option
Questions
ayuda
daypo
search.php

Minitest del2

COMMENTS STATISTICS RECORDS
TAKE THE TEST
Title of test:
Minitest del2

Description:
80 del 2

Creation Date: 2025/05/15

Category: Others

Number of questions: 32

Rating:(0)
Share the Test:
Nuevo ComentarioNuevo Comentario
New Comment
NO RECORDS
Content:

The Mixed MRP indicator is used in conjunction with which of the planning strategies? There are 2 correct answers to this question. Net requirements planning. Subassembly planning strategies. MTO planning. Gross requirements planning.

What are the main processes of the embedded PP/OS in SAP S/4HANA? There are 3 correct answers to this question. Optimization of the production plan. Long-term production planning. Production order processing. Source determination for external procurement.

Which of the following steps of order execution generates financial postings? There are 2 correct answers to this question. Order release. Goods receipt. Material staging. Material availability check.

A planner is trying to move an order from one resource to another, but gets an error. What caused the error? The resource to which planner is moving the order to: Please choose the correct answer. Isn't a finite scheduling resource. Isn't maintained in the routing operation (PDS) of the material in PP-DS. Has a mode priority maintained as “B”. Is maintained as an alternate resource to the resource where the order currently exists.

What data processing steps are obsolete if you use SAP S/4HANA Analytics? There are 2 correct answers to this question. Pre computed aggregation views. Online transaction processing (OLTP). Extract on, transformation, and loading (ETL). Online analytical processing (OLAP).

Which material master setting is required to use the repetitive planning table for production with production orders? Please choose the correct answer. A repetitive manufacturing profile must be assigned on the MRP4 view. At least one valid production version must exist on the MRP4 view. An overall profile be assigned on the Work Scheduling view. The Selection Method must be set to “2 Selection by production version”.

Which of the following is the main reason for an alternative production method being required for different production lots? Please choose the correct answer. Validity date. Efficiency. Lot size. Labor availability.

Which information is required when you create a product master in SAP S/4HANA? There are 2 correct answers to this question. Industry sector. Selection screen for views. Product type. Base unit of measure.

The setup time on the production line to produce a material is extensive. You would like to avoid multiple setups and limit the production of the material based on a planning calendar. Which type of lot size procedure should you use to accomplish this? Please choose the correct answer. Minimum lot sizing. Fixed lot sizing. Periodic lot sizing. Exact lot sizing.

You are a consultant on an SAP S/4HANA Cloud Greenfield project. Which of the following aspects should you focus on to achieve and maintain clean core data quality? There are 2 correct answers to this question. Efficiency. Accuracy. Timeliness. Stability.

What are key benefits of SAP S/4HANA MRP Live? There are 3 correct answers to this question. Significantly higher data footprint leveraging SAP HANA. Runs on any device. Simplified MRP processes with reduced processing times. Simultaneous capacity planning by default. Real-time analysis of disruptions in the material flow.

Identify the various types of BOM. There are 3 correct answers to this question. Simple. Variant. Multiple. Item category BOM.

Which of the following are production master data objects in SAP S/4HANA? There are 2 correct answers to this question. Product cost collector. Bill of materials. General ledger. Work center.

Which of the following statement is correct? Please choose the correct answer. The planned costs for internal activities are defined in the material master of the product. The planned costs for material components are calculated by: Planned quantity * price. The planned costs for internal activities are calculated from the process costs.

When you execute an MRP Live run from various MRP monitoring apps, which of the following statements are correct? There are 2 correct answers to this question. MRP will always plan materials with single-item/single-level planning. Net change planning is executed. Regenerative planning is always used to make sure that the material is always planned. Only MRP materials are considered; MPS materials are out of scope with monitoring apps.

Which of the following are required to be configured before you can create a BOM? Please choose the correct answer. BOM status. BOM usage. None of the above. Item Categories. User-specific settings.

What do you use to schedule operations from planned orders so that the production plan can be fulfilled? Please choose the correct answer. Demand Planning (DP). Capacity Requirements Planning (CRP). Supply Network Planning (SNP). Material Requirements Planning (MRP).

Which of the following statements are correct? There are 2 correct answers to this question. Shift notes and shift reports are two separate means of documenting special occurrences within a shift with reference to a sales order. You use the shift note in order to enter times and comments for an event that cannot be entered elsewhere in the system. A shift report is a PDF document that is created automatically by the background processing. The shift report serves to collect all the important information on a work center or work center hierarchy in a shift. Shift reports can be changed at any times.

Which statements are correct concerning BOMs? There are 3 correct answers to this question. You can create a BOM that is applicable to all the plants by maintaining special character “*”. BOM usage controls which material types for BOM headers are allowed. When you create the BOM for the first time, it will have a blank technical type. Pipeline materials can't be assigned as a stock item in the BOM. It's not possible to allocate group BOMs to individual plants.

Which of the following settings are contained in a product heuristic? There are 3 correct answers to this question. Available-to-promise. Net requirements. Lot-sizing. Scheduling strategy.

For which data objects do you have to set up CIF integration models in S/4HANA to use them in advanced planning? There are 2 correct answers to this question. Contract. Work center. Production plant. Material master.

Which statements are correct with reference to the Schedule Production app? There are 3 correct answers to this question. You can perform dispatch, deallocate, and reschedule of operations. This app is applicable only for pacemaker or bottleneck work center. You can have more than one work center as a bottleneck work center. Planning Mode can be selected flexibly between Bucket and Sequence. Only the Chart view is available for this app.

Which SAP solutions can be used for forecasting in Supply Chain Planning? There are 2 correct answers to this question. Material Requirements Planning (MRP). Supply Chain Management (SCM). Integrated Business Planning (IBP). Capacity Requirements Planning (CRP).

Which report would you use to display an overview of all the necessary parts and materials? There are 2 correct answers to this question. Level-by-level explosion. Multilevel BOM explosion. BOM comparison. Material where-used list.

You want to schedule an order in the graphical planning board. What are valid planning directions? There are 2 correct answers to this question. Infinite sequencing. Squeezing in. Backwards. Forward with reverse.

You have maintained the parameters for simple discontinuation in the material master of a component. Which business process will be affected if the available stock is zero and the discontinuation date is in the past? Please choose the correct answer. Backflushing. Production order release. Material requirements planning. Kanban.

With reference to the material availability check, which of the following statements are correct? There are 2 correct answers to this question. The material availability check is always performed automatically. When there is a material shortage, the system sets the status MSPT (material shortage). You can check missing parts information by accessing Transaction COOIS. The scope of check is determined for each component.

What is a typical transportation processing SAP Transportation Management? Please choose the correct answer. Transportation Planning, Transportation Execution, Order Management, Freight Costing and Settlement, Analytics and Reporting. Order Management, Transportation Planning, Freight Costing and Settlement, Transportation Execution, Analytics and Reporting. Order Management, Transportation Planning, Transportation Execution, Freight Costing and Settlement, Analytics and Reporting. Transportation Planning, Order Management, Transportation Execution, Freight Costing and Settlement, Analytics and Reporting.

A __________ is the smallest organizational unit of external accounting for which a complete and self-contained bookkeeping system can be replicated. Please choose the correct answer. Plant. Storage location. Client. Company code.

What are typical characteristics of make-to-order production? There are 2 correct answers to this question. Unrestricted use stock. Sales order specific procurement. Planned independent requirements for a finished product trigger its production. Sales order specific stock.

What are the key capabilities of SAP S/4HANA MRP Live? There are 3 correct answers to this question. Real-time exception handling based on live data. Batch processing and traditional MRP list analysis. Simulation of “What if” scenarios in real-time. Analysis of MRP lists. Integration with SAP Fiori for enhanced user experience.

A material has been set up as a phantom assembly by entering the special procurement key in the material master. How can you switch off the phantom assembly in a specific bill of material (BOM)? Please choose the correct answer. Change the explosion type of the phantom assembly in the BOM. Change the item category of the phantom assembly in the BOM. Change the special procurement key of the phantom assembly in the BOM. Change the phantom item indicator for the phantom assembly in the BOM.

Report abuse