Content:

1 + 1. 0. 2. All.

2+1. 2. 3. 0.

A planned order is a formal request that indicates. How many units of a product are needed. Where the finished goods are to be shipped. What materials are needed. Where the raw materials are stored. When the materials are needed.

Warehouse management is typically used. By organizations that have small quantities of materials. By transportation companies. By organizations that have either large quantities of materials or an expensive inventory. By storage companies. By organizations that demand better reporting for their inventory.

A stock transfer can NOT involve movements. Between storage locations in different plants. Between plants in different company codes. Between different storage types within the same storage location. Between plants in one company code. Between storage locations within one plant.

Which one of the following is not a type of organizational data that is utilized in the procurement process?. Client. Company Code. Storage Location. Purchasing Organization. Manufacturing Plant.

What is a storage location?. The place where raw materials are received. The place within a plant where materials are kept until they are needed. The place where materials are collected for staging and inspection. The place within a plant where machines are installed for production purposes. The place within a plant where finished goods are kept for sale.

Which organizational element(s) control(s) the entry of accounting data in the vendor master?. Purchasing organization. Client. Company Code. Client and Company Code. Client and Purchasing Organization.

Which of the following represent common stock statuses?. Temporary location. In transit. Blocked. Unconfirmed. Fast-moved item.

In a stock transfer from a plant where the storage location is warehouse managed to a plant where it is not, which of the following activities occurs at the receiving plant?. A goods receipt triggers WM process steps. A simple goods receipt is recorded in IM. A goods issue triggers WM process steps. A simple goods issue is recorded in IM. None of the above.

Which of the following statements concerning the material planning process are NOT TRUE?. It can involve the creation of an operations plan. The demand management step creates requirements for individual materials. The final procurement proposals trigger either the production or procurement process. The requirements step specifies the way the materials will be transported. MRP uses sales objectives to generate the final procurement proposals.

Which of the following is an important report in the production process?. Work list. Stock requirement list. Online list. BOM. None of the above.

The master data relevant to the production process are. Work centers. Material master. Bills of material. Client. Company code.

Which one of the following best describes a work center?. A location where materials are placed right before they are shipped. Another term used to describe an office building. A location where value-added work needed to produce a material is carried out. A shipping dock. A storage shelf in a warehouse.

Which of the following items represent demand elements of the availability check group?. Purchase requisitions. Production orders. Purchase orders. Safety stock. Material reservations.

Examples of … are furniture and computers. Assembling. Manufacturing. Discrete manufacturing. Process manufacturing.

Which of the following statements regarding a BOM are TRUE?. A BOM identifies the components needed to make the material. A BOM identifies the sequence of operations needed to make the materials. A BOM component can have its own BOM. A BOM identifies the material’s routing strategy.

Examples of production resource tools are. Raw materials. Fixtures. Engineering drawings. Calibration instruments. Warehouse building.

What term identifies the list of materials needed to produce one or more units of a finished good?. Routing. Source materials. Component listing. Bill of components. Bill of materials.

Which of the following is not a step in the production process?. Production authorization. Goods issue. Request production. Billing. Order release.

If a company has adopted the make-to-stock strategy, what is the trigger for the production of goods?. Need to increase inventory. Customer order. Request for quotation. Customer inquiry. Billing document.

All of the following can serve as a work center except. A group of machines. A group of people responsible for completing operations. A production line. A work area. A shipping dock.

Which process involves the actual creation of the products?. Material Planning. Procurement Process. Production Process. Fulfillment Process. Lifecycle Data Management.

___________ is concerned with matching the demand for materials in the organization with the supply. Business Planning. The Silo Effect. Project Management. Material Planning. None of the above.

Which of the following are options when a production manager receives a planned order?. Create an alternate planned order. Reject the planned order. Combine the planned order with other orders. Authorize the production. Return the order to purchasing.

A production order typically includes references to which of the following?. BOM. Routing. Work centers. Sales order. PRT.

When the finished goods have been produced the SAP ERP system allows a user to record which of the following?. Confirmation. Goods issue. Order release. Goods receipt. Authorize production.

Which of the following are included in the header information of a production order?. Status. Work center. Plant. Validity. Material number.

Which user inputs are included in a goods receipt?. Plant. Material master. Quantities. Dates. Production order number.

What does a stock requirement list contain?. Material. BOM. Plant. MRP type. All of the above.

In process industries like chemicals and beverages, the bill of materials is also known as a(n). Formula. List of chemicals. Bill of chemicals. Equation. Material list.

What operation in the routing is sometimes necessary to prepare materials for use in production?. Back-flushing. Confirmation. Material staging. Recall. Reservation.

What are the basic time elements in the production process?. Setup time. Alternate time. Build time. Teardown time. Processing time.

Which of the following can be included in processing time?. Machine time. Configuring work center. Configuring equipment. Labor time. Setup time.

Which of the following are the general classifications of time elements in production?. Floating. Volatile. Fixed. Explosive. Variable.

Which of the following are scenarios under which stock transfers involving warehouse movements can occur?. Stock transfer from a plant where the storage location is not warehouse managed to a plant where it is. Stock transfer from a storage bin in a non warehouse managed storage location to a storage bin in another non warehouse-managed storage location. Stock transfer between two non warehouse-managed storage locations. Stock transfer from a plant where the storage location is warehouse managed to a plant where it is not. Stock transfer between two warehouse-managed storage locations.

A storage location-to-storage location transfer involves which of the following?. A stock transfer among several storage locations of two plants. A stock transfer between two storage locations of two plants. A stock transfer among several storage locations within the same plant. A stock transfer between two storage locations within the same plant. A stock transfer between or among at least two storage locations within one or more plants.

Which of the following statements apply to stock transport orders?\. Goods can be received into quality inspection or blocked stock statuses. Goods received can be posted to consumption accounts rather than material accounts. Purchase requisitions can be converted to purchase orders. No history is available to track the tasks associated with STOs. An availability check can be executed to assess material availability in the supplying plant.

Which of the following are warehouse management steps related to the production process?. Create invoice. Goods issue. Create outbound delivery. Create transfer order. Create transfer requirement.

Which of the following options is appropriate when two locations are physically close to each other and there is no significant time lag between issue and receipt?. One-step procedure. Two-step procedure. Three-step procedure. Stock transport order. None of the above.

The material master is grouped into different views or segments based on which factors?. Processes that use the materials. Material type. Organizational level. Material composition. Material description.

Which of the following statements about the goods receipt step are NOT true?. It results in a decrease in inventory. It can occur during the procurement process. It can result in the creation of material and financial accounting documents. Materials are placed in an appropriate storage location with an appropriate status. It can occur during the production process.

The key organizational level associated with inventory management is. Plant. Company code. Storage section. . Storage area. Storage location.

When do unplanned receipts occur?. When an invoice has been canceled. When material is transferred to another location. When a reference document does not exist. When a stock transfer is created. When the capacity of a storage location is exceeded.

In the production process, a goods issue reflects. Moving raw materials or semifinished goods from a work center to storage bins. Shipping finished goods or trading goods to a customer to fill a sales order. Issuing finished goods to a production order. Shipping finished goods to a customer against a goods. Issuing raw materials or semifinished goods to a production order.

Shelf storage, pallet storage, and rack storage are examples of. Storage bins. Warehouses. Storage sections. Storage types. None of the above. None of the above.

Fast-moving, slow-moving, heavy, light, large, and small are examples of. Storage bins. Warehouses. Storage sections. Storage types. None of the above.

Which of the following is not a document in the production process?. Production order. Planned order. Purchase order /Sales order. Material withdrawal slip.

Which of the following defines the steps or operations necessary to create the product?. Product routing. Bill of material. Engineering drawing. Packing list.

In the production process, which of the following are not master data?. Bill of material. Customers/ Suppliers. Routings. . Work centers.

… is taking raw materials such as plastic, pellets and creating something from them, such as a plate or a cup. Assembling. Manufacturing. Discrete manufacturing. Process manufacturing. Process manufacturing.

In the producting process, which of the following screens in SAP are the primary sources of instance level information?. Stock requirement list. Production order status. Purchase order history. Sales order. Invoice.

A production order typically not includes references to which of the following?. BOM. Routing. Work centers. Sales order. PRT.

Which of the following information is not necessary to process a material withdrawal slip?. Material number(s). Received by. Authorized by. Issued by. Issued by.

Report abuse