option
Questions
ayuda
daypo
search.php

Kabs Con text

COMMENTS STATISTICS RECORDS
TAKE THE TEST
Title of test:
Kabs Con text

Description:
Conversion Test kabs

Creation Date: 2025/09/18

Category: Others

Number of questions: 40

Rating:(0)
Share the Test:
Nuevo ComentarioNuevo Comentario
New Comment
NO RECORDS
Content:

What SAP systems can you use for the ABAP Test Cockpit (ATC) to perform the custom code analysis for an SAP S/4HANA conversion? Note: There are 2 correct answers to the question. SAP ECC system from SAP ERP 6.0 EHP 8. SAP Solution Manager 7.2. Standalone AS ABAP with SAP_BASIS 752. SAP S/4HANA Server 2022.

Which of the following are valid options to check the progress of an inplace SUM DMO run? Note: There are 2 correct answers to these questions. Check the dump size of the database export in the SUM directory, subdirectory abap, subdirectory load. Check the charts Control Center in the SUM UI. Check the log files written in the SUM directory, subdirectory abap, subdirectory log. Check logs for job starting with RSUPG_SGEN in the SAP system.

You are performing an inplace SAP S/4HANA conversion including DMO. What is the latest point in time when you can reset the procedure without losing business data?. The end of the business downtime. The end of the database migration. The start of the Execution roadmap step. The start of the business downtime.

You are performing an SAP S/4HANA conversion, scenario strategy Standard, with DMO as an inplace migration. How dose SUM transfer the data from the source database to the target database during the migration?. Using R3load and memory pipes. Using R3load and network socket connection. Using R3load and filter transfer. Using work processes and network socket connection.

Which of the following SUM activities require a stack XML file calculated by the maintenance planner? Note: There are 3 correct answers to this questions. Benchmark tool. SAP S/4HANA conversion without DMO. SAP S/4HANA conversion including DMO. Prerequisite check. DMO without system update.

You are performing an SAP S/4HANA conversion. You are in the BIND_PATCH phase of the Configuration roadmap step. For some software components, you find entries in the Calculated level column. What does the Calculated level indicate for those software components?. The SAP Support Package contained in the upgrade media, calculated by the maintenance planner. The SAP Support Package in the download directory that are newer than the selected Support Package stack. The SAP Support Package that will be bound to the conversion. The SAP Support Package of the Support Package stack, calculated by the maintenance planner.

You want to use the Custom Code Migration Worklist via remote code analysis using the ABAP Test Cockpit (ATC). How can you get the latest content of the simplification database?. Download it from the SAP Support Portal. Generate it by analyzing the specific custom code via RFC. Apply the corresponding SAP Note via the Note Assistant. Configure it within transaction ATC.

Which step can be optimized when you provide the MIGRATE_DT_DUR. XML file to SUM?. Downtime conversion. Downtime migration. Shadow on target creation. Silent data migration (SDM).

You are executing as SAP S/4HANA Conversion with scenario strategy Standard. When will the shadow instance be stopped for the last time?. At the end of the downtime. Before the downtime starts. As part of the cleanup process. Early in the downtime.

You are performing an SAP S/4HANA conversion. When dose the silent data migration (SDM) take place using the SUM defaults?. Before the start of the SUM technical downtime. During the Preprocessing roadmap step. During the Postprocessing roadmap step. After SUM has ended.

What do you need to know about the SAP S/4HANA Conversion Guide? Note: There are 2 correct answers to this question. It explains where to find information about the custom code analysis. It is an operating system-specific document. It contains a section about the simplification item (SI) checks. It explains the database migration option (DMO) of SUM.

You are running an SAP ECC system with SAP_BASIS 740, non-Unicode on SAP MaxDB. Which of the following are possible paths to perform an SAP S/4HANA conversion? Note: There are 3 correct answers to this question. Unicode conversion SAPS/4HANA conversion including database migration. Unicode conversion Database migration SAPS/4HANA conversion including database migration. Unicode conversion SAPS/4HANA conversion including database migration Database migration. Unicode conversion Upgrade to SAP ECC with SAP_BASIS 750 including database migration Database migration. SAP S/4HANA conversion including database migration and Unicode conversion.

What is the benefit of using the UPGANA.XML file from a previous SUM run?. To make the progress information within SUM UI more accurate. To skip selected phases during the SUM run. To auto-fill specific fields on selected screens on the SUM UI. To repeat specific phases during the SUM run.

You performed a custom code check for an SAP S/4HANA conversion. In which transaction can you review the result? Note: There are 2 correct answers to this question. SAT (Runtime Analysis). SE80(Object Navigation). ATC (ABAP Test Cockpit). SYCM (Simplification Database Content).

What is the minimum SAP_BASIS release of an SAP ECC system that can be converted to an SAP S/4HANA Sever 2023?. 740. 731. 700. 750.

What do you need to consider when performing the SI check for an SAP S/4HANA conversion? Note: There are 2 correct answers to this question. You need to build up an SI check framework by applying SAP Notes. You need an SAP system based on based on AS ABAP 7.52 or above for the SI check framework. The errors from the SI check must be solved; otherwise, SUM will report an error. The SI checks are executed in the development system, and the result are transported into the subsequent system.

Which preparational steps must be performed for an SAP S/4HANA conversion? Note: There are 2 correct answers to this question. Perform the custom code adjustment. Uninstall SAP Fiori apps NOT released for SAP_UI 7.50. Install add-on SAP Gateway 7.50. Delete client 066 (Early-Watch client).

You are performing an SAP S/4HANA conversion with scenario strategy Standard Which phases are executed during SUM technical downtime? Note: There are 2 correct answers to this question. TABIM_UPG. PARMVNT_UPG. PARDIST_SHD. TABIM_SHADOW_INC.

What are the benefits of using the benchmarking option of the DMO for SUM? Note: There are 2 correct answers to this question. You can find optimal number of parallel R3load process by monitoring host performance. You can obtain migration duration files from a previous benchmark run that can be used to optimize the next runs. You can record the modification adjustment during migration and use the transport in the nest runs. You can verify that the content of the download directory matches the stack.XML file.

You are performing an SAP S/4HANA conversion with the migration repetition option. After which phase does SUM stop to enable a test cycle?. EU_CLONE_MIGSOT_RUN. EU_IMPORT_ALL. EU_CLONE_MIG_DT_CREATE. EU_CLONE_MIG_DT_RUN.

What is the name of the additional server that is used for a transition to SAP S/4HANA cloud Private Edition?. Migration Server. Migration Hub. Central Instance. Transition Server.

You are running an SAP ECC system. For which of the following activities does SUM allow you to use the near-Zero Downtime Maintenance (nZDM) capabilities? Note: There are 3 correct answers to this question. Perform an SAP S/4HANA conversion including DMO. Perform an SAP S/4HANA conversion without DMO. Apply SAP Support Packages. Upgrade the SAP system. Use DMO for SUM.

You are using DMO of SUM. You defined 40 parallel R3load process during uptime and 80 parallel R3load processes during downtime. You have chosen table count verification, but not table contents comparison. Phase_EU_CLONE_MIG_DT_RUN is running. In the Charts Control Center, you can see 40 process buckets being executed in parallel. Why are 40 Process Buckets executed in parallel?. Sum is still running in uptime; the 40 defined R3load process are considered. Therse are 40 pairs of R3load processes, so there are 80 R3load processes running. Without table contents comparison, only 40 R3load process are being started. There are 40 R3load processes used for copying and 40 R3load processes for table count verification.

You are performing an SAP S/4HANA conversion for your production system. This conversion project requires that certain business functions are switched on. Following SAP recommendations, how will you achieve this? Note: There are 2 correct answers to this question. During conversion, SUM delivers some business functions already activated. Activate the required business functions manually in the production system. Activate the required business function in the switch framework from section S/4H_ALWAYS_ON_FUNCTIONS. Import a transport request from the development system that contains the recording of the activation.

Sum was registered at the SAP Host Agent, where does the SAP Host Agent find the path to the SUM directory?. The path was stored in file sumabap.conf during registration. The path is taken from the URL entered in the browser to start SUM. The path was stored in file host_profile during registration. The path was stored to the environment of user <sid>adm during registration.

You are performing as SAP S/4HANA conversion with DMO. You are using the downtime-optimized data conversion (DoC). Which steps can partially be moved to uptime processing. Note: There are 2 correct answers to this question. Software update. Conversion. Migration. Main import.

You are planning an SAP S/4HANA conversion. Which conversion-specific task must be performed during the preparation phase?. Solve problems from the simplification item (SI) check. Perform the migration of data to the new data structure. Check the compatibility of custom code with SAP S/4HANA. Run the database migration to the SAP HANA database.

Which steps should be performed during the adjustment of dictionary objects (SPDD) in the development system before SUM continues? Note: There are 2 correct answers to this question. Release the transport request containing the modification adjustment. Create new version of the objects you need to adjust. Manually activate the adjusted dictionary object. Assign the transport request as a modification adjustment transport.

During a SUM run, you want to check if the PERCONV_UP phase is still properly. Where can you find information about this? Note: There are 2 correct answers to this question. Check the latest log files in the SUM directory, subdirectory abap, subdirectory tmp. Check the running batch job via Job Overview. Check for running R3trans processes on the host where SUM is running. Check for running R3load processes on the host where SUM is running.

What is the main purpose of performing benchmark runs for an SAP S/4HANA conversion?. To optimize the main import. To optimize the conversion. To optimize the activation. To optimize the migration.

Which of the following scenarios does Software Update Manager cover? Note: There are 2 correct answers to this question. Conversion to SAP S/4HANA Cloud Public Edition. Conversion to SAP S/4HANA on-premise. Conversion to SAP S/4HANA Cloud Private Edition. New Implementation.

You are performing an SAP S/4HANA conversion of the development system, which credentials do you use, and in which system, to perform the adjustment of dictionary objects (SPDD)?. Credentials of a named user in the development client of the development system. Credentials of a named user in client 000 of the shadow system. Credentials of user DDIC in client 000 of the shadow system. Credentials of user DDIC in the development client of the development system.

When using the DMO of SUM, which files can be handled by SUM in the download directory? Note: There are 2 correct answers to this question. Parameter file SAPup_add.par. Breakpoint configuration file SAPUPPHAS.BRK. MIGRATE_DT_DUR.XML file from a previous run. Stack XML file calculated by the maintenance planner.

You are performing an SAP S/4HANA conversion with DMO. You entered a specific number of R3load processes during the Extraction Roadmap step. Where can you change this during the migration via the Utilities option of the SUM UI? Note: There are 2 correct answers to this question?. In Process Control Center. In SUM Analysis. In DMO Migration Preparation. In SUM Parameters.

Which steps can SUM perform during an SAP S/4HANA conversion? Note: There are 2 correct answers to this question. Software update. Unicode conversion. Database migration. Custom code analysis.

During the upgrade of your development system, you run into the adjustment of non-dictionary object, handled by transaction SPAU. There you fine=d programs that are shown in status “automatic adjustment” (green traffic light). What will happen with these programs when you continue with your upgrade without performing any other actions inside your SAP system?. SUM continues with the nest phase, and the coding of your modified objects are set to new SAP standard. SUM continues with the next phase, and your modifications are kept as in the start release. Before continuing with the next phase, SUM asks for a modification adjustment transport. SUM refuses to continue unless you have marked a transport request as modification adjustment transport.

You want to perform an SAP S/4HANA conversion using SUM with inplace DMO. Which steps run before the beginning of the technical downtime, irrespective of your SUM configuration? Note: There are 3 correct answers to this question. Import of dictionary object from the download directory in phase DDIC_UPG. Import of upgrade and language data from the download directory in phase TABIM_UPG. Creation of application tables in the SAP HANA database in phase EU_CLONE_MIG_DT_CREATE. Activation of dictionary object in phase ACT_UPG. Generation of the new ABAP loads in phase RUN_SGEN_GENER8.

How does SUM recognize modification adjustment transports from predecessor system?. By searching for transport request in DIR_TRANS, subdirectory “transport”. By searching for transport request that are assigned to project SAP_ADJUST. By searching for transport request in file umodauto.lst. By searching for transport request named <sid>KO<number>.

You have selected “Standard” as scenario strategy in the SUM tool. Which steps take place via the shadow instance? Note: There are 2 correct answers to this question. Conversion of application tables (PARCONV_UPG). Modification adjustment (SPDD). Modification adjustment (SPAU). Activation of dictionary objects (ACT_UPG).

Which orchestration tool facilitates a move to SAP cloud by wrapping different scenarios such as Lift&Shift or system conversion to SAP S/4HANA?. Software Orchestrator. RISE with SAP system transition workbench. SAP migration cockpit. SAP Business Transformation Center.

Report abuse