ARSOR 23
|
|
Title of test:
![]() ARSOR 23 Description: ARSOR 23 |



| New Comment |
|---|
NO RECORDS |
|
Which are the benefits of using advanced conditions instead of basic conditions? Note: There are 2 correct answers to this question. Ability to use fields from the sourcing project header. Ability to apply conditions to specific suppliers. Ability to include multiple questions. Ability to assign conditional expressions. In a multistage event, what is the purpose of running an RFI before conducting an RFP or an auction? Note: There are 2 correct answers to this question. To narrow the list of suppliers to invite to later events. To gather pricing and capability information. To gain a preliminary bid from each supplier. To verify if suppliers can meet the specifications. Which of the following price attributes will be used in calculating the savings within a line item?. Ceiling/ floor value. Reserve price. Initial response. Historic price. Which steps are required to set up a total cost term? Note: There are 3 correct answers to this question. Create a line item within the event. Designate if the term is an adder, subtractor, multiplier, or percentage discount. Set the answer type and acceptable value for all non-numeric terms. Add each term to the event template. Access the Sourcing Library for a list of approved terms. Which of the following methods can be used to add suppliers to a sourcing event? Note: There are 2 correct answer to this question. Added automatically from a test event. Search for suppliers using the UI (Invite Participant button). Added automatically from an SAP Ariba Discovery posting. Added manually via Excel import. You are a consultant on an SAP S/4HANA Cloud green field project. Which of the following aspects should you focus on to achieve and maintain clean core data quality? Note: There are 2 correct answers to this question. Timeliness. Stability. Efficiency. Accuracy. Which action can a user in the Materials Manager group perform?. Enter estimated pricing for materials. Create quote requests for materials they own. Create quote requests for materials. Assign contract manufacturers to BOMs. Once the sourcing request is fully approved, which of the following data is copied into the sourcing project from the sourcing request. Note: There are 2 correct answers to this question. Departments. Name. Process status. Currency. You are a consultant on an SAP S/4HANA Cloud greenfield project. As part of their clean core journey, the customer must to eliminate redundant systems and establish an efficient architectural design. Which of the following can you use to do the analysis?. SAP Best Practices. Which of the following considerations should you keep in mind when using auction templates? Note: There are 2 correct answers to this question. Runs over a short period of time. When there is a significant difference between the expected price of item and the actual price. Expected low competition between strategic and preferred suppliers. Price is the most important factor. |




