How does the work center influence cost calculation in the maintenance order? Note: There are 2 correct Answers to this question. Via organizational unit and personal hourly rate. Via activity type and hourly rate. Via business partner and hourly price. Via cost center and activity type.

Which options do you have to allow the assignment of order operation to object list entries? choose 3 answer. To all notification. Only to notification created via maintenance plans. To all maintenance plans. To all task list. To all object list entries.

Which of the following is not a Customizing setting for order types? 1 answer. Residence time. Settlement profile. Settlement rule. Structure indicator. Planning plant.

What are the effects when theplanner technically complete the maintenance order? choose 2 answers. The technician CANNOT create time confirmations. The system deletes open purchase order. The system close open reservations. The planner CANNOT add an order operation.

You are planning maintenance execution on the emplyee level. Which combination of SAP objects is mandatory within SAP S/4 HANA? choose 1 answer. Planner group and personnel number. SAP user and personnel number. Business partenerand personnel number. Organizational unit and personnel number.

You want to set up a scenario for regular maintenance. The first event should take place after 1 year; after that, it is a regular cycle of 6 months. Which parameter do you have to use to map this in the system? 1 answer. Scheduling indicator. Maintenance package offset. Maintenance plan category. Shift factor.

You want to see historical information relating to the phases when equipment was installed at a functional location. Where can you find this information? 1 answer. Object Statistics. Structure Display. Location Analysis List. Usage List.

Which of the following can you assign to an equipment category via a view profile? Note: There are 2 correct Answers to this question. Manufacturer data. Serial data. Warranty. Configuration.

Which of the following statements about breakdown maintenance are correct? Note: There are 3 correct Answers to this question. More than one operation must always be maintained in the maintenance order. Orders and notifications can be used in combination. Notifications are used for documentation of technical findings and activities performed. Orders always need to be combined with notifications. Maintenance orders can be created as immediate orders without any planning.

Which operations can the responsible person preform after a maintenance order in technically completed? choose 3 answers. Lock or unlock the order. Change the planned cost. Update the estimate cost. Create invoice receipt for delivered material. Change the settlement rule.

Which feature does SAP S/4HANA include? choose 2 answer. Support of any database. Unchanged data model. In-memory platform. SAPUI5-Based UI.

Once the Job Card is printed, the status of the order changes to __________. TECO. Conf. JIPR. TTJL.

How does the work center influence cost calculation in the maintenance order? Note: There are 2 correct Answers to this question. Via activity type and hourly rate. Via cost center and activity type. Via organizational unit and personal hourly rate. Via business partner and hourly price.

You need to create a new functional location. Which actions can you perform with the SAP Fiori app "Create Technical Object"? Note: There are 3 correct Answers to this question. Assign documents. Edit classification data and characteristics. Create a task list for functional location. Assign a subordinate piece of equipment. Change a reference location.

Which statements are correct for standard processes in PM/PS cost control? Note: There are 2 correct Answers to this question. Maintenance order costs can be settled to a WBS element. Budget can be assigned to a maintenance plan. Maintenance costs can be settled to a network operation. Budget can be assigned to a WBS element.

The planner adds non-stock material in a released maintenance order. Which of the following statements regarding the purchasing process are correct? Note: There are 3 correct Answers to this question. The maintenance order can be set to TECO before the invoice is created. A purchase order is created automatically as soon as the order is saved. A purchase requisition can be created automatically as soon as the order is saved. A goods receipt can be posted after the maintenance order is technically completed. A goods receipt can ONLY be posted for a maintenance order with status REL.

Which statements regarding a maintenance order with status REL are correct? Note: There are 3 correct Answers to this question. Shop papers can be printed only after the order release. The controller can determine actual cost surcharges. Goods receipts for external services can be entered. The planner can change planned costs at the operation level. The planner can change estimated costs only at the header level.

You want to display vehicle-specific data for a piece of equipment. How do you proceed? 1 answer: Assign a view profile to the combination of equipment category and vehicle class. Assign a view profile to an equipment category for fleet equipment. Assign a view profile to the combination of fleet object type and equipment category. Define the field selection for the vehicle equipment master data.

Which steps are available for the maintenance technician when using the Report Malfunction tile? Note: There are 3 correct Answers to this question. View details of the technical object by navigating to the Asset Viewer. Input estimated costs for repair malfunction. Add a URL to provide further information. Select and print the maintenance order shop papers. Display the current location of the technical object.

Which operations can the responsible person perform after a maintenance order is technically completed? Note: There are 3 correct Answers to this question. Create an invoice receipt for delivered materials. Change the planned costs. Update the estimated costs. Lock or unlock the order. Change the settlement rule.

How do you set up the visible tiles for a specific user in SAP Fiori launchpad? Note: There are 2 correct Answers to this question. By assigning a PFCG role with an SAP Fiori tile group. By assigning the tiles directly. By assigning a PFCG role with an SAP Fiori catalog. By assigning a portal role with an SAP Fiori catalog.

To which objects can a personnel number be directly assigned? Note: There are 2 correct Answers to this question. Equipment. Planner group. Work center. Business partner.

You want to set up a scenario for regular maintenance. The first event should take place after 1 year; after that, it is a regular cycle of 6 months. Which parameter do you have to use to map this in the system? 1 answer. Shift factor. Maintenance plan category. Scheduling indicator. Maintenance package offset.

The maintenance technician wants to document work steps for a technical object in a notification. What are the best options to be used in regard to code-based reporting? Note: There are 2 correct Answers to this question. An activity in the notification header. A task in the notification item. An entry in the object list. A text in the subject long text screen.

You create two maintenance packages and only one package should be executed at a time. Which parameter determines this? 1 answer. Lead flow. Hierarchy. Package sequence. Cycle set sequence.

Which material type is the best choice if you only want to create a structure element within the BOM? 1 answer. Maintenance Assembly (IBAU). Manufacturer Part (HERS). Compatible Unit (CBAU). Spare Part (ERSA).

What are the prerequisites for serializing a piece of equipment? Note: There are 3 correct Answers to this question. Add a serialized material to the construction type field of the equipment master. Assign a serial number profile to the related material master. Maintain a serial number for an existing equipment master. Assign a serial number profile to the equipment category. Add a serialized material to the equipment serial data view.

Which activities can the technician perform with the Report and Repair Malfunction SAPUI5 app? Note: There are 2 correct Answers to this question. Complete Close Report. Release Print. Release Start Work. Put in Process Schedule.

Which steps support the maintenance technician in the Report and Repair Malfunction app (3 tiles)? Note: There are 3 correct Answers to this question. Complete the malfunction report. Assign a production resource tool (PRT) to the operation. Find malfunction records already created in a list. Verify planned and actual costs. Plan repair work for the responsible work center.

The technical completion of the current maintenance order was posted with a delay of 5 days. What happens to the next planned date if you set the shift factor for early completion to 100%? 1 answer. It will be 5 days earlier. It is not shifted. It is postponed by 5 days. It is postponed by a full cycle (100%).

You want to assign a maintenance planning plant directly to an organizational unit. Which of the following units can you use? 1 answer. Controlling area. Maintenance planner groups. Maintenance work center. Location.

You cancel the technical completion of a work order. What are the effects? Note: There are 2 correct Answers to this question. Referenced notifications are put In Process again. Open purchase orders are recompiled. Open purchase requisitions are recompiled. Open reservations are recompiled.

Which functionalities belong to the current portfolio of SAP BusinessObjects Business Intelligence? Note: There are 2 correct Answers to this question. SAP Lumira. Plant Maintenance Information Systems (PMIS). SAP Quick Viewer. SAP Crystal Reports.

To which objects can a personnel number be directly assigned? Note: There are 2 correct Answers to this question. Planner group. Equipment. Business partner. Work center.

Which statement is correct when planning maintenance work that is to be carried out by an external company? 1 answer. If you assign a control key for an external order operation, the actual values must always be entered as a goods receipt in the system. A service master record must always be assigned to the external order operation. If you assign a control key with indicator "Service" for an external service, you have to enter the actual values via the service entry sheet. In the control key assigned to the order operation, the "Service" indicator must always be activated.

Which of the following statements about SAP Asset Manager are true? Note: There are 3 correct Answers to this question. SAP Asset Manager is available for SAP S/4HANA and SAP ERP. SAP Asset Manager can be used offline. SAP Asset Manager provides single sign-on functionality. SAP Asset Manager is available only for the iOS platform. SAP Asset Manager can run on smart watches.

You have created a new equipment category, "linear", with the corresponding view profile. Which fields appear in the equipment linear data tab? Note: There are 3 correct Answers to this question. Object network. Segment. Type of offset. Start marker. Unit of measure.

Which functions are available in the Resource Scheduling for Maintenance Planners app? Note: There are 2 correct Answers to this question. Monitor maintenance order operations due in the next 4 weeks. Cancel dispatched maintenance order operations. Schedule and dispatch maintenance operations by shifts. Print job papers from a maintenance order.

Which objects can you use in the safety measure list? Note: There are 2 correct Answers to this question. Documents. Permits. Work approval. Work clearance documents.

You require stock material to carry out maintenance tasks. Which of the following statements regarding material planning in the maintenance order are correct? Note: There are 3 correct Answers to this question. A goods receipt can be entered for a technically completed maintenance order. Material can be assigned at the order operation level. A control key for internal workforce is required when assigning stock material to an order operation. The pick list for materials can be printed before order release. Material can be assigned at the order header level.

Which objects have been enhanced with linear data in maintenance processes? Note: There are 3 correct Answers to this question. Maintenance plan item. Maintenance plan header. Measurement document. Work order confirmation. Equipment task list.

Which of the following parameters are available when you define a new maintenance plan category? Note: There are 3 correct Answers to this question. Change documents. Maintenance activity type. Call object. Order type. Completion date.

What can be determined using the offset within a maintenance strategy? Note: There are 1 correct answer. The scheduled start date of the maintenance order. The call date for the maintenance order. The basic start date of the maintenance order. The first due date of a maintenance package.

You want to assign a maintenance planning plant directly to an organizational unit. Which of the following units can you use? Note: There are 1 correct answer. Maintenance planner groups. Maintenance work center. Location. Controlling area.

Which parameter in the material master is a prerequisite for refurbishment? 1 answer. Valuation class 8000. Valuation category B (in-house/external procurement). Valuation type H (origin). Valuation category C (condition-based).

The maintenance engineer creates a strategy plan with the call object maintenance order. Shift factors are set to 100%. Which date is relevant for the calculation of future planned dates if the maintenance work is delayed? 1 answer. Planned end date of the maintenance order. Planned date of the next call, independent of maintenance order dates. Actual finish date of the maintenance order. Technical completion date of the maintenance order.

You want to display additional document information within the document flow of a maintenance order. For which type of document must this be customized? 1 answer. Purchase order. Invoice. Goods movement. Service entry sheet.

In which maintenance object can you use an activity type? Note: There are 2 correct Answers to this. Maintenance order operation. Maintenance order header. Work center. Notification activity.

You want to set up a scenario for regular maintenance. The first event should take place after 1 year; after that, it is a regular cycle of 6 months. Which parameter do you have to use to map this in the system? 1 answer. Maintenance plan category. Scheduling indicator. Maintenance package offset. Shift factor.

You want to schedule a performance-based maintenance plan. Which parameters are mandatory? Note: There are 2 correct Answers to this question. Start counter reading. Estimated annual performance. Scheduling period. Counter overflow reading.

Which functions are available in the Resource Scheduling for Maintenance Planners app? Note: There are 2 correct Answers to this question. Cancel dispatched maintenance order operations. Print job papers from a maintenance order. Schedule and dispatch maintenance operations by shifts. Monitor maintenance order operations due in the next 4 weeks.

Which of the following can you assign to an equipment category via a view profile? Note: There are 2 correct Answers to this question. Warranty. Configuration. Serial data. Manufacturer data.

Which steps are available for the maintenance technician when using the Report Malfunction tile? Note: There are 3 correct Answers to this question. Input estimated costs for repair malfunction. Display the current location of the technical object. View details of the technical object by navigating to the Asset Viewer. Add a URL to provide further information. Select and print the maintenance order shop papers.

You want to create a single-cycle plan with a cycle of 12 months. You use the scheduling indicator Time - key date. The orders should be called 3 months before the planned date. How can you set up the maintenance plan? Note: There are 1 correct answer to this question. Set the offset to 3 months. Set the call horizon to 75%. Set the call horizon to 90 days. Set the call horizon to 25%.

You want to see historical information relating to the phases when equipment was installed at a functional location. Where can you find this information? Note: There are 1 correct answer to this question. Structure Display. Location Analysis List. Usage List. Object Statistics.

Which statements are correct for standard processes in PM/PS cost control? Note: There are 2 correct answers to this question. Budget can be assigned to a WBS element. Maintenance order costs can be settled to a WBS element. Budget can be assigned to a maintenance plan. Maintenance costs can be settled to a network operation.

You want to display additional document information within the document flow of a maintenance order. For which type of document must this be customized? Note: There are 1 correct answer to this question. Purchase order. Invoice. Goods movement. Service entry sheet.

Where can you see the results of the material availability check for maintenance orders? Note: There are 2 correct Answers to this question. In the report Material: Where-Used List. Within a maintenance order. In the material reservation list in inventory management. In the list editing (single-level) for maintenance orders.

You have created a new equipment category, "linear", with the corresponding view profile. Which fields appear in the equipment linear data tab? Note: There are 3 correct Answers to this question. Segment. Start marker. Type of offset. Object network. Unit of measure.

The planner adds stock materials in the maintenance order. Which statements regarding reservations in maintenance orders are correct? Note: There are 2 correct Answers to this question. Open reservations can be cleared when a maintenance order operation is finally confirmed. For the combination of order type and planner group, you can decide when reservations are created. All open reservations are closed when the maintenance order is set to TECO. Reservations are created only after a material availability check has been performed.