In which phase do you verify the SAP Best Practices content that meets the customer's business needs, and capture delta requirements? Note: There are 2 correct answers to this question. Explore. Discovery. Realize. Prepare.

What have SAP S/4HANA Cloud Business Workflows been designed for? Note: There are 3 correct answers to this question. To create standard procedures from SAP Signavio Process Navigator. To create business processes with a high number of people involved in a pre-defined sequence. To create very simple release or approval procedures. To create complex, repeated work processes with iterative cycles. To create cross-product workflow procedures.

What are some characteristics of the SAP S/4HANA Migration Cockpit? Note: There are 2 correct answers to this question. Combining the local and remote schema approaches into one migration project. Extensibility using the Legacy System Migration Workbench. Guidance and simulation of the migration process. Mapping source values to SAP S/4HANA target values.

Where do you find industry cloud solutions to address a customer's unique requirement?. SAP Signavio Process Navigator. SAP Business Technology Platform. SAP Store. SAP Discovery Center.

In Central Business Configuration, which tasks must you conclude prior to Confirm Scoping is Completed activity? Note: There are 3 correct answers to this question. Assign Deployment Target. Select Group Ledger Scenarios. Select the Group Currency. Select Sector, Country/Region(s), and Languages. Define Primary Finance Settings.

How would you describe the different dimensions of SAP's organizational change management framework?. Change realization includes activities to realize the business benefits associated with the cloud implementation. Change effectiveness contains activities that can be applied to evaluate the impact of change management interventions. Change leadership involves activities to enable all management levels to handle the cloud implementation and deal with resistance. Change strategy covers activities to set up change management properly. Change communication encompasses activities to provide relevant project information to the different stakeholder groups at the right time.

What can you do with the SAP for Me mobile app? Note: There are 2 correct answers to this question. Get full transparency into your SAP product portfolio. Download learning content from SAP Learning Hub. Interact with SAP easily. Access the SAP ONE Support Launchpad.

After you completed the Explore Phase Quality Gate you notice that the Fit to Standard workshops have been carried out without the input of the finance experts of the Australian office of the customer. The Australian office is scheduled to go live in a later implementation phase. What should you do? Note: There are 2 correct answers to this question. Put the project on hold and run all required Fit to Standard workshops with Australian users. Proceed with the as-is plan because the Australian office of the customer is scheduled for a later implementation phase. Get approval from Australian key users on any of the configuration items that cannot be changed after system provisioning. Review the scope items to ensure their functionality is available and appropriate for use by Australian users.

How does an implementation consultant support customer experts during Fit-to-Standard workshops? Note:There are 2 correct answers to this question. Conduct end-user training on active scope items. Determine set up instructions for customer-driven integrations. Highlight areas that require configuration or customization decisions. Demonstrate SAP Best Practice business processes in the starter system.

When doing a new implementation on premise or private cloud, which system is recommended to demonstrate standard functionality in the Explore phase?. Development. Starter. Sandbox. Trial.

Which of the following is the customer's responsibility in both on-premise and private cloud scenarios?. Middleware. Operating system. Servers. Database.

When conducting an upgrade of an SAP S/4HANA Cloud, public edition three system landscape, in which phase are the Business Roles updated?. Discover. Explore. Realize. Deploy.

If a customer wants to develop their own custom application and integrate it with SAP S/4HANA Cloud Public Edition, what tools would you recommend to develop the app? Note: There are 2 correct answers to this question. SAP HANA Cloud. SAP Cloud Portal Service. SAP Business Application Studio. SAP Build.

In the SAP Activate run phase the new system is monitored, maintained, and optimized to ensure it runs smoothly and efficiently. Which change management activity can only be realized in the run phase of the cloud implementation?. Mapping of SAP roles to employees. Development of the user adoption strategy. Measurement of actual user adoption metrics. Conduction of a pulse check.

What are some benefits for customers of using the SAP Activate methodology? Note: There are 3 correct answers to this question. It offers customers accelerators to help run their project as efficiently as possible. It relies on a traditional Waterfall approach for all project implementations, thus providing predictable outcomes. It contains time-phased instructions to help execute tasks throughout the implementation journey. It is designed to streamline the implementation process by reducing resource requirements from the customers and partners. It guides customers through the entire SAP S/4HANA Cloud lifecycle and provides quick value realization.

Which tasks are mandatory before you can migrate data for a specific object? Note: There are 2 correct answers to this question. You select the same migration method previously used for other objects. All previous migration projects are in the "Finished" status. Predecessor objects have been migrated. Permission to migrate the data has been assigned.

What are some purposes of using Business Driven Configuration Questionnaires (BDCQs) during the implementation of SAP S/4HANA Cloud Public Edition? Note: There are 2 correct answers to this question. To reduce the need for customer involvement. To ensure the appropriate level of business context for the Fit-to-Standard workshop. To gather configuration values and validate solution fit. To suggest new features in the SAP S/4HANA Cloud, Public Edition solution.

Which organizational change management activity is usually performed in which SAP Activate phase? Note: There are 2 correct answers to this question. The business readiness assessment is usually conducted in the discover phase. The change plan is usually developed in the explore phase. The change assessment is usually conducted in the prepare phase. The user adoption analysis is usually conducted in the run phase.

When should you run Digital Discovery Assessments of an SAP S/4HANA Cloud Public Edition implementation project?. After each upgrade. After the Realize phase. During the Discover phase. During the Deployment phase.

Which type of testing should be done after a release upgrade has occurred?. Regression tests. User Acceptance tests. String tests. Integration tests.

What accelerator can help you document the configuration definition in the Explore phase?. Data definition template. Test plan template. Change request template. Backlog template.

What tool would you use for managing project tasks and Solution Documentation when implementing SAP S/4HANA Cloud, public edition?. SAP Transformation Navigator. SAP Signavio Process Navigator. SAP Roadmap Viewer. SAP Cloud ALM.

Which of the following Accelerators can you find in the SAP Signavio Process Navigator? Note: There are 2 correct answers to this question. Data Migration plan. Stakeholder Identification Guide. Test Script. Process Diagram.

You are implementing SAP S/4HANA Cloud, public edition for your customer. How do you activate the pre- configuration?. Via the SAP Cloud ALM. Via the SAP Business Technology Platform. SAP Contact Center. Via the Central Business Configuration System.

In SAP Cloud ALM, which attributes can be used to categorize features? Note: There are 3 correct answers to this question. Risk level. Workstream. Tags. Deliverable. Release.

From which platform are you able to deploy a trial system within a short timeframe?. SAP Learning Hub. SAP Support Portal. SAP Cloud Appliance Library. SAP Business Technology Platform.

Which of the following capabilities does test management in SAP Cloud ALM for Implementation provide? Note: There are 2 correct answers to this question. Test Data Container. Manual and Automated Testing. Test Plans. Load and Volume Testing.

When applying a cloud mindset in a greenfield implementation, which of the following should you consider? Note: There are 2 correct answers to this question. Use quality gates. Ensure transparency on deviations. Use SAP Digital Discovery Assessment. Use supported extensibility technologies.

A mid-market customer wants to add a small sales agency (15 employees) office to their existing SAP S/4HANA Cloud Public Edition system. The sales agency is located in a country that was localized two years ago. The sales agency plans to use SAP Best Practice scope items and the org structure as is. The original Digital Discovery Assessment (DDA) did not identify any integration or extensibility requirements. Using the "Simple" configuration transport mode for the deployment of the sales agency, how should the project manager proceed?. Plan the last active sprint for any previous deployment wave to be completed and fully tested before turning on Simple Transport Mode via the Export Software Collection App. Plan the last active sprint for any previous deployment wave to be completed so that all open transports are released before turning on Simple Transport Mode via the Extensibility Settings App. Plan the last active sprint for any previous deployment wave to be completed so that all opentransports are released before turning on Simple Transport Mode via the Custom Logic App. Plan to have multiple deployment waves open at the same time using both Simple and Flexible transport modes via the Export Software Collection App.

What are some purposes of using Business Driven Configuration Questionnaires (BDCQs) during the implementation of SAP S/4HANA Cloud Public Edition? Note: There are 2 correct answers to this question. To gather configuration values and validate solution fit. To suggest new features in the SAP S/4HANA Cloud, Public Edition solution. To reduce the need for customer involvement. To ensure the appropriate level of business context for the Fit-to-Standard workshop.

Which of the following are captured in a completed Digital Discovery Assessment? Note: There are2 correct answers to this question. Business role permission requirements. Target customer go-live date. SAP Fiori application extensions. Known integration requirements.

If you cannot find a prepackaged solution process that addresses integration requirements in SAP Signavio Process Navigator, where do you look next?. SAP Cloud ALM. SAP Business Accelerator Hub. SAP Discovery Center. SAP Business Technology Platform.

What does the Side-by-Side extensibility option mean?. SAP S/4HANA extensions are context-aware and focused on tight integration. Extending SAP S/4HANA using SAP ABAP Development Workbench. Extend SAP S/4HANA using APIs published on SAP Business Accelerator Hub. There are two SAP S/4HANA instances: one for standard code and another for custom developments.

Which embedded support offerings can you make use of in the SAP Fiori Launchpad? Note: There are 3 correct answers to this question. Video tutorials from the SAP Help Portal. Recorded system simulations from the Learning Center. Digital assistance from generative AI (SAP Joule). Recorded webinars from the SAP Learning Website. Assessment questions from the SAP Learning Hub.

How do you define the term Organizational Change Management?. It is a comprehensive, cyclic, and structured approach for transitioning individuals, groups, and organizations from a traditional to an agile organizational set-up with focus on the added value for the impacted users. It is a comprehensive, cyclic, and structured approach for transitioning individuals, groups, and organizations from a current to a future state with intended business benefits. It is a selective, singular, and intuitive approach for transitioning individuals, groups, and organizations from a traditional to an agile organizational set-up with intended business benefits. It is a selective, singular, and intuitive approach for transitioning individuals, groups, and organizations from a current to a future state with focus on the added value for the impacted users.

In which deployment models is application management the responsibility of the customer? Note: There are 3 correct answers to this question. Private Cloud. Platform as a Service. Software as a Service. On premise. Infrastructure as a Service.

What tools enable non-developers to create low/no-code extensions? Note: There are 2 correct answers to this question. SAP Fiori extensibility apps. SAP Build. SAP Cloud SDK. SAP Business Application Studio.

What can you find in the SAP Fiori apps reference library? Note: There are 3 correct answers to this question. Related app-specific solution design guidelines. Shortcut to the Maintenance Planner tool to establish the technical update path. Installation and configuration requirements for selected apps. Shortcut to the Quicksizer tool to estimate hardware requirements. Related app recommendations based on your usage profile.

Why are non-standard scope items activated in the starter system when implementing SAP S/4HANA Cloud Public Edition?. To review the functional scope as identified for the customer's solution. To automatically migrate legacy data to the development instance. To enable the system to automatically detect and resolve data inconsistencies. To comply with SAP's licensing requirements for cloud implementations.

Which of the following steps are part of the fit-to-standard process? Note: There are 2 correctanswers to this question. Enable customers on standard business processes. Design to-be business process models. Review Best Practices process flow. Document integration requirements.

Which organizational change management activity is usually performed in which SAP Activate phase? Note:There are 2 correct answers to this question. The change assessment is usually conducted in the prepare phase. The business readiness assessment is usually conducted in the discover phase. The user adoption analysis is usually conducted in the run phase. The change plan is usually developed in the explore phase.

Which of the following tools can support you in managing requirements and software development for implementation projects? Note: There are 2 correct answers to this question. SAP Cloud ALM. Focused Insights for SAP Solution Manager. Focused Build for SAP Solution Manager. SAP Focused Run.

Which of the following configuration items CANNOT be changed after the initial provisioning of SAP S/4HANA Cloud Public Edition? Note: There are 2 correct answers to this question. Group currency. Custom fields in standard objects. User access rights. Fiscal Year Variant.

How can you migrate data to SAP S/4HANA Cloud Public Edition? Note: There are 2 correct answers to this question. With XML or CSV templates. With a separate SAP HANA database. With the zero downtime service. With Core Data Services.

Which activities can you complete in the Maintain Business Roles SAP Fiori app? Note: There are 2 correct answers to this question. Assign business catalogs to a business role. Maintain restrictions. Maintain technical catalogs. Assign PFCG profiles to a business role.

In the SAP Activate prepare phase, the cloud project is set up and officially launched. Which change management activities are usually started in this phase? Note: There are 3 correct answers to this question. Identify the key stakeholders and conduct a stakeholder analysis. Conduct a detailed change impact analysis. Develop an initial change plan for the cloud project. Develop and align the change network strategy. Facilitate the role mapping process.

You have created a project-specific deliverable that is not part of the SAP Activate roadmap in SAP Cloud ALM. What must you create to manage all tasks that are related to that deliverable? Note: There are 2 correct answers to this question. A custom team. A custom task. A custom release. A custom deliverable.

When deploying SAP S/4HANA Cloud, private edition using new implementation, which of the following is recommended to code custom developments? Note: There are 2 correct answers to this question. SAP Support Portal. SAP Business Technology Platform. SAP Best Practices. SAP ABAP Workbench.

In the SAP Activate explore phase, the project team conducts fit-to-standard workshops to identify gaps between business requirements and the SAP best practice standard. Which change management challenge is typical for this phase?. Some business users do not adopt the new cloud solution. Some project team members have never heard of organizational change management. Some business departments do not feel well prepared for the go-live. Some managers show resistance towards the cloud standard.

Why would you use level 3 Business Driven Configuration Questionnaires (BDCQs)?. They build a consolidated backlog during the Realize phase. To validate customer scopes during Fit-To-Standard workshops and provide the required configuration values for the Realize phase. To validate customer scopes and requirements against SAP S/4HANA Cloud Public Edition best practices.

Through which component do you access your assigned process tasks from the SAP Activate Roadmap of SAP S/4HANA Cloud Public Edition (3-system landscape)?. SAP Cloud ALM for Service. SAP Central Business Configuration. SAP Cloud ALM for Operations. SAP Cloud ALM for Implementation.

In which workstream do you execute an organizational change impact analysis?. Project Management. Analytics. Solution Adoption. Application Design and Configuration.

What are the special characteristics of SAP's organizational change management framework? Note: There are 3 correct answers to this question. It is aligned with the SAP Activate implementation methodology. It supports an agile way of working. It is targeted at fostering fast and sustainable user adoption. It is only suitable for large-scale, complex cloud deployments. It contains activities that help to enhance system performance.

What is the primary purpose of the SAP Activate methodology?. To provide end-to-end application lifecycle management. To manage project documentation. To expedite all deployments of SAP products. To enable access to the SAP ecosystem.

Which of the following systems are used to implement SAP S/4HANA Cloud Public Edition for a customer? Note: There are 3 correct answers to this question. Sandbox system. Starter system. Test system. Trial system. Development system.

What are success factors for the different dimensions of the change management framework? Note: There are 3 correct answers to this question. Regarding change strategy, it is important to fulfill the expectations towards change management. Regarding change effectiveness, it is important to use a balanced combination of change effectiveness measures. Regarding change leadership, it is important to establish stakeholder management as an ongoing activity. Regarding change realization, it is important to actively support the business units in the development of a new operating model. Regarding change communication, it is important to develop a compelling, comprehensive change story.

During a Fit-to-Standard workshop, what can you do with SAP Cloud ALM? Note: There are 2 correct answers to this question. Configure the to-be-solution. Test all scoped processes. Capture requirements. Analyze Solution Process Flow diagrams (BPMNs).

What are objectives of the Executive board as opposed to the Steering Committee? Note: There are 3 correct answers to this question. To approve project results. To set business vision and goals. To approve the project vision. To allocate project funding. To approve project goals.

Through which applications can you launch the Cloud Integration Automation Service (CIAS)? Note: There are 2 correct answers to this question. SAP Signavio Process Navigator. SAP Business Accelerator Hub. SAP Cloud ALM. SAP for Me.

Why does SAP recommend to perform regression testing during the upgrade window for SAP S/4HANA Cloud Public Edition?. To ensure that new features of the upgrade are working as specified in the requirements. To validate that all user permissions have been properly migrated to the new version. To confirm that the database schema changes have been implemented successfully. To verify existing functionality still works correctly after the upgrade.

Which of the following cloud services are available on SAP Business Technology Platform? Note: There are 3 correct answers to this question. SAP Cloud ALM. SAP HANA Cloud. SAP Integration Suite. SAP Master Data Governance. SAP Data Migration Cockpit.

You have assigned a deployment target in SAP Central Business Configuration, but have not yet completed the Confirm Scoping milestone. Which of the following tasks can you complete? Note: There are 2 correct answers to this question. Rename the deployment target. Assign a different deployment target. Create a company code. Define the group currency.

What are some responsibilities of a customer center of excellence (CCOE)? Note: There are 2 correct answers to this question. Help reduce the IT department's workload. Maintain a knowledge base with internal SAP experts. Implement standardized end-to-end operational processes. Define Key Performance Indicators (KPIs) to support continuous improvements.

How is SAP's organizational change management framework connected with the SAP Activate methodology? Note: There are 2 correct answers to this question. Each change management dimension is assigned to a specific SAP Activate phase. The SAP Activate phases build the dimensions of the organizational change management framework. The start of each change management activity is assigned to one specific SAP Activate phase. Some change management activities are executed in more than one SAP Activate phase.

Which system tenant is the first to be provisioned when implementing SAP S/4HANA Cloud, public edition?. SAP S/4HANA Cloud Sandbox system. SAP S/4HANA Cloud Development system. SAP Cloud Identity Services. Central Business Configuration system.

After integration requirements have been finalized, what is used to analyze, design, and document the integration strategy?. SAP Business Accelerator Hub. Integration Solution Advisory Methodology. Integration and API List. SAP Cloud ALM Requirements app.

Which solution is designed to help customers understand their environmental, social, and governance (ESG) data?. SAP Green Token. SAP Sustainability Footprint Management. SAP Responsible Design and Production. SAP Sustainability Control Tower.

What defines the organizational entities that are required in SAP Central Business Configuration? Note: There are 2 correct answers to this question. The selected scope. The selected deployment target. Added partner content. System consistency checks.

Which of the following are SAP Activate workstreams? Note: There are 2 correct answers to this question. Change Management. Extensibility. Data Migration. Project Management.

What are some important characteristics of "key users"? Note: There are 3 correct answers to this question. Programming skills. Collaborative attitude. Training skills. Technical system knowledge. Business expertise.

Which of the following capabilities does SAP Cloud ALM for implementation provide? Note: There are 3 correct answers to this question. Test Planning. Enterprise Architecture Managemen. Project Management. Analytics. Process Mining.

Which of the following tools are considered enablers for digital transformation? Note: There are 3 correct answers to this question. SAP Activate Community. SAP Roadmap Viewer. SAP Product Availability Matrix. Software Logistics Toolset. SAP Signavio Process Navigator.

Where is the initial list of known integrations documented?. In SAP Cloud ALM. In the Digital Discovery Assessment. In the Business Driven Configuration Questionnaire. In the Fit-to-Standard Workshops.

How does identity and access management work in SAP S/4HANA Cloud Public Edition?. Through departmental security tokens that are issued to organizational units rather than individual users. Through an AI-driven security model that adjust permissions dynamically by analyzing user behavior patterns. Through predefined business roles and catalogs assigned to users. Through a matrix-based permission system where each user is assigned to specific organizational levels and functional areas.

Which SAP products relate to the scenarios included in the SAP Activate roadmap for the Intelligent Enterprise? Note: There are 3 correct answers to this question. SAP Integrated Business Planning for Supply Chain. SAP S/4HANA Cloud. SAP Sales Cloud. SAP Concur. SAP Fieldglass.

Which of the following is part of the Explore phase in the "New Implementation of SAP S/4HANA Cloud, public edition" transition path?. Solution Validation and Delta Design. Develop and document Enablement Strategy. Fit-to-standard. Request SAP S/4HANA Cloud Development System.

Why does SAP recommend to document alternative processes when implementing SAP S/4HANA Cloud Public Edition?. To allow for future deprecation of alternative processes when standard solutions become available. To suggest new feature alternative business processes for SAP inclusion in future upgrades. To ensure alternative processes are permanently used instead of standard features. To allow the system to be fully customized for the customer.

When estimating effort required for an SAP S/4HANA Cloud Public Edition implementation project, what can you use to validate your estimates? Note: There are 2 correct answers to this question. The Digital Discovery Assessment. Joule studio. Integration scenarios via the Business Accelerator Hub. Existing WBS structures.

Why must you schedule product upgrade windows when implementing SAP S/4HANA Cloud Public Edition?. To synchronize data between test and production instances. To align with semi-annual innovation cycles. To schedule downtime for system maintenance. To plan marketing campaigns around new releases.

You have assigned a business role to an end user who has been granted access to only one specific application. While you have a day off, it turns out that the app doesn't show up on the user's launchpad. What can the user do?. Use the search function to find the app. Assign a launchpad space to the business role. Create a page and assign it to the launchpad space. Assign a different business role that provides access.

Which of the following would prevent SAP from running a Post-Upgrade Test (PUT) on a customer's behalf? Note: There are 2 correct answers to this question. The process steps have been reordered. The test process failed the execution pre-check. An execution variant has not been maintained. Data marked for deletion is picked for execution.

You are defining the testing strategy for your project. What would you include in a Scope of Integration test? Note: There are 2 correct answers to this question. The functionality of end-to-end business processes. The procedures for data migration. The connectivity between database and application servers. The connectivity with other systems.