topics. Communication to the Project Management Office.

Your project is preparing for the Fit/Gap analysis workshops. If you use the Agile approach, what sequence of activities do you perform in the Explore Phase?. A. a. Conduct Solution Validation workshops b. Conduct Delta Design workshops c. Set reference value d. Prioritize initial backlog. B. a. Conduct Solution Validation workshops b. Set reference value c. Prioritize initial backlog d. Conduct Delta Design workshops. C. a. Set reference value b. Prioritize initial backlog c. Conduct Delta Design workshops d. Conduct Solution Validation workshops. D. a. Set reference value b. Conduct Solution Validation workshops c. Prioritize initial backlog d. Conduct Delta Design workshops.

What tool provides guidance on replacing custom code developed for SAP ERP with SAP S/4HANA functionality for the "System Conversion" transition path?. Software Update Manager with Database Migration Option. SAP Code Inspector. Software Provisioning Manager. Simplification Item Check (SI-Check).

Which of the following is not correct about workstreams? There are 2 correct answers to this question. Workstreams are dependent on phase start and end. It is a collection of related deliverables. It is assigned as an attribute to phases, deliverables and tasks. It can span phases.

What tool is used to synchronize changes between SAP ERP and SAP S/4HANA maintenance tracks?. SAP Code Vulnerability Analyzer. Retrofit. SAP Code Inspector. Business Process Change Analyzer.

What Solution Operations Framework can customers use to create a joint Business and IT organization, that will secure transparency and efficiency of SAP implementation, innovation, operation, and quality of business processes and systems?. SAP Operations Control Center. Business Transformation Management Methodology. Customer Center of Expertise. SAP Activate.

Who determines the tasks that are required to complete the committed backlog items in a sprint?. Project Manager. Product Owner. SCRUM Master. Project Team.

What do you do during Sprint Execution?. Hold a retrospective at the end of each week. Measure the sprint progress with a percentage complete report. End a sprint when the sprint backlog items are all complete. Present status of selected user stories in the sprint scope on a scrumboard.

In what respect is SAP Activate Methodology different from the ASAP Methodology?. Includes Fit/Gap analysis instead of Blueprint. Supports cloud deployments. Supports only new implementations. Leverages iterative incremental build.

What is the objective of a sprint retrospective meeting?. Improve the SCRUM process. Review and prioritize the backlog. Define the stakeholder management approach. Provide formal feedback to the project manager.

What is the minimum number of quality gates mandated by the SAP Activate methodology?. 4. 0. 5. 3.

How can SRCUM teams be organized?. By project governance level. By project phase. By job title. By work stream.

What is the term used for workshops, which are intended to set value targets, validate SAP Standard functionality against customer requirements. And collect delta requirements in the "New Implementation of SAP S/4HANA" transition path?. Solution Validation. Delta Design. Fit-to-Standard. Design Thinking.

Working in an Agile approach, what should your planning look like at the beginning of the Realize phase?. User Stories are in a Ready state for NO more than the first three Sprints. Go-Live scope is fixed on the first of January the following year. Project scope and planning are completed and final. Timelines of the Sprint may differ due to the workload.

Which content is made available after you activate SAP Best Practices for a new financial implementation? There are 2 correct answers to this question. Online help. Pre-configured business processes. Implementation Guide. Standard chart of accounts.

Which new project roles are introduced with the SAP Activate Methodology for the Agile delivery approach? There are 2 correct answers to this question. Integration Lead. SCRUM Master. Design Thinking Coach. Product Owner.

Via which media does SAP provide Ready-to-run systems for SAP S/4HANA deployments? There are 2 correct answers to this question. SAP App Center. SAP Cloud Appliance Library. Blu-ray disks. SAP Solution Builder tool.

Which Value Chains does SAP Solution Manager 7.2 deliver? There are 3 correct answers to this question. Detect-to-Correct. Requirements-to-Deploy. Request-to-Fulfill. Cash-to-Order. Hire-to-Retire.

In SAP Activate, what tool is used in the during the Realize phase to make forecasts based on actual data?. Release Plan. Burn down Chart. Project Plan. Product Increment.

What tool would you use for managing project tasks and Solution Documentation when implementing SAP S/4HANA Cloud?. SAP Transformation Navigator. Implementation portal for SAP S/4HANA Cloud. SAP Support Marketplace. SAP Roadmap Viewer.

Which new role is introduced in the SAP Activate Methodology in a Full Scrum Team?. Project Manager. System Administrator. Product Owner. Application Consultant.

Which artifacts are part of the solution adoption workstream? There are 3 correct answers to this question. Business transformation review (point of view). Project plan. System go live announcement(order). Detailed design-business process.

Which statement are part of the 5 golden rules for SAP S/4HANA Cloud single tenant edition? There are 2 correct answers to this question. Foster cloud mindset and adherence to the fit to standard approach. Use SAP solution manager 7.2 with focused build. Document deviations from golden rules for transparency and future use in upgrade. Stick to the security standard of the customer organization.