What are deliverables of the Integration work stream in the PREPARE phase? There are 3 correct answers to this question. Fit/Gap Analysis. Network Connectivity Check. Adaptation Specifications. Security Checks. Data Cleansing.

What is a difference between the SAP Activate methodology for a new implementation of SAP S/4HANA cloud edition and a new implementation of SAP S/4HANA on-premise?. For the cloud edition, there is an additional work stream for integration with on-premise systems. For on-premise, there are additional deliverables for the system setup. For on-premise, there is an additional Q-Gate for system installation. For the cloud edition, there is an additional Q-Gate for integration with on-premise systems.

What is the final activity in the REALIZE phase of a new implementation of SAP S/4HANA CLOUD edition?. Solution validation. End-to-End walkthrough. Data migration. Readiness check.

What is the purpose of the Solution Validation activity in the EXPLORE phase? There are 3 correct answers to this question. To log additional scope items. To identify gaps. To educate project participants. To verify technical installation. To challenge changes to standard.

What SAP S/4HANA deployment model has the characteristics of a core ERP scope with rapid innovation, SAP-led governance, and standardization?. SAP S/4HANA Cloud, single tenant edition. SAP S/4HANA deployed in SAP HANA Enterprise Cloud. SAP S/4HANA Cloud. SAP S/4HANA on premise.

What is the best target environment for a System Conversion journey is as described in the SAP Activate methodology?. SAP S/4HANA On-Premise Edition. SAP Hybris. Hybrid of SAP S/4HANA Cloud Edition and SAP S/4HANA On-Premise Edition. SAP S/4HANA Cloud Edition.

What are some goals of the Fit-to-Standard workshops? 3 answers. To review the SAP Best Practices in the starter system. To identify customer-defined configuration changes within the scope of the service. To identify relevant data migration objects. To define the Integration and API List for the solution. To gather input for customer-defined customizations to the solution.

What are some characteristics of SAPS/4HANA Cloud? 2 answers. SAP S/4HANA Cloud runs in an infrastructure with private, managed services for SAP solutions. SAP S/4HANA Cloud includes quarterly innovation cycles. SAP S/4HANA Cloud is single-tenant; meaning your service runs in a dedicated environment. SAP S/4HANA Cloud provides additional functionality for customers that require broad extensions and deep configuration capabilities. SAP S/4HANA Cloud is multi-tenant, meaning your service runs in a shared environment.

In which phase of the SAP Activate Methodology does the team complete the System Assessment?. Realize. Deploy. Prepare. Explore.

How do you create print and interactive forms that look like their paper counterparts?. Maintain custom forms in the ABAP UI editor. Maintain custom forms in SAP Cloud Platform Forms by Adobe. Maintain custom forms in the Maintain Form Templates Fiori app. Maintain custom form content in the Manage Logos and Manage Texts Fiori apps.

What is the purpose of a firm-up sprint?. To demonstrate functionality from previous sprint. To perform sprint testing. To revise a release plan and sprint plan. To run end-to-end integration test.

Which content packages are available in the SAP Package Library? There are 2 correct answers to this question. SAP Activate Methodology. SAP Best Practices. Solution Builder. Rapid Deployment Solutions.

Which activities are part of the Application: Solution Adaption work stream of SAP Activate for new implementations? There are 3 correct answers to this question. Value Audits. Production Support Plan. Value Determination. Change Management Plan. Scope Validation.

In which phase of the SAP Activate methodology does the team complete the Cut-over Rehearsal?. Prepare. Explore. Realize. Deploy.

Which of the following is a Key Deliverable of the PREPARE Phase?. Solution Scope and Value Determination. Change Impact Analysis and Communication Plan. Baseline Build. Release and Sprint Plan.

When do you perform User Acceptance Testing during the Agile Build?. Before Integration Testing. During each Firm-up Sprint. After each Sprint. After Integration Testing.

Which component of SAP Activate offers customers a reference solution in the cloud for a quick start?. SAP Implementation Assistant. SAP Activate Methodology. Guided Configuration. SAP Best Practices.

Which of the following content best outlines the scope of the Integration Test?. a. Solution baseline b. Delta/gap solutions c. Data flows with non-SAP application. a. Solution baseline b. Delta configuration c. Data flows between SAP solutions. a. Prototype b. Delta/gap solutions c. Data flows with non-SAP application. a. Prototype b. Delta configuration c. Data flows between SAP solutions.

What are some responsibilities of the Business Process Expert in SAP S/4HANA CLOUD Implementation? 2 answers. Guides the system configuration. Expert in solution processes and configuration. Performs and confirms configuration. Drive decisions and perform testing.

What is a key characteristics of SAP Activate for new implementation of S/4HANA CLOUD edition?. Start with executable content. Limited involvement of business stakeholders. Waterfall approach. Design based.

What are some characteristics of the "Cloud" mindset? 3 answers. Make the company fit the software. Heavy customizations and modifications. Business blueprint phase. Workarounds and light extensions. Fit-to-Standard workshops. Make the software fit the company.

What are some of the intelligent technologies that enable end-to-end automation? 3 answers. Embedded Analytics. Predictive Analytics. Machine Learning. Fundamental Simplication. Conversational AI.

Which of the following activities are part of the Realize Phase of a system conversion journey to SAP S/4HANA On-premise edition? 3 answers. Operations impact analysis. Custom code adjustment. Delta configuration. Development system migration. Sandbox system migration.

What are some goals of the Fit-to-Standard workshops? 3 answers. To define the integration and API list for the solution. To review the SAP Best Practices in the starter system. To identify relevant data migration objects. To identify customer defined configuration changes. To gather input for customer defined customization.

What key activities does the Guided configuration support you with? 3 answers. Manage roles of configuration users. Train new users. Create test data. Test configured processes. View solution scope.

What key characteristics of Agile project delivery?. Frequent and detailed project scheduling. Formal and detailed documentation. Iterative build with frequent inspections. Frequent Quality Gates.

How are build and test tasks planned and executed in the REALIZE phase?. By using the sprint backlog list as input for each iteration. By executing regression tests after each iteration. With Quality gates for sign off after each iteration. By using incremental build in fixed scope iteration.

What are key characteristics of the implementation approach in SAP activate methodology? 3 answers. Premium engagement ready. On-premise only. Fixed scope. Validate solution. Start with SAP best practices.

What are the responsibilities of the Product Owner in release and sprint planning? 2 answers. Analyze the functional and technical dependencies between the user stories?. Define objectives for each release. Prioritize backlog user stories by business priority. Estimate the backlog user stories.

Which of the following is true about a CLOUD implementation project? There are 2 correct answers to this question. In the prepare phase of a cloud implementation project the project team provide the customer with materials to review as self­ enablement. Starter Systems are not required to be in place for the 'Fit to Standard' workshops. The entire transport system is kept intact and up and running. The Starter System is specific to SAP S/4HANA Cloud.

Relating to Scrum which of the following is correct? 2 answers. Product backlog is a list of features prioritized by business value, the items come from diverse sources, including the scrum team. Sprint backlog is a subset of product backlog loaded onto the sprint timebox it is the list of work the team is addressing during the current sprint. Burndown chart provides visibility into the product backlog illustrate progress by the work is in horizontal and time is vertical.

What is the last process flow step of the Realization Phase for New Implementation CLOUD?. Transition to Operations to Production Support Plan. Transition to Operations to User training.

What are the key characteristics (6) of Activate?. 1. START WITH BEST PRACTICES : Use ready-to run business processes. 2. VALIDATE SOLUTION : Validate to best practices with fit/gap workshops, capture delta. 3. MODULAR, SCALABLE AND AGILE : Structure project to deliver the solution incrementally. 4. CLOUD READY : Leverage the flexibility and speed of the cloud. 5. PREMIUM ENGAGEMENT READY Build and Run fully supported via SAP control centers. 6. QUALITY BUILT-IN : Identify risk early with total quality approach. 4. EXTENSIBILITY READY : Leverage the flexibility and speed of the cloud platform.

What view is available under Phase in Roadmap Viewer?? 3 answers. Phase. Work-stream. Deliverable. Task.

What are three deliverables for Customer Team Enablement?. Self Enablement. Customer Team Learning Plan. Knowledge Transfer. Customer Training.

What are the deliverables in the Preparation Phase for New Cloud Implementation? 6 answers. Customer Team Self Enablement. Project Initiation and Governance. Project Plans, Schedule and budget. Project Standards and Infrastructure. Project Kick-off and On-Boarding. Phase Closure. Customer Trial Account.

What is the purpose of SCRUM of SCRUMs? It consists of the lead consultants and product owners from the individual scrum teams. Scrum of Scrums focuses on. Integration topics and Cohesive solution build. Backlog topics. Sprint Review.

What are the modules of the S/4HANA platform? 3 answers. S/4 Platform consist of HANA In Memory DB, S/4 Applications like Simple Finance. Role based Fiori UI. All available in either on-premise or on the cloud. The S/4 Platform has planned integration to the various LOB Cloud solutions. S/4 Platform consist of Business Suite.

How are best practices implemented in SAP Business Suite On-Premise? 2 answers. Through industry - specific functionality can be configured and adapted. The SAP Activate methodology for Business Suite and On-Premise- uses Waterfall. With new Implementations of SAP Business Suite SAP Best Practices need to be assembled and applied followed by additional prototyping activity to create a baseline build for Solution Validation workshops. Through workstreams - specific functionality can be configured and adapted. The SAP Activate methodology for Business Suite and On-Premise- uses Waterfall.

What are the deliverables in the Solution Adoption workstream? 6 answers. Value determination. Value realization. Value audit. Change management plan. End user training plan. End user training. Knowledge training.

What are the accelerators for Fit/Gap? 6 answers. Solution Validation Overview. Solution Validation Workshop. Sprint Backlog Template. Solution Validation Workshop Schedule. Solution Specific Accelerators in the JAM site. RICEF Specification Template. Integration Template.

What is the Level 4 project governance responsible for (Project Team)? 3 answers. Day-to-day execution and delivery of project tasks, identifying, documenting and resolving issues and risk within the framework of their authority. Identification, resolution and communication of issues and risk to PMO. Status reporting and communication to the PMO. Communication of business requirements.

What is necessary for On-Premise deployment but not in Cloud deployments for New Implementations? 2 answers. For new Implementations of SAP S/4HANA (on prem.) the best practice content will be selected and activated with the Implementation Cockpit. This is then followed by the prioritized prototyping to create the Baseline Build. With SAP Business Suite (cloud) there would need to be download and import of BP + pre-assembly services to activate the Best Practices prior to Rapid Prototyping.

What are the accelerators that can be used in the Solution Design workstream for New Implementation? 7 answers. Solution Validation Overview. Solution Validation Workshop. Sprint Backlog Template. Solution Validation Workshop Schedule. Solution Specific Accelerators in the JAM site. RICEF Specification Template. Integration Template. Product/Sprint Backlog template.

SAP Activate Guided configuration is a new environment and approach for an assisted way to implement SAP Best Practices and facilitates the lifecycle management of the pre-configured business processes from SAP and any additional customizing added by the customer. SAP is providing various tools to support these efforts. 3 answers. Solution Builder. Self Service Configuration UIs. Expert Configuration. Expert Customization.

What is the order of key deliverable for Solution Design for New Implementation On-Premise? 4 answers. Baseline Build. Validation Workshops (Workshops A). Backlog Prioritization. Design for Gaps and Delta (Workshops B). Configuration Build.

What are some artifacts of Scrum? 4 answer. Product backlog - The cumulative list of desired deliverables for the product. Often called the "User Story". Sprint backlog - The team's to do list for the sprint. Unlike the product backlog, it has a finite life-span: the length of the current sprint. Burn down charts - A chart that shows what work is left to do. Task board - A visibility tool that allows tasks to be tracked from to do, into progress, and to completion. Task backlog - A visibility tool that allows tasks to be tracked from to do, into progress, and to completion.

Sprint Planning marks the beginning of the sprint. Consists of two parts: team commits to a set of deliverables, and identifies the tasks that must be completed to meet these deliverables. What are the steps in the Sprint Cycle ? 5 answers. Sprint planning. Daily scrum - It is a brief, daily, focused meeting where each participant shares: what they did since last stand up, what they are doing before the next stand-up, and what obstacles are slowing them down (blockers). Story time - Backlog grooming. You discuss and improve the stores in the backlog by: Defining and refining acceptance criteria, Story sizing (estimation), Story splitting. Sprint review - The end of the sprint where stories are listed that the team committed to but didn't complete and demo the stories that did get done. Retrospectives - Dedicated time for the team to discuss the sprint, what was learned, and how to improve the next sprint with one or two specific changes. Daily planning.

The SAP JAM sites are parted up in three different parts?. Entry/overview - Phase summary - methodology summary - Featured content. Phase view/key deliverables. Key deliverable - Description, Accelerators, Summary of tasks. Key Performance.

What are the three tiles used in the FIORI view in solution manager?. My projects. My tasks. Project analytics. Me Area.

What are the 3 components/pillars of the SAP Activate framework?. Sap Activate methodology : Ready to run processes, Reference solution, Best practice for integration and migration, Best practice for extensibility, Complete solution. SAP Best practice provides projects with a baseline configuration. SAP Guided Configuration - The configuration tools : Tools for assisted implementation , Continuous innovation Content awareness, Empowerment of the users, Updates each quarter. SAP Customization.

What are a part of the methodology used for SAP Activate? 4 answers. Start with SAP best Practices. One agile implementation - for any deployment. Four phases. Designed for partner extensions. Two phases.

Which project are using the SAP Solution Manager? Choose Correct answer. ON-premise projects. Cloud projects. Hybrid projects.

What are the benefits of a SAP S/4HANA CLOUD deployment? 4 answers. Designed for enterprises that need a standard cloud solution. Core processes. Lines of business. Fast innovation. Fast set-up.

What are the 3 workstreams that crosses all four phases for a new implementation in the CLOUD?. Project management. Solution Adoption. Technical architecture & Infrastructure. Design and Configuration. Data Management.

What does the deliverable - Customer team self- enablement contain? 4 answers. Training content. Interactive learning. SAP Activate learning room. S/4 HANA Learning room. SAP JAM.

Technical architecture & infrastructure - includes the starter system provisioning. Which tasks are performed? 4 answers. Assess the infrastructure. Verify that the customer received the URL, initial logon and password of the cloud system. Enable the customer on user creation. Create of the key users and consultant ID in initial system. Assess the configuration.

Mention some of the tasks performed during the REALIZE phase for integration? 6 answers. Set-up network integration/HCI/PI/PO. Configure Integration cloud. Configure on-premise. Create mappings. Execute initial integrated data load. Repeat setup process in production. Create list.

What are the benefits of the system conversion? 3 answers. Migrate without reimplementation. No disruption for existing businesss processes. Re-evaluation of customization and existing process flows. Migrate without customization.

What will be the largest adjustments that are needed during a Conversion project to SAP S/4HAN On-premise? 2 answers. Table and configuration adjustments. Custom code / assessment and clean up. View configuration.

What are two of the important tasks during the prepare phase for a conversion project SAP/4HANA On-premise regarding the custom code? 2 answers. Analyze the Custom code in the existing implementation. Run a readiness check. One step conversion using DMO and SUM.

What are the 3 elements during the prepare phase for a new implementation for SAP S/4HANA?. Project setup. Roadmap and approach. System including Best practice. Project activation.

What are the 4 elements during the explore phase for a new implementation for SAP S/4HANA?. Activate solution & Rapid prototyping. Solution FIT/gap. Delta Design. Delta backlog. Sprint execution.

What are the 3 elements during the Deploy for a new implementation for SAP S/4HANA?. Readiness check. Cutover. Go-live. Operational setup.

What are the tasks under the realize phase for a Landscape Transformation? 3 answers. Perform Client Transfer. Perform Company Code transfer. Create cutover plan. Setup landscape transformation software.

Fit-to-Standard Workshop Which application contains step-by-step demonstrations of key process?. My Recipients application. Maintain Business Roles application. Query Browser application. My Learning application.

Fit-to-Standard Workshop. You are taking part in a validation workshop for a scope item, and you identify a gap in a reporting requirement What do you do?. Write the extension specifications. Propose possible solutions. Document the gap in detail. Create the change request.

SAP S/4HANA Cloud Configuration and User Management Which customizing activates are allowed though the self-service configuration UI? 2 answers. Adaptation of fields within SAP Best Practices content. Deletion of SAP Best Practices content. Addition of new custom fields within SAP Best Practices content. Addition of new SAP Best Practices business process.

Organizational Units and Best Practices How do you manage the organizational structure in SAP S/4HANA cloud?. The new SAP S/4HANA Cloud tenant comes with a basic organizational structure You create new units as copies of the existing ones. The new SAP S/4HANA Cloud tenant comes with a best-practice organizational structure, The structure is fixed and it CANNOT be modified. The new SAP S/4HANA Cloud tenant comes with no organizational structure The structure is generated upon client activation. The new SAP S/4HANA Cloud tenant comes with an organizational structure that includes all the possible organizational units, You can delete the organizational units you do NOT need.

Organizational Units and Best Practices What does the simulate import function allow you to do in the manage your solution app?. Activate the organizational structure and simulate business process execution against it. Import best practice business transactions and test business processes. Generate mass business transactions to test the system. Test migration data against system customizing without commit.

Fit-to-Standard Workshop What is the purpose of the Fit-to-Standard workshop?. To alter the standard SAP processes so that they fit with the customer’s requirements. To design enhancements to cover the gaps between business processes and SAP standard processes. To map the standard SAP roles to people in the organization. To understand and be aware of gaps between business processes and SAP standard processes.

SAP S/4HANA Cloud Content Lifecycle Management How can customers activate additional SAP Best Practices Processes? 3 answers. Request activation in the Starter System through the SAP Cloud Platform during the Realize phase. Request activation in the Starter System through the SAP Cloud Platform during the Prepare phase. Request activation in the Quality system after it is upgraded to the latest quarters phase. Request activation in the Quality system from the SAP Service center during the Run Phase. Request activation in the Production system after it is upgraded to the latest quarters phase.

Fit-to-Standard Workshop What do you typically do before discussing how the standard process fits with the customer’s requirement?. Perform a delta scope prioritization. Demonstrate the business scenarios and concepts. Identify the required configuration. Identify gaps.

SAP S/4HANA Cloud Business Process Testing In what phase of the SAP Activate methodology do you test the business process?. Prepare. Explore. Change. Realize.

InApp and Side-by-Side Extensibility Which in app extensibility options are available in SAP S/4HANA Cloud? 2 answers. Managed extensibility. Key user extensibility. Classic extensibility. Integration extensibility.

SAP Activate for SAP S/4HANA Cloud Methodology and Best Practices What are the key elements of the Prepare phase of the SAP Activate methodology? 3 answers. Data migration. Project setup. Customer Self-enablement. User training. System provisioning.

SAP Activate for SAP S/4HANA Cloud Methodology and Best Practices How does the implementation consultant support the customer during Fit-to-Standard workshops? 2 answers. Demonstrate SAP Best Practices in the starter system. Review current custom code in the customer system. Show and explain all available self-service configuration UIs. Highlight gaps that require configuration or extensibility decisions.

Fit-to-Standard Workshop What part of SAP best Practices typically takes up the most time in the planned workshops?. Organization structure. Business processes. Business roles. Data migration.

Fit-to-Standard Workshop Which resources do you use when planning a Fit-to-Standard workshop? 2 answers. Test scripts. Business process flows. Legacy system configurations. As-is process descriptions.

SAP Activate for SAP S/4HANA Cloud Methodology and Best Practices Which tools are used during the Realize phase of an SAP S/4HANA Cloud deployment? 3 answers. Test Tool. SAP S/4HANA migration cockpit. Product Availability Matrix. Implementation Guide. Manage Your Solution application.

SAP Activate for SAP S/4HANA Cloud Methodology and Best Practices What is this purpose of the Starter system in the SAP S/4HANA Cloud Implementation project?. To demonstrate the customer’s personalized solution, including process flowers, the organizational structure, and authorizations. To configure the customer’s personalized solution for demonstration and testing during the Realize phase. To conduct a blueprint workshop to identify all customer requirements for a completely customized solution. To demonstrate SAP Best Practices processes in a preconfigured system and identify customer personalization requirements during Fit-to-Standard workshops.

SAP S/4HANA Cloud Content Lifecycle Management When is the Quality system activated?. After SAP Best Practices content is migrated from the Starter system to the Quality system. After a new change project is created. After the Starter system is terminated. After the organizational structure and chart of accounts are defined.

Fit-to-Standard Workshop What do you do in a Fit-to-Standard workshop?. Define the organizational structure and chart of accounts. Validation the purchased software. Define the scope items of the organization. Find solutions for standard gaps.

SAP S/4HANA Cloud Configuration and User Management Which activates are performed by the SAP global service center? 2 answers. SAP Best Practice model company activation. Legacy data migration. User training content development. Expert configuration.

Fit-to-Standard Workshop Which of the following are outcomes of the Fit-to-Standard workshop? 3 answers. Solution impact on business processes. Gap identification and mitigation. System landscape optimization. Identification of source code changes. Expert configuration definition.

In what respect is SAP Activate Methodology different from the ASAP Methodology?. WBS Structure includes Delivarable and Task. Supports only new implementations. Includes Testing Activities. Supports cloud deployments.

What do you do during Sprint Execution?. Present status of selected user stories in the sprint scope on a scrumboard. Hold a retrospective at the end of each week. End a sprint when the sprint backlog items are all complete. Measure the sprint progress with a percentage complete report.

What is a Benefit of using Guided Configuration instead of the Implementation Guide?. It eliminates the need for Content Lifecycle Management. It eliminates the need to generate transport requests for configuration settings. It ensures only those configuration activities required for pre-selected scope are available. It ensures configuration is done using SAP Solution Manager.

Which of the following are distinct characteristics of the ten Quality Principles? (2). Typical pitfalls. Stability. Orientation. Fundamentals.

Which of the following activities are part of the REALIZE Phase of a System Conversion journey to SAP S/4HANA On-Premise Edition? (3). Development environment setup. Operations readiness. Custom code management execution. Configuration and product enhancements. Training enabled.

Which component of SAP Activate can be deployed in the CLOUD for a quick start?. SAP Activate Methodology. Guided Configuration. SAP Best Practices. SAP Implementation Assistant.

In which phase of the SAP Activate methodology does the team define the Data Migration Architecture?. Explore. Prepare. Realize. Deploy.

What is a delivarable of the Customer Team Enablement workstream in the PREPARE phase of SAP Activate?. Customer team self enablement. Process documentation. Project charter. Knowledge transfer to end users.

Which of the following is a Key Deliverable of the PREPARE phase?. Release and Sprint Plan. Change Impact Analysis and Communication Plan. Baseline Build. Transition Planning.

Which of the following content best outlines the sequence of the testing of the Configuration and Product Enhancement that follows a unit test?. 1. Integration test 2. User acceptance test 3. String test. 1. String test 2. User acceptance test 3. Integration test. 1. String test 2. Integration test 3. User acceptance test. 1. Integration test 2. String test 3. User acceptane test.

Which of the following activities support the REALIZE Phase of a System Conversion journey to SAP S/4HANA On-Premise Edition? (3). Value determination. Sizing and scalability verification. Data aging configuration. Custom code impact analysis. Non-Production System Migration.

Which activity helps the project team to add the user stories to the product backlog?. Conducting the Solution Validation. Preparing a Project Schedule. Assessing Project Risks. Planning the User Acceptance Test.

In which phase of the SAP Activate methodology does the team run a Landscape Transformation Assessment?. Deploy. Prepare. Explore. Realize.

Which of the following activities are part of the DEPLOY Phase of a Landscape Transformation journey to SAP S/4HANA On-Premise Edition? (2). Optimize software Change Control. Dress Rehearsal. Solution activation. Production Cutover.

Which of the following Key Deliverables do you complete in the Design and Configuration workstream in the EXPLORE phase? (3). Initial Sizing. Transition Preparation. Activate Solution. Design for the Gaps and Deltas. Solution Scope and Value Determination.

Which of the following tasks are part of the Handover to Support Organization key deliverable after the Production Cutover key deliverable? (2). Perform Workload Analysis. Set up the Operations Control Center. Perform a technical systems test. Resolve issues identified during the Hyper Care period.

Your project is perfrming high-level planning for a System Conversion journey from SAP Business Suite to SAP S/4HANA on-premise edition. In which order should the key deliverables be performed for all project phases?. 1. Integration Validation. 2. Custom Code Analysis. 3. Handover to Support Organization. 4. Operations Readiness. 1. Custom Code Analysis. 2. Handover to Support Organization. 3. Code Adjustment. 4. Operations Readiness. 1. Custom Code Analysis. 2. Integration Validation. 3. Operations Readiness. 4. Handover to Support Organization. 1. Handover to Support Organization. 2. Custom Code Analysis. 3. Integration Validation. 4. Operations Readiness.

Which of the following tasks are required in the PREPARE phase? (3). Define technical architecture. Define the data aging plan. Approve the test strategy. Define cutover approach. Enable the Project team.

What technique helps agile Project teams to prioritize a large, flat backlog?. Fit/Gap Analysis. Planning Poker. Retrospective. User Story Mapping.

Which activities are part of the Design and Configuration workstream of the SAP Activate methodology? (2). Confirm integration prerequisites. Fit to Standard Analysis. Configuration Definition. Schedule kick-off workshop.

What is the final activity in the REALIZE Phase of new implementations of SAP S/4HANA cloud edition?. Data migration. Test execution. Readiness check. Solution validation.

What Accelerator can help you document the Configuration Definition in the EXPLORE phase?. Data Definition. Product/Sprint Backlog Template. RICEF Specification Template. Change Request Template.

Which accelerators support the Fit to Standard Analysis activity in the EXPLORE phase? (2). Workshop Schedule Template. RICEF Specification Template. Sprint Backlog Template. Quality Gate Checklist.

What is SAP Agile Data Preparation - Delivery Options? 2 answers. Cloud. Integration. On-Premise. Representation.

How many deliverables are a part of Key Deliverable "Project Initiation"?. One. Two. Three. Four.

SAP Best Practices Content offers Project Accelerators. Package. Scope items. Building blocks. Configuration Data.

Which of the following is not correct about FIT / GAP Analysis? There are 2 correct answers to this question. Prioritize delta requirement and gaps. Minimize the needs for rework during realization. Drive towards adopting customers processes. Validate pre-activate and pre-assembled solution in the development system.

Which of the following tools are used for rapid database migration? There are 2 correct answers to this question. SWPM (software provisioning manager). Database Migration Option (DMO). SAP Solution Manager. Software Update Manager (SUM).

Which of the following is NOT correct about the REALIZE phase? There are 2 correct answers to this question. The team prepares for operations so that the functionality can be brought live. The beginning of the Realize phase the team prepares a list of all the requirements in a backlog. The project team ensures that the build is meeting the business requirements. Detailed design workshops are held.

What is a benefit of using Guided Configuration instead of the Implementation Guide? Please choose the correct answer. It eliminates the need to generate transport requests for configuration settings. It ensures the configuration is done using SAP Solution Manager. It ensures SAP updates do NOT conflict with customer configurations. It eliminates the need for Content Lifecycle Management.

Arrange the following in the correct sequence of steps followed for a 'Fit to Standard' workshop. Please choose the correct answer. Review Best Practice Process Flow, Demonstrate Business Scenarios and Concepts, Discuss how the process fit with customer requirements, Identify gaps, Identify required configuration, Enable customer on execution of scenarios. Review Best Practice Process Flow, Demonstrate Business Scenarios and Concepts, Identify required configuration, Discuss how the process fit with customer requirements, Enable customer on execution of scenarios, Identify gaps. Demonstrate Business Scenarios and Concepts, Review Best Practice Process Flow, Identify required configuration, Discuss how the process fit with customer requirements, Enable customer on execution of scenarios, Identify gaps. Discuss how the process fit with customer requirements, Review Best Practice Process Flow, Demonstrate Business Scenarios and Concepts, Identify required configuration, Enable customer on execution of scenarios, Identify gaps.

Which of the following is not correct about workstreams? There are 2 correct answers to this question. Workstreams are dependent on phase start and end. It can span phases. It is a collection of related deliverables. It is assigned as an attribute to phases, deliverables and tasks.

In which phase the Custom Code will be adjusted and data aging configured?. Realize. Prepare. Deploy. Explore.

At what stage is the Project Baseline determined ?. Prepare. Explore. Realize. Deploy.

Where can you find Project Library Accelerators?. SAP Cloud Appliance Library. SAP Best Practices Explorer. SAP Roadmap Viewer. Fully Activated Appliance.

What can you do in the SAP Roadmap Viewer tool?. Navigate detailed Solution Implementation Roadmaps. Create a customer-specific version of a roadmap. Download full roadmap content for offline navigation. Comment on Deliverables and Tasks within Roadmaps.

What are some of the defined recommendations for organizational change success? 3 answers. Maintain a robust governance structure, especially in the Run phase. Promote the case for change and look forward to avoid change fatigue. Be aware of cultural and language barriers for regions, countries, and Lines of Business impacted by the change. Don't worry about the scale of change for end users. Collect feedback from employees occasionally.

Which of the following is not a characteristic that the quality principles are based on? Please choose the correct answer. International standard. Experience of Typical Pitfalls. Best Practices. SAP Quality Award example winners.

In which phase does the Operations and Support (transition to operations – OLD TERM) work stream start ?. Prepare. Explore. Realize. Deploy.

Customer Team Enablement WORSTREAM for OnPremise task ?. PREPARE - Project Team Enablement. PREPARE - Project Training Strategy & Plan. DISCOVER- Project Team Enablement. EXPLORE - Project Training Strategy & Plan.

Integration WORSTREAM for OnPremise task ?. PREPARE - Interface Inventory. EXPLORE - Interface Inventory. REALIZE - Interface Inventory.

Customer Team Enablement Workstream : Major enablement areas for the Customer Team are ? 3 answers. Solution Expertise. Technical Expertise. Project Management - SAP Activate Overview, Solution Validation Guidelines, Project Standard. Functional Expertise.

Data Management Workstream consists of 3 substreams ?. Data Migration. Data Volume Management. Master Data Management. System Data Migration.

What is required for sprint execution? 3 answers. Define what it means to have requirements completed - e.g. definition of Done (for example all functionality must be tested, documented, training material completed). Define the acceptance criteria for all project backlog items included in the sprint. Use of sprint burn-down chart to illustrate progress (It is in the project backlog accelerator). Present status of selected user stories in the sprint scope on a scrumboard.

Your project is performing some high-level planning for a System Conversion journey from SAP Business Suite to SAP S/4HANA on-premise edition. What is the correct sequence of selected key deliverables across the project phases? Please choose the correct answer. a. Detailed system Assessment b. Production Readiness Check c. Code Adjustment d. Validation of Migration. a. Detailed system Assessment b. Code Adjustment c. Validation of Migration d. Production Readiness Check. a. Production Readiness Check b. Detailed system Assessment c. Code Adjustment d. Validation of Migration. a. Code adjustment b. Detailed System Assessment c. Production Readiness Chec.