option
Questions
ayuda
daypo
search.php

Sunny Production Planning & Manufacturing

COMMENTS STATISTICS RECORDS
TAKE THE TEST
Title of test:
Sunny Production Planning & Manufacturing

Description:
SAP Production Planning and Manufacturing (PP)

Creation Date: 2021/05/19

Category: Others

Number of questions: 137

Rating:(2)
Share the Test:
Nuevo ComentarioNuevo Comentario
New Comment
Report comment
Have you passed C_TS422_1909?
Answer
END OF LIST
Content:

When would you use reporting point backflush in repetitive manufacturing?Note: There are 2 correct answers to this question. When you need to determine the work in progress. When you require an up-to-date inventory for components. When goods issues can wait for final confirmation. When you have production lines with short lead times.

An MRP run was executed overnight. The next morning an employee posted a goods receipt. Which transaction will show the stock situation prior to the receipt?. The order report. The planning table. The stock/requirements list. The MRP list.

For an in-house scenario, what are characteristics of materials requirements planning in classic ERP? Note: There are 2 correct answers to this question. It uses infinite planning. It generates released production orders. It generates a feasible solution as output. It uses demand elements as input.

Which process order function uses a resource network?. Resource selection. Capacity planning. Capacity leveling. Resource scheduling.

When the goods receipt for a finished product is posted during confirmation in a repetitive manufacturing environment, which of the following actions are also performed by default? Note: There are 2 correct answers to this question. Archiving of backflush documents. Reduction of the capacity requirements. Posting of production costs to cost collector. Staging of components for the next order in the sequence.

Which of the following order types can you define for the Production order category "10"? Note: There are 3 correct answers to this question. CO Production Orders (external number assignment). PP Production Orders (internal number assignment). PP Production Orders (external number assignment). PP Production Orders (special processing). PP Process Orders (internal number assignment).

You are using the document management system (DMS). Where should the DMS document links be assigned to have them automatically copied to production orders? Note: There are 2 correct answers to this question. Routing header. Bill of material. Material master. Work center.

In a first step you have created master recipes. In which sequence are the additional objects created?. Process order. Control recipe. Process message. PI sheet. Control recipe. Process order. Process message. PI sheet. Control recipe. Process order. PI sheet. Process message. Process order. Control recipe. PI sheet. Process message.

Which times are used for Basic Date Scheduling of manufacturing planned orders in MRP? Note: There are 2 correct answers to this question. Setup time. Opening period. Float before and float after production. Goods receipt processing time.

Which functions can you use for capacity leveling in the SAP ERP system? Note: There are 2 correct answers to this question. Detailed scheduling heuristics. Sequence planning. Lead time optimization. Midpoint scheduling.

Which task list types can have parallel sequences? Note: There are 2 correct answers to this question. Rate routings (R). Reference operation sets (S). Routings (N). Master recipes (2).

Which is the correct sequence of steps in the MRP run when a shortage occurs?. Lot size calculation -> Net requirements calculation -> Scheduling -> BOM explosion. BOM explosion -> Lot size calculation -> Net requirements calculation -> Procurement type -> Scheduling. Net requirements calculation -> Lot size calculation -> Procurement type -> Scheduling -> BOM explosion. Procurement type -> Lot size calculation -> Scheduling -> Net requirements calculation -> BOM explosion.

A customer needs to support a scenario in which constrained work center capacities are leveled for the critical materials first. Which planning method is a prerequisite to support such a scenario?. Gross requirements planning. Material requirements planning. Regenerative planning (NEUPL). Master production scheduling.

A warehouse manager likes to streamline the goods receipt (GR) process for production orders. Where can you enable the automatic GR? Note: There are 2 correct answers to this question. Confirmation profile. Scheduling margin key. Production scheduling profile. Operation control key.

Which material master setting is required to use the repetitive planning table for production with production orders?. The Selection Method must be set to "2 Selection by production version". An overall profile must be assigned on the Work Scheduling view. A REM profile must be assigned on the MRP4 view. At least one valid production version must exist on the MRP4 view.

Where can you apply availability checking using the available-to-promise (ATP) logic? Note: There are 3 correct answers to this question. Freight orders. Sales orders. Purchase orders. Goods movements. Production orders.

What type of planning can consider dependent requirements created for consumption based materials, bulk materials and Kanban materials?. MRP - Material Requirements Planning. ATP - Available-to-promise with MRP areas. LTP - Long Term Planning. MPS - Master Production Scheduling.

You are using a "range of coverage" profile to determine the dynamic safety stock for your material. In which situation does a "range of coverage" become ineffective and unable to adjust the safety stock level?. The minimum stock level is exceeded and planned orders are unfirmed. The minimum stock level only is exceeded and all planned orders are firmed. The maximum stock level is exceeded and all planned orders are firmed. The maximum stock level is exceeded and planned orders are unfirmed.

A routing contains 3 operations. Only the last operation is defined as a milestone. You enter a confirmation of the last operation. What happens to the predecessors?. The first two operations are automatically confirmed. An error message is raised, requiring milestone definitions for prior operations. Only the second operation as the direct predecessor is automatically confirmed. An error message is raised, requiring confirmations for prior operations.

What does the bill of material usage (BOM usage) control at the BOM item level? Note: There are 2 correct answers to this question. Default values for the item status. Maximum allowed low-level code. Default unit of measure. Allowed material type.

Your customer complains about incorrect duration for production order operations. What time elements could cause the issue? Note: There are 3 correct answers to this question. Move time. Processing time. Tear down time. Floating time. Queue time.

To ensure that the warehouse operator only stages large components in the exact required quantity for each production order, which warehouse material staging method would you recommend?. Crate parts. Pick parts. Release order parts. Kanban.

Your customer wants to include restricted-use stock as a potential receipt in the existing ATP check for component availability. Which information is required to implement this change request in the scope of check? Note: There are 2 correct answers to this question. The checking control for the order type. The ATP category for restricted-use stock. The checking group from the material master. The checking rule from the business application.

Which of the following will decrease capacity requirements of production orders? Note: There are 2 correct answers to this question. Decrease the order quantity. Dispatch an operation. Confirm an operation. Reschedule the order to a later time.

The setup time on the production line to produce a material is extensive. You would like to avoid multiple setups and limit the production of the material based on a planning calendar. Which type of lot size procedure should you use to accomplish this?. Fixed lot sizing. Exact lot sizing. Minimum lot sizing. Periodic lot sizing.

Which of the following is a pure capacity leveling function? Note: There are 1 correct answers to this question. Lead time scheduling. Finite scheduling. Basic date scheduling. Today scheduling.

Before a user can add multiple production versions in a material master, what information should be collected? Note: There are 3 correct answers to this question. Task list group number. Work center hierarchy. Lot sizes. Validity dates. BOM status.

In which customizing activity do you set up automatic routing selection for production orders?. Define order-type-dependent parameters. Define selection profiles. Define scheduling parameters for production orders. Define production scheduling profile.

In manual goods issue posting with reference to a production order, which component can be considered for a planned consumption of 50 pieces (pcs)?. A component with 100 pcs on stock, NOT being a backflush material. A component with 0 stock, being a backflush material with negative stocks allowed. A component being a non-stock material, NOT being a backflush material. A component with 40 pcs on stock, being a backflush material with negative stocks NOT allowed.

You are seeing the risk that there could be insufficient stock available for a backflushed material. How do you address this issue? Note: There are 2 correct answers to this question. Post a replacement material instead. Allow negative stock in inventory management. Postprocess a backlog list. Manually post goods issue of the material.

When do you recommend the use of repetitive manufacturing? Note: There are 2 correct answers to this question. Low product complexity. Low product stability. High product stability. High product complexity.

The production plan is being disrupted by last minute demands that are entered in the system. Which is the most efficient way to handle last minute demands and protect the current production plan? Note: There are 1 correct answers to this question. In the stock requirements list, set a manual firming fence for a date based on the replenishment lead time of the material. Manually firm all planned orders for materials within the replenishment lead time of the material. In the material master record, set MRP type to P4 and a planning time fence based on the replenishment lead time of the material. In the material master record, set MRP type to P1 and a planning time fence based on the replenishment lead time of the material.

Where can you set the "Delivery Completed" indicator?. In the production order. In the production scheduling profile. In the order confirmation. In the material master.

When the goods receipt for a production order is posted, what happens with the production order?. The production order is deleted from the stock/requirements list. The production order is deleted in the system. The production order is archived automatically. The production order´s quantity is set to 0 in the stock/requirements list.

Which of the following data objects are updated when a user confirms an operation? (1 Answers are correct). Shop floor information system. Production order total order quantity. Production order header status. Warehouse transfer order status.

Next to the object itself, what additional information can be stored in an object management record? Note: There are 2 correct answers to this question. Parameter effectivity. Lock information. Alternative dates. Authorization group.

Which of the following apply to master production scheduling (MPS)? Note: There are 2 correct answers to this question. It is set by the MRP type. It is used to plan consumption based materials. It uses basic date scheduling only. It can also plan MRP items.

On which of the following levels can you influence the availability check for the components of production orders? Note: There are 2 correct answers to this question. Production controller. Material master. MRP controller. Production order type.

What is supported by the concept of work centers in SAP Solution Manager? Note: There are 3 correct answers to this question. Supports a task oriented work approach. Improves collaboration and status reporting. Requires no maintenance beyond initial setup. Makes navigation easy through central role-based access and user environment. Needs three work centers to complete all tasks linked to a business goal.

What are options for printing production order data? Note: There are 2 correct answers to this question. Reprint of a production order for a job ticket. Print of a production order with system status CRTD. Original print of previously printed operations of an order. Mass print of orders in the background.

A material has been planned in a NETCH (Net change) planning run. Which planning file entries are created by the system when you change the quantity of a component in the bill of material (BOM) of the header material?. The BOM explosion indicator only. The BOM explosion and the NETCH indicator only. The BOM explosion, the NETCH and the NETPL planning indicators only. The NETCH and NETPL planning indicators only.

The Kanban procedure could be used to trigger which of the following kinds of replenishment? Note: There are 2 correct answers to this question. Vendor consignment. Subcontracting. Stock transfer. In-house production.

In which material master views can you select the batch management checkbox? Note: There are 2 correct answers to this question. Purchasing. Basic Data 1. MRP 4. Work Scheduling.

In which of the following objects can you activate backflushing for production orders?. Material master (final product). Work center. Production version. Production scheduling profile.

Which information is required when you set up an order type?. Automatic actions on order release. Production supervisor. Overdelivery tolerance limit. Settlement profile.

What are the requirements for working with a Co-product? Note: There are 2 correct answers to this question. The indicator in the material BOM item. The indicator in the routing header. The indicator in the material BOM header. The indicator in the material MRP data.

What is influenced by the item category while maintaining a material BOM? Note: There are 2 correct answers to this question. If subitems can be entered. If a change number can be entered. If the component quantity can be negative. If a characteristic can be entered.

What are some of the demand elements considered in the MRP run? Note: There are 2 correct answers to this question. Safety Stock. Sales Orders. Stock. Purchase Orders.

In which of the following master data objects can you define the production order default storage location for a material component? Note: There are 2 correct answers to this question. Work center, in the production supply area. BOM, in the item for the material. Material master of the finished product. Routing, in the component allocation.

Which of the following are activities associated with Production Order processing? Note: There are 3 correct answers to this question. Material staging. Goods receipt. Initiate payment. Invoice creation. Order release.

What is the first step in the MRP run?. Net requirements calculation. BOM explosion. Lot size calculation. Source determination.

Which Kanban master data object controls the relationship between the supply and demand source?. Rate routing. Control cycle. Kanban container. Production supply area.

Many of your manufacturing workers take vacations during the months of June, July, and August so capacity for that time period is about half of normal capacity. Which object do you use to maintain this properly in the ERP system so you always have an accurate depiction of capacity?. Intervals of available capacity. Standard capacity. Number of individual capacities. Planning calendar.

Which lot sizing procedures optimize the total costs resulting from ordering costs and storage costs? Note: There are 2 correct answers to this question. Replenish up to maximum stock level. Groff reorder procedure. Part period balancing. Daily lot size.

When exactly 6 exception messages occur for an order, what does the system display in the MRP List?. All exception messages that were created. The first two exception messages created. The five highest priority exception messages created. The two highest priority exception messages created.

In long-term planning, which master data objects can either be taken from the operative data or be newly defined? Note: There are 2 correct answers to this question. Work center. Material master. BOM. Routing.

How can you enhance the system statuses of a production order scenario with user statuses?. By creating a user profile and assigning it to the production scheduling profile. By activating the user statuses in status and action management. By enhancing the system status customizing table with user statuses. By defining a status profile and assigning it to the order type.

Where can you maintain consumption mode and consumption periods for planning strategies? Note: There are 2 correct answers to this question. In the plant parameters. In the material master. In the MRP group. In the requirements class.

On which of the following objects can you aggregate actual and planned costs for production orders? Note: There are 2 correct answers to this question. Planned order. Product cost collector. Production order. Routing.

In which data object is the production line (repetitive manufacturing relevant work center) maintained?. REM profile. Bill of material. Production version. Cost collector.

You produce your material based on a forecast derived from historical sales and expect it to be in inventory when your customer orders. If customers order more than the forecasted quantity, you want to increase production to try to meet the extra demand. Which is the appropriate planning strategy to use?. Planning without final assembly (50). Make-to-order production (20). Anonymous make-to-stock (10). Planning with final assembly (40).

How can you release a production order? There are 2 correct answer. Automatically, using the production scheduling profile. Manually, in the missing parts overview of the order. Manually, in the collective conversion of planned orders. Automatically, using collective orders.

Which objects can be defined as a Production Resource Tool? Note: There are 3 correct answers to this question. Documents. Functional locations. Equipments. Work centers. Materials.

At the end of the MRP run you receive the exception message "Reschedule In Operation". What caused the message to be generated?. The requirements date occurs after that of a firmed planned receipt. The requirements date occurs before that of a firmed planned receipt. The requirement no longer exists. A firmed planned receipt cannot be rescheduled.

Which of the following objects can you release so that the business transactions for process order execution and process management can be executed? Note: There are 2 correct answers to this question. Individual phases. Individual control recipes. Individual process instructions. Individual operations.

Which planning strategy requires the entry of planned independent requirements at the subassembly level, so the in-house production of this component can be triggered before a finished goods Sales order is received?. Planning at assembly level. Gross requirements planning. Planning without final assembly. Planning with final assembly.

Which of the following functions can be performed when the production order has the status "Created" (CRTD)?. A user can trigger material availability check via mass processing (transaction COHV). A user can trigger material staging via mass processing (transaction COHV). A user can trigger printing of shop floor paper manually (transaction CO02). A user can schedule a background job to release production orders (transaction COOIS).

In a production order scenario, for a certain material component a purchase requisition should be automatically created during order creation. Which BOM item category fulfills this request?. Stock item (L). Class item (K). Non-stock item (N). Variable Sized item (R).

What user group is SAP Fiori targeted for?. Technical users. Casual users. Administrative users. Business users.

The material master of your finished product contains MRP type "PD". You set a manual firming date in the stock requirements list. Which of the following will firm planned orders? Note: There are 2 correct answers to this question. Setting a planning time fence in the Material Master Record. Creating a planned order within the planning time fence. Assigning a production scheduling profile. Manually changing the quantity of a planned order.

Where in the configuration of planning strategies do you set the indicator for consumption?. Requirements class. Strategy group. Strategy. Requirements type.

How is the bill of material (BOM) exploded when you use a BOM explosion number?. With respect to a common key date for product and each assembly. With respect to defined separate key dates for product and each assembly. With respect to a common change status for product and each assembly. With respect to a defined separate change status for product and each assembly.

Which setting needs to be made for the automatic capacity availability check that is performed with production order release?. Finite scheduling needs to be activated in the scope of check. The capacity overall profile needs to be assigned in the checking control. The checking group needs to be assigned in the production scheduling profile. The bottleneck indicator needs to be activated in the relevant work center.

What are prerequisites for using batch derivation? Note: There are 2 correct answers to this question. Receiver-sender relationships. Process instructions. Batch determination selection conditions. Batch where-used list.

Which of the following are features of the technical operations components within SAP Solution Manager? Note: There are 3 correct answers to this question. Technical and Management Reporting. Configuration Management. Technical Monitoring and Alerting. Testing. Root Cause Analysis.

Which data object can be updated with the scheduling results of a routing?. Material master. Production version. MRP profile. Production scheduling profile.

What Kanban status automatically posts goods receipt with reference to the procurement element?. In use. Full. Wait. Empty.

What are some of the advantages of using Kanban? Note: There are 2 correct answers to this question. Replenishments are based on centralized planning. It is a simplified form of production control. Replenishments are created close to the actual need. It is mostly accomplished by manual postings.

A planner updated a production order status from partially confirmed "PCNF" to technically completed "TECO" by mistake. What impact would this have to other users for this specific production order?. The buyer can still see component reservations. The production manager can still see the capacity requirements. The warehouse clerk can still carry out goods issue transactions. The production operator cannot enter additional confirmations.

How can you avoid order proposals for planned independent requirements with dates in the past? There are 2 correct answer. Reorganize planned independent requirements. Set the requirements reduction indicator in the requirements class. Use a planning strategy with requirements consumption. Maintain adjustment parameters in the MRP group.

Which reports can you access via the order and resource reporting transaction inadvanced planning? There are 3 correct answers to this question. Production overview. Planning file entries. Production list. Operation list. WIP list.

For which planning-relevant data objects do you set just one indicator to includethen in PP/DS? There are 2 correct answers to this question. Production version. Plant. Work center. Material.

A customer is considering switching from order-related settlement to productrelated settlement. What are capabilities of cost collectors? There are 2 correct answers to this question. They can be used for repetitive manufacturing. They can be used for manufacturing with collective orders. They can be created automatically during month end process. They can be applied to make-to-stock production order.

How can you limit the number of master data objects to be created when themanufacturing process is the same for many different products?. By assigning different materials to the same routing. By assigning the same production version to different materials. By creating routings with parallel sequences. By creating routings with alternative sequences.

Which functional capabilities does the Detailed Scheduling Board have? There are 2 correct answers to this question. Enter time-ticket confirmation for production orders. Undo for drag & Drop planning activities. Change planned order quantities. Change sales order quantities.

What are drawbacks of the separation of OLTP and OLAP? There are 4 correct answers to this question. The OLAP system needs to write back the data to the OLTP system. Multiple copies of the data exist. Batch process are required to keep OLTP and OLAP in sync. Only the OLAP system has the latest data. Only the OLAP system has a predefined subset of the data.

Which data model changes have been implemented in Sales and Distribution?There are 3 correct answers to this question. Elimination of output condition tables. Elimination of customer master tables. Elimination of LIS tables for rebates. Elimination of status tables. Elimination of document index tables.

In order to use strategy 70 – Planning At Assembly Level, what order field must be set besides the planning strategy?. Individual/Collective Indicator. Storage Location MRP Indicator. Dependent Requirements indicator. Mixed MRP indicator.

How does the new Inventory Management Data model contribute to the reduction of the data footprint? There are 3 correct answers to this question. By eliminating fields for different stock types. By eliminating inventory history tables. By eliminating inventory tables. By eliminating hybrid tables. By eliminating material master tables.

Which of these are layers in SAP Best Practice content?There are 3 correct answers to this question. Process diagrams. Building blocks. Configuration guides. Solution packages. Scope items.

A planner wants to interactively resolve an overload situation on a resource using advanced planning tools without any automatic rescheduling activity by the system. Which combination of settings for resource and detailed scheduling strategy are required to receive related alerts?. Finite resource and infinite strategy. Infinite resource and finite strategy. Finite resource and finite strategy. Infinite resource and infinite strategy.

During planning you are facing an overload situation on a resource. Which activities do you consider to create a feasible production plan? There are 3 correct answers to this question. Use DS heuristic “Schedule Sequence”. Use rescheduling with an alternative mode. Use multilevel MRP run for the products on the resource. Use optimization with respect to set-up times. Use a bucket-oriented capacity check.

Which warehouse management functions are available in SAP EWM but NOT in SAP WM? There are 3 correct answers to this question. Handling Unit Management. Expected goods receipt. Slotting. Yard Management. Labor Management.

You are using heuristic SAP_ERP_001. Which of the following criteria are included in the automatic source determination logic when a planned order iscreated?. Vendor rating. Component availability. Delivery date. Quota arrangement. Costs.

A resource was created in SAP S/4HANA PP/DS through the internal CIF integration and named “W1904_1000_001”. What does the suffix 001 in the resource name represent?. Available capacity version. Capacity category. Number of individual capacities. Work center category.

You want to procure your material components based on a forecast for the finished material derived from historical sales. When customers order, you produce the finished product and reserve it for that particular order. Which is the appropriate planning strategy to use?. Planning with final assembly (40). Production by lot size (30). Make-to-order production (20). Planning without final assembly (50).

Which SAP solutions are part of the Digital Value Network portfolio? There are 3 correct answers to this question. SAP Fieldglass. SAP Human Capital Management. Concur. SAP Hybris. SAP Visual Enterprise.

What are pillars of SAP Activate?There are 2 correct answers to this question. SAP Best Practices. Premium engagement. SAP Max Attention. Guided Configuration.

Which material-specific information can be transferred to a transportation lane in PP/DS? There are 3 correct answers to this question. Quota arrangements. Production versions. Purchasing info records. Special procurement keys. Outline agreement.

How can Production Planning and Detailed Scheduling (PP/DS) enhance the standard planning functionality?. By providing replenishment proposals with exact times. By providing cross-plant planning and deployment. By providing multilevel material requirements planning. By providing future demands from demand figures in the past.

What steps are possible in a PP/DS production planning run?There are 3 correct answers to this question. Demand consumption. Optimization. Heuristics. Detailed scheduling functions. Backorder processing.

The pegging situation was changed because of an MRP heuristic run. What is acapability of dynamic pegging?. It enables the propagation of network alerts across the bill of materials structure. It propagates changed sales order priorities to the pegged planned orders. It links receipts from an alternative location in case of a shortage in the default location. It replaces fixed pegging relationships unless they have been created for stock.

What must be used in the system to plan the requirements for different Sub-contractors separately?. Production versions. MRP areas. Planning plant. Storage locations.

In Make-to-order production, which field controls whether the components willbe planned as sales order specific stock?. The item category of the component in the BOM. The Individual/Collective indicator of the component. The MRP Type of the component. The Planning Strategy of the finished product.

Which of the following apply to MRP Live? There are 2 correct answers to this question. Planned orders need to be converted to purchase requisitions for externally procured materials. The sequence of planning materials is calculated across plants. The definition of the planning scope is more flexible. The BAdIs for classical MRP also apply to MRP Live.

Which capabilities does the Alert monitor have?There are 3 correct answers to this question. Generate alerts based on defined threshold values. Automatically predict alerts in future planning cycles. Nominate time-dependent substitutes for a planner. Automatically send alerts with Alert Notification Engine. Automatically reschedule in case of overload alerts.

Which of the following is an advantage of MRP Live and NOT available in classical MRP? There are 2 correct answers to this question. MRP Live can plan materials with recursive BOMs. MRP Live can propose alternative solutions. MRP Live can create production orders automatically. MRP Live can priorities demand from sales orders.

What is the correct sequence of the following Activate methodology phases?. Prepare, Explore, Realize, Deploy. Prepare, Validate, Test, Go-Live. Validate, Realize, Test , Deploy. Prepare, Realize, Iterate, Continuous Improvement.

In the Manage Shortage view of the new SAP Fiori app “Monitor Material Coverage”, what do the stars indicate?. The viability of the proposed solution. The presence of firmed planned orders. The priority of the proposed solution. The presence of production orders.

Which elements are included in the structure of the batch where-used list? There are 3 correct answers to this question. Stock transfers. Purchase orders. Planned orders. Transfers from batch to batch. Collective orders.

What are properties of MRP Live? There are 2 correct answers to this question. Data is read sequentially from the database tables. It is executed on the database server. The code is written in SQL Script. It uses the same BAdis as classic MRP Production controller.

You want to perform capacity availability checks on your production orders. What must be set for this to occur? Note: There are 2 correct answers to this question. Checking control must have an overall profile assigned in customizing. Indicator Relevant for finite scheduling must be set. Checking rule and group must be assigned. PRT Availability check must be set.

Which activity can trigger an automatic availability check for the components of a production order?. Material staging. Order rescheduling. Order release. Goods receipt for a missing part.

When you want to create Routing from existing routing you use? (There are 2 correct answers to this question). Reference operation set. Copy from Functionality. Routing group. Master Routing.

The Individual / Collective indicator in the material Master determines?. Whether a component is procured for a special customer requirement in the individual segment. Requirement quantities of dependent materials are grouped together during MRP run. The Material Requirement Planning. The Special Procurement.

What is the purpose of collective orders?. To manage production orders for an entire finished product on multiple levels. To post production costs on a cost collector instead of the production order. To combine order management of co-products and by-products with the main product. To post any component withdrawals single back flush with order confirmation.

Which of the following are prerequisites for running MRP in a plant?There are 3 correct answers to this question. Assign a valid planning strategy. Set up the planning file. Activate requirements planning. Configure MRP groups. Maintain plant parameters.

Which of the following data field in the MRP views is not mandatory when MRP type is “VB” during CBP. Lot Size Key. Reorder Point. Procurement Type. Safety Stock.

What determines whether the planned independent requirements in MRP consume other requirements?. Requirements type. Requirements profile. Consumption sequence procedure. Order type.

What is the difference between operation-related and order-related confirmation?. Order confirmation is a confirmation of the entire order at order header level and an Operation confirmation allows you to confirm an order step by step. Order confirmation is a confirmation of the entire order before sending to production and operation confirmation is a step by step confirmation of production order. Order confirmation is partial confirmation of the order and operation confirmation is automatic final confirmation of the order. Order confirmation requires a goods receipt, operation confirmation does not require a goods receipt.

What is the industry standard that uses COM/DCOM technology to define manufacturer independent interfaces for the industrial usage area?. SAP COM/COM model. SAP OPC. SAP OCOM. SAP OLE.

What is the T code for “Display production lot”?. MDL3. MDL4. MEL5. MEL3.

How can the number of rescheduling message be reduced or limited. Net change planning. Reduce lead time to 1. Planning time fence. Tolernace value.

When planning material from different plants which controls relationship between the plant. Schedule margin key. Gr processing time. Material master - Special procurement key is used which comes in Material Master.

What supplies will MRP create to offset shortages?. Planned order. purchase order. production order. firmed order.

What are things after releasing production order ?. Print Production order. Print sales order. Print Planned order. Print Purchase order.

In front of Object what information is provided in object management? There are 3 correct answer. Lock. Authorization. Validity dates element / Alternative dates. Additional information. Description / long text.

What are the options for the material staging from a warehouse management system? There 3 correct answer. Create parts are ordered manually. Release order parts are ordered manually. Pick parts are provided for the production order in exactly the same quantity as the requirements quantity. Release order parts are ordered automatically.

Where you will set base quantity of BOM?. Default Value in SPRO. Base qty. Bom status. Unit of measure of size.

Where can we set the backflush? There are 4 correct answer. Operation – Confirmation -Parameters for order Confirmation. Workcenter. Material Master components. Routing. Production scheduling View.

Where you will maintain collective records for goods movement?. MF45. MF46. MF47. COGI.

From which things demand will generate? There are 3 correct answer. Sales order. Independent requirement. Purchase order. Freight order.

What are the time elements used in basic date scheduling? There are 2 correct answer. In house production time. Lead time. Move time. Queue time. GR processing time.

Where we can set auto print? There are 2 correct answer. Confirmation profile. Scheduling margin key. Production scheduling profile. Operation control key.

The system can carry out reduction measures in _____ scheduling for orders. Basic. Lead time. Long time.

Mention Benefits of SAP Solution manager? There are 8 correct option. Automated Configuration Tracking. Easy Integration. Faster ROI. Reduced Administration Effort. Improved Patch and Upgrade management. Automated Alerts. Lowering Cost. Centralized management. Inventory management. Soloution mangement.

ATP Availability check is carried out for? There are 3 correct answer. Production Order – Process order. Goods movement. Planned order. Purchase Order. Sales Order.

Report abuse