What SAP Cloud Platform integration tool would you use to integration SAP S/4HANA Cloud and SAP S/4HANA on-premise (Only 1 answer is correct). SAP Cloud Platform, Open Connectors. SAP Cloud Platform, Cloud Integration. SAP Cloud Platform, API Management. SAP Cloud Platform, Connectivity.

What are some of the required customer activities to maintain their SAP S/4HANA Cloud system post-go-live (3 answers are correct). Activate new scope (if applicable). Conduct regression testing on business processes. Maintain business catalogs. Stay current. Test new features in the Stay Current Early Knowledge Enablement Sandbox / Trial environment.

Which of the following tools is used to install SAP S/4HANA? Please choose the correct answer. (Only 1 answer is correct). Data Migration server. SWPM (Software Provisioning Manager). SAP Solution Manager. Cloud Application Library.

What SAP middleware tool hosts the SAP Best Practices pre-delivered integration content and can be used for custom integration development (Only 1 answer is correct). SAP HANA Enterprise Cloud. SAP API Management. Process Integration. SAP Cloud Platform.

What does SAP define as the three key components of how a data center works (3 answers are correct). Cooling. Backup Retention Procedures. Power Supply. Certification Standards. Controlled Access.

What are some characteristics of the "Cloud" mindset (3 answers are correct). Make the company fit the software. Heavy customizations and modifications. Business blueprint phase. Workarounds and light extensions. Fit-to-Standard workshops.

What does it mean if an SSCUI has a "Yes" in the "Redo in P System" column (Only 1 answer is correct). You must manually redo the configuration in the production system because it is not captured in change projects. SSCUI records are specific to a company or country and every country has its own unique configuration records. The configuration is transferred from the quality system to the production system in change projects. The configuration records are the same for all countries and all country solutions have the same data.

Where can you find the Migration Object Template documentation (Only 1 answer is correct). SAP Support Portal. SAP Best Practices Explorer. SAP Roadmap Viewer accelerator. SAP Help Portal.

In which SAP Activate methodology phase does the team complete the Transformation Strategy Please choose the correct answer. (Only 1 answer is correct). Prepare. Explore. Realize. Deploy.

What are the four dimensions of SAP Enterprise Support (Only 1 answer is correct). Collaboration, Empowerment, Innovation and value realization, and Mission-critical support. Collaboration, Personalized engagement, Innovation and value realization, and Mission-critical support. Expert access, Empowerment, Innovation and value realization, and Mission-critical support. Collaboration, Empowerment, Preferred care, and Mission-critical support.

What must be defined in the Preset Phase of implementation to enable configuration of business processes (2 answers are correct). Organizational Structure. Master Data. Expert Configuration. Chart of Accounts.

Where do you request provisioning of the Quality System (Only 1 answer is correct). Manage Your Solution app in Starter System. Incident/Service Request to SAP Service Center. Configure Your Solution app in Starter System.

What SAP S/4HANA deployment model has the characteristics of a core ERP scope with rapid innovation, SAP-led governance, and standardization (Only 1 answer is correct). SAP S/4HANA Cloud, single tenant edition. SAP S/4HANA deployed in SAP HANA Enterprise Cloud. SAP S/4HANA Cloud. SAP S/4HANA on premise.

Why might you choose to migrate data to SAP S/4HANA Cloud with the Staging approach (Only 1 answer is correct). If you can import the data manually. If you need to find a way to automate the transfer of data. If you need to transfer a lot of data. If you need to import a small amount of data.

What configuration cannot be changed after Preset phase activation" (2 answers are correct). New country activation. Organizational structure keys. Maintain Takeover Date for Asset Accounting. Fiscal year variant.

What are some of the intelligent technologies that enable end-to-end automation (3 answers are correct). Embedded Analytics. Predictive Analytics. Machine Learning. Fundamental Simplification. Conversational AI.

Which of the following are the benefits of SAP JAM There are 2 correct answers to this question? (2 answers are correct). User collaboration. Reduced Recovery Time. Easy to use. Highly available.

What are some goals of the Fit-to-Standard workshops (3 answers are correct). To define the Integration and API List for the solution. To review the SAP Best Practices in the starter system. To identify relevant data migration objects. To identify customer-defined configuration changes within the scope of the service. To gather input for customer-defined customizations to the solution.

How can organizations closely connect subsidiaries with headquarters to run end-to-end business scenarios (Only 1 answer is correct). With a cloud solution. With a 2-tier ERP solution. With a 4-tier ERP solution. With a fully functional ERP solution.

Which of the following are not phases of the SAP Activate methodology There are 2 correct answers to this question? (2 answers are correct). Go-Live & Support. Preparation. Prepare. Realize.

The tasks associated with Landscape transportation are in which workstream Please choose the correct answer. (Only 1 answer is correct). Transition to Operations. System & data migration. Application Solution Adoption. Technical Architecture and Infrastructure.

Which of the following is not correct about workstreams There are 2 correct answers to this question. (2 answers are correct). It is assigned as an attribute to phases, deliverables, and tasks. It can span phases. It is a collection of related deliverables. Workstreams are dependent on phase start and end.

What are some of the capabilities end users can utilize to adapt and change their launchpad home page according to the way they work (3 answers are correct). Rearrange or move tiles within a group. Add any SAP Fiori apps to a group, regardless of role. Delete a pre-delivered group. Rename a pre-delivered tile. Add a new group.

What are examples of some information captured in the Digital Discovery Assessment (2 answers are correct). Customer master data. Scope items selected within functional business areas. Integration requirements. Configuration values required.

What are some responsibilities of customer key users after go-live of an SAP S/4HANA Cloud project (3 answers are correct). Complete the implementation activities as assigned. Responsible for inspection and approval of results and of the overall project. Search for solutions and process incidents from end-users directly and when necessary, request help from SAP. Manage Users and Task Assignment. Monitor internal/external communications such as printers and integration with third-parties.

What APIs (Application Programming Interface) is used to connect SAP Cloud to SAP on-premise solutions (Only 1 answer is correct). BAPI. SOAP. IDoc. Data.

What are some responsibilities of the steering committee during the implementation of an SAP S/4HANA Cloud project (3 answers are correct). Maintain responsibilities for users in your company. Act as a multiplier within your organization to train and support end-users. Last escalation level for problems (conflict management). Responsible for inspection and approval of results and of the overall project. Ensures the resources necessary for the project's success are available.

How many change projects can be active at a time (Only 1 answer is correct). 3. 2. 4. 1.

What are some responsibilities of the Configuration Expert project team role in an SAP S/4HANA Cloud implementation (2 answers are correct). Manages interactions with the SAP Service Center. Serves as the central contact for SAP. Resolution of business process issues. Prepares and leads the Fit-to-Standard analysis process.

Who receives the initial login information for the Starter, Quality, and Production Systems when they are provisioned (Only 1 answer is correct). SAP Service Center, who then forwards the information to you. Customer Key User identified as the "IT Contact". Project Manager on the Customer Implementation Team. Project Manager on the Partner Implementation Team.

Which of the following activities are performed in the Explore phase of SAP Activate in SAP S/4HANA ImplementationThere are 3 correct answers to this question. (3 answers are correct). Adjusting custom code objects. Implementing best practices. Creating transnational data. Changing master data. Organizational structure.

Which of the following tools are used for rapid database migration There are 2 correct answers to this question. (2 answers are correct). Database migration option (DMO). SAP Solution Manager. SWPM (software provisioning manager). Software Update Manager (SUM).

What are some functions of Business Catalogs (2 answers are correct). Analyze if authorizations are missing or insufficient B. Enable you to restrict user access. Enable you to restrict user access. Provide access to one or more applications. Display information about the usage of business roles.

How many countries can be activated at a time (Only 1 answer is correct). 3. 2. 1. 4.

What is the best transition scenario for a customer looking for some, but not full process redesign, and re-use of existing processes in some areas that still fit (Only 1 answer is correct). Selective Data Transition. New Implementation. System Conversion.

What are the three cornerstones of SAP's cloud security strategy (3 answers are correct). Secure People. Secure Operations. Secure Company. Secure Cloud. Secure Products.

What does "de-coupling extensions" mean in SAP S/4HANA Cloud (2 answers are correct). Extensions will not clash with quarterly release upgrades. Extensions are separated from the stable system of records. Extensions are applied with modifications in the HANA database. Extensions could conflict with future release enhancements.

What hosts the Test Execution Service that drives automated business process testing in SAP S/4HANA Cloud (Only 1 answer is correct). SAP Cloud Platform. SAP Cloud Identity. Manage Your Solution app. SAP HANA Enterprise Cloud.

What tool would you use for managing project tasks and Solution Documentation when implementing SAP S/4HANA Cloud (Only 1 answer is correct). SAP Roadmap Viewer. SAP Transformation Navigator. Implementation Portal for SAP S/4HANA Cloud. SAP Support Marketplace.

Which of the following tools are specific to the Data Management workstream (3 answers are correct). SAP Landscape Transformation. SAP Roadmap Viewer. SAP Data Services. SAP S/4HANA Migration Cockpit (for both SAP S/4HANA Cloud and SAP S/4HANA editions). SAP Solution Manager.

How do you gain access to the SAP Activate Methodology Jam site? (Only 1 answer is correct). Register on SAP Service Marketplace. Send e-mail to SAP contact address. Submit email address via on-line form. Join SAP S/4HANA group on SAP Community Network.

Which of the following activities are part of the Realize Phase of a System Conversion journey to SAP S/4HANA On-Premise Edition(3 answers are correct). Operations impact analysis. Custom code adjustment. Delta configuration. Development system migration. Sandbox system migration.

Which activity is part of the SAP Activate Methodology for a new implementation of SAP S/4HANA on-premise edition but NOT of the cloud edition (Only 1 answer is correct). End-to-End Integration Test. User Acceptance Test. Unit Test. Technical System Test.

What do you do during an iterative approach to build a solution? (Only 1 answer is correct). Build the solution module by module. Deliver a prototype of the solution. Provide a working solution only at the end of the release. Include frequent inspection check-points.

Which deliverable is specific to on-premise and NOT for the cloud? (Only 1 answer is correct). Technical Design Solution. Knowledge Transfer. Adaptation Specification. Learning Needs Analysis.

Which activities are critical for delivering Agile projects? (2 answers are correct). Retrospective agenda creation. Sprint planning. Release planning. Blueprint scheduling.

Which key deliverable includes the development of RICEFW objects? (Only 1 answer is correct). Development Build. Enhancement Delivery. Sprint Execution. Custom Extensions Management.

In Which phase does the Transition to Operations work stream start? (Only 1 answer is correct). Explore. Realize. Deploy. Prepare.

What is the purpose of the Solution Validation activity in the Explore phase? (3 answers are correct). To verify technical installation. To identify gaps. To log additional scope items. To challenge changes to standard. To educate project participants.

What is the most granular level of the methodology you can view in the Roadmap Viewer? (Only 1 answer is correct). Scenario. Task. Deliverables. Phase.

Which tool can you use to collaborate with other SAP Activate methodology practitioners? (Only 1 answer is correct). SAP Jam. SAP Solution Manager. SAP Implementation Assistant. Roadmap Viewer.

Which content packages are available in the SAP Package Library? (2 answers are correct). SAP Activate Methodology. SAP Best Practices. Solution Builder. Rapid Deployment Solutions.

In which SAP Activate methodology phase does the team complete the Integration Validation? (Only 1 answer is correct). Explore. Realize. Deploy. Prepare.

When does the project team receive formal confirmation that the user stories are completed to the satisfaction of the product owner? (Only 1 answer is correct). During the daily SCRUM meeting. During the sprint retrospective. During the sprint review. During user acceptance testing.

What is the deliverable of the Application. Customer Team Enablement work stream in the Prepare phase of SAP Activate? (Only 1 answer is correct). Project Charter. Project Documentation. Knowledge transfer to end users. Learning plan.

Which activity helps the project team to add the user stories to the product backlog? (Only 1 answer is correct). Planning the User Acceptance Test. Preparing a Project Schedule. Conducting the Solution Validation. Assessing Project Risks.

Which key activities does the Guided Configuration support you with? (3 answers are correct). Manage roles of configuration users. Train new users. Create test data. Test configured processes. E. View solution scope.

What is the purpose of the SAP Activate Methodology? (Only 1 answer is correct). To enable access to the SAP ecosystem. To accelerate the initial implementation of SAP S/4HANA. To provide end-to-end integrated application lifecycle management. To manage project and solution documentation.

Who determines the tasks that are required to complete the committed backlog items in a sprint? (Only 1 answer is correct). Project Manager. Product Owner. Project Team. SCRUM Master.

What are the responsibilities of the Product Owner in release and sprint planning? (2 answers are correct). Analyze the functional and technical dependencies between the user stories. Define objectives for each release. Prioritize backlog user stories by business priority. Estimate the backlog user stories.

What is the purpose of the scrum board? (Only 1 answer is correct). To document the results of integration testing. To manage the resource load. To show the functional breakdown of the solution scope. To visualize team progress.

Which of the following is a Key Deliverable of the Prepare phase? (Only 1 answer is correct). Solution Scope and Value Determination. Change Impact Analysis and Communication Plan. Baseline Build. Release and Sprint Plan.

What is the difference between the SAP Activate methodology for a new implementation of SAP S/4HANA cloud edition and a new implementation of SAP S/4HANA on-premise? (Only 1 answer is correct). For the cloud edition, there is an additional work stream for integration with on-premise systems. For the cloud edition, there is an additional Q-Gate for integration with on-premise systems. For on-premise, there is an additional Q-Gate for system installation. For on-premise, there are additional deliverables for the system setup.

What are deliverables of the Application: Integration workstream in the prepare phase? (3 answers are correct). Fit/Gap Analysis. Data Cleansing. Security Checks. Adaptation Specifications. Network Connectivity Checks.

Which of the following tasks are part of the Production support after the Go Live key deliverable? (2 answers are correct). Resolve issues identified during the HyperCare period. Provide further training to customer end users. Set up the Operations Control Center. Perform a Technical systems test.

What is the key characteristic of Agile project delivery? (Only 1 answer is correct). Frequent and detailed project scheduling. Formal and detailed documentation. Iterative build with frequent inspections. Frequent Quality Gates.

Which collaboration features can SAP Activate Jam users access? (2 answers are correct). Ask questions. Update Key Deliverable wikis. Tweet questions. Comment on documents.

In what respect is SAP Activate Methodology different from the ASAP Methodology? (Only 1 answer is correct). Supports cloud deployments. Supports only new implementations. Leverages iterative incremental build. Includes Fit/Gap analysis instead of Blueprint.

Which content is made available after you activate SAP Best Practices for a new financial implementation? (2 answers are correct). Implementation Guide. Online help. Pre-configured business processes. Standard chart of accounts.

Which of the following tasks are required in the Prepare Phase? (3 answers are correct). Train the project team. Set up the infrastructure to support the project. Define the communication plan. Approve the test strategy. Identify relevant SAP Best Practices.

Which tools does SAP Activate provide to support Guided Configuration? (3 answers are correct). Solution Builder. Expert Configuration. Self Service Configuration. SAP Solution Composer. Model Company.

In which phase of the SAP Activate methodology does the team complete the Cut-over Rehearsal? (Only 1 answer is correct). Prepare. Explore. Realize. Deploy.

How are the build and test tasks planned and executed in the Realize phase? (Only 1 answer is correct). By using the sprint backlog list as input for each iteration. By executing regression tests after each iteration. With Q-Gates for sign off after each iteration. By using incremental build in fixed-scope iteration.

What can users do in the Roadmap Viewer tool? (Only 1 answer is correct). Display and navigate detailed SAP Activate methodology WBS. Upload SAP Activate WBS into SAP Solution Manager 7.1. Download full SAP Activate methodology content for use off-line. Create a customer-specific version of SAP Activate Methodology.

How can SCRUM teams be organized? (Only 1 answer is correct). By job title. By work stream. By project phase. By project governance level.

What is the objective of a sprint retrospective meeting? (Only 1 answer is correct). Define the stakeholder management approach. Review and prioritize the backlog. Provide formal feedback to the project manager. Improve the SCRUM process.

What tool do you use to configure an SAP Business Suite on-premise solution? (Only 1 answer is correct). ABAP Workbench. SAP Implementation Guide. Configuration Composer. Expert Configuration.

Which accelerations can you use during the Scope Validation/Fit-Gap Analysis activity in the Explore Phase? (2 answers are correct). Sprint Backlog Template. RICEF Specification Template. Solution Validation Workshop. Quality Gate Checklist.

What are the benefits of the SAP best practices? (3 answers are correct). Fast time to value. Predictable results. Simple on-boarding to cloud. Fixed organizational structure. Reduced functional scope.

Which navigation option do you use in the Roadmap Viewer to access the SAP Activate Methodology content? (Only 1 answer is correct). Navigate by assigned Delivery Mode. Navigate by RACI matrix accountability. Navigate by work stream. Navigate by Project Team Member Role.

What does a project jump-start include for a new implementation of SAP S/4HANA on-premise edition? (Only 1 answer is correct). SAP Best Practices. Rapid prototyping. Project team training. Full project SCRUM.

Which of the following content best outlines the scope of the Integration Test? (Only 1 answer is correct). Prototype. Delta/gap solutions. Data flows with non-SAP application.

Which component of SAP Activate offers customers a reference solution in the cloud for a quick start? (Only 1 answer is correct). SAP Implementation Assistant. SAP Activate Methodology. Guided Configuration. SAP Best Practices.

What are the three pillars of SAP Activate? (3 answers are correct). SAP Activate Methodology. SAP Best Practices. SAP S/4HANA in-memory database. SAP Solution Manager. Guided Configuration.

Which criterion does the Product Owner use to sequence the product backlog? (Only 1 answer is correct). Resource availability. Complexity. Business priority. Relative effort.

In which phase of the SAP Activate Methodology does the team complete the System Assessment? (Only 1 answer is correct). Deploy. Explore. Prepare. Realize.

According to the Definition of Done, which activity must be completed for each sprint? (Only 1 answer is correct). End user training must be delivered. Solution must be built and configured in the development system (DEV). Functionality must be tested in the Quality System (QAS). Functionality must be released to the business.

Which activities are part of the Application: Solution Adaption workstream of SAP Activate for new implementations? (3 answers are correct). Value Audits. Production Support Plan. Value Determination. Change Management Plan. Scope Validation.

What is the best target environment for a System Conversion journey is as described in the SAP Activate methodology? (Only 1 answer is correct). SAP Hybris. SAP S/4HANA Cloud Edition. SAP S/4HANA On-Premise Edition. Hybrid of SAP S/4HANA Cloud Edition and SAP S/4HANA On-Premise Edition.

Who determines the priority of user stories in the backlog of an Agile project? (Only 1 answer is correct). Project Manager. Project Team. SCRUM Master. Product Owner.

What must you do when you implement SAP Business Suite On-Premise with SAP Best Practices? (Only 1 answer is correct). Activate and apply SAP Best Practices content with the self-service configuration UI. Activate and apply SAP Best Practices with SAP Solution Manager. Apply SAP Best Practices with the Configure your Solution application. Assemble and apply SAP Best Practices to the system.

What information does the product team need so that they can estimate the relative size of backlog user story correctly? (Only 1 answer is correct). Available project resources. Test strategy. Definition of Done. Overall project schedule.

What are key characteristics of the implementation approach in SAP Activate Methodology? (3 answers are correct). Premium engagement ready. On-premise only. Fixed scope. Validate solution. Start with SAP Best Practices.

What does SAP Activate recommend to keep team members informed and aligned? (Only 1 answer is correct). Daily status meeting with project manager. Daily team stand-up meeting. Daily email status updates to project manager. Daily progress review meeting with sponsor.

What do you do during Sprint Execution? (Only 1 answer is correct). End a sprint when the sprint backlog items are all complete. Measure the sprint progress with a percentage complete report. Hold a retrospective at the end of each week. Present status of selected user stories in the sprint scope on a scrum board.

Which of the following building blocks are part of the SAP S/4HANA platform? (2 answers are correct). SAP Fiori UX. SAP HANA in-memory database. SAP Solution Manager. LOB Cloud Solution.

What is the focus of a SCRUM of SCRUMS in an Agile context? (Only 1 answer is correct). Best Practice adoption. Communication to the Project Management Office. Backlog management. Integration topics.

What is the hierarchy level under Phase in the SAP Jam space for SAP Activate on-premise? (Only 1 answer is correct). Key Deliverable. Scenario. Work Stream. Task.

What is SAP Activate? (Only 1 answer is correct). A step-by-step instruction on how to remove from SAP best practices to your custom solution. A methodology for each of the deployment modes (cloud , on-premise, hybrid). A bundle of ASAP , SAP Launch , and Rapid Deployment Solutions. A combination of SAP best practices , methodology, and guided configuration.

What is a key characteristic of SAP Activate for new implementations of S/4HANA cloud edition? (Only 1 answer is correct). Start with executable content. Limited involvement of business stakeholders. Waterfall approach. Design-based.

What is the final activity in the Realize phase of a new implementation of SAP S/4HANA cloud edition? (Only 1 answer is correct). Data migration. End-to-End walkthrough. Readiness check. Solution validation.

Which of the following activities are part of the Deploy Phase of a Landscape Transformation journey to SAP S/4HANA On-Premise Edition? (2 answers are correct). Solution Activation. Optimize software Change Control Management. Training delivery. Access organizational and production readiness.

Which new project roles are introduced with the SAP Activate Agile methodology? (2 answers are correct). SCRUM Master. Product Owner. Integration Lead. Design Thinking Coach.

What is the purpose of a firm-up sprint? (Only 1 answer is correct). To demonstrate functionality from previous sprint. To perform sprint testing. To revise a release plan and sprint plan. To run end-to-end integration test.

In which tools can the project team access the SAP Activate Methodology content including accelerators? (2 answers are correct). SAP Community Network. Roadmap Viewer. SAP Jam. SAP Service Marketplace.

What do you do during post cutover? (Only 1 answer is correct). Setup Operational Support. Perform the Verification Session of the SAP Going Live Chec. Perform Technical System Test. Conduct Organizational Readiness Check.

Which of the following activities support the Realize Phase of a System Conversion journey to SAP S/4HANA On-Premise Edition?(2 answers are correct). Custom code Adjustment planning. Data aging configuration. Non-production systems migration. Value determination.

Your project is preparing for the Fit/Gap analysis workshops. If you use the Agile approach, what sequence of activities do you perform in the Explore Phase? (Only 1 answer is correct). Conduct Solution Validation workshops. Set reference value. Prioritize initial backlog. Conduct Delta Design workshops.

What technique helps agile project teams to prioritize a large, flat backlog? (Only 1 answer is correct). Fit/Gap Analysis. User Story Mapping. Retrospective. Planning Poker.

When do you perform User Acceptance Testing during the Agile Build? (Only 1 answer is correct). Before Integration Testing. During each Firm-up Sprint. After each Sprint. After Integration Testing.

What is the minimum number of quality gates mandated by the SAP Activate methodology? (Only 1 answer is correct). 0. 3. 4. 5.

Which estimation technique can be used in Agile project delivery to size the user stories during sprint planning? (Only 1 answer is correct). Detailed bottom-up effort estimate the breaks each user story up into hours or shorter tasks. Relative estimate in ideal person days that reflects the best estimate provided by the project team. Detailed bottom-up effort estimate by the SCRUM Master in story points based on the user story. Product Owner's relative estimate of the effort that will be needed to implement the user story.

Which of the following Key Deliverables do you complete in the Solution Design work stream in the Explore phase? (3 answers are correct). Design for the Gaps and Deltas. Baseline Build. Data Migration Approach. Validation Workshops.

In SAP Activate, what replaces the detailed Blueprint from ASAP? (Only 1 answer is correct). Business Process Mapping. Value Determination. Custom Extension management. Fit/Gap Workshops.

What are the responsibilities of the Project Team on level 4? (2 answers are correct). Set Project policy, standards and oversight. Set business priorities, goals and objectives. Identify and resolve issues and risks. Perform status reporting and communication.

In which phase you execute the User Acceptance Test? (Only 1 answer is correct). Build and Test. Deploy. Final Preparation. Realize.

In which phase do you verify that the SAP Best Practice solution scenarios meet the business needs of the customer? (Only 1 answer is correct). Explore. Deploy. Realize. Prepare.

In which phase do you create a prioritized list of user requirements? (Only 1 answer is correct). Realize. Explore. Prepare. Deploy.

In which phase of the SAP Activate methodology does the team complete the Transformation Planning? (Only 1 answer is correct). Deploy. Explore. Prepare. Realize.

In which phase of the SAP Activate methodology does the team complete the Transformation Planning (Only 1 answer is correct). Explore. Prepare. Realize. Deploy.

In which SAP Activate methodology phase does the team identify and design functional quick wins in scope of the conversion project (Only 1 answer is correct). Explore. Prepare. Realize. Deploy.

How can the project manager help to keep momentum in the project and help to keep the customer involved (2 answers are correct). Increase the number of Q-Gates. Leverage agile cycles to build and test the solution. Walk through the solution processes with the stakeholders. Add customer resources to the project to reduce the need for formal training.

What structure level do you see when you access the Roadmap Viewer and chose work stream navigation (Only 1 answer is correct). Task. Scope item. Deliverable. Scenario.

Which of the following can be used to navigate through the roadmap (2 answers are correct). Task. Workstreams. Deliverable. Phases.

Arrange the following in the correct sequence of steps followed for a 'Fit to Standard' workshop (Only 1 answer is correct). Review Best Practice Process Flow, Demonstrate Business Scenarios and Concepts, Discuss how the process fit with customer requirements, Identify gaps, Identify required configuration, Enable customer on execution of scenarios. Demonstrate Business Scenarios and Concepts, Review Best Practice Process Flow, Identify required configuration, Discuss how the process fit with customer requirements, Enable customer on execution of scenarios, Identify gaps. Review Best Practice Process Flow, Demonstrate Business Scenarios and Concepts, Identify required configuration, Discuss how the process fit with customer requirements, Enable customer on execution of scenarios, Identify gaps. Discuss how the process fit with customer requirements, Review Best Practice Process Flow, Demonstrate Business Scenarios and Concepts, Identify required configuration, Enable customer on execution of scenarios, Identify gaps.

Which accelerator can help you document the detailed design of solution extensions (Only 1 answer is correct). RICEF Specification Template. Change Request Template. Sprint Backlog Template. Product Backlog Template.

Which of the following is not correct about the REALIZE phase (2 answers are correct). The beginning of the Realize phase the team prepares a list of all the requirements in a backlog. The team prepares for operations so that the functionality can be brought live. Detailed design workshops are held. The project team ensures that the build is meeting the business requirements.

What can you do in the SAP Roadmap viewer tool? (Only 1 answer is correct). Comment on deliverables and tasks within roadmaps. Navigate detailed solution roadmaps. create a customer specific version of the roadmap. Download full roadmap content for offline navigation.

When is provisioning of the production system requested (Only 1 answer is correct). After the starter system is decommissioned. Immediately after receive the inactive quality system (Preset phase). Immediately after receiving the active quality system. After completing configuration of the business processes in the quality system.

What are some activities the project team will perform in executing project work during the Explore Phase (3 answers are correct). Collect project data and report on progress and performance. Manage risks and implement risk response activities. Manage Background Jobs, Input and Output. Deal with user authorization requests. Establish and manage internal and external communications.

What is a benefit of using Guided Configuration instead of the Implementation Guide Please choose the correct answer. (Only 1 answer is correct). It ensures SAP updates do NOT conflict with customer configurations. It eliminates the need for Content Lifecycle Management. It eliminates the need to generate transport requests for configuration settings. It ensures configuration is done using SAP Solution Manager.

What are the two options for transferring data to SAP S/4HANA Cloud (2 answers are correct). Data Aging (1K8). Data Migration to SAP S/4HANA from Staging (2Q2). Data Migration to SAP S/4HANA from File (BH5). Data Migration to SAP S/4HANA from SAP (BH3).

Why do you use the Implementation Portal for SAP S/4HANA Cloud (2 answers are correct). To use as an input for Fit-to-Standard workshops that helps the team understand areas to spend more time on during workshops. To manage implementation tasks based on SAP Activate Methodology that are automatically generated and adapted to the customer's scope. To use the guided workflow to integrate SAP Cloud solutions. To monitor the progress of implementation tasks in real time.

In which SAP Activate Methodology phase is the Experience Trial accessed by customers (Only 1 answer is correct). Discover. Explore. Prepare. Realize.

What are some characteristics of SAP S/4HANA Cloud (2 answers are correct). SAP S/4HANA Cloud is single-tenant; meaning your service runs in a dedicated environment. SAP S/4HANA Cloud is multi-tenant, meaning your service runs in a shared environment. SAP S/4HANA Cloud includes quarterly innovation cycles. SAP S/4HANA Cloud runs in an infrastructure with private, managed services for SAP solutions.

What is the primary function of the Starter System in the Fit-to-Standard workshops (Only 1 answer is correct). To gather the customer's detailed configuration requirements. To provide a secondary sandbox that will be maintained by the customer post go-live. To demonstrate SAP Best Practices. To configure and test the solution in a sandbox.

What are the three elements of SAP Activate? (3 answers are correct). Content. Methodology. Focused Build. Tools.

Where can you find Project Library Accelerators? (Only 1 answer is correct). SAP Cloud Appliance Library. SAP Best Practices Explorer. Fully Activated Appliance. SAP Roadmap Viewer.

How do you create print and interactive forms that look like their paper counterparts (Only 1 answer is correct). Maintain custom forms in the ABAP UI editor. Maintain custom forms in SAP Cloud Platform Forms by Adobe. Maintain custom form content in the Manage Logos and Manage Texts Fiori apps. Maintain custom forms in the Maintain Form Templates Fiori app.

Which of the following is not a characteristic that the quality principles are based on (Only 1 answer is correct). International standard. Experience of Typical Pitfalls. Best Practices. SAP Quality Award example winners.

Which of the following is not correct about Fit/Gap Analysis (2 answers are correct). Validate pre-activate and pre-assembled solution in the development system. Prioritize delta requirements and gaps. Drive towards adopting customers processes. Minimize the needs for rework during realization.

What is the correct order of the SAP Activate Methodology phases? (Only 1 answer is correct). Plan -> Build -> Run -> Sustain. Prepare -> Discover -> Explore -> Realize -> Deploy -> Run. Discover -> Prepare -> Explore -> Realize -> Deploy -> Run. Plan -> Design -> Build -> Operate.

What are some extension item types that can be transported from the Quality system to the Production system? (3 answers are correct). Employee Data. Form Templates. Custom Fields. Query Designer Report. Master Data.

What are some of the defined recommendations for organizational change success (3 answers are correct). Maintain a robust governance structure, especially in the Run phase. Promote the case for change and look forward to avoiding change fatigue. Be aware of cultural and language barriers for regions, countries, and Lines of Business impacted. Don't worry about the scale of change for end users. Collect feedback from employees occasionally.

Which of the following SAP S/4HANA Landscape Transformation options are enabled (3 answers are correct). Migration of selected applications. Migration of business unit. System Upgrade. System consolidation. Security Migration.

In which of the following project phases is it important to plan and schedule data loads followed by load validation activities? (Only 1 answer is correct). Explore. Prepare. Realize. Deploy.

Which of the following are the key responsibilities of the Scrum Master (3 answers are correct). Team protection. Team support. Responsible for the project delivery. Leadership skill. Task initiator.

What is the purpose of the Solution Builder tool in the SAP Activate Guided Configuration (Only 1 answer is correct). To activate the Best Practices content. To personalize activated, ready-to run business processes. To create delta building blocks for complementary content. To create customer-specific scope items.

In which phase of the SAP Activate Methodology does the team complete the System Assessment (Only 1 answer is correct). Explore. Prepare. Realize. Deploy.

Which activities are part of the Design and Configuration application of the SAP Activate methodology (2 answers are correct). Perform Fit/Gap Analysis. Confirm Integration prerequisites. Conduct Scope Validation. Schedule kick-off workshop.

Which of the following is true about a cloud implementation project (2 answers are correct). The entire transport system is kept intact and up and running. The Starter System is specific to SAP S/4HANA Cloud. Starter Systems are not required to be in place for the 'Fit to Standard' workshops. In the prepare phase of a cloud implementation project the project team provide the customer with materials to review as self- enablement.

SAP now offers the ability to deploy and manage solutions in which of the following environments (Only 1 answer is correct). Cloud and On-premise. Cloud. Cloud, On-premise and Hybrid. On-premise.

Which of the following are available in the initial SAP Methodologies JAM Page (2 answers are correct). Task description. Roadmaps. Summary. Accelerators.

Which of the following are the pillars of SAP Activate (3 answers are correct). Guided Configuration. SAP Activate Methodology. SAP Best Practices. SAP Launch Methodology. SAP ASAP Methodology.

In the System conversion to SAP S/4 HANA Deploy phase, which of the following tasks are included (Only 1 answer is correct). Scheduling project plan. Final testing. Interface setup. Hyper care support.

Which of the following statements about Scrum is correct (Only 1 answer is correct). The three ceremonies are sprint planning, daily scrum, sprint review (retrospective). In Scrum, as best practices, we have three main roles, and three artifacts or three ceremonies. In Scrum, the team is Self-organized, define all task necessary for all project life cycle. Scrum Master defines and prioritizes features and gathers requirements.

What types of extensibility are supported directly in the SAP S/4HANA Cloud solution (2 answers are correct). In-App (Key User) Extensibility. Classic Extensibility. Side-by-Side Extensibility. Managed Extensibility.

What is SCRUM of SCRUMS Please choose the correct answer. (Only 1 answer is correct). Alternative to regular SCRUM process for smaller teams. Integration meeting between the various project teams. Frequent inspection of code and configuration prior to quality gates. Mechanism for gathering and validating requirements.

What are some of the training tools / resources available in SAP Learning Hub (3 answers are correct). Live Sessions in SAP Learning Rooms. Learning Center App. SAP Learning Rooms. SAP Best Practice Business Processes. SAP Learning Journeys.