option
Questions
ayuda
daypo
search.php

ERASED TEST, YOU MAY BE INTERESTED ON Dpvm

COMMENTS STATISTICS RECORDS
TAKE THE TEST
Title of test:
Dpvm

Description:
test dpvm2025

Author:
AVATAR
will jt
Other tests from this author

Creation Date: 13/03/2025

Category: Competitive Exam

Number of questions: 20
Share the Test:
New CommentNuevo Comentario
No comments about this test.
Content:
To set up a DP Vessel in the Auto Position Mode. The minimum sensors required are: At least two gyros with no errors enabled At least one gyro and one PRS enabled. At least three MRU with Median Test enabled. At least three PRS with Median test enabled.
When the electrical power demand from the thrusters exceeds a set percentage of the on line generating capacity what will happen? Electrical power for thrusters will be reduced temporality until additional generators are brought on line. The vessel will have a blackout of one switchboard. Just close the tie breaker and keep working Thrusters will automatically be shut down to prevent a blackout.
Is the DPVM Scheme a n entirely new training and certification scheme ? It´s a new training scheme This sheme has been always existed No, it exist since 2000 All the options .
What does the acronym DPVM stand for ? Disgusting Person Vessel member Dynamic Positioning Vessel Maintainer Dynamic Positioning Vessel Motion Dynamic Positioning Vessel Manager.
Ventiation and HVAC for spaces containing equipment essential to DP should Be designed to comply with the redundancy concept Respect the company policy work just when necessary respect the client requirement only.
According to IMO MSC 1/Circ. 1580 what means a ''Power System''? Means all componensts and systems necessary to supply means only the generators group When we talk about Power system , we are talking about UPS Power system is anorther name to power management system (PMS).
How often are the FMEA Proving Trials to be completed every 5 months every 10 years every 5 years every 1 years .
what is included as a Compressed Air System ? All the options Service air Control air Staring air .
For which DP classes is it mandatory to have FMEA? Only class 3 Only Class 2 and 3 Only Class 1 All DP classes .
Is the Footprint Plot the same as Capability Plot Sometimes yes No As captian's desire Yes .
A major reason for the loss of hydro - acoustic signals is Soliton Rain Sun spot activity beacon battery lost.
List what kind of PRS principle should be avoided in case of dense fog Radar Hydroacoustic microwave laser .
what kind of PRS is a fanbeam? and a Cyscan ? Laser Radio Hydroacoustic microwave.
Azimuth thruster ready signal received in DP controller is of following typer analog output analog input digital output digital input.
What type of sensor is fitted to a pipelayer current sensor piper tension sensor piper broken alarm sensor piper touchdown alarm.
what movement is defined as heading control ? yaw sway roll heave.
what is the most important capability pilot the full power capability plot DP manufactures capability plot the DNV capability plot the wcf plot .
Which protocol is used in DP networking? TCP/IP DP inteface protocol DP/PCP DP Networking protocol.
what movement is defined as the vertical movement Sway Heave Roll Yaw .
A major reason for the loss of hydro-acoustic signals is ? Marine growth Pressure gradient in the water column Noise and aeration from thrusters engine vibration .
Report abuse