Questions
ayuda
option
My Daypo

ERASED TEST, YOU MAY BE INTERESTED ONEstudo de Prova

COMMENTS STATISTICS RECORDS
TAKE THE TEST
Title of test:
Estudo de Prova

Description:
Estudo de Prova A

Author:
Ximenes
(Other tests from this author)

Creation Date:
19/07/2020

Category:
Others

Number of questions: 264
Share the Test:
Facebook
Twitter
Whatsapp
Share the Test:
Facebook
Twitter
Whatsapp
Last comments
No comments about this test.
Content:
Which content is made available after you activate SAP Best Practices for a new financial implementation? There are 2 correct answers to this question. Pre-configured business processes Standard chart of accounts Online help Implementation Guide.
In which phase of the SAP Activate methodology does the team complete the Cut-over Rehearsal? Deploy Explore Prepare Realize.
In which SAP Activate methodology phase does the team complete the Transformation Strategy? Deploy Realize Prepare Explore.
What is the minimum number of quality gates mandated by the SAP Activate methodology? 0 5 3 4.
Who determines the priority of user stories in the backlog of an Agile project? Project Team SCRUM Master Product Owner Project Manager.
Which activities are critical for delivering Agile projects? There are 2 correct answers to this question. Release planning Retrospective agenda creation Blueprint scheduling Sprint planning.
What are the benefits of the SAP best practices? There are 3 correct answers to this question. Simple on-boarding to cloud Reduced functional scope Predictable results Fixed organizational structure Fast time to value.
How do you gain access to the SAP Activate Methodology Jam site? Submit e-mail address via on-line form Join SAP S/4HANA group on SAP Community Network Register on SAP Service Marketplace Send e-mail to SAP contact address.
What does SAP Activate recommend to keep team members informed and aligned? Daily status meeting with project manager Daily team stand-up meeting Daily e-mail status updates to project manager Daily progress review meeting with sponsor.
What do you do during post cutover? Perform the Verification Session of the SAP Going Live Check Perform Technical System Test Setup Operational Support Conduct Organizational Readiness Check.
What must you do when you implement SAP Business Suite On-Premise with SAP Best Practices? Activate and apply SAP Best Practices with SAP Solution Manager Activate and apply SAP Best Practices content with the self-service configuration UI Apply SAP Best Practices with the Configure your Solution application Assemble and apply SAP Best Practices to the system.
How many deliverables are a part of the Key Deliverable 'Project Initiation'? Two Four Three One.
What does a project jump-start include for a new implementation of SAP S/4HANA on-premise edition? Full project SCRUM SAP Best Practices Rapid prototyping Project team training.
What is the hierarchy level under Phase in the SAP Jam space for SAP Activate on-premise? Key Deliverable Scenario Work Stream Task.
Which of the following tasks are part of the Production support after the Go Live key deliverable? There are 2 correct answers to this question. Resolve issues identified during the Hyper Care period Provide further training to customer end users Perform a Technical systems test Set up the Operations Control Center.
Which accelerations can you use during the Scope Validation/Fit-Gap Analysis activity in the Explore Phase? There are 2 correct answers to this question. Solution Validation Workshop Sprint Backlog Template Quality Gate Checklist RICEF Specification Template.
Which estimation technique can be used in Agile project delivery to size the user stories during sprint planning? Product Owner’s relative estimate of the effort that will be needed to implement the user story Relative estimate in ideal person days that reflects the best estimate provided by the project team Detailed bottom-up effort estimate the breaks each user story up into hours or shorter tasks Detailed bottom-up effort estimate by the SCRUM Master in story points based on the user story complexity.
Which of the following are not phases of the SAP Activate methodology? There are 2 correct answers to this question. Realize Preparation Go-Live & Support Prepare.
Which of the following tools is used to install SAP S/4HANA. Data Migration server Cloud Application Library SAP Solution Manager SWPM (Software Provisioning Manager).
What are the responsibilities of the Product Owner in release and sprint planning? There are 2 correct answers to this question. Define objectives for each release Estimate the backlog user stories Prioritize backlog user stories by business priority Analyze the functional and technical dependencies between the user stories.
Which of the following content best outlines the scope of the Integration Test? a. Prototype b. Delta/gap solutions c. Data flows with non-SAP application a. Solution baseline b. Delta configuration c. Data flows between SAP solutions a. Prototype b. Delta configuration c. Data flows between SAP solutions a. Solution baseline b. Delta/gap solutions c. Data flows with non-SAP application.
Which activities are part of the Design and Configuration application of the SAP Activate methodology? There are 2 correct answers to this question. Conduct Scope Validation Schedule kick-off workshop Confirm Integration prerequisites Perform Fit/Gap Analysis.
Which of the following is not correct about workstreams? There are 2 correct answers to this question. It is assigned as an attribute to phases, deliverables and tasks It is a collection of related deliverables Workstreams are dependent on phase start and end It can span phases.
Identify the two landscape transformation specific tasks in the explore phase. There are 2 correct answers to this question. Perform Client transfer Setup Landscape Transformation Software Define the Data Migration Architecture Run a Landscape Transformation Assessment.
How are the build and test tasks planned and executed in the Realize phase? With Q-Gates for sign off after each iteration By executing regression tests after each iteration By using incremental build in fixed-scope iteration By using the sprint backlog list as input for each iteration.
Who determines the priority of user stories in the backlog of an Agile project? Product Owner Project Manager SCRUM Master Project Team.
What are the three pillars of SAP Activate? There are 3 correct answers to this question. SAP Best Practices SAP S/4HANA in-memory database SAP Activate Methodology Guided Configuration SAP Solution Manager.
What is the final activity in the Realize phase of a new implementation of SAP S/4HANA cloud edition? End-to-End walkthrough Data migration Readiness check Solution validation.
In which SAP Activate methodology phase does the team complete the Integration Validation? Realize Prepare Explore Deploy.
What is the most granular level of the methodology you can view in the Roadmap Viewer? Scenario Task Deliverables Phase.
What information does the product team need so that they can estimate the relative size of backlog user story correctly? Available project resources Test strategy Definition of Done Overall project schedule.
What is SAP Activate? A step-by-step instruction on how to remove from SAP best practices to your custom solution A methodology for each of the deployment modes (cloud , on-premise, hybrid) A bundle of ASAP , SAP Launch , and Rapid Deployment Solutions A combination of SAP best practices , methodology, and guided configuration.
In which phase do you verify that the SAP Best Practice solution scenarios meet the business needs of the customer? Explore Deploy Realize Prepare.
Which of the following activities are part of the Realize Phase of a System Conversion journey to SAP S/4HANA On-Premise Edition? There are 3 correct answers to this question. Operations impact analysis Custom code adjustment Delta configuration Development system migration Sandbox system migration.
What is the purpose of a firm-up sprint? To demonstrate functionality from previous sprint To perform sprint testing To revise a release plan and sprint plan To run end-to-end integration test.
Which new project roles are introduced with the SAP Activate Agile methodology? There are 2 correct answers to this question. SCRUM Master Product Owner Integration Lead Design Thinking Coach.
What are deliverables of the Application: Integration work stream in the prepare phase? There are 3 correct answers to this question. Fit/Gap Analysis Data Cleansing Security Checks Adaptation Specifications Network Connectivity Checks.
Which of the following activities support the Realize Phase of a System Conversion journey to SAP S/4HANA On-Premise Edition? There are 2 correct answers to this question. Custom code Adjustment planning Data aging configuration Non-production systems migration Value determination.
Which of the following SAP S/4HANA Landscape Transformation options are enabled? There are 3 correct answers to this question. System Upgrade System Consolidation Migration of Business Units Migration of Selected Applications Security Migration.
Which of the following is a Key Deliverable of the Prepare phase? Solution Scope and Value Determination Change Impact Analysis and Communication Plan Baseline Build Release and Sprint Plan.
Which of the following are the key responsibilities of the Scrum Master? There are 3 correct answers to this question. Task initiator Responsible for the project delivery Team protection Leadership skill Team support.
What are key characteristics of the implementation approach in SAP Activate Methodology? There are 3 correct answers to this question. Premium engagement ready On-premise only Fixed scope Validate solution Start with SAP Best Practices.
Which key activities does the Guided Configuration support you with? There are 3 correct answers to this question. Manage roles of configuration users Train new users Create test data Test configured processes View solution scope.
What is the best target environment for a System Conversion journey is as described in the SAP Activate methodology? SAP Hybris SAP S/4HANA Cloud Edition SAP S/4HANA On-Premise Edition Hybrid of SAP S/4HANA Cloud Edition and SAP S/4HANA On-Premise Edition.
In what respect is SAP Activate Methodology different from the ASAP Methodology? Supports cloud deployments Supports only new implementations Leverages iterative incremental build Includes Fit/Gap analysis instead of Blueprint.
Which of the following building blocks are part of the SAP S/4HANA platform? There are 2 correct answers to this question. SAP Fiori UX SAP HANA in-memory database SAP Solution Manager LOB Cloud Solution.
Which of the following is not correct about Fit/Gap Analysis? There are 2 correct answers to this question. Minimize the needs for rework during realization. Validate pre-activate and pre-assembled solution in the development system. Prioritize delta requirement and gaps. Drive towards adopting customers processes.
When does the project team receive formal confirmation that the user stories are completed to the satisfaction of the product owner? During the sprint review During the daily SCRUM meeting During the sprint retrospective During user acceptance testing.
Which of the following tasks are required in the Prepare Phase? There are 3 correct answers to this question. Approve the test strategy Identify relevant SAP Best Practices Set up the infrastructure to support the project Train the project team Define the communication plan.
SAP now offers the ability to deploy and manage solutions in which of the following environments? Cloud Cloud and On-premise Cloud, On-premise and Hybrid On-premise.
Which key deliverable includes the development of RICEFW objects? Enhancement Delivery Development Build Sprint Execution Custom Extensions Management.
What does a project jump-start include for a new implementation of SAP S/4HANA on-premise edition? Project team training Full project SCRUM Rapid prototyping SAP Best Practices.
What do you do during an iterative approach to build a solution? Build the solution module by module Include frequent inspection check-points Deliver a prototype of the solution Provide a working solution only at the end of the release.
What is the focus of a SCRUM of SCRUMS in an Agile context? Integration topics Backlog management Best Practice adoption Communication to the Project Management Office.
What can users do in the Roadmap Viewer tool? Display and navigate detailed SAP Activate methodology WBS Upload SAP Activate WBS into SAP Solution Manager7.1 Download full SAP Activate methodology content for use off-line Create a customer-specific version of SAP Activate Methodology.
What is a key characteristic of SAP Activate for new implementations of S/4HANA cloud edition? Waterfall approach Design-based Limited involvement of business stakeholders Start with executable content.
In the System conversion to SAP S/4 HANA Deploy phase, which of the following tasks are included? Hyper care support Scheduling project plan Interface setup Final testing.
What is the objective of a sprint retrospective meeting? Define the stakeholder management approach Improve the SCRUM process Review and prioritize the backlog Provide formal feedback to the project manager.
Which content packages are available in the SAP Package Library? There are 2 correct answers to this question. Solution Builder SAP Best Practices Rapid Deployment Solutions SAP Activate Methodology.
How can SRCUM teams be organized? By work stream By job title By project phase By project governance level.
Which of the following is true about a cloud implementation project? There are 2 correct answers to this question. In the prepare phase of a cloud implementation project the project team provide the customer with materials to review as self-enablement. Starter Systems are not required to be in place for the 'Fit to Standard' workshops. The entire transport system is kept intact and up and running. The Starter System is specific to SAP S/4HANA Cloud.
Which tool can you use to collaborate with other SAP Activate methodology practitioners? Roadmap Viewer SAP Implementation Assistant SAP Jam SAP Solution Manager.
What tool do you use to configure an SAP Business Suite on-premise solution? Configuration Composer Expert Configuration SAP Implementation Guide ABAP Workbench.
Which navigation option do you use in the Roadmap Viewer to access the SAP Activate Methodology content? Navigate by assigned Delivery Mode Navigate by work stream Navigate by RACI matrix accountability Navigate by Project Team Member Role.
How can the project manager help to keep momentum in the project and help to keep the customer involved? There are 2 correct answers to this question. Leverage agile cycles to build and test the solution Walk through the solution processes with the stakeholders Increase the number of Q-Gates Add customer resources to the project to reduce the need for formal training.
Which of the following Key Deliverables do you complete in the Solution Design work stream in the Explore phase? There are 3 correct answers to this question. Design for the Gaps and Deltas Solution Scope and Value Determination Data Migration Approach Baseline Build Validation Workshops.
In which tools can the project team across the SAP Activate Methodology content including accelerators? There are 2 correct answers to this question. SAP Service Marketplace Roadmap Viewer SAP Jam SAP Community Network.
Which of the following is not a characteristic that the quality principles are based on? Best Practices SAP Quality Award example winners International standard Experience of Typical Pitfalls.
Which collaboration features can SAP Activate Jam users access? There are 2 correct answers to this question. Tweet questions Comment on documents Ask questions Update Key Deliverable wikis.
What technique helps agile project teams to prioritize a large, flat backlog? User Story Mapping Fit/Gap Analysis Planning Poker Retrospective.
In which phase of the SAP Activate Methodology does the team complete the System Assessment? Deploy Prepare Explore Realize.
What is the purpose of the Solution Builder tool in the SAP Activate Guided Configuration? To activate the Best Practices content To personalize activated, ready-to run business processes To create delta building blocks for complementary content To create customer-specific scope items.
In Which phase does the Transition to Operations work stream start? Deploy Explore Realize Prepare.
In which phase do you create a prioritized list of user requirements? Realize Explore Prepare Deploy.
Which of the following can be used to navigate through the roadmap? There are 2 correct answers to this question. Workstreams Deliverables Phases Tasks.
What are SCRUM of SCRUMS? Mechanism for gathering and validating requirements Integration meeting between the various project teams Frequent inspection of code and configuration prior to quality gates Alternative to regular SCRUM process for smaller teams.
Which criterion does the Product Owner use to sequence the product backlog? Business priority Relative effort Complexity Resource availability.
Your project is preparing for the Fit/Gap analysis workshops. If you use the Agile approach, what sequence of activities do you perform in the Explore Phase? a. Set reference value b. Prioritize initial backlog c. Conduct Delta Design workshops d. Conduct Solution Validation workshops a. Conduct Solution Validation workshops b. Set reference value c. Prioritize initial backlog d. Conduct Delta Design workshops a. Set reference value b. Conduct Solution Validation workshops c. Prioritize initial backlog d. Conduct Delta Design workshops a. Conduct Solution Validation workshops b. Conduct Delta Design workshops c. Set reference value d. Prioritize initial backlog.
Which deliverable is specific to on-premise and NOT for the cloud? Adaptation Specification Learning Needs Analysis Technical Design Solution Knowledge Transfer.
Which activity is part of the SAP Activate Methodology for a new implementation of SAP S/4HANA on-premise edition but NOT of the cloud edition? Technical System Test Unit Test User Acceptance Test End-to-End Integration Test.
Which of the following is not correct about the REALIZE phase? There are 2 correct answers to this question. The beginning of the Realize phase the team prepares a list of all the requirements in a backlog. The project team ensures that the build is meeting the business requirements. The team prepares for operations so that the functionality can be brought live. Detailed design workshops are held.
What is the purpose of the scrumboard? To document the results of integration testing To show the functional breakdown of the solution scope To visualize team progress To manage the resource load.
In which SAP Activate methodology phase does the team identify and design functional quick wins in scope of the conversion project? Explore Prepare Deploy Realize.
What structure level do you see when you access the Roadmap Viewer and chose work stream navigation? Scenario Deliverable Scope Item Task.
What is the key characteristic of Agile project delivery? Frequent and detailed project scheduling Iterative build with frequent inspections Frequent Quality Gates Formal and detailed documentation.
Which of the following are the benefits of SAP JAM? There are 2 correct answers to this question. Highly available Reduced Recovery Time User collaboration Easy to use.
What is the purpose of the SAP Activate Methodology? To provide end-to-end integrated application lifecycle management To accelerate the initial implementation of SAP S/4HANA To manage project and solution documentation To enable access to the SAP ecosystem.
Which activity helps the project team to add the user stories to the product backlog? Planning the User Acceptance Test Preparing a Project Schedule Conducting the Solution Validation Confirm Integration prerequisites.
Which activities are part of the Design and Configuration application of the SAP Activate methodology? There are 2 correct answers to this question. Perform Fit/Gap Analysis Schedule kick-off workshop Conduct Scope Validation Confirm Integration prerequisites.
Which of the following activities are performed in the Explore phase of SAP Activate in SAP S/4HANA Implementation? There are 3 correct answers to this question. Adjusting custom code objects Implementing best practices Creating transactional data Organizational structure Changing master data.
What are the responsibilities of the Product Owner in release and sprint planning? There are 2 correct answers to this question. Prioritize backlog user stories by business priority Analyze the functional and technical dependencies between the user stories Estimate the backlog user stories Define objectives for each release.
Your project is performing some high-level planning for a System Conversion journey from SAP Business Suite to SAP S/4HANA on-premise edition. What is the correct sequence of selected key deliverables across the project phases? a. Production Readiness Check b. Detailed system Assessment c. Code Adjustment d. Validation of Migration a. Detailed system Assessment b. Production Readiness Check c. Code Adjustment d. Validation of Migration a. Code adjustment b. Detailed System Assessment c. Production Readiness Check d. Validation of Migration a. Detailed system Assessment b. Code Adjustment c. Validation of Migration d. Production Readiness Check.
What must you do when you implement SAP Business Suite On-Premise with SAP Best Practices? Activate and apply SAP Best Practices content with the self-service configuration UI Assemble and apply SAP Best Practices to the system Apply SAP Best Practices with the Configure your Solution application Activate and apply SAP Best Practices with SAP Solution Manager.
Which activities are part of the Application: Solution Adaption work stream of SAP Activate for new implementations? There are 3 correct answers to this question. Change Management Plan Value Determination Production Support Plan Scope Validation Value Audits.
What structure level do you see when you access the Roadmap Viewer and chose work stream navigation? Deliverable Scope Item Scenario Task.
Which content packages are available in the SAP Package Library? There are 2 correct answers to this question. Solution Builder SAP Activate Methodology SAP Best Practices Rapid Deployment Solutions.
Which activities are part of the Design and Configuration application of the SAP Activate methodology? There are 2 correct answers to this question. Confirm Integration prerequisites Conduct Scope Validation Schedule kick-off workshop Perform Fit/Gap Analysis.
The tasks associated with Landscape transportation are in which workstream? Application Solution Adoption Technical Architecture and Infrastructure System & Data Migration Transition to Operations.
Which deliverable is specific to on-premise and NOT for the cloud? Technical Design Solution Knowledge Transfer Learning Needs Analysis Adaptation Specification.
In which phase do you create a prioritized list of user requirements? Explore Deploy Prepare Realize.
Which of the following statements about Scrum is correct? The three ceremonies are sprint planning, daily scrum, sprint review (retrospective). In Scrum, as best practices, we have three main roles, and three artifacts or three ceremonies. Scrum Master defines and prioritizes features and gathers requirements. In Scrum, the team is Self-organized, define all task necessary for all project life cycle.
What is the purpose of the scrumboard? To visualize team progress To show the functional breakdown of the solution scope To document the results of integration testing To manage the resource load.
In which tools can the project team across the SAP Activate Methodology content including accelerators? There are 2 correct answers to this question. Roadmap Viewer SAP Community Network SAP Jam SAP Service Marketplace.
What tool do you use to configure an SAP Business Suite on-premise solution? ABAP Workbench Expert Configuration Configuration Composer SAP Implementation Guide.
What is a key characteristic of SAP Activate for new implementations of S/4HANA cloud edition? Start with executable content Design-based Limited involvement of business stakeholders Waterfall approach.
Which of the following statements about Scrum is correct? The three ceremonies are sprint planning, daily scrum, sprint review (retrospective). In Scrum, as best practices, we have three main roles, and three artifacts or three ceremonies. Scrum Master defines and prioritizes features and gathers requirements. In Scrum, the team is Self-organized, define all task necessary for all project life .
What structure level do you see when you access the Roadmap Viewer and chose work stream navigation? Task Scope Item Scenario Deliverable.
What do you do during Sprint Execution? Measure the sprint progress with a percentage complete report End a sprint when the sprint backlog items are all complete Present status of selected user stories in the sprint scope on a scrumboard Hold a retrospective at the end of each week.
In which SAP Activate methodology phase does the team complete the Transformation Strategy? Explore Prepare Realize Deploy.
What are SCRUM of SCRUMS? Frequent inspection of code and configuration prior to quality gates Mechanism for gathering and validating requirements Integration meeting between the various project teams Alternative to regular SCRUM process for smaller teams.
What is the purpose of the SAP Activate Methodology? To manage project and solution documentation To provide end-to-end integrated application lifecycle management To enable access to the SAP ecosystem To accelerate the initial implementation of SAP S/4HANA.
What are the responsibilities of the Product Owner in release and sprint planning? There are 2 correct answers to this question. Analyze the functional and technical dependencies between the user stories Define objectives for each release Estimate the backlog user stories Prioritize backlog user stories by business priority.
Which of the following activities are part of the Deploy Phase of a Landscape Transformation journey to SAP S/4HANA On-Premise Edition? There are 2 correct answers to this question. Access organizational and production readiness Optimize software Change Control Management Training delivery Solution Activation.
What is the key characteristic of Agile project delivery? Formal and detailed documentation Iterative build with frequent inspections Frequent Quality Gates Frequent and detailed project scheduling.
Which criterion does the Product Owner use to sequence the product backlog? Business priority Complexity Resource availability Relative effort.
What is a deliverable of the Application. Customer Team Enablement work stream in the Prepare phase of SAP Activate? Learning plan Project Documentation Project Charter Knowledge transfer to end users.
In which phase of the SAP Activate methodology does the team complete the Transformation Planning? Explore Deploy Realize Prepare.
Which of the following are the benefits of SAP JAM? User collaboration Reduced Recovery Time Easy to use Highly available.
Which of the following are available in the initial SAP Methodologies JAM Page? There are 2 correct answers to this question. Summary Accelerators Task description Roadmaps.
What are the responsibilities of the Project Team on level 4 in the picture below? There are 2 correct answers to this question. Set Project policy, standards and oversight Set business priorities, goals and objectives Identify and resolve issues and risks Perform status reporting and communication.
In which SAP Activate methodology phase does the team identify and design functional quick wins in scope of the conversion project? Realize Prepare Deploy Explore.
When do you perform User Acceptance Testing during the Agile Build? During each Firm-up Sprint After Integration Testing Before Integration Testing After each Sprint.
When does the project team receive formal confirmation that the user stories are completed to the satisfaction of the product owner? During the sprint review During the daily SCRUM meeting During the sprint retrospective During user acceptance testing .
In the System conversion to SAP S/4 HANA Deploy phase, which of the following tasks are included? Hyper care support Scheduling project plan Interface setup Final testing .
What tool do you use to configure an SAP Business Suite on-premise solution? Configuration Composer Expert Configuration SAP Implementation Guide ABAP Workbench .
In which tools can the project team across the SAP Activate Methodology content including accelerators? There are 2 correct answers to this question. SAP Service Marketplace Roadmap Viewer SAP Jam SAP Community Network .
What is the purpose of the Solution Builder tool in the SAP Activate Guided Configuration? To activate the Best Practices content To personalize activated, ready-to run business processes To create delta building blocks for complementary content To create customer-specific scope items .
In Which phase does the Transition to Operations work stream start? Deploy Explore Realize Prepare .
Which accelerations can you use during the Scope Validation/Fit-Gap Analysis activity in the Explore Phase? There are 2 correct answers to this question Solution Validation Workshop Sprint Backlog Template Quality Gate Checklist RICEF Specification Template .
Which activities are part of the Design and Configuration application of the SAP Activate methodology? There are 2 correct answers to this question. Conduct Scope Validation Schedule kick-off workshop Confirm Integration prerequisites Perform Fit/Gap Analysis .
Which of the following is not correct about the REALIZE phase? There are 2 correct answers to this question. The beginning of the Realize phase the team prepares a list of all the requirements in a backlog. The project team ensures that the build is meeting the business requirements. The team prepares for operations so that the functionality can be brought live. Detailed design workshops are held.
In which SAP Activate methodology phase does the team identify and design functional quick wins in scope of the conversion project? Prepare Realize Deploy Explore.
In which of the following project phases is it important to plan and schedule data loads followed by load validation activities? Explore Realize Deploy Prepare.
What is a benefit of using Guided Configuration instead of the Implementation Guide? It eliminates the need to generate transport requests for configuration settings It ensures SAP updates do NOT conflict with customer configurations It ensures configuration is done using SAP Solution Manager It eliminates the need for Content Lifecycle Management.
In SAP Activate, what replaces the detailed Blueprint from ASAP? Fit/Gap Workshops Business Process Mapping Custom Extension management Value Determination.
In which phase you execute the User Acceptance Test? Build and Test Realize Final Preparation Deploy.
What is a difference between the SAP Activate methodology for a new implementation of SAP S/4HANA cloud edition and a new implementation of SAP S/4HANA on-premise? For on-premise, there is an additional Q-Gate for system installation For the cloud edition, there is an additional work stream for integration with on-premise systems For on-premise, there are additional deliverables for the system setup For the cloud edition, there is an additional Q-Gate for integration with on-premise .
In which phase do you create a prioritized list of user requirements? Realize Deploy Prepare Explore.
Arrange the following in the correct sequence of steps followed for a 'Fit to Standard' workshop. Review Best Practice Process Flow, Demonstrate Business Scenarios and Concepts, Identify required configuration, Discuss how the process fit with customer requirements, Enable customer on execution of scenarios, Identify gaps Discuss how the process fit with customer requirements, Review Best Practice Process Flow, Demonstrate Business Scenarios and Concepts, Identify required configuration, Enable customer on execution of scenarios, Identify gaps Review Best Practice Process Flow, Demonstrate Business Scenarios and Concepts, Discuss how the process fit with customer requirements, Identify gaps, Identify required configuration, Enable customer on execution of scenarios Demonstrate Business Scenarios and Concepts, Review Best Practice Process Flow, Identify required configuration, Discuss how the process fit with customer requirements, Enable customer on execution of scenarios, Identify gaps.
Which of the following is true about a cloud implementation project? There are 2 correct answers to this question. In the prepare phase of a cloud implementation project the project team provide the customer with materials to review as self-enablement. The Starter System is specific to SAP S/4HANA Cloud. The entire transport system is kept intact and up and running. Starter Systems are not required to be in place for the 'Fit to Standard' workshops.
In which phase of the SAP Activate methodology does the team complete the Transformation Planning? Realize Prepare Explore Deploy.
What is a deliverable of the Application. Customer Team Enablement work stream in the Prepare phase of SAP Activate? Learning plan Project Documentation Knowledge transfer to end users Project Charter.
What is a difference between the SAP Activate methodology for a new implementation of SAP S/4HANA cloud edition and a new implementation of SAP S/4HANA on-premise? For on-premise, there is an additional Q-Gate for system installation For the cloud edition, there is an additional Q-Gate for integration with on-premise For on-premise, there are additional deliverables for the system setup For the cloud edition, there is an additional work stream for integration with on-premise systems.
What is the key characteristic of Agile project delivery? Frequent and detailed project scheduling Frequent Quality Gates Formal and detailed documentation Iterative build with frequent inspections.
Which of the following tools are used for rapid database migration? There are 2 correct answers to this question. SWPM (software provisioning manager) Database Migration Option (DMO) Software Update Manager (SUM) SAP Solution Manager.
Which of the following statements about Scrum is correct? In Scrum, the team is Self-organized, define all task necessary for all project life cycle. The three ceremonies are sprint planning, daily scrum, sprint review (retrospective). In Scrum, as best practices, we have three main roles, and three artifacts or three ceremonies.Scrum Master defines and prioritizes features and gathers requirements Scrum Master defines and prioritizes features and gathers requirements.
Which of the following are available in the initial SAP Methodologies JAM Page? There are 2 correct answers to this question. Summary Accelerators Roadmaps Task description.
Which activity helps the project team to add the user stories to the product backlog? Preparing a Project Schedule Assessing Project Risks Planning the User Acceptance Test Conducting the Solution Validation.
Which of the following is not correct about the REALIZE phase? There are 2 correct answers to this question. The project team ensures that the build is meeting the business requirements. The team prepares for operations so that the functionality can be brought live. The beginning of the Realize phase the team prepares a list of all the requirements in a backlog. Detailed design workshops are held.
According to the Definition of Done, which activity must be completed for each sprint? Solution must be built and configured in the development system (DEV) Functionality must be tested in the Quality system (QAS) End user training must be delivered Functionality must be released to the business.
In which phase you execute the User Acceptance Test? Final Preparation Deploy Realize Build and Test.
What is the purpose of the Solution Validation activity in the Explore phase? There are 3 correct answers to this question. To educate project participants To log additional scope items To verify technical installation To identify gaps To challenge changes to standard.
Which Value Chains does SAP Solution Manager 7.2 deliver? There are 3 correct answers to this question. Request-to-Fulfill Requirements-to-Deploy Hire-to-Retire Cash-to-Order Detect-to-Correct.
How would you describe the Explore phase in the "New Implementation of SAP S/4HANA Cloud" transition path? Fit-to-standard Setup and Enablement Simplification and Custom Code Impact Analysis Solution Validation and Delta Design.
What is the difference between the "New Implementation of SAP S/4HANA Cloud" and the "New Implementation of SAP S/4HANA" transition paths? There are 2 correct answers to this question SAP S/4HANA uses the Implementation Guide (IMG) and the In-App Extensibility Option for configuration and development and SAP S/4HANA Cloud uses SSCUls and the Side-by-Side Extensibility Option. Upgrades of SAP S 4HANA Cloud are managed by SAP,and upgrades of SAP S/4HANA are managed by the customer. There are different roles in the Application Design and Configuration workstream. Different sets of work streams are used for these transition paths.
What tool provides sizing estimations for the "System Conversion" transition path? Scope and Effort Analyzer SAP Transformation Navigator SAP Readiness Check SAP Best Practices Explorer.
Which artifacts in the Testing work stream are created within the Realize phase for the New Implementation of SAP S/4HANA Cloud" transition path? There are 2 correct answers to this question. Reporting Functional Specifications Functional Specifications User Acceptance Test – Plan Functional Test Scenarios.
How do you achieve frequent checkpoints with the End User in an? There are 2 correct answers to this question. Demo the SAP Model Company User Acceptance Test Solution Demo for Sprints Solution Review for Waves.
What is the difference between the "System Conversion and the "New Implementation of SAP S/4HANA" transition paths? There are 2 correct answers to this question. SSCUls are used in System Conversion for configuring SAP S/4HANA through the Manage Your Solution app. In the Realize phase, custom code is adjusted rather than developed for System Conversion. In the Realize phase, data is converted and NOT migrated for System Conversion There are different upgrade cycles.
Which of the following activities are part of the Deploy Phase of a Landscape Transformation journey to SAP S/4HANA On-Premise Edition? There are 2 correct answers to this question. Optimize software Change Control Management Access organizational and production readiness Training delivery Solution Activation.
How does the provisioning of SAP S/4HANA Cloud differ from the setup of SAP S/4HANA? There are 2 correct answers to this question. SAP S/4HANA systems take less time to provision than SAP S/4HANA Cloud systems. To start a Solution Validation workshop, a DEV system is available for SAP S/4HANA, while a Starter system is required for Fit-to-standard for SAP S/4HANA Cloud. There is a Preset phase for 0-system, which is unique for SAP S/4HANA Cloud. In SAP S/4HANA Cloud, decommissioning/shutdown of the Starter system is initiated automatically after the P-system is requested through the Manage Your Solution app, whereas in an SAP S/4HANA system, the DEV system persists.
What is the correct order of the SAP Activate Methodology phases? Prepare -> Discover -> Explore -> Realize -> Deploy -> Run Plan -> Design -> Build -> Operate Plan -> Build -> Run -> Sustain Discover -> Prepare -> Explore -> Realize -> Deploy -> Run.
Which of the following are examples of Ready-to-run SAP S/4HANA systems? There are 2 correct answers to this question. SAP Model Company SAP Best Practices Explorer Fully Activated Appliance SAP Mission ControlCenter.
What are two important approaches, based on the Control Center concept that SAP proposes to use for streamlined implementation and operations within Premium Engagements? There are 2 correct answers to this question. Always Connected Build SAP Like a Factory Run SAP Like a Factory Intelligent Enterprise.
What is the purpose of the Solution Validation activity in the Explore phase? There are 3 correct answers to this question. To log additional scope items To verify technical installation To challenge changes to standard To educate project participants To identify gaps.
What is the term used for workshops, which are intended to set value targets, validate SAP Standard functionality against customer requirements. And collect delta requirements in the "New Implementation of SAP S/4HANA" transition path? Design Thinking Solution Validation Delta Design Fit-to-Standard.
Which estimation technique can be used in to size the User Stories during Sprint Planning? Detailed bottom-up effort estimate by the Scrum Master in Story Points based on the User Story complexity Relative estimate in Ideal Person Days that reflects the best estimate provided by the project team Detailed bottom-up effort estimate that breaks each User Story up into hours or shorter tasks Product Owner's relative estimate of the effort that will be needed to implement the User Story.
Which of the following will help you avoid modification of standard functionality in SAP S/4HANA Cloud, Single Tenant Edit on? There are 3 correct answers to this question The 5 Golden Rules Contract restrictions in SAP HANA Enterprise Cloud and SAP S/4HANA Cloud, Single Tenant Edition The Side-by-Side Extensibility Option (such as SAP Cloud Platform) A developer key SAP Code Inspector.
What does the Side-by-Side Extensibility Option mean? Transfer reporting to BW/4HANA Extensibility based on the SAP Cloud Platform and published APls Context-aware SAP S/4HANA extensions, focused on tight integration Have two SAP S/4HANA instances - one for standard code, and another for custom developments.
What Solution Operations Framework can customers use to create a joint Business and IT organization, that will secure transparency and efficiency of SAP implementation, innovation, operation, and quality of business processes and systems? Customer Center of Expertise SAP Operations Control Center Business Transformation Management Methodology SAP Activate.
What is the primary purpose of the SAP Activate Methodology? To manage solution documentation To provide the sequence of actions in the project To enable access to the SAP ecosystem To provide end-to-end Application Lifecycle Management.
Which of the following content best outlines the sequence of testing within the Application Design and Configuration work stream in the Realize phase? i. String test ii. User Acceptance Test iii. Integration Test i. Integration Test ii. User Acceptance Test iii. String test i. String test ii. Integration Test iii. User Acceptance Test i. Data Migration ii. String test iii. User Acceptance Test.
Which tools does SAP Activate provide to support Guided Configuration? There are 3 correct answers to this question. Model Company Expert Configuration Self Service Configuration SAP Solution Composer Solution Builder.
What are some of the key characteristics of the implementation approach in SAP Activate Methodology? There are 3 correct answers to this question. Fixed scope On premise only Delta-based Cloud Ready Based on Ready-to-use Content.
What is a benefit of using Guided Configuration instead of the Implementation Guide? It ensures SAP updates do NOT conflict with customer configurations It ensures configuration is done using SAP Solution Manager It eliminates the need for Content Lifecycle Management It eliminates the need to generate transport requests for configuration settings.
Arrange the following in the correct sequence of steps followed for a 'Fit to Standard' workshop. Demonstrate Business Scenarios and Concepts, Review Best Practice Process Flow, Identify required configuration, Discuss how the process fit with customer requirements, Enable customer on execution of scenarios, Identify gaps Review Best Practice Process Flow, Demonstrate Business Scenarios and Concepts, Discuss how the process fit with customer requirements, Identify gaps, Identify required configuration, Enable customer on execution of scenarios Discuss how the process fit with customer requirements, Review Best Practice Process Flow, Demonstrate Business Scenarios and Concepts, Identify required configuration, Enable customer on execution of scenarios, Identify gaps Review Best Practice Process Flow, Demonstrate Business Scenarios and Concepts, Identify required configuration, Discuss how the process fit with customer requirements, Enable customer on execution of scenarios, Identify gaps.
Which of the following are benefits of using Ready-to-use Content? There are 2 correct answers to this question. Fast Time-to-Value Run SAP Like a Factory Minimized Total Cost of Ownership Predictable results.
Which artifacts are created within Application Design and Configuration work stream in the Explore phase of the "New Implementation of SAP S/4HANA" transition path? There are 3 correct answers to this question. Detailed Design - Business Process Roles and Authorizations Management Concept Delta Requirements List - Register Organization Structure Specification Project Procedure - Mock-up Modeling.
Which of the following are part of the 10 SAP Quality Principles? There are 2 correct answers to this question. Plan one phase at a time. Start scoping early. Use standard functionality optionally. Achieve production readiness.
Which statements are part of the 5 Golden Rules for SAP S/4HANA Cloud, Single Tenant Edition? There are 2 correct answers to this question. Document deviations from Golden Rules for transparency and future use in upgrades. Use SAP Solution Manager 7.2 with Focused Build. Foster a cloud mindset and adherence to the Fit-to-Standard approach. Stick to the security standards of the customer organization.
How often will an upgrade be performed on an SAP S/4HANA Cloud, Single Tenant Edition environment? Every quarter One upgrade and two feature packs per year Schedule is defined by Service Level Agreement for SAP HANA Enterprise Cloud and SAP S/4HA NA Cloud, Single Tenant Edition Services Every year.
Which artifacts are part of the Solution Adoption work stream? There are 3 correct answers to this question. Project Plan System Go live Announcement (order) Business Transformation Review (Point of View) Project Business Case Detailed Design - Business Process.
What tool is used to synchronize changes between SAP ERP and SAP S/4HANA maintenance tracks? Business Process Change Analyzer Retrofit SAP Code Inspector SAP Code Vulnerability Analyzer.
What is a Strategy Level 0 (LO) artifact? Approach document that is developed by a united Project Team (partner + customer) Preliminary strategy developed by the customer to approach the project in a specific work stream Project result that is developed solely by the partner Optional information that is NOT important for project activities.
What are the three elements of SAP Activate? There are 3 correct answers to this question. Methodology SAP Solution Manager Content Tools Focused Build.
What tool provides guidance on replacing custom code developed for SAP ERP with SAP S/4HANA functionality for the "System Conversion" transition path? Software Provisioning Manager Simplification Item Check (SI-Check) SAP Code Inspector Software Update Manager with Database Migration Option.
Which of the following belong to the Application Design and Configuration work stream for SAP S/4HANA Cloud in the Explore phase? There are 2 correct answers to this question. Integration prerequisites confirmation Fit-to-standard workshop Configuration definition Kick-off workshop.
What are key characteristics of the implementation approach in SAP Activate Methodology? There are 3 correct answers to this question. Premium engagement ready On-premise only Start with SAP Best Practices Validate solution Fixed scope.
Which statements are part of the 5 Golden Rules for SAP S/4HANA Cloud, Single Tenant Edition? There are 2 correct answers to this question. Use SAP Solution Manager 7.2 with Focused Build. Document deviations from Golden Rules for transparency and future use in upgrades Foster a cloud mindset and adherence to the Fit-to-Standard approach. Stick to the security standards of the customer organization.
In the System conversion to SAP S/4 HANA Deploy phase, which of the following tasks are included? Final testing Hyper care support Interface setup Scheduling project plan.
Which of the following are benefits of using Ready-to-use Content? There are 2 correct answers to this question. Predictable results Run SAP Like a Factory Fast Time-to-Value Minimized Total Cost of Ownership.
Which estimation technique can be used in to size the User Stories during Sprint Planning? Relative estimate in Ideal Person Days that reflects the best estimate provided by the project team Detailed bottom-up effort estimate that breaks each User Story up into hours or shorter tasks Product Owner's relative estimate of the effort that will be needed to implement the User Story Detailed bottom-up effort estimate by the Scrum Master in Story Points based on the User Story complexity.
What is the purpose of a firm-up sprint? To perform String test To revise a release plan and sprint plan To run end-to-end integration test To demonstrate functionality from previous sprint.
What is the basis for approving work results (signing Act of Acceptance) on a Project Phase level? Definition of Done for User Story Definition of Ready for Sprint Scrum of Scrums meeting decision Agreed and met Acceptance Criteria within Quality Gate.
What is the key characteristic of Agile project delivery? Frequent Quality Gates Iterative build with frequent inspections Formal and detailed documentation Frequent and detailed project scheduling.
Where can you find Project Library Accelerators? Fully Activated Appliance SAP Cloud Appliance Library SAP Best Practices Explorer SAP Roadmap Viewer.
What does the Content element of SAP Activate provide? There are 3 correct answers to this question. Functional Specifications for WRICEF development End-User guides Integration Content Business Processes Content Migration Content.
Ready-to-use Content in SAP Activate includes which of the following? There are 2 correct answers to this question. Project Accelerators Courses delivered by SAP Education SAP Best Practices Business models from leading companies in each industry sector.
Which end-to-end turn-key Application Lifecycle Management (ALM) solution can support you in managing requirements and software development for large, Agile projects? Focused Build Requirement Management Change Request Management Solution Manager Test Suite.
Which accelerator can help you document the detailed design of solution extensions? Product Backlog Template RICEF Specification Template Sprint Backlog Template Change Request Template.
What can you do in the SAP Roadmap Viewer tool? Comment on Deliverables and Tasks within Roadmaps. Download full roadmap content for offline navigation. Navigate detailed Solution Implementation Roadmaps. Create a customer-specific version of a roadmap.
Which artifacts are part of the Solution Adoption work stream? There are 3 correct answers to this question. Project Business Case Detailed Design - Business Process Project Plan Business Transformation Review (Point of View) System Go live Announcement (order).
Which accelerators support the Fit-to-standard workshop in the Explore phase? There are 2 correct answers to this question. Business-Driven Configuration Questionnaire Quality Gate Checklist Backlog template Test Strategy.
Via which media does SAP provide Ready-to-run systems for SAP S/4HANA deployments? There are 2 correct answers to this question. Blu-ray disks SAP Cloud Appliance Library SAP App Center SAP Solution Builder tool.
Which of the following are examples of Ready-to-run SAP S/4HANA systems? There are 2 correct answers to this question. SAP Mission ControlCenter SAP Model Company Fully Activated Appliance SAP Best Practices Explorer.
What is the difference between the "New Implementation of SAP S/4HANA Cloud" and the "New Implementation of SAP S/4HANA" transition paths? There are 2 correct answers to this question. Upgrades of SAP S 4HANA Cloud are managed by SAP,and upgrades of SAP S/4HANA are managed by the customer. Different sets of work streams are used for these transition paths. SAP S/4HANA uses the Implementation Guide (IMG) and the In-App Extensibility Option for configuration and development and SAP S/4HANA Cloud uses SSCUls and the Side-by-Side Extensibility Option. There are different roles in the Application Design and Configuration workstream.
Which of the following is not correct about the REALIZE phase? There are 2 correct answers to this question. Detailed design workshops are held. The beginning of the Realize phase the team prepares a list of all the requirements in a backlog. The project team ensures that the build is meeting the business requirements. The team prepares for operations so that the functionality can be brought live.
What is the primary purpose of the SAP Activate Methodology? To provide end-to-end Application Lifecycle Management To manage solution documentation To enable access to the SAP ecosystem To provide the sequence of actions in the project.
What term is used for a Ready-to-run SAP S/4HANA system with pre-built Solution Documentation, which supports End-to-End Processes for a specific industry so that the Project Team can focus on differentiation and innovation? Fully Activated Appliance Best Practice System SAP Model Company SAP Cloud Appliance Library.
What technique helps agile project teams to prioritize a large, flat backlog? User Story Mapping Fit/Gap Analysis Planning Poker Retrospective .
In which phase of the SAP Activate Methodology does the team complete the System Assessment? Deploy Prepare Explore Realize .
What is a deliverable of the Application. Customer Team Enablement work stream in the Prepare phase of SAP Activate? Project Charter Knowledge transfer to end users Project Documentation Learning plan.
What Solution Operations Framework can customers use to create a joint Business and IT organization, that will secure transparency and efficiency of SAP implementation, innovation, operation, and quality of business processes and systems? Customer Center of Expertise Business Transformation Management Methodology SAP Operations Control Center SAP Activate.
In which phase do you verify that the SAP Best Practices content meets the customer's business needs, and then capture gaps? Prepare Deploy Explore Realize.
Where can you find the Integration Content? There are 3 correct answers to this question. SAP Solution Manager SAP Best Practices Explorer Cloud Integration Automation Service SAP Cloud Appliance library SAP API Business Hub.
Which of the following tools are specific to the Data Management work stream? There are 3 correct answers to this question. SAP Roadmap Viewer SAP Data Services SAP Landscape Transformation SAP Solution Manager SAP S/4HANA Migration Cockpit (for both SAP S/4HANA Cloud and SAP S/4HANA editions).
Which Value Chains does SAP Solution Manager 7.2 deliver? There are 3 correct answers to this question. Detect-to-Correct Cash-to-Order Requirements-to-Deploy Hire-to-Retire Request-to-Fulfill.
Which of the following are benefits of using Ready-to-use Content? There are 2 correct answers to this question. Run SAP Like a Factory Fast Time-to-Value Predictable results Minimized Total Cost of Ownership.
Which of the following is true about a cloud implementation project? There are 2 correct answers to this question. The Starter System is specific to SAP S/4HANA Cloud. Starter Systems are not required to be in place for the 'Fit to Standard' workshops. In the prepare phase of a cloud implementation project the project team provide the customer with materials to review as self-enablement. The entire transport system is kept intact and up and running.
Which statements are part of the 5 Golden Rules for SAP S/4HANA Cloud, Single Tenant Edition? There are 2 correct answers to this question. Document deviations from Golden Rules for transparency and future use in upgrades. Foster a cloud mindset and adherence to the Fit-to-Standard approach. Use SAP Solution Manager 7.2 with Focused Build. Stick to the security standards of the customer organization.
What is the purpose of the Solution Validation activity in the Explore phase? There are 3 correct answers to this question. To educate project participants To challenge changes to standard To identify gaps To verify technical installation To log additional scope items.
Which of the following Key Deliverables do you complete in the Solution Design work stream in the Explore phase? There are 3 correct answers to this question. Solution Scope and Value Determination Design for the Gaps and Deltas Validation Workshops Data Migration Approach Baseline Build.
Which of the following are components of SAP Model Company? There are 3 correct answers to this question. Accelerators Business Process Content for SAP Solution Manager Business-Driven Configuration Questionnaire Quality Gate Checklist Preconfigured Solution.
What is the order of artifacts within the Technical Architecture and Infrastructure workstream in the Prepare phase? Hardware specification from Hardware Vendor -> Parameters Hardware Sizing calculation -> Hardware Sizing results -> Technical Strategy Hardware specification from Hardware Vendor -> Technical Strategy -> Parameters Hardware Sizing calculation -> Hardware Sizing results Technical strategy -> Hardware specification from Hardware Vendor -> Parameters Hardware Sizing calculation -> Hardware Sizing results Technical Strategy -> Parameters Hardware Sizing calculation -> Hardware Sizing results -> Hardware Specification from Hardware Vendor.
Which accelerators support the Fit-to-standard workshop in the Explore phase? There are 2 correct answers to this question. Quality Gate Checklist Business-Driven Configuration Questionnaire Test Strategy Backlog template.
Which of the following activities are part of the Realize Phase of a System Conversion journey to SAP S/4HANA On-Premise Edition? There are 3 correct answers to this question. Custom code adjustment Development system migration Sandbox system migration Operations impact analysis Delta configuration.
How would you describe the Realize phase in the "New Implementation of SAP S/4HANA" transition path? Configuration copy Configure Configure and develop Configure and adjust custom code.
What does the Side-by-Side Extensibility Option mean? Extensibility based on the SAP Cloud Platform and published APls Have two SAP S/4HANA instances - one for standard code, and another for custom developments Transfer reporting to BW/4HANA Context-aware SAP S/4HANA extensions, focused on tight integration.
What is the basis for approving work results (signing Act of Acceptance) on a Project Phase level? Definition of Ready for Sprint Definition of Done for User Story Agreed and met Acceptance Criteria within Quality Gate Scrum of Scrums meeting decision.
What are some of the key characteristics of the implementation approach in SAP Activate Methodology? There are 3 correct answers to this question. Based on Ready-to-use Content On premise only Fixed scope Delta-based Cloud Ready.
In SAP Activate, what tool is used in the during the Realize phase to make forecasts based on actual data? Release Plan Burn down Chart Product Increment Project Plan.
Which artifacts are part of the Solution Adoption work stream? There are 3 correct answers to this question. Business Transformation Review (Point of View) Project Business Case Detailed Design - Business Process Project Plan System Go live Announcement (order).
Which of the following activities are part of the Deploy Phase of a Landscape Transformation journey to SAP S/4HANA On-Premise Edition? There are 2 correct answers to this question. Access organizational and production readiness Solution Activation Optimize software Change Control Management Training delivery.
What is the primary purpose of the SAP Activate Methodology? To manage solution documentation To provide the sequence of actions in the project To provide end-to-end Application Lifecycle Management To enable access to the SAP ecosystem.
In which phase will the customer develop a preliminary strategy for building a target Operations and Support organizational model? Discover phase Run phase Prepare phase Explore phase.
Which of the following tasks are required in the Prepare Phase? There are 3 correct answers to this question. Train the project team Approve the test strategy Set up the infrastructure to support the project Identify relevant SAP Best Practices Define the communication plan.
How do you set up Scrum teams? There are 2 correct answers to this question. Based on group size, but a minimum of 12 people Based on End-to-End Processes like Order-to-Cash By type of work, like configuration Scrum, documentation Scrum, and testing Scrum. As a cross-functional team covering multiple functions, like configuration, data loads, and testing.
Which of the following Key Deliverables do you complete in the Solution Design work stream in the Explore phase? There are 3 correct answers to this question. Design for the Gaps and Deltas Validation Workshops Data Migration Approach Solution Scope and Value Determination Baseline Build.
What does the Content element of SAP Activate provide? There are 3 correct answers to this question. Migration Content Functional Specifications for WRICEF development Business Processes Content End-User guides Integration Content.
Which tools does SAP Activate provide to support Guided Configuration? There are 3 correct answers to this question. Expert Configuration SAP Solution Compohttps://en.daypo.com/create.phpser Model Company Solution Builder Self Service Configuration.
What is the difference between the "New Implementation of SAP S/4HANA Cloud" and the "New Implementation of SAP S/4HANA" transition paths? There are 2 correct answers to this question. SAP S/4HANA uses the Implementation Guide (IMG) and the In-App Extensibility Option for configuration and development and SAP S/4HANA Cloud uses SSCUls and the Side-by-Side Extensibility Option. Should have chosen Upgrades of SAP S 4HANA Cloud are managed by SAP,and upgrades of SAP S/4HANA are managed by the customer. There are different roles in the Application Design and Configuration workstream. Different sets of work streams are used for these transition paths.
Why is there NO Sandbox system in the "New Implementation of SAP S/4HANA Cloud, Single Tenant Edition" transition path? Because the project team uses the DEV system to confirm solution fit and define delta requirements Because SAP S/4HANA Cloud, Single Tenant Edition, contains predefined business processes which should NOT be changed Because the customer may use the SAP Model Company Because the Fit-to-Standard workshop is conducted using the Q-system.
What are some of the key topics covered in the Customer Team Enablement workstream? There are 3 correct answers to this question Planning skills Project Sourcing Approach Solution Expertise Project Management Technical Expertise.
Where can you find the Integration Content? There are 3 correct answers to this question. Cloud Integration Automation Service SAP API Business Hub SAP Best Practices Explorer SAP Solution Manager SAP Cloud Appliance library.
Which artifacts are part of the Solution Adoption work stream? There are 3 correct answers to this question. Business Transformation Review (Point of View) System Go live Announcement (order) Detailed Design - Business Process Project Plan Project Business Case.
What is a Strategy Level 0 (LO) artifact? Project result that is developed solely by the partner Approach document that is developed by a united Project Team (partner + customer) Preliminary strategy developed by the customer to approach the project in a specific work stream Optional information that is NOT important for project activities.
Which end-to-end turn-key Application Lifecycle Management (ALM) solution can support you in managing requirements and software development for large, Agile projects? Solution Manager Test Suite Change Request Management Focused Build Requirement Management.
Where can you find Data Migration templates? SAP S/4HANA Migration Cockpit SAP Roadmap Viewer SAP Cloud Appliance Library SAP Best Practices Explorer.
Which of the following are components of SAP Model Company? There are 3 correct answers to this question. Quality Gate Checklist Acclerators Preconfigured Solution Business Process Content for SAP Solution Manager Business-Driven Configuration Questionnaire.
What is the term used for workshops, which are intended to set value targets, validate SAP Standard functionality against customer requirements. And collect delta requirements in the "New Implementation of SAP S/4HANA" transition path? Fit-to-Standard Design Thinking Solution Validation Delta Design.
What tool would you use for managing project tasks and Solution Documentation when implementing SAP S/4HANA Cloud? Implementation portal for SAP S/4HANA Cloud SAP Support Marketplace SAP Transformation Navigator SAP Roadmap Viewer.
What Sprint types are part of the SAP Activate Methodology? There are 3 correct answers to this question. Firm-up Initial Foundational Build Daily.
Which of the following scenarios are enabled for the "Selective Data Transition" transition path with the SAP Landscape Transformation tool? There are 3 correct answers to this question. System Upgrade Consolidation through online data replication Extraction of Business Units System Consolidation Security Migration.
What accelerator can help you document the Configuration Definition in the Explore phase? Test Strategy Change Request template Data Definition Backlog template.
Which accelerators support the Fit-to-standard workshop in the Explore phase? There are 2 correct answers to this question. Backlog template Quality Gate Checklist Business-Driven Configuration Questionnaire Test Strategy.
Which of the following is part of the Explore phase in the "New Implementation of SAP S/4HANA Cloud' transition path? Which of the following is part of the Explore phase in the "New Implementation of SAP S/4HANA Cloud' transition path? Setup and Enablement Solution Validation and Delta Design Fit-to-standard.
In which phase should you create a Data Migration Strategy (LO) during a Selective Data Transition? Deploy Explore Discover Realize.
Which tools does SAP Activate provide to support Guided Configuration? There are 3 correct answers to this question. Expert Configuration SAP Solution Composer Solution Builder Self Service Configuration Model Company.
What tool provides sizing estimations for the "System Conversion" transition path? Scope and Effort Analyzer SAP Best Practices Explorer SAP Readiness Check SAP Transformation Navigator.
Which of the following belong to the Application Design and Configuration work stream for SAP S/4HANA Cloud in the Explore phase? There are 2 correct answers to this question. Configuration definition Fit-to-standard workshop Integration prerequisites confirmation Kick-off workshop.
Ready-to-use Content in SAP Activate includes which of the following? There are 2 correct answers to this question. Business models from leading companies in each industry sector SAP Best Practices Project Accelerators Courses delivered by SAP Education.
Why is there NO Sandbox system in the "New Implementation of SAP S/4HANA Cloud, Single Tenant Edition" transition path? Because the customer may use the SAP Model Company Because the project team uses the DEV system to confirm solution fit and define delta requirements Because SAP S/4HANA Cloud, Single Tenant Edition, contains predefined business processes which should NOT be changed Because the Fit-to-Standard workshop is conducted using the Q-system.
Which of the following tools are specific to the Data Management work stream? There are 3 correct answers to this question. SAP Roadmap Viewer SAP Data Services SAP S/4HANA Migration Cockpit (for both SAP S/4HANA Cloud and SAP S/4HANA editions) SAP Solution Manager SAP Landscape Transformation.
Which of the following is part of the Explore phase in the "New Implementation of SAP S/4HANA Cloud' transition path? Setup and Enablement Simplification and Custom Code Impact Analysis Fit-to-standard Solution Validation and Delta Design.