Questions
ayuda
option
My Daypo

ERASED TEST, YOU MAY BE INTERESTED ON5/6

COMMENTS STATISTICS RECORDS
TAKE THE TEST
Title of test:
5/6

Description:
SAP Sales and Distribution S4/HANA 1909

Author:
BumbleBee is the Author
(Other tests from this author)

Creation Date:
01/08/2021

Category:
Competitive Exam

Number of questions: 171
Share the Test:
Facebook
Twitter
Whatsapp
Share the Test:
Facebook
Twitter
Whatsapp
Last comments
No comments about this test.
Content:
Which Value Chains does SAP Solution Manager 7.2 deliver? 3 answers Detect-to-Correct Request-to-Fulfill Hire-to-Retire Requirements-to-Deploy Cash-to-Order.
How does the provisioning of SAP S/4HANA Cloud differ from the setup of SAP S/4HANA? There are 2 correct answers to this question. To start a Solution Validation workshop, a DEV system is available for SAP S/4HANA, while a Starter system is required for Fit-to-standard for SAP S/4HANA Cloud. There is a Preset phase for 0-system, which is unique for SAP S/4HANA Cloud. In SAP S/4HANA Cloud, decommissioning/shutdown of the Starter system is initiated automatically after the P-system is requested through the Manage Your Solution app, whereas in an SAP S/4HANA system, the DEV system persists. SAP S/4HANA systems take less time to provision than SAP S/4HANA Cloud systems.
Which of the following building blocks are part of the SAP S/4HANA platform? There are 2 correct answers to this question. SAP Fiori UX SAP HANA in-memory database SAP Solution Manager LOB Cloud Solution.
What tool provides sizing estimations for the "System Conversion" transition path? Please choose the correct answer. SAP Readiness Check SAP Transformation Navigator SAP Best Practices Explorer Scope and Effort Analyzer.
Which component of SAP Activate offers customers a reference solution in the cloud for a quick start? Please choose the correct answer. SAP Implementation Assistant SAP Activate Methodology Guided Configuration SAP Best Practices.
How are the build and test tasks planned and executed in the Realize phase? Please choose the correct answer. By using the sprint backlog list as input for each iteration. By executing regression tests after each iteration With Q-Gates for sign off after each iteration By using incremental build in fixed-scope iteration.
Which content is made available after you activate SAP Best Practices for a new financial implementation? There are 2 correct answers to this question. Implementation Guide Online help Pre-configured business processes Standard chart of accounts.
What must you do when you implement SAP Business Suite On-Premise with SAP Best Practices? Please choose the correct answer. Activate and apply SAP Best Practices content with the self-service configuration UI Activate and apply SAP Best Practices with SAP Solution Manager Apply SAP Best Practices with the Configure your Solution application Assemble and apply SAP Best Practices to the system.
What are some of the key topics covered in the Customer Team Enablement workstream? There are 3 correct answers to this question. Solution Expertise Project Management Technical Expertise Project Sourcing Approach Planning skills.
What is the primary purpose of the SAP Activate Methodology? Please choose the correct answer. To manage solution documentation To provide the sequence of actions in the project To provide end-to-end Application Lifecycle Management To enable access to the SAP ecosystem.
How would you describe the Explore phase in the "New Implementation of SAP S/4HANA Cloud" transition path? Please choose the correct answer. Simplification and Custom Code Impact Analysis Setup and Enablement Solution Validation and Delta Design Fit-to-standard.
Which of the following are the benefits of SAP JAM? There are 2 correct answers to this question. Easy to use Reduced Recovery Time Highly available User collaboration.
When do you perform User Acceptance Testing during the Agile Build? Please choose the correct answer. Before Integration Testing During each Firm-up Sprint After each Sprint After Integration Testing.
Which artifacts are created within Application Design and Configuration work stream in the Explore phase of the "New Implementation of SAP S/4HANA" transition path? There are 3 correct answers to this question. Delta Requirements List - Register Roles and Authorizations Management Concept Project Procedure - Mock-up Modeling Detailed Design - Business Process Organization Structure Specification.
What is a benefit of using Guided Configuration instead of the Implementation Guide? Please choose the correct answer. It ensures configuration is done using SAP Solution Manager It eliminates the need for Content Lifecycle Management It eliminates the need to generate transport requests for configuration settings It ensures SAP updates do NOT conflict with customer configurations.
In which phase should you first run the SAP Readiness Check for SAP S/4HANA in a "Selective Data Transition" transition path, in a System Consolidation scenario that includes conversion from SAP ERP? Please choose the correct answer. Discover Prepare Explore Realize.
What information does the product team need so that they can estimate the relative size of backlog user story correctly? Please choose the correct answer. Available project resources Test strategy Definition of Done Overall project schedule.
What is a difference between the SAP Activate methodology for a new implementation of SAP S/4HANA cloud edition and a new implementation of SAP S/4HANA on-premise? Please choose the correct answer. For the cloud edition, there is an additional work stream for integration with on-premise systems For the cloud edition, there is an additional Q-Gate for integration with on-premise systems For on-premise, there is an additional Q-Gate for system installation For on-premise, there are additional deliverables for the system setup.
SAP now offers the ability to deploy and manage solutions in which of the following environments? Please choose the correct answer. Cloud and On-premise On-premise Cloud Cloud, On-premise and Hybrid.
In the "New Implementation of SAP S/4HANA" transition path, which systems are part of the project system landscape? There are 2 correct answers to this question. DEV P-system Starter system QAS.
What is the final activity in the Realize phase of a new implementation of SAP S/4HANA cloud edition? Please choose the correct answer. Data migration End-to-End walkthrough Readiness check Solution validation.
In which phase do you create an ordered list of everything that is known to be needed in the product"? Please choose the correct answer. Explore Prepare Realize Deploy.
Which of the following tools is used to install SAP S/4HANA. Please choose the correct answer. SAP Solution Manager SWPM (Software Provisioning Manager) Cloud Application Library Data Migration server.
How often will an upgrade be performed on an SAP S/4HANA Cloud, Single Tenant Edition environment? Please choose the correct answer. One upgrade and two feature packs per year Schedule is defined by Service Level Agreement for SAP HANA Enterprise Cloud and SAP S/4HA NA Cloud, Single Tenant Edition Services Every year Every quarter.
Which statements are part of the 5 Golden Rules for SAP S/4HANA Cloud, Single Tenant Edition? There are 2 correct answers to this question. Foster a cloud mindset and adherence to the Fit-to-Standard approach. Document deviations from Golden Rules for transparency and future use in upgrades. Stick to the security standards of the customer organization. Use SAP Solution Manager 7.2 with Focused Build.
What structure level do you see when you access the Roadmap Viewer and chose work stream navigation? Please choose the correct answer. Deliverable Scenario Task Scope Item.
Which of the following belong to the Application Design and Configuration work stream for SAP S/4HANA Cloud in the Explore phase? There are 2 correct answers to this question. Kick-off workshop Configuration definition Fit-to-standard workshop Integration prerequisites confirmation.
What does the Content element of SAP Activate provide? There are 3 correct answers to this question. Functional Specifications for WRICEF development End-User guides Business Processes Content Migration Content Integration Content.
The tasks associated with Landscape transportation are in which workstream? Please choose the correct answer. System & Data Migration Transition to Operations Technical Architecture and Infrastructure Application Solution Adoption.
Identify the two landscape transformation specific tasks in the explore phase. There are 2 correct answers to this question. Setup Landscape Transformation Software Define the Data Migration Architecture Perform Client transfer Run a Landscape Transformation Assessment.
What is a deliverable of the Application. Customer Team Enablement work stream in the Prepare phase of SAP Activate? Please choose the correct answer. Project Charter Project Documentation Knowledge transfer to end users Learning plan.
What is the term used for workshops, which are intended to set value targets, validate SAP Standard functionality against customer requirements. And collect delta requirements in the "New Implementation of SAP S/4HANA" transition path? Please choose the correct answer. Solution Validation Design Thinking Delta Design Fit-to-Standard.
Which of the following are components of SAP Model Company? There are 3 correct answers to this question. Preconfigured Solution Business Process Content for SAP Solution Manager Business-Driven Configuration Questionnaire Quality Gate Checklist Accelerators.
Which new project roles are introduced with the SAP Activate Methodology for the Agile delivery approach? There are 2 correct answers to this question. SCRUM Master Product Owner Integration Lead Design Thinking Coach.
Which of the following tools are used for rapid database migration? There are 2 correct answers to this question. Software Update Manager (SUM) Database Migration Option (DMO) SWPM (software provisioning manager) You have a limit of 1scale levels for each condition record.
Arrange the following in the correct sequence of steps followed for a 'Fit to Standard' workshop. Please choose the correct answer. Discuss how the process fit with customer requirements, Review Best Practice Process Flow, Demonstrate Business Scenarios and Concepts, Identify required configuration, Enable customer on execution of scenarios, Identify gaps Review Best Practice Process Flow, Demonstrate Business Scenarios and Concepts, Identify required configuration, Discuss how the process fit with customer requirements, Enable customer on execution of scenarios, Identify gaps Demonstrate Business Scenarios and Concepts, Review Best Practice Process Flow, Identify required configuration, Discuss how the process fit with customer requirements, Enable customer on execution of scenarios, Identify gaps Review Best Practice Process Flow, Demonstrate Business Scenarios and Concepts, Discuss how the process fit with customer requirements, Identify gaps, Identify required configuration, Enable customer on execution of scenarios.
Your project is preparing for the Fit/Gap analysis workshops. If you use the Agile approach, what sequence of activities do you perform in the Explore Phase? Please choose the correct answer. a. Conduct Solution Validation workshops b. Set reference value c. Prioritize initial backlog d. Conduct Delta Design workshops a. Set reference value b. Prioritize initial backlog c. Conduct Delta Design workshops d. Conduct Solution Validation workshops a. Conduct Solution Validation workshops b. Conduct Delta Design workshops c. Set reference value d. Prioritize initial backlog a. Set reference value b. Conduct Solution Validation workshops c. Prioritize initial backlog d. Conduct Delta Design workshops .
Which of the following are levels in the structure of an SAP Best Practices Solution Package? There are 2 correct answers to this question. Scope Items Building Blocks Configuration Guides Business Process Scenarios.
Which tools does SAP Activate provide to support Guided Configuration? There are 3 correct answers to this question. Solution Builder Expert Configuration Self Service Configuration SAP Solution Composer Model Company.
According to the Definition of Done, which activity must be completed for each sprint? Please choose the correct answer. End user training must be delivered The Solution must be built and configured in the development system (DEV) Functionality must be tested in the Quality system (QAS) Functionality must be released to the business.
What tool is used to synchronize changes between SAP ERP and SAP S/4HANA maintenance tracks? Please choose the correct answer. SAP Code Vulnerability Analyzer SAP Code Inspector Business Process Change Analyzer Retrofit.
Which estimation technique can be used in Agile project delivery to size the user stories during sprint planning? Please choose the correct answer. Detailed bottom-up effort estimate the breaks each user story up into hours or shorter tasks Relative estimate in ideal person days that reflects the best estimate provided by the project team Detailed bottom-up effort estimate by the SCRUM Master in story points based on the user story complexity Product Owner’s relative estimate of the effort that will be needed to implement the user story.
In which phase of the SAP Activate methodology does the team complete the Transformation Planning? Please choose the correct answer. Deploy Explore Prepare Realize.
What can users do in the Roadmap Viewer tool? Please choose the correct answer. Display and navigate detailed SAP Activate methodology WBS Upload SAP Activate WBS into SAP Solution Manager7.1 Download full SAP Activate methodology content for use off-line Create a customer-specific version of SAP Activate Methodology.
Which of the following statements about Scrum is correct? Please choose the correct answer. In Scrum, the team is Self-organized, define all task necessary for all project life cycle. The three ceremonies are sprint planning, daily scrum, sprint review (retrospective). Scrum Master defines and prioritizes features and gathers requirements. In Scrum, as best practices, we have three main roles, and three artifacts or three ceremonies.
What is the purpose of the Solution Validation activity in the Explore phase? There are 3 correct answers to this question. To verify technical installation To identify gaps To log additional scope items To challenge changes to standard To educate project participants.
What is the best target deployment option of SAP S/4HANA for the "System Conversion" transition path? Please choose the correct answer. Hybrid of SAP S/4HANA Cloud and SAP S/4HANA SAP C/4HANA SAP S/4HANA Cloud SAP S/4HANA.
What are the three pillars of SAP Activate? There are 3 correct answers to this question. SAP Activate Methodology SAP Best Practices SAP S/4HANA in-memory database SAP Solution Manager Guided Configuration.
What is the correct order of the SAP Activate Methodology phases? Please choose the correct answer. Plan -> Design -> Build -> Operate Discover -> Prepare -> Explore -> Realize -> Deploy -> Run Plan -> Build -> Run -> Sustain Prepare -> Discover -> Explore -> Realize -> Deploy -> Run.
Which activity is part of the SAP Activate Methodology for a new implementation of SAP S/4HANA on-premise edition but NOT of the cloud edition? Please choose the correct answer. End-to-End Integration Test User Acceptance Test Unit Test Technical System Test.
Where can you find Data Migration templates? Please choose the correct answer. SAP Best Practices Explorer SAP S/4HANA Migration Cockpit SAP Cloud Appliance Library SAP Roadmap Viewer.
Which artifacts in the Testing work stream are created within the Realize phase for the New Implementation of SAP S/4HANA Cloud" transition path? There are 2 correct answers to this question. Functional Test Scenarios Functional Specifications Reporting Functional Specifications User Acceptance Test – Plan.
Which deliverable is specific to on-premise and NOT for the cloud? Please choose the correct answer. Technical Design Solution Knowledge Transfer Adaptation Specification Learning Needs Analysis.
When does the Scrum Team receive formal confirmation that the User Stories are completed to the satisfaction of the Product Owner? Please choose the correct answer. i. String test ii. User Acceptance Test iii. Integration Test i. Data Migration ii. String test iii. User Acceptance Test i. Integration Test ii. User Acceptance Test iii. String test i. String test ii. Integration Test iii. User Acceptance Test .
What are the responsibilities of the Product Owner in release and sprint planning? There are 2 correct answers to this question. Analyze the functional and technical dependencies between the user stories. Define objectives for each release. Prioritize backlog user stories by business priority. Estimate the backlog user stories.
What is the order of artifacts within the Technical Architecture and Infrastructure workstream in the Prepare phase? Please choose the correct answer. Technical strategy -> Hardware specification from Hardware Vendor -> Parameters Hardware Sizing calculation -> Hardware Sizing results Hardware specification from Hardware Vendor -> Parameters Hardware Sizing calculation -> Hardware Sizing results -> Technical Strategy Technical Strategy -> Parameters Hardware Sizing calculation -> Hardware Sizing results -> Hardware Specification from Hardware Vendor Hardware specification from Hardware Vendor -> Technical Strategy -> Parameters Hardware Sizing calculation -> Hardware Sizing results.
When does the project team receive formal confirmation that the user stories are completed to the satisfaction of the product owner? Please choose the correct answer. During the daily SCRUM meeting During the sprint retrospective During the sprint review During user acceptance testing.
What is the difference between the "New Implementation of SAP S/4HANA Cloud" and the "New Implementation of SAP S/4HANA" transition paths? There are 2 correct answers to this question. Different sets of work streams are used for these transition paths. Upgrades of SAP S 4HANA Cloud are managed by SAP,and upgrades of SAP S/4HANA are managed by the customer. There are different roles in the Application Design and Configuration workstream. SAP S/4HANA uses the Implementation Guide (IMG) and the In-App Extensibility Option for configuration and development and SAP S/4HANA Cloud uses SSCUls and the Side-by-Side Extensibility Option.
Which of the following scenarios are enabled for the "Selective Data Transition" transition path with the SAP Landscape Transformation tool? There are 3 correct answers to this question. Security Migration System Upgrade Extraction of Business Units System Consolidation Consolidation through online data replication.
Which of the following are part of the 10 SAP Quality Principles? There are 2 correct answers to this question. Start scoping early. Plan one phase at a time. Use standard functionality optionally. Achieve production readiness.
What are the benefits of the SAP best practices? There are 3 correct answers to this question. Fast time to value Predictable results Simple on-boarding to cloud Fixed organizational structure Reduced functional scope.
What is the basis for approving work results (signing Act of Acceptance) on a Project Phase level? Please choose the correct answer. Agreed and met Acceptance Criteria within Quality Gate Definition of Done for User Story Definition of Ready for Sprint Scrum of Scrums meeting decision.
What is the best target environment for a System Conversion journey is as described in the SAP Activate methodology? Please choose the correct answer. Hybrid of SAP S/4HANA Cloud Edition and SAP S/4HANA On-Premise Edition SAP Hybris SAP S/4HANA On-Premise Edition SAP S/4HANA Cloud Edition.
What are the three elements of SAP Activate? There are 3 correct answers to this question. Tools SAP Solution Manager Content Focused Build Methodology.
Which key deliverable includes the development of RICEFW objects? Please choose the correct answer. Enhancement Delivery Custom Extensions Management Development Build Sprint Execution.
Which of the following are benefits of using Ready-to-use Content? There are 2 correct answers to this question. Predictable results Run SAP Like a Factory Minimized Total Cost of Ownership Fast Time-to-Value.
Which activities are part of the Design and Configuration application of the SAP Activate methodology? There are 2 correct answers to this question. Confirm Integration prerequisites Perform Fit/Gap Analysis Conduct Scope Validation Schedule kick-off workshop.
What do you do during Sprint Execution? Please choose the correct answer. Hold a retrospective at the end of each week End a sprint when the sprint backlog items are all complete Present status of selected user stories in the sprint scope on a scrumboard Measure the sprint progress with a percentage complete report.
Which of the following will help you avoid modification of standard functionality in SAP S/4HANA Cloud, Single Tenant Edit on? There are 3 correct answers to this question. Contract restrictions in SAP HANA Enterprise Cloud and SAP S/4HANA Cloud, Single Tenant Edition A developer key The 5 Golden Rules The Side-by-Side Extensibility Option (such as SAP Cloud Platform) SAP Code Inspector.
Which content packages are available in the SAP Package Library? There are 2 correct answers to this question. SAP Best Practices Solution Builder Rapid Deployment Solutions SAP Activate Methodology.
Why is there NO Sandbox system in the "New Implementation of SAP S/4HANA Cloud, Single Tenant Edition" transition path? Please choose the correct answer. Because the customer may use the SAP Model Company Because the Fit-to-Standard workshop is conducted using the Q-system Because the project team uses the DEV system to confirm solution fit and define delta requirements Because SAP S/4HANA Cloud, Single Tenant Edition, contains predefined business processes which should NOT be changed.
What Solution Operations Framework can customers use to create a joint Business and IT organization, that will secure transparency and efficiency of SAP implementation, innovation, operation, and quality of business processes and systems? Please choose the correct answer. SAP Operations Control Center Customer Center of Expertise Business Transformation Management Methodology SAP Activate.
What is the purpose of the scrumboard? Please choose the correct answer. To show the functional breakdown of the solution scope To visualize team progress To manage the resource load To document the results of integration testing.
Ready-to-use Content in SAP Activate includes which of the following? There are 2 correct answers to this question. SAP Best Practices Courses delivered by SAP Education Project Accelerators Business models from leading companies in each industry sector.
Which activity helps the Project Team add User Stories to the Product Backlog? Please choose the correct answer. Conducting the Solution Validation workshop Preparing a Project Schedule Assessing Project Risks Planning the User Acceptance Test.
Which of the following is true about a cloud implementation project? There are 2 correct answers to this question. Starter Systems are not required to be in place for the 'Fit to Standard' workshops. In the prepare phase of a cloud implementation project the project team provide the customer with materials to review as self-enablement. The entire transport system is kept intact and up and running. The Starter System is specific to SAP S/4HANA Cloud.
How do you achieve frequent checkpoints with the End User in an? There are 2 correct answers to this question. User Acceptance Test Solution Review for Waves Solution Demo for Sprints Demo the SAP Model Company.
Which of the following are available in the initial SAP Methodologies JAM Page? There are 2 correct answers to this question. Task description Roadmaps Summary Accelerators.
What is the focus of a SCRUM of SCRUMS in an Agile context? Please choose the correct answer. Backlog management Integration topics Best Practice adoption Communication to the Project Management Office.
Which end-to-end turn-key Application Lifecycle Management (ALM) solution can support you in managing requirements and software development for large, Agile projects? Please choose the correct answer. Change Request Management Solution Manager Test Suite Requirement Management Focused Build.
What is the most granular level of the methodology you can view in the SAP Roadmap Viewer? Please choose the correct answer. Scenario Deliverables Phase Task.
Which of the following are not phases of the SAP Activate methodology? There are 2 correct answers to this question. Realize Go-Live & Support Prepare Preparation.
What does SAP Activate recommend to keep team members informed and aligned? Please choose the correct answer. Daily team stand-up meeting Daily progress review meeting with sponsor Daily e-mail status updates to project manager Daily status meeting with project manager.
Which of the following SAP S/4HANA Landscape Transformation options are enabled? There are 3 correct answers to this question. Migration of Selected Applications Migration of Business Units System Consolidation Security Migration System Upgrade.
Which of the following is not correct about the REALIZE phase? There are 2 correct answers to this question. Detailed design workshops are held. The team prepares for operations so that the functionality can be brought live. The project team ensures that the build is meeting the business requirements. The beginning of the Realize phase the team prepares a list of all the requirements in a backlog.
What do you do during an iterative approach to build a solution? Please choose the correct answer. Provide a working solution only at the end of the release Build the solution module by module Include frequent inspection check-points Deliver a prototype of the solution.
What is the purpose of the Solution Builder tool in the SAP Activate Guided Configuration? Please choose the correct answer. To create delta building blocks for complementary content To activate the Best Practices content To personalize activated, ready-to run business processes To create customer-specific scope items.
In SAP Activate, what replaces the detailed Blueprint from ASAP? Please choose the correct answer. Value Determination Business Process Mapping Fit/Gap Workshops Custom Extension management.
Which of the following are the pillars of SAP Activate? There are 3 correct answers to this question. SAP Activate Methodology Guided Configuration SAP Best Practices SAP Launch Methodology SAP ASAP Methodology.
Which new role is introduced in the SAP Activate Methodology in a Full Scrum Team? Please choose the correct answer. Application Consultant Product Owner System Administrator Project Manager.
Via which media does SAP provide Ready-to-run systems for SAP S/4HANA deployments? There are 2 correct answers to this question. SAP Cloud Appliance Library Blu-ray disks SAP Solution Builder tool SAP App Center.
In which SAP Activate methodology phase does the team complete the Integration Validation? Please choose the correct answer. Prepare Realize Deploy Explore.
In which phase should you create a Data Migration Strategy (LO) during a Selective Data Transition? Please choose the correct answer. Explore Discover Deploy Realize.
What is the hierarchy level under Phase in the SAP Jam space for SAP Activate on-premise? Please choose the correct answer. Scenario Key Deliverable Task Work Stream.
Which of the following tasks are part of the Production support after the Go Live key deliverable? There are 2 correct answers to this question. Set up the Operations Control Center Perform a Technical systems test Provide further training to customer end users Resolve issues identified during the Hyper Care period.
Which of the following is not correct about Fit/Gap Analysis? There are 2 correct answers to this question. Prioritize delta requirement and gaps. Validate pre-activate and pre-assembled solution in the development system. Drive towards adopting customers processes. Minimize the needs for rework during realization.
Which collaboration features can SAP Activate Jam users access? There are 2 correct answers to this question. Comment on documents Tweet questions Ask questions Update Key Deliverable wikis.
Which of the following is part of the Explore phase in the "New Implementation of SAP S/4HANA Cloud' transition path? Please choose the correct answer. Fit-to-standard Solution Validation and Delta Design Simplification and Custom Code Impact Analysis Setup and Enablement.
In which of the following project phases is it important to plan and schedule data loads followed by load validation activities? Please choose the correct answer. Deploy Prepare Explore Realize.
What is a Strategy Level 0 (LO) artifact? Please choose the correct answer. Preliminary strategy developed by the customer to approach the project in a specific work stream Project result that is developed solely by the partner Optional information that is NOT important for project activities Approach document that is developed by a united Project Team (partner + customer).
What Sprint types are part of the SAP Activate Methodology? There are 3 correct answers to this question. Daily Foundational Firm-up Initial Build.
What is a key characteristic of SAP Activate for new implementations of S/4HANA cloud edition? Please choose the correct answer. Start with executable content Design-based Limited involvement of business stakeholders Waterfall approach.
In which phase of the SAP Activate Methodology does the team complete the System Assessment? Please choose the correct answer. Realize Explore Prepare Deploy.
What is the objective of a sprint retrospective meeting? Please choose the correct answer. Review and prioritize the backlog Improve the SCRUM process Provide formal feedback to the project manager Define the stakeholder management approach.
In SAP Activate, what tool is used in the during the Realize phase to make forecasts based on actual data? Please choose the correct answer. Release Plan Product Increment Burn down Chart Project Plan.
Which of the following activities are part of the Realize Phase of a System Conversion journey to SAP S/4HANA On-Premise Edition? There are 3 correct answers to this question. Custom code adjustment Development system migration Sandbox system migration Operations impact analysis Delta configuration.
Working in an Agile approach, what should your planning look like at the beginning of the Realize phase? Please choose the correct answer. Timelines of the Sprint may differ due to the workload. Project scope and planning are completed and final. Go-Live scope is fixed on the first of January the following year. User Stories are in a Ready state for NO more than the first three Sprints.
Which of the following content best outlines the sequence of testing within the Application Design and Configuration work stream in the Realize phase? Please choose the correct answer. i. String test ii. User Acceptance Test iii. Integration Test i. Data Migration ii. String test iii. User Acceptance Test i. String test ii. Integration Test iii. User Acceptance Test i. Integration Test ii. User Acceptance Test iii. String test .
What is the key characteristic of Agile project delivery? Please choose the correct answer. Frequent and detailed project scheduling Formal and detailed documentation Iterative build with frequent inspections Frequent Quality Gates.
How many deliverables are a part of the Key Deliverable 'Project Initiation'? Please choose the correct answer. Three One Four Two.
What is SAP Activate? Please choose the correct answer. A bundle of ASAP , SAP Launch , and Rapid Deployment Solutions A step-by-step instruction on how to remove from SAP best practices to your custom solution A combination of SAP best practices , methodology, and guided configuration A methodology for each of the deployment modes (cloud , on-premise, hybrid).
What are some of the key characteristics of the implementation approach in SAP Activate Methodology? There are 3 correct answers to this question. Delta-based Cloud Ready Fixed scope Based on Ready-to-use Content On premise only.
What are deliverables of the Application: Integration work stream in the prepare phase? There are 3 correct answers to this question. Data Cleansing Security Checks Adaptation Specifications Network Connectivity Checks Fit/Gap Analysis.
Which key activities does the Guided Configuration support you with? There are 3 correct answers to this question. View solution scope Test configured processes Manage roles of configuration users Create test data Train new users.
What is the minimum number of Quality Gates mandated for SAP S/4HANA transition projects? Please choose the correct answer. 5 2 4 3.
Which tool can you use to collaborate with other SAP Activate methodology practitioners? Please choose the correct answer. SAP Jam SAP Solution Manager SAP Implementation Assistant Roadmap Viewer.
What does the Side-by-Side Extensibility Option mean? Please choose the correct answer. Context-aware SAP S/4HANA extensions, focused on tight integration Extensibility based on the SAP Cloud Platform and published APls Have two SAP S/4HANA instances - one for standard code, and another for custom developments Transfer reporting to BW/4HANA.
In which phase do you verify that the SAP Best Practices content meets the customer's business needs, and then capture gaps? Please choose the correct answer. Realize Deploy Prepare Explore.
In which phase do you execute the User Acceptance Test? Please choose the correct answer. Final Preparation Build and Test Realize Deploy.
What technique helps a Scrum Team to prioritize a large, flat Backlog? Please choose the correct answer. User Story Mapping Retrospective Planning Poker Fit/Gap Analysis.
How do you gain access to the SAP Activate Methodology Jam site? Please choose the correct answer. Send e-mail to SAP contact address Join SAP S/4HANA group on SAP Community Network Submit e-mail address via on-line form Register on SAP Service Marketplace.
Which navigation option do you use in the Roadmap Viewer to access the SAP Activate Methodology content? Please choose the correct answer. Navigate by work stream Navigate by RACI matrix accountability Navigate by Project Team Member Role Navigate by assigned Delivery Mode.
What can you do in the SAP Roadmap Viewer tool? Please choose the correct answer. Create a customer-specific version of a roadmap. Comment on Deliverables and Tasks within Roadmaps. Navigate detailed Solution Implementation Roadmaps. Download full roadmap content for offline navigation.
Which accelerations can you use during the Scope Validation/Fit-Gap Analysis activity in the Explore Phase? There are 2 correct answers to this question. Solution Validation Workshop RICEF Specification Template Quality Gate Checklist Sprint Backlog Template.
Which artifacts are part of the Solution Adoption work stream? There are 3 correct answers to this question. Business Transformation Review (Point of View) Detailed Design - Business Process System Go live Announcement (order) Project Plan Project Business Case.
In which phase do you create a prioritized list of user requirements? Please choose the correct answer. Prepare Deploy Realize Explore.
In which SAP Activate methodology phase does the team complete the Transformation Strategy? Please choose the correct answer. Prepare Explore Realize Deploy.
In which phase of the SAP Activate methodology does the team complete the Cut-over Rehearsal? Please choose the correct answer. Prepare Realize Explore Deploy.
What is the purpose of the SAP Activate Methodology? Please choose the correct answer. To accelerate the initial implementation of SAP S/4HANA To manage project and solution documentation To enable access to the SAP ecosystem To provide end-to-end integrated application lifecycle management.
Which of the following Key Deliverables do you complete in the Solution Design work stream in the Explore phase? There are 3 correct answers to this question. Baseline Build Data Migration Approach Design for the Gaps and Deltas Solution Scope and Value Determination Validation Workshops.
Which of the following tasks are required in the Prepare Phase? There are 3 correct answers to this question. Train the project team Set up the infrastructure to support the project Approve the test strategy Identify relevant SAP Best Practices Define the communication plan.
Which accelerator can help you document the detailed design of solution extensions? Please choose the correct answer. Change Request Template Sprint Backlog Template Product Backlog Template RICEF Specification Template.
What do you do during post cutover? Please choose the correct answer. Conduct Organizational Readiness Check Setup Operational Support Perform Technical System Test Perform the Verification Session of the SAP Going Live Check.
What are the responsibilities of the Project Team on level 4 in the picture below? There are 2 correct answers to this question. Perform status reporting and communication Set Project policy, standards and oversight Identify and resolve issues and risks Set business priorities, goals and objectives.
What are key characteristics of the implementation approach in SAP Activate Methodology? There are 3 correct answers to this question. Start with SAP Best Practices Validate solution Premium engagement ready Fixed scope On-premise only.
Which of the following are the key responsibilities of the Scrum Master? There are 3 correct answers to this question. Team protection Leadership skill Team support Task initiator Responsible for the project delivery.
How can the project manager help to keep momentum in the project and help to keep the customer involved? There are 2 correct answers to this question. Walk through the solution processes with the stakeholders Increase the number of Q-Gates Leverage agile cycles to build and test the solution Add customer resources to the project to reduce the need for formal training.
Which of the following tools are specific to the Data Management work stream? There are 3 correct answers to this question. SAP Landscape Transformation SAP Roadmap Viewer SAP Data Services SAP S/4HANA Migration Cockpit (for both SAP S/4HANA Cloud and SAP S/4HANA editions) SAP Solution Manager.
What accelerator can help you document the Configuration Definition in the Explore phase? Please choose the correct answer. Data Definition Change Request template Backlog template Test Strategy.
When does the Scrum Team receive formal confirmation that the User Stories are completed to the satisfaction of the Product Owner? Please choose the correct answer. During the Sprint Retrospective During the daily Scrum meeting During the Sprint Review During the User Acceptance Test.
In which SAP Activate methodology phase does the team identify and design functional quick wins in scope of the conversion project? Please choose the correct answer. Realize Deploy Prepare Explore.
How would you describe the Realize phase in the "New Implementation of SAP S/4HANA" transition path? Please choose the correct answer. Configure and adjust custom code Configure Configuration copy Configure and develop.
Which of the following is not correct about workstreams? There are 2 correct answers to this question. It can span phases It is assigned as an attribute to phases, deliverables and tasks It is a collection of related deliverables Workstreams are dependent on phase start and end.
What tool would you use for managing project tasks and Solution Documentation when implementing SAP S/4HANA Cloud? Please choose the correct answer. SAP Support Marketplace SAP Roadmap Viewer Implementation portal for SAP S/4HANA Cloud SAP Transformation Navigator.
Which of the following is a Key Deliverable of the Prepare phase? Please choose the correct answer. Solution Scope and Value Determination Release and Sprint Plan Baseline Build Change Impact Analysis and Communication Plan.
How can SRCUM teams be organized? Please choose the correct answer. By job title By project governance level By work stream By project phase.
Which activities are part of the Application: Solution Adaption work stream of SAP Activate for new implementations? There are 3 correct answers to this question. Value Determination Value Audits Scope Validation Change Management Plan Production Support Plan.
Your project is performing some high-level planning for a System Conversion journey from SAP Business Suite to SAP S/4HANA on-premise edition. What is the correct sequence of selected key deliverables across the project phases? Please choose the correct answer. a. Detailed system Assessment b. Production Readiness Check c. Code Adjustment d. Validation of Migration a. Production Readiness Check b. Detailed system Assessment c. Code Adjustment d. Validation of Migration a. Detailed system Assessment b. Code Adjustment c. Validation of Migration d. Production Readiness Check a. Code adjustment b. Detailed System Assessment c. Production Readiness Check d. Validation of Migration .
Which of the following can be used to navigate through the roadmap? There are 2 correct answers to this question. Workstreams Tasks Phases Deliverables.
What tool provides guidance on replacing custom code developed for SAP ERP with SAP S/4HANA functionality for the "System Conversion" transition path? Please choose the correct answer. Software Update Manager with Database Migration Option Simplification Item Check (SI-Check) Software Provisioning Manager SAP Code Inspector.
Which of the following activities are part of the Deploy Phase of a Landscape Transformation journey to SAP S/4HANA On-Premise Edition? There are 2 correct answers to this question. Training delivery Solution Activation Optimize software Change Control Management Access organizational and production readiness.
In what respect is SAP Activate Methodology different from the ASAP Methodology? Please choose the correct answer. Supports only new implementations Supports cloud deployments Includes Fit/Gap analysis instead of Blueprint Leverages iterative incremental build.
Where can you find Project Library Accelerators? Please choose the correct answer. Fully Activated Appliance SAP Roadmap Viewer SAP Best Practices Explorer SAP Cloud Appliance Library.
In which phase do you verify that the SAP Best Practice solution scenarios meet the business needs of the customer? Please choose the correct answer. Deploy Explore Realize Prepare.
Which accelerators support the Fit-to-standard workshop in the Explore phase? There are 2 correct answers to this question. Backlog template Business-Driven Configuration Questionnaire Test Strategy Quality Gate Checklist.
What tool do you use to configure an SAP Business Suite on-premise solution? Please choose the correct answer. SAP Implementation Guide Configuration Composer ABAP Workbench Expert Configuration.
In the System conversion to SAP S/4 HANA Deploy phase, which of the following tasks are included? Please choose the correct answer. Interface setup Final testing Scheduling project plan Hyper care support.
Who determines the tasks that are required to complete the committed backlog items in a sprint? Please choose the correct answer. SCRUM Master Project Team Project Manager Product Owner.
Which of the following activities are performed in the Explore phase of SAP Activate in SAP S/4HANA Implementation? There are 3 correct answers to this question. Adjusting custom code objects Organizational structure Implementing best practices Creating transactional data Changing master data.
In which tools can the project team across the SAP Activate Methodology content including accelerators? There are 2 correct answers to this question. SAP Jam SAP Service Marketplace Roadmap Viewer SAP Community Network.
What is SCRUM of SCRUMS? Please choose the correct answer. Integration meeting between the various project teams Mechanism for gathering and validating requirements Frequent inspection of code and configuration prior to quality gates Alternative to regular SCRUM process for smaller teams.
What are two important approaches, based on the Control Center concept that SAP proposes to use for streamlined implementation and operations within Premium Engagements? There are 2 correct answers to this question. Run SAP Like a Factory Build SAP Like a Factory Intelligent Enterprise Always Connected.
Which activities are critical for delivering Agile projects? There are 2 correct answers to this question Retrospective agenda creation Release planning Blueprint scheduling Sprint planning.
Who determines the priority of user stories in the backlog of an Agile project? Please choose the correct answer. Product Owner Project Team Project Manager SCRUM Master.
What does a project jump-start include for a new implementation of SAP S/4HANA on-premise edition? Please choose the correct answer. Rapid prototyping Full project SCRUM Project team training SAP Best Practices.
Which of the following activities support the Realize Phase of a System Conversion journey to SAP S/4HANA On-Premise Edition? There are 2 correct answers to this question. Non-production systems migration Value determination Data aging configuration Custom code Adjustment planning.
In which phase will the customer develop a preliminary strategy for building a target Operations and Support organizational model? Please choose the correct answer. Prepare phase Discover phase Run phase Explore phase.
Which criterion does the Product Owner use to sequence the product backlog? Please choose the correct answer. Business priority Relative effort Resource availability Complexity.
What term is used for a Ready-to-run SAP S/4HANA system with pre-built Solution Documentation, which supports End-to-End Processes for a specific industry so that the Project Team can focus on differentiation and innovation? Please choose the correct answer. Best Practice System SAP Model Company SAP Cloud Appliance Library Fully Activated Appliance.
How do you set up Scrum teams? There are 2 correct answers to this question. By type of work, like configuration Scrum, documentation Scrum, and testing Scrum. Based on End-to-End Processes like Order-to-Cash Based on group size, but a minimum of 12 people As a cross-functional team covering multiple functions, like configuration, data loads, and testing.
Where can you find the Integration Content? There are 3 correct answers to this question. SAP Cloud Appliance library SAP Solution Manager SAP API Business Hub Cloud Integration Automation Service SAP Best Practices Explorer.