option
Questions
ayuda
daypo
search.php

mytestformetodo

COMMENTS STATISTICS RECORDS
TAKE THE TEST
Title of test:
mytestformetodo

Description:
mytestformetodo

Creation Date: 2020/09/02

Category: Others

Number of questions: 31

Rating:(0)
Share the Test:
Nuevo ComentarioNuevo Comentario
New Comment
NO RECORDS
Content:

What facts document the strengths of SAP S/4Hana?. 7X higher data throughput. 10x higher data footprint. 1800x faster analytics and reporting. 4x less process steps.

What are major reasons for the SAP S/4Hana Enterprise Management System?. It is based on stable core ERP processes. It provides a scalable infrastructure. It includes CRM, SRM and APO. It offers analytics with real-time data.

Taking the MRP cockpit as an example - what are key capabilities of SAP S/4Hana's new user interface?. System-based decision support. On the fly simulations. Mobile access. Personalization.

Which requirements would you need to address with regard to the graphical user interface for a developer user?. Browser-based, simple UI. Frontend-Orientation. Overall authorization. Multiple system access.

Which of the following characteristics apply to SAP Fiori Launchpad?. It requires Google Chrome as a browser. It can be used side-by-side with other UIs. It can be personalized. It is role-based.

Which of the following statements apply to the 'new' category of the sap user experience strategy? Choose the correct answer. The new applications are delivered with the latest UI technology. SAP Fiori is used for existing applications. Customers improve applications with various UI technologies.

What does the simplification list contain?. Impact of a simplification. Services related to a simplification. Notes. References to education material.

What does subcontracting with MRP areas in S/4Hana offer?. Consideration of default planning parameters if MRP-area specific material master is not maintained. Seperate planning for every subcontractor. Seperation of subcontracting demand and stock into different planning sections.

Which of the following is the recommended strategic solution for long-term strategic planning and forecasting? Choose the correct answer. PP-SOP, Sales and Operations Planning in the PP module. IBP, Integrated Business Planning (cloud-based). APO-DP, Demand Planning in Advanced Planning and Optimization.

Which role does a production version have in terms of supply source selection in SAP S/4Hana manufacturing? Choose the correct answer. It is optional. It doesnt play any role anymore. It is mandatory.

Which of the following SAP ERP MRP processing keys are still supported by SAP S/4Hana?. NETPL (Net Change planning for the planning horizon. NETCH (Net Change planning for total horizon. NEUPL (Regenerative planning).

What are key benefits of the SAP S/4Hana MRP Live?. Significantly higher data footprint leveraging SAP Hana. Runs on any device. Real-time analysis of disruptions in the material flow. Simultaneous capacity planning by default.

What are key capabilities of SAP S/4Hana MRP Live?. Analysis of MRP lists. Exception handling based on real-time data. Simulation of 'what if' scenarios in real-time.

What does 'one MRP' mean in SAP S/4Hana Enterprise Management? Choose the correct answer. The MRP run is carried out once a day at nighttime. There is one MRP in S/4Hana that can plan all materials. Materials should either be planned in APO or in S/4Hana, not both. Quantities and capacities are always planned synchronously in one planning run.

Which of the following statements are true for Make-to-stock production?. Sales orders ae fullfilled by anonymous warehouse stock. Planned independent requirements always trigger assembly. Sales orders always trigger production. Planning assemblies can be combined with Make-to-stock concept.

Which of the following planning strategies are Make-to-stock strategies?. Production by lote size. Planning with final assembly. Planning at assembly level. Planning without final assembly.

Which of the following statements are true for Make-to-order production. Sales orders are fullfilled by anonymous warehouse stock. Planned independent requirements always trigger final assembly. Sales orders always trigger production. Planning assemblies can be combined with Make-to-order concept.

Which of the following planning strategies are Make-to-order strategies? Choose the correct answer. Production by lot size. Planning with final assembly. Planning at assembly level. Planning without final assembly.

Which of the following statements applies to planning at assembly level?. You can use any planning strategy for the finished product. Consumption only takes place on the level of the finished product. Forecast is done for the assembly/assemblies. Consumption is triggered by the MRP run.

In which of the following can you find the main items and tasks of PP/DS planning. Demand forecasting. Cross-location, period-based planning. Location-related material requirements planning. Location-related capacity planning.

To view alerts in PP/DS, what setup needs to be created?. Create an application-specific profile. Configure alerts in the core interface. Assign an alert profile to the planning tool. Select material-specific alerts in the product master.

Which of the following are alert types in PP/DS?. Alerts to update the time series. Quantity alerts. Date and time alerts. Capacity alerts.

Which of the following settings are contained in a product heuristic?. Avalaible-to-promise. Net requirements. Lot-sizing. Scheduling strategy.

At which level is scheduling performed.Choose the correct answer. Production data structure. Order. Resource. Material.

In which of the following master data objects do we find control settings for pegging (interval, tolerance, procedure)? Choose the correct answer. Material Master. Resource. Production Data Structure. Production Process Model.

Operations can be rescheduled from a resource to an alternate resource using which of the following ways?. Manual drag and drop. Using a PDS with multiple modes. Attaching a production note to the PDS. Selecting a different PDS using a heuristic.

At which level do detailed scheduling (DS) heuristics plan? Choose the correct answer. Product. Order. Resource. Vendor.

What is the missing acronym? With SAP S4Hana, OLTP and __________ applications are managed within the same system. HTTP. JSON. ETL. OLAP.

What is the name of the SAP S4Hana core?. Enterprise Resource Management. Enterprise Management. Enterprise Central Component. Enterprise Line of Business (LOB).

What is SAP Fiori?. Mobile tecnology. User experience. Data model. Reporting tool.

Which Hana edition allows more extensive customer modifications?. On premise. Cloud.

Report abuse