When is provisioning of the production system requested? After the starter system is decommissioned Immediately after receive the inactive quality system (Preset phase) Immediately after receiving the active quality system After completing configuration of the business processes in the quality system.
What are some activities the project team will perform in executing project work during the Explore Phase? Collect project data and report on progress and performance Manage risks and implement risk response activities Manage Background Jobs, Input and Output. Deal with user authorization requests. Establish and manage internal and external communications.
In which phase you execute the User Acceptance Test? Please choose the correct answer.Response: Build and Test Deploy Final Preparation Realize.
Which of the following activities are part of the Deploy Phase of a Landscape Transformation journey to SAPS/4HANA On-Premise Edition?There are 2 correct answers to this question.Response: Solution Activation Optimize software Change Control Management Training delivery Access organizational and production readiness.
Which navigation option do you use in the Roadmap Viewer to access the SAP Activate Methodology content? Please choose the correct answer.Response: Navigate by assigned Delivery Mode Navigate by RACI matrix accountability Navigate by work stream Navigate by Project Team Member Role.
What is a benefit of using Guided Configuration instead of the Implementation Guide? Please choose the correct answer. It ensures SAP updates do NOT conflict with customer configurations It eliminates the need for Content Lifecycle Management It eliminates the need to generate transport requests for configuration settings It ensures configuration is done using SAP Solution Manager.
What are the two options for transferring data to SAP S/4HANA Cloud? Data Aging (1K8) Data Migration to SAP S/4HANA from Staging (2Q2) Data Migration to SAP S/4HANA from File (BH5) Data Migration to SAP S/4HANA from SAP (BH3).
In the System conversion to SAP S/4 HANA Deploy phase, which of the following tasks are included? Please choose the correct answer. Scheduling project plan Final testing Interface setup Hyper care support.
Which activities are critical for delivering Agile projects? There are 2 correct answers to this question.Response: Retrospective agenda creation Sprint planning Release planning Blueprint scheduling.
Why do you use the Implementation Portal for SAP S/4HANA Cloud? 2 Ans To use as an input for Fit-to-Standard workshops that helps the team understand areas to spend more time on during workshops. To manage implementation tasks based on SAP Activate Methodology that are automatically generated and adapted to the customer's scope To use the guided workflow to integrate SAP Cloud solutions. To monitor the progress of implementation tasks in real time.
In which SAP Activate methodology phase does the team complete the Integration Validation?Please choose the correct answer.Response: Explore Realize Deploy Prepare.
What is the purpose of the SAP Activate Methodology? Please choose the correct answer.Response: To enable access to the SAP ecosystem To accelerate the initial implementation of SAP S/4HANA To provide end-to-end integrated application lifecycle management To manage project and solution documentation.
In which SAP Activate Methodology phase is the Experience Trial accessed by customers? Discover Explore Prepare Realize.
What are key characteristics of the implementation approach in SAP Activate Methodology? There are 3 correct answers to this question.Response: Premium engagement ready On-premise only Fixed scope Validate solution Start with SAP Best Practices.
What is the most granular level of the methodology you can view in the Roadmap Viewer? Please choose the correct answer.Response: Scenario Task Deliverables Phase.
How can SRCUM teams be organized? Please choose the correct answer.Response: By job title By work stream By project phase By project governance level.
In which phase of the SAP Activate methodology does the team complete the Cut-over Rehearsal?Please choose the correct answer.Response Prepare Explore Realize Deploy.
How are the build and test tasks planned and executed in the Realize phase? Please choose the correct answer.Response: By using the sprint backlog list as input for each iteration. By executing regression tests after each iteration With Q-Gates for sign off after each iteration By using incremental build in fixed-scope iteration.
What are some characteristics of SAP S/4HANA Cloud? 2 ans SAP S/4HANA Cloud is single-tenant; meaning your service runs in a dedicated environment. SAP S/4HANA Cloud is multi-tenant, meaning your service runs in a shared environment. SAP S/4HANA Cloud includes quarterly innovation cycles. SAP S/4HANA Cloud runs in an infrastructure with private, managed services for SAP solutions. SAP S/4HANA Cloud provides additional functionality for customers that require broad extensions and deep configuration capabilities.
Which collaboration features can SAP Activate Jam users access? There are 2 correct answers to this question.Response: Ask questions Update Key Deliverable wikis Tweet questions Comment on documents.
How do you gain access to the SAP Activate Methodology Jam site? Please choose the correct answer.Response Register on SAP Service Marketplace Send e-mail to SAP contact address Submit e-mail address via on-line form Join SAP S/4HANA group on SAP Community Network.
Which accelerations can you use during the Scope Validation/Fit-Gap Analysis activity in the Explore Phase? There are 2 correct answers to this question.Response: Sprint Backlog Template RICEF Specification Template Solution Validation Workshop Quality Gate Checklist.
What is the primary function of the Starter System in the Fit-to-Standard workshops? To gather the customer's detailed configuration requirements To provide a secondary sandbox that will be maintained by the customer post go-live To demonstrate SAP Best Practices To configure and test the solution in a sandbox.
What are the three pillars of SAP Activate? There are 3 correct answers to this question. Response: SAP Activate Methodology SAP Best Practices SAP S/4HANA in-memory database SAP Solution Manager Guided Configuration.
Which estimation technique can be used in Agile project delivery to size the user stories during sprint planning? Please choose the correct answer.Response: Detailed bottom-up effort estimate the breaks each user story up into hours or shorter tasks Relative estimate in ideal person days that reflects the best estimate provided by the project team Detailed bottom-up effort estimate by the SCRUM Master in story points based on the user story complexity Product Owner's relative estimate of the effort that will be needed to implement the user story.
What can users do in the Roadmap Viewer tool?Please choose the correct answer.Response: Display and navigate detailed SAP Activate methodology WBS Upload SAP Activate WBS into SAP Solution Manager7.1 Download full SAP Activate methodology content for use off-line Create a customer-specific version of SAP Activate Methodology.
In which SAP Activate methodology phase does the team complete the integration validation? Please choose the correct answer. Explore Deploy Realize Prepare.
Which of the following statements about Scrum is correct? Please choose the correct answer. Scrum Master defines and prioritizes features and gathers requirements In Scrum, the team is Self-organized, define all task necessary for all project life cycle. In Scrum, as best practices, we have three main roles, and three artifacts or three ceremonies. The three ceremonies are sprint planning, daily scrum, sprint review (retrospective).
Which new project roles are introduced with the SAP Activate Agile methodology? There are 2 correct answers to this question.Response: SCRUM Master Product Owner Integration Lead Design Thinking Coach.
Arrange the following in the correct sequence of steps followed for a Fit to Standard workshop. Please choose the correct answer. Demonstrate Business Scenarios and Concepts, Review Best Practice Process Flow, Identifyrequired configuration, Discuss how the process fit with customer requirements, Enable customer on execution of scenarios, Identify gaps Review Best Practice Process Flow, Demonstrate Business Scenarios and Concepts, Discuss how the process fit with customer requirements, Identify gaps, Identify required configuration, Enable customer on execution of scenarios Review Best Practice Process Flow, Demonstrate Business Scenarios and Concepts, Identify required configuration, Discuss how the process fit with customer requirements, Enable customer on execution of scenarios, Identify gaps Discuss how the process fit with customer requirements, Review Best Practice Process Flow, Demonstrate Business Scenarios and Concepts, Identify required configuration, Enable customer on execution of scenarios, Identify gaps.
Which of the following are the key responsibilities of the Scrum Master? There are 3 correct answers to this question. Task initiator Responsible for the project delivery Team support Leadership skill Team protection.
Which of the following Key Deliverables do you complete in the Solution Design work stream in the Explore phase?There are 3 correct answers to this question.Response Design for the Gaps and Deltas Baseline Build Data Migration Approach Validation Workshops Solution Scope and Value Determination.
What types of extensibility are supported directly in the SAP S/4HANA Cloud solution? 2 Ans In-App (Key User) Extensibility Classic Extensibility Side-by-Side Extensibility Managed Extensibility.
What are SCRUM of SCRUMS? Please choose the correct answer. Alternative to regular SCRUM process for smaller teams Integration meeting between the various project teams Frequent inspection of code and configuration prior to quality gates Mechanism for gathering and validating requirements.
Which of the following is not correct about the REALIZE phase? There are 2 correct answers to this question. The project team ensures that the build is meeting the business requirements. The beginning of the Realize phase the team prepares a list of all the requirements in a backlog. The team prepares for operations so that the functionality can be brought live. Detailed design workshops are held.
In which phase do you create a prioritized list of user requirements? Please choose the correct answer.Response Realize Explore Prepare Deploy.
What are some of the training tools / resources available in SAP Learning Hub? Live Sessions in SAP Learning Rooms Learning Center App SAP Learning Rooms SAP Best Practice Business Processes SAP Learning Journeys.
What does a project jump-start include for a new implementation of SAP S/4HANA on- premise edition?Please choose the correct answer.Response: SAP Best Practices Rapid prototyping Project team training Full project SCRUM.
What do you do during an iterative approach to build a solution? Please choose the correct answer.Response: Build the solution module by module Deliver a prototype of the solution Provide a working solution only at the end of the release Include frequent inspection check-points.
What is the final activity in the Realize phase of a new implementation of SAP S/4HANA cloud edition?Please choose the correct answer.Response: Data migration End-to-End walkthrough Readiness check Solution validation.
What is the purpose of a firm-up sprint? Please choose the correct answer.Response: To demonstrate functionality from previous sprint To perform sprint testing To revise a release plan and sprint plan To run end-to-end integration test.
Which of the following are the pillars of SAP Activate? There are 3 correct answers to this question. SAP ASAP Methodology Guided Configuration SAP Launch Methodology SAP Activate Methodology SAP Best Practices.
What SAP Cloud Platform integration tool would you use to integration SAP S/4HANA Cloud and SAP S/4HANA on premise? SAP Cloud Platform, Open Connectors SAP Cloud Platform, Cloud Integration SAP Cloud Platform, API Management SAP Cloud Platform, Connectivity.
Which accelerator can help you document the detailed design of solution extensions? Please choose the correct answer. Change Request Template Product Backlog Template Sprint Backlog Template RICEF Specification Template.
What are some of the required customer activities to maintain their SAP S/4HANA Cloud system post go-live? 3 Ans Activate new scope (if applicable) Conduct regression testing on business processes Maintain business catalogs Stay current Test new features in the Stay Current Early Knowledge Enablement Sandbox / Trial environment.
In SAP Activate, what replaces the detailed Blueprint from ASAP? Please choose the correct answer.Response: Business Process Mapping Value Determination Custom Extension management Fit/Gap Workshops.
Which of the following tools is used to install SAP S/4HANA. Please choose the correct answer. Data Migration server SWPM (Software Provisioning Manager) SAP Solution Manager Cloud Application Library.
Which tools does SAP Activate provide to support Guided Configuration? There are 3 correct answers to this question.Response: Solution Builder Expert Configuration Self Service Configuration SAP Solution Composer Model Company.
In which SAP Activate methodology phase does the team identify and design functional quick wins in scope of the conversion project? Please choose the correct answer. Realize Deploy Explore Prepare.
Your project is performing some high-level planning for a System Conversion journey from SAP Business Suite to SAP S/4HANA on-premise edition. What is the correct sequence of selected key deliverables across the project phases?Please choose the correct answer.Response: a) Code adjustment b) Detailed System Assessment c) Production Readiness Check d) Validation of Migration a) Production Readiness Check b) Detailed system Assessment c) Code Adjustment d) Validation of Migration a) Detailed system Assessment b) Code Adjustment c) Validation of Migration d) Production Readiness Check a) Detailed system Assessment b) Production Readiness Check c) Code Adjustment d) Validation of Migration.
What are the benefits of the SAP best practices? There are 3 correct answers to this question.Response: Fast time to value Predictable results Simple on-boarding to cloud Fixed organizational structure Reduced functional scope.
Who determines the priority of user stories in the backlog of an Agile project? Please choose the correct answer.Response: Project Manager Project Team SCRUM Master Product Owner.
What structure level do you see when you access the Roadmap Viewer and chose work stream navigation?Please choose the correct answer. Scope Item Deliverable Scenario Task.
SAP now offers the ability to deploy and manage solutions in which of the following environments? Please choose the correct answer. Cloud On-premise Cloud, on premise & hybrid Cloud and On-premise.
What SAP middleware tool hosts the SAP Best Practices pre-delivered integration content and can be used for custom integration development? SAP HANA Enterprise Cloud SAP API Management Process Integration SAP Cloud Platform.
In what respect is SAP Activate Methodology different from the ASAP Methodology? Please choose the correct answer.Response: Supports cloud deployments Supports only new implementations Leverages iterative incremental build Includes Fit/Gap analysis instead of Blueprint.
Which of the following can be used to navigate through the roadmap? There are 2 correct answers to this question Deliverables Phases Tasks Workstreams.
What does SAP define as the three key components of how a data center works? 3 Ans Cooling Backup Retention Procedures Power Supply Certification Standards Controlled Access.
In which phase of the SAP Activate methodology does the team complete the Transformation Planning?Please choose the correct answer.Response: Deploy Explore Prepare Realize.
What are some characteristics of the "Cloud" mindset? 3 Ans Make the company fit the software Heavy customizations and modifications Business blueprint phase Workarounds and light extensions Fit-to-Standard workshops Make the software fit the company.
What does it mean if an SSCUI has a "Yes" in the "Redo in P System" column? You must manually redo the configuration in the production system, because it is not captured in change projects. SSCUI records are specific to a company or country and every country has its own unique configuration records. The configuration is transferred from the quality system to the production system in change projects. The configuration records are the same for all countries and all country solutions have the same data.
Where can you find the Migration Object Template documentation? SAP Support Portal SAP Best Practices Explorer SAP Roadmap Viewer accelerator SAP Help Portal.
Which of the following activities are part of the Realize Phase of a System Conversion journey to SAP S/4HANA On-Premise Edition?There are 3 correct answers to this question.Response: Operations impact analysis Custom code adjustment Delta configuration Development system migration Sandbox system migration.
What does SAP Activate recommend to keep team members informed and aligned? Please choose the correct answer.Response: Daily status meeting with project manager Daily team stand-up meeting Daily e-mail status updates to project manager Daily progress review meeting with sponsor.
In which SAP Activate methodology phase does the team complete the Transformation Strategy? Please choose the correct answer Prepare Explore Realize Deploy.
When does the project team receive formal confirmation that the user stories are completed to the satisfaction of the product owner?Please choose the correct answer.Response: During the daily SCRUM meeting During the sprint retrospective During the sprint review During user acceptance testing.
According to the Definition of Done, which activity must be completed for each sprint? Please choose the correct answer.Response: End user training must be delivered Solution must be built and configured in the development system (DEV) Functionality must be tested in the Quality system (QAS) Functionality must be released to the business.
What are the responsibilities of the Project Team on level 4 in the picture below? There are 2 correct answers to this question.Response: Set Project policy, standards and oversight Set business priorities, goals and objectives Identify and resolve issues and risks Perform status reporting and communication.
What is the hierarchy level under Phase in the SAP Jam space for SAP Activate on-premise? Please choose the correct answer.Response: Key Deliverable Scenario Work Stream Task.
What are the four dimensions of SAP Enterprise Support? Collaboration, Empowerment, Innovation and value realization, and Mission-critical support Collaboration, Personalized engagement, Innovation and value realization, and Mission-critical support Expert access, Empowerment, Innovation and value realization, and Mission-critical support Collaboration, Empowerment, Preferred care, and Mission-critical support.
Which content packages are available in the SAP Package Library? There are 2 correct answers to this question.Response: SAP Activate Methodology SAP Best Practices Solution Builder Rapid Deployment Solutions.
What must be defined in the Preset Phase of implementation to enable configuration of business processes? 2 Ans Organizational Structure Master Data Expert Configuration Chart of Accounts.
In which phase do you verify that the SAP Best Practice solution scenarios meet the business needs of the customer?Please choose the correct answer.Response: Explore Deploy Realize Prepare.
Where do you request provisioning of the Quality system? Manage Your Solution app in Starter System Incident/Service Request to SAP Service Center Configure Your Solution app in Starter System.
What SAP S/4HANA deployment model has the characteristics of a core ERP scope with rapid innovation, SAPled governance, and standardization? SAP S/4HANA Cloud, single tenant edition SAP S/4HANA deployed in SAP HANA Enterprise Cloud SAP S/4HANA Cloud SAP S/4HANA on premise.
Why might you choose to migrate data to SAP S/4HANA Cloud with the Staging approach? If you can import the data manually If you need to find a way to automate the transfer of data If you need transfer a lot of data If you need to import a small amount of data.
What configuration cannot be changed after Preset phase activation ? 2 Ans New country activation Organizational structure keys Maintain Takeover Date for Asset Accounting Fiscal year variant.
Which key deliverable includes the development of RICEFW objects? Please choose the correct answer.Response: Development Build Enhancement Delivery Sprint Execution Custom Extensions Management.
How do you create print and interactive forms that look like their paper counterparts? Maintain custom forms in the ABAP UI editor. Maintain custom forms in the Maintain Form Templates Fiori app. Maintain custom forms in SAP Cloud Platform Forms by Adobe. Maintain custom form content in the Manage Logos and Manage Texts Fiori apps.
What are some of the intelligent technologies that enable end-to-end automation? 3 Ans Embedded Analytics Predictive Analytics Machine Learning Fundamental Simplification Conversational AI.
Which of the following are the benefits of SAP JAM? There are 2 correct answers to this question. User collaboration Reduced Recovery Time Easy to use Highly available.
Which of the following tasks are required in the Prepare Phase? There are 3 correct answers to this question.Response: Train the project team Set up the infrastructure to support the project Define the communication plan Approve the test strategy Identify relevant SAP Best Practices.
What are some goals of the Fit-to-Standard workshops? 3 Ans To define the Integration and API List for the solution To review the SAP Best Practices in the starter system. To identify relevant data migration objects. To identify customer-defined configuration changes within the scope of the service. To gather input for customer-defined customizations to the solution.
What is SAP Activate?Please choose the correct answer.Response: A step-by-step instruction on how to remove from SAP best practices to your custom solution A methodology for each of the deployment modes (cloud , on-premise, hybrid) A bundle of ASAP , SAP Launch , and Rapid Deployment Solutions A combination of SAP best practices , methodology, and guided configuration.
What technique helps agile project teams to prioritize a large, flat backlog? Please choose the correct answer.Response: Fit/Gap Analysis User Story Mapping Retrospective Planning Poker.
What is the purpose of the scrumboard? Please choose the correct answer.Response: To document the results of integration testing To manage the resource load To show the functional breakdown of the solution scope To visualize team progress.
How can organizations closely connect subsidiaries with headquarters to run end-to-end business scenarios? With a cloud solution With a 2-tier ERP solution With a 4-tier ERP solution With a fully functional ERP solution.
What is the key characteristic of Agile project delivery? Please choose the correct answer.Response: Frequent and detailed project scheduling Formal and detailed documentation Iterative build with frequent inspections Frequent Quality Gates.
Which of the following are not phases of the SAP Activate methodology? There are 2 correct answers to this question. Go-Live & Support Preparation Prepare Realize.
Which content is made available after you activate SAP Best Practices for a new financial implementation?There are 2 correct answers to this question.Response: Implementation Guide Online help Pre-configured business processes Standard chart of accounts.
The tasks associated with Landscape transportation are in which workstream? Please choose the correct answer Transition to Operations System & data migration Application Solution Adoption Technical Architecture and Infrastructure.
What is a deliverable of the Application. Customer Team Enablement work stream in the Prepare phase of SAP Activate?Please choose the correct answer.Response: Project Charter Project Documentation Knowledge transfer to end users Learning plan.
Which of the following is not correct about Fit/Gap Analysis? There are 2 correct answers to this question. Prioritize delta requirement and gaps. Drive towards adopting customers processes Minimize the needs for rework during realization Validate pre-activate and pre-assembled solution in the development system.
Which of the following building blocks are part of the SAP S/4HANA platform? There are 2 correct answers to this question.Response: SAP Fiori UX SAP HANA in-memory database SAP Solution Manager LOB Cloud Solution.
Which of the following is not correct about workstreams? There are 2 correct answers to this question. It is assigned as attribute to phases, deliverables and tasks. It can span phases It is a collection of related deliverables Workstreams are dependent on phase start and end.
What are some of the capabilities end users can utilize to adapt and change their launchpad home page according to the way they work? 3 Ans Rearrange or move tiles within a group Add any SAP Fiori apps to a group, regardless of role Delete a predelivered group Rename a predelivered tile Add a new group.
What are examples of some information captured in the Digital Discovery Assessment? 2 Ans Customer master data Scope items selected within functional business areas Integration requirements Configuration values required.
Which of the following activities support the Realize Phase of a System Conversion journey to SAP S/4HANA On-Premise Edition?There are 2 correct answers to this question.Response: Custom code Adjustment planning Data aging configuration Non-production systems migration Value determination.
Who determines the tasks that are required to complete the committed backlog items in a sprint?Please choose the correct answer.Response Project Manager Product Owner Project Team SCRUM Master.
What are some responsibilities of customer key users after go-live of an SAP S/4HANA Cloud project ? 3 Ans Complete the implementation activities as assigned. Responsible for inspection and approval of results and of the overall project. Search for solutions and process incidents from end users directly and when necessary, request help from SAP. Manage Users and Task Assignment Monitor internal/external communications such as printers and integration with third-parties.
What APIs (Application Programming Interface) are used to connect SAP Cloud to SAP on premise solutions? BAPI SOAP IDoc Data.
In which phase of the SAP Activate Methodology does the team complete the System Assessment?Please choose the correct answer.Response: Deploy Explore Prepare Realize.
What are some responsibilities of the steering committee during implementation of an SAP S/4HANA Cloud project? 3 Ans Maintain responsibilities for users in your company. Act as a multiplier within your organization to train and support end users. Last escalation level for problems (conflict management ). Responsible for inspection and approval of results and of the overall project. Ensures the resources necessary for the project's success are available.
Which activity is part of the SAP Activate Methodology for a new implementation of SAP S/4HANA on-premise edition but NOT of the cloud edition?Please choose the correct answer.Response: End-to-End Integration Test User Acceptance Test Unit Test Technical System Test.
Which of the following is true about a cloud implementation project? There are 2 correct answers to this question. The entire transport system is kept intact and up and running. Starter Systems are not required to be in place for the 'Fit to Standard' workshops. The Starter System is specific to SAP S/4HANA Cloud. In the prepare phase of a cloud implementation project the project team provide the customer with materials to review as self-enablement.
In which tools can the project team across the SAP Activate Methodology content including accelerators?There are 2 correct answers to this question.Response SAP Community Network Roadmap Viewer SAP Jam SAP Service Marketplace.
How many change projects can be active at a time? 3 2 4 1.
What are some responsibilities of the Configuration Expert project team role in an SAP S/4HANA Cloud implementation? 2 Ans Manages interactions with the SAP Service Center Serves as the central contact for SAP Resolution of business process issues Prepares and leads the Fit-to-Standard analysis process.
Which deliverable is specific to on-premise and NOT for the cloud? Please choose the correct Technical Design Solution Knowledge Transfer Adaptation Specification Learning Needs Analysis.
What is the purpose of the Solution Validation activity in the Explore phase? There are 3 correct answers to this question.Response: To verify technical installation To identify gaps To log additional scope items To challenge changes to standard To educate project participants.
What are some extension item types can be transported from the Quality system to the Production system? 4 Ans Form Templates Custom Fields Communication Arrangements Master Data Query Designer Report Employee Data Custom Business Logic.
Which of the following is a Key Deliverable of the Prepare phase? Please choose the correct answer.Response: Solution Scope and Value Determination Change Impact Analysis and Communication Plan Baseline Build Release and Sprint Plan.
How can the project manager help to keep momentum in the project and help to keep the customer involved? 2 Ans Leverage agile cycles to build and test the solution Increase the number of Q-Gates Add customer resources to the project to reduce the need for formal training Walk through the solution processes with the stakeholders.
Who receives the initial login information for the Starter, Quality, and Production Systems when they are provisioned? SAP Service Center, who then forwards the information to you Customer Key User identified as the "IT Contact" Project Manager on the Customer Implementation Team Project Manager on the Partner Implementation Team.
Which of the following activities are performed in the Explore phase of SAP Activate in SAP S/4HANA Implementation?There are 3 correct answers to this question Adjusting custom code objects Implementing best practices Creating transnational data Changing master data Organizational structure.
Which of the following is not a characteristic that the quality principles are based on? Please choose the correct Experience of Typical Pitfalls SAP Quality Award example winners International standard Best Practices.
Which of the following tools are used for rapid database migration? There are 2 correct answers to this question. Database migration option (DMO) SAP Solution Manager SWPM (software provisioning manager) Software Update Manager (SUM).
When do you perform User Acceptance Testing during the Agile Build? Please choose the correct Before Integration Testing During each Firm-up Sprint After each Sprint After Integration Testing.
What is a key characteristic of SAP Activate for new implementations of S/4HANA cloud edition?Please choose the correct answer.Response: Start with executable content Limited involvement of business stakeholders Waterfall approach Design-based.
In Which phase does the Transition to Operations work stream start? Please choose the correct answer.Response: Explore Realize Deploy Prepare.
Which accelerator can help you document the detailed design of solution extensions? Please choose the correct answer. Sprint Backlog Template RICEF Specification Template Change Request Template Product Backlog Template.
In which of the following project phases is it important to plan and schedule data loads followed by load validation activities? Deploy Realize Prepare Explore.
What is the focus of a SCRUM of SCRUMS in an Agile context? Please choose the correct answer.Response: Best Practice adoption Communication to the Project Management Office Backlog management Integration topics.
What do you do during Sprint Execution?Please choose the correct answer.Response: End a sprint when the sprint backlog items are all complete Measure the sprint progress with a percentage complete report Hold a retrospective at the end of each week Present status of selected user stories in the sprint scope on a scrumboard.
Which of the following tasks are part of the Production support after the Go Live key deliverable?There are 2 correct answers to this question.Response: Resolve issues identified during the Hyper Care period Provide further training to customer end users Set up the Operations Control Center Perform a Technical systems test.
What are some functions of Business Catalogs? 2 Ans Analyze if authorizations are missing or insufficient Enable you to restrict user access Provide access to one or more applications Display information about the usage of business roles.
Which activities are part of the Application: Solution Adaption work stream of SAP Activate for new implementations?There are 3 correct answers to this question.Response: Value Audits Production Support Plan Value Determination Change Management Plan Scope Validation.
What are the responsibilities of the Product Owner in release and sprint planning? There are 2 correct answers to this question.Response: Analyze the functional and technical dependencies between the user stories Define objectives for each release Prioritize backlog user stories by business priority Estimate the backlog user stories.
What do you do during post cutover? Please choose the correct answer.Response: Setup Operational Support Perform the Verification Session of the SAP Going Live Check Perform Technical System Test Conduct Organizational Readiness Check.
What is the best target environment for a System Conversion journey is as described in the SAP Activate methodology?Please choose the correct answer.Response: SAP Hybris SAP S/4HANA Cloud Edition SAP S/4HANA On-Premise Edition Hybrid of SAP S/4HANA Cloud Edition and SAP S/4HANA On-Premise Edition.
How many countries can be activated at a time? 3 2 1 4.
What is the objective of a sprint retrospective meeting? Please choose the correct answer.Response: Define the stakeholder management approach Review and prioritize the backlog Provide formal feedback to the project manager Improve the SCRUM process.
What must you do when you implement SAP Business Suite On-Premise with SAP Best Practices?Please choose the correct answer.Response: Activate and apply SAP Best Practices content with the self-service configuration UI Activate and apply SAP Best Practices with SAP Solution Manager Apply SAP Best Practices with the Configure your Solution application Assemble and apply SAP Best Practices to the system.
What is the best transition scenario for a customer looking for some, but not full process redesign, and re-use of existing processes in some areas that still fit? Selective Data Transition New Implementation System Conversion.
Your project is preparing for the Fit/Gap analysis workshops. If you use the Agile approach, what sequence of activities do you perform in the Explore Phase?Please choose the correct answer.Response: a) Conduct Solution Validation workshops b) Set reference value c) Prioritize initial backlog d) Conduct Delta Design workshops a) Set reference value b) Prioritize initial backlog c) Conduct Delta Design workshops d) Conduct Solution Validation workshops a) Conduct Solution Validation workshops b) Conduct Delta Design workshops c) Set reference value d) Prioritize initial backlog a) Set reference value b) Conduct Solution Validation workshops c) Prioritize initial backlog d) Conduct Delta Design workshops.
What information does the product team need so that they can estimate the relative size of backlog user story correctly?Please choose the correct answer.Response: Available project resources Test strategy Definition of Done Overall project schedule.
What is the purpose of the Solution Builder tool in the SAP Activate Guided Configuration? Please choose the correct answer. To create customer-specific scope items To activate the Best Practices content To personalize activated, ready-to run business processes To create delta building blocks for complementary content.
Which of the following are available in the initial SAP Methodologies JAM Page? There are 2 correct answers to this question Task description Accelerators Summary Roadmaps.
What are the three cornerstones of SAP's cloud security strategy? 3 Ans Secure People Secure Operations Secure Company Secure Cloud Secure Products.
What is the minimum number of quality gates mandated by the SAP Activate methodology? Please choose the correct answer.Response: 0 3 4 5.
What is a difference between the SAP Activate methodology for a new implementation of SAP S/4HANA cloud edition and a new implementation of SAP S/4HANA on-premise?Please choose the correct answer.Response: For the cloud edition, there is an additional work stream for integration with on-premise systems For the cloud edition, there is an additional Q-Gate for integration with on-premise systems For on-premise, there is an additional Q-Gate for system installation For on-premise, there are additional deliverables for the system setup.
Which activity helps the project team to add the user stories to the product backlog? Please choose the correct answer. Response Planning the User Acceptance Test Preparing a Project Schedule Conducting the Solution Validation Assessing Project Risks.
Which of the following content best outlines the scope of the Integration Test? Please choose the correct answer.Response a) Prototype b) Delta/gap solutions c) Data flows with non-SAP application a) Prototype b) Delta configuration c) Data flows between SAP solutions a) Solution baseline b) Delta/gap solutions c) Data flows with non-SAP application a) Solution baseline b) Delta configuration c) Data flows between SAP solutions.
Which activities are part of the Design and Configuration application of the SAP Activate methodology?There are 2 correct answers to this question Schedule kick-off workshop Conduct Scope Validation Confirm Integration prerequisites Perform Fit/Gap Analysis.
Which criterion does the Product Owner use to sequence the product backlog? Please choose the correct answer.Response Resource availability Complexity Business priority Relative effort.
What does "de-coupling extensions" mean in SAP S/4HANA Cloud? 2 Ans Extensions will not clash with quarterly release upgrades Extensions are separated from the stable system of records. Extensions are applied with modifications in the HANA database Extensions could conflict with future release enhancements.
What hosts the Test Execution Service that drives automated business process testing in SAP S/4HANA Cloud? SAP Cloud Platform SAP Cloud Identity Manage Your Solution app SAP HANA Enterprise Cloud.
When is the Quality System upgraded to the latest release? Don the Release to Customer (RTC) date The second weekend after the RTC date The first weekend after the RTC date The third weekend after the RTC date.
What does "SSCUI" stand for? Self-Service Customization User Interface Self-Service Configuration User Interface Self-Service Creation User Interface Self-Service Collection User Interface.
What are some responsibilities of the Business Process Expert in SAP S/4HANA Cloud implementation projects? 2 Ans Guides the system configuration Expert in solution processes and configuration Performs and confirms configuration Drive decisions and perform testing.
In SAP S/4HANA Cloud, what is the basis of an integrated accounting system in which financial accounting and management accounting data are recorded in a single chart of accounts? Chart of Accounts Fiscal Year General Ledger Universal Journal.
Which of the following are accurate statements regarding the Organizational Structure app? 2 Ans The IDs of existing entities can be changed through a Change Project after content activation. It is impossible to delete an entity once it has been created with the Organizational Structure app You can delete an entity created with the Organizational Structure app as long as you have not carried out content activation. A relationship between two entities can only be defined after both entities have been created.
What tool do you use to configure an SAP Business Suite on-premise solution? Please choose the correct answer.Response: ABAP Workbench SAP Implementation Guide Configuration Composer Expert Configuration.
Identify the two landscape transformation specific tasks in the explore phase. There are 2 correct answers to this question Define the Data Migration Architecture Run a landscape transformation assessment Setup Landscape Transformation Software Perform Client transfer.
Which component of SAP Activate offers customers a reference solution in the cloud for a quick start?Please choose the correct answer.Response: SAP Implementation Assistant SAP Activate Methodology Guided Configuration SAP Best Practices.
Which of the following SAP S/4HANA Landscape Transformation options are enabled? There are 3 correct answers to this question. System consolidation Migration of business unit Security Migration Migration of selected applications System Upgrade.
Which tool can you use to collaborate with other SAP Activate methodology practitioners? Please choose the correct answer.Response: SAP Jam SAP Solution Manager SAP Implementation Assistant Roadmap Viewer.
What are some characteristics of the Quality system? 2 Ans Used to run your business in SAP S/4HANA Cloud Used for quality assurance check of business processes during quarterly upgrades Decommissioned 30 days after Production system provisioning Configurable system during implementation.
Which key activities does the Guided Configuration support you with? There are 3 correct answers to this question.Response: Manage roles of configuration users Train new users Create test data Test configured processes View solution scope.
What are deliverables of the Application: Integration work stream in the prepare phase? There are 3 correct answers to this question.Response: Fit/Gap Analysis Data Cleansing Security Checks Adaptation Specifications Network Connectivity Checks.
What are some of the defined recommendations for organizational change success? 3 Ans Don't worry about the scale of change for end users. Promote the case for change and look forward to avoid change fatigue. Collect feedback from employees occasionally. Be aware of cultural and language barriers for regions, countries, and Lines of Business impacted by your change. Maintain a robust governance structure, especially in the Run phase.
What is the focus of a SCRUM of SCRUMS in an Agile Context? Best Practice adoption Communication to the Project Management Office Integration Topics Backlog Management.