C_TS422_2504 Private cloud production planning

COMMENTS STATISTICS RECORDS
TAKE THE TEST
Title of test:
C_TS422_2504 Private cloud production planning

Description:
C_TS422 - SAP Certified Associate - SAP S/4HANA Cloud Private Edition, Product

Creation Date: 2025/06/28

Category: Others

Number of questions: 80

Rating:(0)
Share the Test:
Nuevo ComentarioNuevo Comentario
New Comment
NO RECORDS
Content:

Which of the following elements does MRP take into account during net requirement calculation?. Production orders. Planned orders (firmed). Planned orders (unfirmed). ATP quantities.

In documentation for MRP in Advanced Planning, you read that new orders are created through infinite planning. What does this mean for the capacity requirements of a new order?. MRP assigns the capacity requirements automatically to work centers with the earliest available capacity. MRP creates the capacity requirements without considering existing load on the work centers. MRP assigns the capacity requirements automatically after the last scheduled operation for each work center. MRP creates the capacity requirements at the earliest possible time.

Which master data fields can have an impact on whether MRP creates planned orders or purchase requisitions for a material? Note: There are 2 correct answers to this question. Procurement type. MRP type. Material type. MRP group.

You have a scheduling agreement with a vendor. You want classic MRP to automatically create schedule lines in case of material shortage. What must you do? Note: There are 2 correct answers to this question. Add the agreement to the source list and mark it for MRP relevance. Set the creation indicator for purchase requisitions on the initial screen of the MRP run. Set the creation indicator for delivery schedule lines on the initial screen of the MRP run. Add the agreement to the quota arrangement and mark it for MRP relevance.

How are dependent requirements for assemblies created? Note: There are 2 correct answers to this question. They are created together with the independent requirement for the finished product. They are created on assembly level during the planning run. They are created with exact times in Advanced Planning. They are only created for multilevel bill of material (BOM) structures.

Which time elements does MRP consider in backward scheduling to determine the basic dates for components from depender Note: There are 2 correct answers to this question. Planned delivery time. Total replenishment lead time. Operation duration. In-house production time.

In your plant, MRP is activated. Which options do you have to exclude a material from the MRP run? Note: There are 2 correct answers to this question. Use a specific MRP list. Use a specific material status. Use a specific material group. Use a specific MRP type.

What determines whether the planned independent requirements in demand management are consumed by other requirements? Note: There are 2 correct answers to this question. Order type. Requirements profile. Requirements type. Planning strategy.

What does forecasting in the demand planning cycle include? Note: There are 3 correct answers to this question. One-off events. Past production planning quantities. Past quotation quantities. Past sales order quantities. Market intelligence.

Which SAP applications can be used for forecasting in Supply Chain Planning? Note: There are 2 correct answers to this question. Capacity Requirements Planning (CRP). Integrated Business Planning (IBP). Material Requirements Planning (MRP). Supply Chain Management (SCM).

What will happen in the MRP run if you have created a new MRP-relevant material that supports both in-house production and external procurement. The MRP run assumes external procurement. The MRP run assumes in-house production. The MRP run plans the material only if a quotation has been maintained. The MRP run does NOT consider the material; it has to be planned interactively.

Where does the system check master data selection settings during the creation of planned orders and production orders? Note: There are 3 correct answers to this question. In the bill of material (BOM). In the MRP controller. In the production version. In the work centers. In the routing.

During production order creation, several valid production versions are found. How does the system choose the production version. Lot size or material cost. Planned order or material number. Alphanumeric or quota arrangement. Validity period or sales order.

How can a material availability check be triggered automatically for a production order? Note: There are 2 correct answers to this question. By capacity planning. By order release. By mass processing. By order confirmation.

For a production version to be valid and consistent, what requirements must be fulfilled? Note: There are 3 correct answers to this question. The deletion flag must NOT be set for the bill of material (BOM) or the routing. The assigned routing and bill of material (BOM) must have the same validity period. The consistency check must be performed. The lot size range must be within the lot size range of the assigned routing. The assigned routing and bill of material (BOM) must be valid in the entire validity period.

You want to use capacity availability checks for production orders. Which settings have to be made for this? Note: There are 2 correct answers to this question. The Relevant for Finite Scheduling indicator must be set. An overall profile must be assigned in the checking control. A checking rule must be assigned to the work centers. The scope of check must be defined in Customizing.

Which business processes are affected by settings in the order-type-dependent parameters? Note: There are 2 correct answers to this question. Schedule production orders. Check material availability. Select master data. Define integration with cost accounting.

For production orders, cost object controlling (COC) can be carried out on an order-related or product- related basis. Which of the following do you have to consider? Note: There are 2 correct answers to this question. Product-related COC is used in manufacturing for co-products. In product-related COC, all costs are debited and credited to a product cost collector. In order-related COC, individual production orders do NOT have cost segments. Order-related COC is beneficial in a flexible production environment.

Which of the following automation options can you use for production orders? Note: There are 2 correct answers to this question. You can use trigger points to automatically create rework orders via confirmations. You can use mass processing to set production orders to technically complete. You can use the production scheduling profile to automatically set orders to technically complete. You can use mass processing to read PP master data for production orders.

You want to create a production order. What methods can you use? Note: There are 2 correct answers to this question. Convert a purchase requisition. Create without material. Create by order release. Create in Kanban process.

You are trying to create a production order and NO valid production version can be selected. What could be the reasons? Note: There are 2 correct answers to this question. The order lot size is NOT within the validity range of a production version. All production versions for the material are locked. NO production lines are assigned to the production versions. NO bills of material (BOMs) are assigned to the production versions.

What are the advantages of collective orders? Note: There are 2 correct answers to this question. To perform availability checks across the entire collective order. To coordinate orders in the planning board for a collective order. To show the flow of batches across the entire collective order. To post confirmations for the entire collective order.

What is a prerequisite for consumption of planned independent requirements to take place for planning strategy 40 (Planning with final assembly)?. MRP creates a dependent requirement. A sales order is delivered. MRP creates a planned order. A sales order is created.

Where do you maintain data to determine the duration of an operation for production? Note: There are 2 correct answers to this question. Work center. Material master. Routing. Production version.

You want to reduce planning efforts for B and C classified materials. Which planning procedure do you recommend?. Consumption-Based Planning. Subassembly Planning. Advanced Planning. Material Requirements Planning.

What are some benefits of planning with planned independent requirements for finished materials? Note: There are 2 correct answers to this question. Reduced delivery times. Reduced times for final assembly. Option to forecast planning for production resources. Option to use make-to-order production.

Your company produces a finished good based on a forecast and expects it to be in stock when customers order it. If customers order more than the forecasted quantity, this must NOT have any impact on the production program. Which planning strategy do you use?. Assembly processing with production orders (82). Planning with final assembly (40). Planning without final assembly (50). Make-to-stock production (10).

You want to trigger in-house production of a semi-finished material before a sales order for the corresponding finished good is received. Which planning strategy supports the consumption of planned independent requirements by dependent requirements for the semi-finished material?. Assembly processing with production orders (82). Planning with final assembly (40). Production by lot size (30). Planning at assembly level (70).

You want to set up a make-to-order planning scenario for a finished product. The bill of material contains two components: one should be procured for eac sales order individually, and the other should be procured jointly for all independent requirements. Forecasting for the finished product is NOT possible. Which settings do you make to achieve this?. Choose planning strategy 50 (Planning without final assembly) and select the corresponding Individual/Collective indicator. Choose planning strategy 20 (Make-to-Order) and select the corresponding Mixed MRP indicator. Choose planning strategy 50 (Planning without final assembly) and select the corresponding Mixed MRP indicator. Choose planning strategy 20 (Make-to-Order) and select the corresponding Individual/Collective indicator.

Your project team decides to use a make-to-order planning strategy for a strategic material in discrete manufacturing. What are the impacts of this decision? Note: There are 3 correct answers to this question. Net requirements calculation is carried out for every sales order individually. Production orders are created with sales order reference. Storage location MRP areas are required for sales-order-specific stock. Both the reduction of make-to-order stock and requirements occur on delivery. Sales orders have to be ATP-confirmed (available-to-promise) to be saved.

How can you limit the validity of a bill of material (BOM)? Note: There are 2 correct answers to this question. By material type. By plant. By period. By material status.

What is the difference between co-products and by-products? Note: There are 2 correct answers to this question. Only co-products have a non-zero inventory valuation. Only co-products have movement type 531. Only co-products have movement type 101. Only co-products appear in the process or production order settlement rule.

Which of the following questions do you have to answer before you start creating a bill of material (BOM)? Note: There are 2 correct answers to this question. In which storage location is the BOM required?. Is the material type allowed in the BOM?. Which base unit of measure does the material have?. What status does the BOM have?.

How can you set up a material as a phantom assembly? Note: There are 2 correct answers to this question. Select a special procurement type inside the material master. Use a special item category in your material BOM (bill of material). Use a special item category in your material BOM (bill of material). Define the special procurement type inside the material BOM (bill of material).

Under what circumstances can you change the material type for a material if stocks, reservations, or purchasing documents exist? Note: There are 2 correct answers to this question. The quantity and value updates are the same. The same batch management level is used. The same base unit of measure is used. The same account category is used.

Which time elements are part of a routing operation? Note: There are 3 correct answers to this question. Wait time. Float before production. Processing time. Pick time. Setup time.

Which alternative item strategies are available in bills of material (BOMs) in SAP S/4HANA Cloud Private Edition? Note: There are 2 correct answers to this question. First in first out (FIFO). Simultaneous. Manual maintenance. 100% check.

What data can you maintain in the subitems of a bill of material (BOM)? Note: There are 2 correct answers to this question. Quantity. Status. Installation point. Scrap percentage.

Which information is required when you create a product master in SAP S/4HANA Cloud Private Edition? Note: There are 2 correct answers to this question. Base unit of measure. Industry sector. Selection screen for views. Product type.

What could be the reason for different combinations of components in a multiple bill of material (BOM)? Note: There are 2 correct answers to this question. Manufacturing date. BOM header status. BOM component status. Lot size.

What does the material type influence? Note: There are 2 correct answers to this question. Which document types and class categories are allowed. Which plant-specific and plant-independent statuses are allowed. Which material master screens appear and in which sequence. Whether the material is produced in-house, procured externally, or both.

Which standard item categories can you select inside a bill of material (BOM)? Note: There are 2 correct answers to this question. Variable-size item. Work item. Preliminary item. WBS item.

Why would you use phantom assemblies? Note: There are 3 correct answers to this question. To simplify the structure of bills of material. To reduce the number of changes required in bills of material. To reduce the number of material masters. To make the assignment of components easier. To increase the number of planning levels.

What are the key features of using a low level code? Note: There are 2 correct answers to this question. To determine the priority of alternative components inside ATP. To determine how costs are rolled up by product costing. To determine the sequence in which materials are planned in MRP. To determine the use of subitems inside material BOM (bill of material).

You have maintained the parameters for simple discontinuation in the material master of a component. Which business process will be affected if the available stock is zero and the discontinuation date is in the past?. Back flushing. Kanban. Material requirements planning. Production order release.

Why do you use Engineering Change Management? Note: There are 2 correct answers to this question. To monitor and document table changes. To enable integration into a sales order. To save multiple changes for an object. To monitor and document object changes.

Which of the following processes lead to an entry in the MRP planning file? Note: There are 2 correct answers to this question. Changing the delivery address in transportation management. Changing the storage bin in warehouse management. Changing the procurement type in the product master. Changing the stock in inventory management.

What are the possible results of a production planning run in Advanced Planning (PP/DS)? Note: There are 2 correct answers to this question. Planned order. Scheduling agreement schedule line. Production order. Purchase order.

Advanced Planning uses master data from SAP S/4HANA Cloud Private Edition. In which data objects can you set the Advanced Planning flag? Note: There are 2 correct answers to this question. Work center. Plant. Production version. Material.

What happens when you set up detailed scheduling with the finite scheduling mode Insert Operation? Note: There are 2 correct answers to this question. Scheduling of an operation takes place as close as possible to the desired date. Sequencing on multi-activity resources is automatically updated. Neighboring operations can be moved in both directions in order to create a slot. Changes are automatically implemented in the complete collective order.

Which of the following are possible configuration steps when setting up the alert monitor in Advanced Planning? Note: There are 2 correct answers to this question. Assign the alert profile to the overall profile. Assign the overall profile to the authorization profile. Create an object selection variant for alerts according to the priority of ATP categories. Create an object selection variant for production-planning-related alerts.

How would you define pegging in the context of Advanced Planning?. An evaluation that is ordered according to the bill-of-material structure of all related products and represents the relationship between the receipt and the issue elements. An evaluation to identify overstock situations in the balance between the receipt and the issue elements after the production planning run. An evaluation that is ordered according to the network structure of all related products and represents the coverage of issue elements with receipt elements and stock. An evaluation to identify material or capacity shortages in the bill-of-material structure after the production planning run.

What can you use standard heuristics in Advanced Planning (PP/DS) for?. To automate material movements in material staging. To set default values in production master data. To solve planning problems for defined objects. To optimize costs and times in production plans.

Your production planners are allowed to execute planning only for specific resources. How can you achieve this in Advanced Planning (PP/DS)?. Use a resource group. Use a planning group. Use a propagation range. Use a planning area.

How can you achieve a feasible production plan in case of capacity constraints? Note: There are 3 correct answers to this question. Execute an infinite production planning run for the critical resources. Reduce the planning time interval. Determine a time period with available capacity on the planning board. Increase the capacity supply in a time-phased interval. Form optimum sequences to reduce setup times.

Mode selection is one of the scheduling options available with Advanced Planning in SAP S/4HANA Cloud Private Edition. When can you use mode selection?. When several operations are maintained for one product. When alternative resources are used within one operation. When several production versions are maintained for one product. When multiple planned orders are scheduled in parallel on one resource.

You use planning strategy Finite Scheduling - with Reverse and want to allow scheduling in the past. How can you parameterize this in the strategy profile. Specify a negative offset time. Specify a negative opening period. Specify a negative planning horizon. Specify a negative PP/DS horizon.

You are a consultant on an SAP S/4HANA Cloud brownfield project. In a meeting the customer decides to remodel an existing business process in accordance with clean core principles. Which of the following SAP Signavio solutions can be used for the remodeling?. SAP Signavio Process Insights. SAP Signavio Process Intelligence. SAP Signavio Process Governance. SAP Signavio Process Manager.

You are a consultant on an SAP S/4HANA Cloud Greenfield project. Which of the following aspects should you focus on to achieve and maintain clean core data quality? Note: There are 2 correct answers to this question. Efficiency. Accuracy. Timeliness. Stability.

What are some SAP recommended guiding principles to achieve clean core operations? Note: There are 3 correct answers to this question. Establish an organizational structure, technical foundation, and transformation methodology for clean core. Integrate clean core practices in the end-to-end value process chain. Establish release management. Establish regular housekeeping tasks and procedures. Define roles and responsibilities as part of a process transformation office.

Which of the following are features of the clean core dashboard? Note: There are 2 correct answers to this question. Customers can grant access to the dashboard to partners. Customers can use the dashboard in the dev, test, and production tenants. It can be accessed by using SAP For Me. It can be used in all SAP S/4HANA Cloud editions.

What options does a planner have in the planning table for repetitive manufacturing? Note: There are 2 correct answers to this question. Change the assignments of production quantities to production lines. Create new production quantities. Dispatch operations to work centers. Reschedule and deallocate operations.

Where do you maintain the work center that represents the production line for repetitive manufacturing? Note: There are 2 correct answers to this question. Production cost collector. Production version. Repetitive manufacturing profile. Routing.

What are the prerequisites for a reporting point confirmation in repetitive manufacturing? Note: There are 2 correct answers to this question. Activating the reporting point backflush in the order dependent parameters. Activating the reporting point backflush in the work centers. Defining the relevant work centers in the routing. Defining the operations as reporting points using the control key.

Which options do you have to plan both quantities and capacities during line loading in repetitive manufacturing? Note: There are 2 correct answers to this question. Assign planned orders manually in the planning table. Run MRP with quota arrangement. Run MRP with automatic selection of production version. Run PP/DS heuristics for repetitive manufacturing.

What does a line hierarchy in repetitive manufacturing represent. A production line with more than one work center. A production line with an alternative sequence in the routing. A production line with a parallel sequence in the routing. A production line with prioritized alternative work centers.

How can you set up the supply source for the Kanban process in SAP S/4HANA Cloud Private Edition? Note: There are 3 correct answers to this question. Use run schedule quantities for in-house production. Use stock transfer reservations for stock transfer. Use purchase orders for external procurement. Use quotations for internal and external procurement. Use purchasing costs for automated source prioritization.

Which actions does the system perform by default when you save a confirmation for a finished product in repetitive manufacturing? Note: There are 3 correct answers to this question. Post the goods receipt for the finished product. Reduce run schedule quantities. Post production costs to the planned order. Update statistics for the Business Information Warehouse. Create associated capacity requirements.

What information do you have to maintain to define the relationship between supply source and demand source in the Kanban process? Note: There are 2 correct answers to this question. Routing. Work Center. Replenishment strategy. Production supply area.

What could be the reason for multiple commitments, where several operations have the same scheduled dates on a work center after dispatching? Note: There are 2 correct answers to this question. The Finite Scheduling indicator is NOT set in the strategy profile. The work center has several individual capacities. Alternative work centers are fully occupied. The Change Planning Direction indicator is set in the strategy profile.

What is a work center hierarchy?. A group of alternative work centers for production, structured in hierarchy levels by priorities. A group of alternative work centers providing a cumulative available capacity for production. A group of work centers in a production line being used in sequence for production. A group of work centers in a parallel sequence that is used to split production quantities and work on them in parallel.

What time element of midpoint scheduled operations can be reduced by reduction strategy settings while dispatching? Note: There are 2 correct answers to this question. Queue time. Teardown time. Move time. Setup time.

You want to insert an operation at a certain time on a work center in the graphical planning table. The planning direction is forward. The desired dispatching time coincides with an operation that has previously been dispatched. How does the insertion take place?. The previously dispatched operation stays as is; the new operation is inserted before the dispatched operation. The previously dispatched operation stays as is; the new operation is inserted after the dispatched operation. The new operation is inserted at the desired time; the previously dispatched operation is moved forward. The new operation is inserted at the desired time; the previously dispatched operation is moved backward.

Which chart types does the tabular planning table for capacity planning provide in SAP S/4HANA Cloud Private Edition?. Order (pool) chart. Capacity requirements chart. Orders (dispatched) chart. Work center capacities chart.

What are the options if the Dispatched operation status is set for a production order operation? Note: There are 2 correct answers to this question. You can reschedule the operation using lead time scheduling. You can reschedule the operation using infinite scheduling in a planning table. You can reschedule the operation using finite scheduling in a planning table. You can reschedule the operation in the Manage Work Center Capacity app.

Which time elements are relevant for lead time scheduling of a production order? Note: There are 2 correct answers to this question. Opening period. Total replenishment lead time. Float after production. Setup time.

How can you support a GMP (Good Manufacturing Practice)-compliant production process? Note: There are 3 correct answers to this question. Digital signature. Approved resources. Recipe approval. GMP-compliant flag. Batch record.

Your quality department detects a deviation in a raw material batch. Unfortunately, this batch has already been used in production. How can you identify all affected finished goods stocks? Note: There are 2 correct answers to this question. Use batch determination. Use the Batch Information Cockpit. Use the batch where-used list. Use batch derivation.

Your project uses process orders for the production of liquid chemicals. What can you define to ensure that production flow only happens in suitable and physically connected tanks? Note: There are 2 correct answers to this question. Resource hierarchy. Resource selection. Resource matrix. Resource network.

Your company manufactures materials whose characteristics differ for each manufacturing process. Which application do you have to use in SAP S/4HANA Cloud Private Edition to be able to track and use this information in all areas of logistics?. Process order management. Engineering change management. Quality management. Batch management.