Which operations are possible when you cancel the technical completion of a maintenance order? Note: There are 2 correct answers to this question. Change the priority. Cancel status Released. Book a goods receipt. Change the estimated costs. To which of the following organizational units can you directly assign a maintenance plant?. Standard purchasing organization. Profit center. Personnel area. Controlling area. The maintenance technician wants to document the finished work steps for a technical object in a notification. Which catalog-based option in the notification can be used?. An activity in the notification header. A text in the subject long text screen. A task in the notification item. An entry in the object. In which component do you have to perform most of theconfiguration to set up SAP Asset Manager?. SAP Cloud Platform (BTP). SAP ERP. SAP Mobile Platform. SAP S/4HANA. Which of the following statements are correct regarding a cross-plant planning scenario?. Multiple planning plants are assigned to a maintenance plant. (m:1). Multiple maintenance plants are assigned to a planning plant. (n:1). It is not supported in SAP S/4HANA. It combines maintenance plants in different controlling areas. You want to schedule a performance-based maintenance plan. Which parameters are mandatory? Note: There are 2 correct answers to this question. Shift factors. Start counter reading. Estimated annual performance. Scheduling period. Which of the following are components of cloud-based SAP Intelligent Asset Management? Note: There are 2 correct answers tothis question. SAP Work Manager. Worker safety applications. SAP Asset Manager. SAP Predictive Maintenance and Service. Which parameter in the material master is a prerequisite for refurbishment?. Valuation class 8000. Valuation category C (condition-based). Valuation type H (origin). Valuation category B (in-house/external procurement). You require stock material to carry out maintenance tasks. Which of the following statements regarding material planning in the maintenance order are correct? Note: There are 3 correct answers to this question. Material can be assigned at order header level. A control key for internal workforce is required when assigning stock material to an order operation. Material can be assigned at order operation level. The pick list for materials can be printed before order release. A goods receipt can be entered for a technically completed maintenance order. During the implementation project you need to define the organizational units relevant for Plant Maintenance. Which of the following objects can you directly assign to a maintenance plant? Note: There are 2 correct answers to this question. Storage location. Maintenance work center. Business partner. Maintenance planner group. The planner adds non-stock material in a released maintenance order. Which of the following statements regarding the purchasing process are correct? Note: There are 3 correct answers to this question. The maintenance order can be set to TECO before the invoice is created. A purchase order is created automatically as soon as the order is saved. A purchase requisition can be created automatically as soon as the the order is saved. A goods receipt can be posted after the maintenance order is technically completed. A goods receipt can ONLY be posted for a maintenance order with status REL. The technical completion of the current maintenance order was posted with a delay of 5 days. What happens to the next planned date if you set the shift factor for early completion to 100%?. It is not shifted. It is postponed by 5 days. It is postponed by a full cycle (100%). It will be 5 days earlier. What can you assign in a notification item? Note: There are 2correct answers to this question. Only one object part. One or more object parts. One or more causes of damage. Only one cause of damage. Which of the following statements about breakdown maintenanceare correct? Note: There are 3 correct answers to this question. More than one operation must always be maintained in the maintenance order. Notifications are used for documentation of technical findings and activities performed. Maintenance orders can be created as immediate orders without any planning. Orders always need to be combined with notifications. Orders and notifications can be utilized in combination. You cancel the technical completion of a work order. What are theeffects? Note: There are 2 correct answers to this question. Open purchase orders are recompiled. Open reservations are recompiled. Referenced notifications are put In Process again. Open purchase requisitions are recompiled. Which objects can you use in the safety measure list? Note: Thereare 2 correct answers to this question. Work approval. Permits. Documents. Work clearance documents. You want to set up a scenario for regular maintenance. The first event should take place after 1 year; after that, it is a regular cycle of 6 months. Which parameter do you have to use to map this in thesystem?. Shift factor. Maintenance plan category. Maintenance package offset. Scheduling indicator. The planner adds stock materials in the maintenance order. Which statements regarding reservations in maintenance orders are correct? Note: There are 2 correct answers to this question. Open reservations can be cleared when a maintenance order operation is finally confirmed. For the combination of order type and planner group you can decide when reservations are created. All open reservations are closed when the maintenance order isset to TECO. Reservations are created only after a material availability checkhas been performed. You want to set up a general maintenance task list for inspectionrounds using the overall time confirmation as a simplified way torecord measurement documents. What do you need to do? Note: There are 2 correct answers to this question. Assign a piece of equipment with an allocated measuring point to a task list operation. Assign an inspection lot to the task list header. Assign a measuring point as a production resources/tools(PRT) to a task list operation. Assign an inspection document as PRT to the task list operation. What happens if you change the primary key of a functional location?. The functional location is immediately assigned to a new superior functional location when the new label is entered. The user must define a new labelling system for the new primary key. Changing the superior functional location via alternative labeling is not possible. The user must decide whether the functional location is assigned to a new superior functional location. Which functionalities are available in the SAP Asset Manager for a maintenance worker? Note: There are 2 correct answers to this question. Display maps. Display and maintain technical objects. Change BOM. Create a work order on the ESRI map. Schedule resources. Change task list. Confirm time sheets. Attach documents. Where can the maintenance planner perform a material availability check? Note: There are 2 correct answers to this question. Via the Manage Maintenance Order List SAP Fiori app. Via the Change Maintenance Order SAP Fiori app. Within the SAP Fiori-based background job. Via the multi-level order list (SAP GUI). You want to create a single cycle plan with a cycle of 12 months. You use the Time - key date scheduling indicator. The orders should be called 3 months before the planned date. How can you setup the maintenance plan? Note: There are 2 correct answers to this question. Set the call horizon to 75%. Set the call horizon to 25%. Set the call horizon to 90 days. Set the offset to 3 months. How does the work center influence cost calculation in the maintenance order? Note: There are 2 correct answers to this question. Via organizational unit and personal hourly rate. Via activity type and hourly rate. Via business partner and hourly price. Via cost center and activity type. Which objects have been enhanced with linear data in maintenance processes? Note: There are 3 correct answers to this question. Work order confirmation. Maintenance plan header. Measurement document. Maintenance plan item. Equipment task list. Which statements are correct for standard processes in PM/PS costcontrol? Note: There are 2 correct answers to this question. Budget can be assigned to a WBS element. Maintenance costs can be settled to a network operation. Maintenance order costs can be settled to a WBS element. Budget can be assigned to a maintenance plan. Which SAP UI technology is used for the technicians job list?. SAP GUI for Windows. Web Dynpro. SAPUI5. SAP GUI for HTML. Which statement is correct about the SAP Fiori tile group? Note:There are 2 correct answers to this question. It can be assigned directly to the user via personalization. It is assigned via a portal role. lt provides only SAPUI5-based apps. It is based on an SAP Fiori tile catalog. What are the prerequisites to serialize a piece of equipment? Note:There are 3 correct answers to this question. Assign a serial number profile to the related material master. Assign a serial number profile to the equipment category. Add a serialized material to the equipment serial data view. Maintain a serial number for an existing equipment master. Add a serialized material to the construction type field of the equipment master. Which of the following can you assign to an equipment category via a view profile? Note: There are 2 correct answers to this question. Configuration. Manufacturer data. Serial data. Warranty. What is the goal of embedded analytics in SAP S/4HANA?. Combine the HANA database with SAP BW InfoProviders. Integrate SAP BusinessObjects Business Intelligence into SAP S/4HANA. Combine transactional and analytical processing. Integrate SAP BW into SAP S/4HANA. Which statements regarding a maintenance order with status REL are correct? Note: There are 3 correct answers to this question. The planner can change estimated costs only at header level. Shop papers can only be printed after the order release. Goods receipts for external services can be entered. The controller can determine actual cost surcharges. The planner can change planned costs at operation level. What does a virtual data model provides?. A copy of the database optimized for analytical purpose. Ready to use business reports. Consumption ready views of data. Reporting tools for users. Which functions are available in the Resource Scheduling for Maintenance Planners app? Note: There are 2 correct answers to this question. Cancel dispatched maintenance order operations. Schedule and dispatch maintenance operations by shifts. Monitor maintenance order operations due in the next 4 weeks. Print job papers from a maintenance order. A piece of equipment cannot be linked to a material. Determine whether this statement is true orfalse. True. False. Which of the following objects can you directly assign when you define the work center? Note: There are 2 correct answers to this question. Fixed price of the activity type. Capacity category. Organizational unit (HR). Calculation key. Which parameter in a maintenance strategy do you use to set the start/end date of the maintenance order?. Initial/subsequent buffer. Package offset. Call horizon. Package hierarchy. You want to display additional document information within the document flow of a maintenance order. For which type of documentmust this be customized?. Invoice. Service entry sheet. Purchase order. Goods movement. You need to create a new functional location. Which actions can you perform with the SAP Fiori app Create Technical Object? Note:There are 3 correct answers to this question. Edit classification data and characteristics. Change a reference location. Assign a subordinate piece of equipment. Assign documents. Create a measuring point. Which actions can you perform with the Create Technical Object SAP Fiori app?. Change a reference location. Edit classification data and characteristics. Display asset viewer. Assign documents. Create measuring point. Which steps are available for the maintenance technician when using the Report Malfunction tile? Note: There are 3 correct answersto this question. Select and print the maintenance order shop papers. Display the current location of the technical object. Add a URL to provide further information. View details of the technical object by navigating to the Asset Viewer. Input estimated costs for repair malfunction. You want to display vehicle-specific data for a piece of equipment. How do you proceed?. Assign a view profile to an equipment category for fleet equipment. Assign a view profile to the combination of fleet object type and equipment category. Define the field selection for the vehicle equipment master data. Assign a view profile to the combination of fleet object type and usage type. Which statements are correct about UI technologies in SAP S/4HANA Asset Management? Note: There are 2 correct answers to this question. Web Dynpro apps can be used in the SAP Fiori launchpad. The cloud version can also use SAP GUI for Windows. SAP GUI transactions can be used in the SAP Fiori launchpad. SAP Fiori launchpad only supports SAP UI5 apps. What is the correct receiver object type for the settlement of arefurbishment order?. The fixed asset. The cost center. The material. The WBS element. How does a performance-based maintenance plan calculate the interval between start date and planned date?. Cycle length divided by annual performance. Cycle length divided by monthly performance. Cycle length divided by ((scheduling period) x (cycle modification factor)). Cycle length divided by (annual performance / 365). Which of the following statements are correct for SAP S/4HANACIoud - Asset Management? Note: There are 2 correct answers to this question. You do NOT have access to the SAP S/4HANA back end system. You have access to the SAP S/4HANA back end system. You can configure SAP S/4HANA Cloud via the SAP Asset Intelligence Network. You can configure SAP S/4HANA Cloud via the self-service configuration UI. Which scheduling parameters are used in a multiple-counter plan? Note: There are 2 correct answers to this question. Scheduling period. Factory calendar. Start date. Scheduling indicator. You are analyzing the data transfer of the cost center of an equipment. What are the possible data origins? Note: There are 2correct answers to this question. The reference functional location of the superior functional location. The individual maintenance of the cost center in the equipment master record. The cost center of the related maintenance work center. The cost center of the superior equipment. Which valuation category do you use to refurbish a material?. Origin. Retail. Condition-based. In-house/external procurement. Which statements about the structure indicator are correct? Note:There are 2 correct answers to this question. It defines the allowed characters for a functional location. It can have a maximum length of 50 characters. It defines hierarchy levels of the functional location structure. It defines which data is transferred to the lower levels of the hierarchy. You want to assign a maintenance planning plant directly to an organizational unit. Which of the following units can you use?. Maintenance work center. Maintenance planner groups. Location. Controlling area. What can be determined using the offset within a maintenancestrategy?. The cycle duration. The first due date of a maintenance package. The start date of the maintenance order. The call date for the maintenance order. Which steps support the maintenance technician in the Report andRepair Malfunction Fiori app (3 tiles)? Note: There are 3 correct answers to this question. Complete the malfunction report. Plan repair work for responsible work center. Assign production resource tool (PRT) to operation. Verify planned and actual costs. Find malfunction records already created in a list. Which activities can the planner perform by using the Maintenance Planning Overview app with the default filters? Note:There are 3 correct answers to this question. Display approved purchase requisitions for which purchase orders have been generated. Display approved purchase requisitions for which NO purchase orders have been generated. Analyze maintenance orders that are still in planning andhave NOT been released. Analyze overdue maintenance orders that have NOT been finally confirmed. Analyze confirmed maintenance orders that have NOT been settled. Which statement is correct when planning maintenance work thatis to be carried out by an external company?. In the control key assigned to the order operation, the "Service" indicator must always be activated. A service master record must always be assigned to the external order operation. If you assign a control key with indicator "Service" for an external service, you have to enter the actual values via the service entry sheet. If you assign a control key for an external order operation, the actual values must always be entered as a goods receipt in the system. What is the function of the print diversion setting?. It enables you to define which shop papers are printed as a system default. It enables you to determine which papers are printed for the technician. It tells the system that a shop paper for an order is ready to be printed. It enables you to chose a printer based on certain fields in the order. How do you set up the visible tiles for a specific user in SAP Fiori launchpad? Note: There are 2 correct answers to this question. By assigning a PFCG role with an SAP Fiori catalog. By assigning a PFCG role with an SAP Fiori tile group. By assigning a portal role with an SAP Fiori catalog. By assigning the tiles directly. Which of the following parameters are available when you define a new maintenance plan category? Note: There are 3 correct answers to this question. Call object. Maintenance activity type. Order type. Completion date. Change documents. The maintenance engineer creates a strategy plan with the call object maintenance order. Shift factors are set to 100%. Which date is relevant for the calculation of future planned dates if the maintenance work is delayed?. Technical completion date of the maintenance order. Date of the final time confirmation. Planned end date of the maintenance order. Planned date of the next call, independent of maintenance order dates. The maintenance engineer creates a single cycle plan with the following parameters: The call object is maintenance order The indicator for separate completion of maintenance call date is NOT set The indicator for completion requirement is NOT activated Both shift factors are set to 100% Which date is relevant for the calculation of further planned dates for call objects?. Completion date of the maintenance plan. Technical completion date of the maintenance order. Planned date of the next call number. Basic finish date of the maintenance order. Which statements related to the creation of maintenance orders are correct? Note: There are 2 correct answers to this question. The document within the document management system canbe assigned only at operational level. The long text of the reference notification can be automatically copied as the long text of the order. The assignment of the header notification to an order CANNOTbe deleted. When an order is created based on a single notification, this notification becomes the header notification. What is a valid partner type within the partner determination procedure?. Purchasing organization. Business partner (gen. Purchasing group. Vendor (external). In which maintenance object can you use an activity type? Note:There are 2 correct answers to this question. Maintenance order operation. Maintenance order header. Notification activity. Work center. You want to create a maintenance order with an external order operation with service items. Which of the following statements are correct? Note: There are 3 correct answers to this question. The usage of a model service specification is mandatory. The assignment of a control key with the service indicator set is mandatory. The actual value entry can only be recorded via the service entrysheet. The assignment of service master records to an order operation is optional. The assignment of a service master record is mandatory. How do you map a counter replacement in SAP S/4HANA Asset Management?. Replace the defective piece of equipment to which a counter is assigned. Create a new measurement document marked as a counter replacement. Create a new measurement document and assign a valuationcode for counter replacement. Deactivate the current counter and create a new counter. You want to have several plan dates calculated in a maintenance plan. Which scheduling parameter do you use?. Call horizon. Lead float. Scheduling period. Scheduling indicator. You have created a new equipment category, "linear", with the corresponding view profile. Which fields appear in the equipment linear data tab? Note: There are 3 correct answers to this question. Object network. Unit of measure. Start marker. Segment. Type of offset. Which of the following statements about orders with operation account assignment (OAA) are correct? Note: There are 3 correct answers to this question. The settlement rule is maintained on header level. Purchase requisitions have the operation as account assignment. A technical object must be assigned to an order operation. Costs are only stored for the operation object. Overall costs are dynamically summed up on header level. Which material type is the best choice if you only want to create a structure element within the BOM?. Spare part (ERSA). Maintenance assembly (IBAU). Non-valuated material (UNBW). Operating supplies (HIBE). You create two maintenance packages and only one package should be executed at a time. Which parameter determines this?. Offset. Subsequent buffer. Hierarchy. Package sequence. You want to assign your maintenance orders to a WBS element. Which of the following statements are correct? Note: There are 2 correct answers to this question. The settlement receiver WBS element can be determined automatically. The assignment is always made to a network activity of the WBS element. The assignment always has to be made manually. The assignment can be made automatically. Which of the following is a prerequisite for external refurbishment?. Select the material group for externally refurbished materials. Activate the subcontracting indicator in an external activity. Define the order type for external refurbishment. Create the purchasing info record for the external provider. What do you need to configure to enable entries in the action log ofan equipment?. Select the time segment check box for the equipment category. Define an additional business view for the equipment category. Define the corresponding history-related field for the equipment reference category. Activate the change documents for the equipment category. You create a revision for a maintenance event builder (MEB) scenario. Which of the following statements are correct? Note: Thereare 2 correct answers to this question. You can assign a network to a revision. You must assign maintenance notifications to the revision. You must use hierarchical task lists for the MEB scenario. You can assign a hierarchical task list to the revision. You create a revision for a Maintenance Event Builder (MEB) scenario. Which objects can you manually assign to a revision? There are 2 correct answers to this question. Automatically created maintenance orders from a Maintenance Plan. Manually created maintenance orders. Automatically created notifications from a Maintenance Plan. Manually created notifications. Where can you see the results of the material availability check for maintenance orders? Note: There are 2 correct answers to this question. In the single-level list editing function for maintenance orders. In the report Material: Where-Used List. Within a maintenance order. In the material reservation list in inventory management. Which of the following are standard functionalities of SAP Asset Manager? Note: There are 3 correct answers to this question. Work orders and operations. Technical objects. Breakdown analytics. ESRI maps. Cost analytics. You want to view transactional and analytical processing data in the Technical Object Breakdowns SAP Fiori app. What is the source of the information?. InfoSet for SAP Query. BW query. Core Data Services (CDS view). BW InfoCube. Which operations can the responsible person perform after a maintenance order is technically completed? Note: There are 3correct answers to this question. Change the planned costs. Change the settlement rule. Lock or unlock the order. Create an invoice receipt for delivered materials. Update the estimated costs. Which activities can the technician perform with the Repair Malfunction SAPUI5 app? Note: There are 2 correct answers to thisquestion. Release. Print. Put in Process. Schedule. Release. Start Work. Complete. Close Report. Which functionalities belong to the current portfolio of SAP Business Objects Business Intelligence? Note: There are 2 correct answers to this question. SAP Crystal Reports. SAP QuickViewer. Plant Maintenance Information Systems (PMIS). SAP Lumira. Which of the following BOMs we use to set up spare parts planning of functional locations. Maintenance BOM. Costing BOM. Construction BOM. Production BOM. You want to assign components to an equipment task list. There is no BOM assigned to the equipment. What is the prerequisite for using the free assignment of material?. OTRA. Assign the header material of a material BOM to the equipment task list header. Assign the header material of a material BOM as assembly to a task list operation. Assign the BOM usage for free assignment of material in Customizing. Free assignment of material is always possible without any prerequisites. You want to see historical information relating to the phases when equipment was installed at a functional location. Where can you find this information?. Historical Orders list. Structure Display. Location Analysis list. Usage list. Which objects can a personnel number be assigned to directly?Note: There are 2 correct answers to this question. Planner group. Work center. Business partner. Equipment. Which of the following statements about SAP Asset Manager are true? Note: There are 3 correct answers to this question. SAP Asset Manager can run on smart watches. SAP Asset Manager is available for Windows platform. SAP Asset Manager provides single sign-on functionality. SAP Asset Manager can be used offline. SAP Asset Manager is available for SAP S/4HANA and SAPERP. In which cases are projects (PS) used in the area of SAP S/4HANAAsset Management? Note: There are 2 correct answers to this question. Condition-based maintenance. Investments. Shutdowns and overhaul. External refurbishment. In which of the following locations can object information can be found?. In master record of technical object. In document. In Notification. In Order. You want to create a new functional location. Which configurationsteps are required? Note: There are 2 correct answers to this question. Define the functional location category. Define the number range for the functional location category. Define the reference functional location. Define the structure indicator. |