option
Questions
ayuda
daypo
search.php

Ol 1

COMMENTS STATISTICS RECORDS
TAKE THE TEST
Title of test:
Ol 1

Description:
Czesc 1

Creation Date: 2022/03/10

Category: Others

Number of questions: 80

Rating:(0)
Share the Test:
Nuevo ComentarioNuevo Comentario
New Comment
NO RECORDS
Content:

A customer is considering switching from order-related settlement to product-related settlement. What are capabilities of cost collectors? There are 2 correct answers to this question. They can be used for repetitive manufacturing. They can be applied to make-to-stock production order. They can be used for manufacturing with collective orders. They can be created automatically during month end process.

A material has been set up as a phantom assembly by entering the special procurement key in the material master. How can you switch off the phantom assembly in a specific bill of material (BOM)? Please choose the correct answer. Change the explosion type of the phantom assembly in the BOM. Change the phantom item indicator for the phantom assembly in the BOM. Change the special procurement key of the phantom assembly in the BOM. Change the item category of the phantom assembly in the BOM.

A material in your company is planned with planning strategy 70 (Planning at assembly level). The consumption mode has been set to backwards with a consumption period of 12 days. Starting from when are the 12 days counted backwards? Please choose the correct answer. From the dependent requirement date of the material. From the planned independent requirement date of the material. From the availability date of the related finished good. From the requested delivery date of the related finished good.

A planner updated a production order status from partially confirmed “PCNF” to technically completed “TECO” by mistake. What impact would this have to other users for this specific production order? Please choose the correct answer. The production operator cannot enter additional confirmations. The warehouse clerk still carry out goods issue transactions. The production manager can still see the capacity requirements. The buyer can still see component reservations.

In the Schedule Production app, which settings can you make in the planning strategy? There are 3 correct answers to this question. Planning mode (bucket/sequence). Direction (forward/backward). Scheduling control (finite/infinite). Finiteness level (0...1). Fixed pegging (on/off).

A planner wants to interactively resolve an overload situation on a resource using advanced planning tools without any automatic rescheduling activity by the system. Which combination of settings for resource and detailed scheduling strategy are required to receive related alerts? Please choose the correct answer. Finite resource and infinite strategy. Infinite resource and finite strategy. Finite resource and finite strategy. Infinite resource and infinite strategy.

A production order is created from a planned order. The system should determine a valid production version. What must you doing the system for the selection to occur? Please choose the correct answer. Set the customizing setting Automatic Selection of Production Version active. Create several production versions with valid dates. Set the customizing setting Manual Selection of Production Version active. Change the production version assignment in the production order using the Read Master Data function.

A resource was created in SAP S/4HANA PP/DS through the internal CIF integration and named “W1904_1000_001”. What does the suffix 001 in the resource name represent? Please choose the correct answer. Capacity category. Available capacity version. Work center category. Number of individual capacities.

A warehouse manager likes to streamline the goods receipt (GR) process for production orders. Where can you enable the automatic GR? There are 2 correct answers to this question. Operation control key. Production scheduling profile. Scheduling margin key. Confirmation profile.

Advanced Planning is delivered with standard out-of-the-box order and resource evaluations. Which evaluations are available? There are 2 correct answers to this question. Order list. Resource utilization. Resource overview. Production list.

Advanced Planning uses master data and transaction data from SAP S/4HANA. In which data objects can you set the advanced planning flag? There are 2 correct answers to this question. Work center. Material. Plant. Production version.

An issue storage location was NOT found through the work center, bill of material (BOM) item, or material master. What determines whether the storage location can be derived from the production version? Please choose the correct answer. MRP Group. Plant Data. MRP Profile. MRP Controller.

At the end of the MRP run you receive the exception message “Reschedule In Operation”. What caused the message to be generated? Please choose the correct answer. The requirements date occurs before that of a firmed planned receipt. The requirements date occurs that of a firmed planned receipt. A firmed planned receipt cannot be rescheduled. The requirement no longer exists.

Before a user can add multiple production versions in a material master, what information should be collected? There are 3 correct answers to this question. Validity dates. BOM status. Lot sizes. Task list group number. Work center hierarchy.

During planning you are facing an overload situation on a resource. Which activities do you consider to create a feasible production plan? There are 3 correct answers to this question. Use DS heuristic “Schedule Sequence”. Use rescheduling with an alternative mode. Use optimization with respect to set-up times. Use multilevel MRP run for the products on the resource. Use a bucket-oriented capacity check.

During production order creation, several valid production versions are found. How does the system choose the product conversion? Please choose the correct answer. Alphanumeric or quota arrangement. Planned order or material number. Lot size or material cost. Validity period or sales order.

For a production version to be valid and consistent what requirements must be fulfilled? There are 3 correct answers to this question. The assigned routing and bill of materials (BOM) must be valid in the entire validity period. The deletion flag must NOT be set for the bill of materials (BOM) or the routing. The lot size range must be within the lot-size range of the assigned routing. The assigned routing must be a rate routing. The assigned routing must NOT have alternative sequences.

For which data objects do you have to set up CIF integration models in S/4HANA to use them in advanced planning? There are 2 correct answers to this question. Production plant. Contract. Work center. Material master.

For which planning-relevant data objects do you set just one indicator to include then in PP/DS? There are 2 correct answers to this question. Work center. Material. Plant. Production version.

How can Production Planning and Detailed Scheduling (PP/DS) enhance the standard planning functionality? Please choose the correct answer. By providing replenishment proposals with exact times. By providing cross-plant planning and deployment. By providing multilevel material requirements planning. By providing future demands from demand figures in the past.

How can you achieve a feasible production plan in case of capacity constraints? There are 3 correct answers to this question. Adjust the available capacity. Select an alternative mode on a resource. Form optimum sequences to reduce setup times. Reduce the planning window. Execute a new production planning run.

How can you avoid order proposals for planned independent requirements with dates in the past? There are 2 correct answers to this question. Maintain adjustment parameter in the MRP group. Reorganize planned independent requirements. Set the requirements reduction indicator in the requirements class. Use a planning strategy with requirements consumption.

How can you carry out cost object controlling for production orders? There are 2 correct answers to this question. Product-related. Order-related. Cost-related. Milestone-related.

How can you enhance the system statuses of a production order scenario with user statuses? Please choose the correct answer. By enhancing the system status customizing table with user statuses. By activating the user statuses in status and action management. By defining a status profile and assigning it to the order type. By creating a user profile and assigning it to the production scheduling profile.

How can you limit the number of master data objects to be created when the manufacturing process is the same for many different products? Please choose the correct answer. By assigning different materials to the same routing. By assigning the same production version to different materials. By creating routings with alternative sequences. By creating routings with parallel sequences.

How can you limit the validity of a bill of material (BOM)? There are 2 correct answers to this question. By plant. By period. By material type. By industry.

How can you set up the supply source for the SAP Kanban process? There are 3 correct answers to this question. Using run schedule quantities for in-house production. Using stock transfer reservations for stock transfer. Using purchase orders for external procurement. Using quotations for internal and external procurement. Using purchasing costs for automated source prioritization.

How does the new Inventory Management Data model contribute to the reduction of the data footprint? There are 3 correct answers to this question. By eliminating inventory tables. By eliminating inventory history tables. By eliminating fields for different stock types. By eliminating material master tables. By eliminating hybrid tables.

How Is the bill of material (BOM) exploded when you use a BOM explosion number? Please choose the correct answer. With respect to defined separate key dates for product and each assembly. With respect to a common change status for product and each assembly. With respect to a common key date for product and each assembly. With respect to a defined separate change status for product and each assembly.

How would you define pegging in the context of Advanced Planning? Please choose the correct answer. An evaluation that is ordered according to the bill-of-material structure of all related products and represents the relationship between the receipt and the issue elements. An evaluation to verify if there are overstock situations in the balance between receipt and issue elements after the production planning run. An evaluation that is ordered according to the network structure of all related products and represents the coverage of issue elements with receipt elements. An evaluation to verify if there are mater al or capacity shortages in the network after the production planning run.

If the stock level drops below the reorder stock in reorder point planning, what is the system logic to trigger procurement? Please choose the correct answer. Fill up based on the lot size procedure. Fill up to the safety stock level. Fill up to the reorder stock level. Fill up to the maximum stock level.

If you use floats to limit dispatching in capacity planning, what type of time element can be reduced by strategy settings while dispatching? Please choose the correct answer. Queue time. Production time. Goods receipt processing time. Minimum wait time.

In a first step you have created master recipes. In which sequence are the additional objects created? Please choose the correct answer. Process order, Control recipe, PI sheet, Process message. Process order, Control recipe, Process message, PI sheet. Control recipe, Process order, Process message, PI sheet. Control recipe, Process order, PI sheet, Process message.

In a production process, you need a certain amount of liquid as input material. The source tank is directly connected to the reactor. How can you process consumption postings? Please choose the correct answer. Backflushing. Transfer order. Kanban. Picking list.

In Demand-Driven Replenishment, materials are classified according to several criteria. What criteria can you use? There are 3 correct answers to this question. Usage in bill of materials. Demand variation. Goods issue value. Average daily usage. Minimum order quantity.

In Make-to-order production, which field controls whether the components will be planned as sales order specific stock? Please choose the correct answer. The Individual/Collective indicator of the component. The MRP Type of the component. The item category of the component in the BOM. The Planning Strategy of the finished product.

In order to use strategy 70 – Planning At Assembly Level, what order field must be set besides the planning strategy? Please choose the correct answer. Mixed MRP indicator. Individual/Collective Indicator. Storage Location MRP Indicator. Dependent Requirements indicator.

In the Manage Shortage view of the new SAP Fiori app “Monitor Material Coverage”, what do the stars indicate? Please choose the correct answer. The viability of the proposed solution. The presence of production orders. The priority of the proposed solution. The presence of firmed planned orders.

In which customizing activity do you set up automatic routing selection for production orders? Please choose the correct answer. Define order-type-dependent parameter. Define production scheduling profile. Define selection profiles. Define scheduling parameters for production orders.

In which data object is the production line (Repetitive manufacturing relevant work center) maintained? Please choose the correct answer. Production version. Cost collector. Repetitive manufacturing profile. Bill of material.

In which data objects do you maintain the production in as the work center for repetitive manufacturing? There are 2 correct answers to this question. Routing. Production version. Repetitive manufacturing profile. Production cost collector.

In which material master views can you select the batch management checkbox? There are 2 correct answers to this question. Work Scheduling. Purchasing. Basic Data 1. MRP 4.

In which of the following master data objects can you define the production order default storage location for a material component? There are 2 correct answers to this question. Work center, in the production supply area. BOM, in the item for the material. Routing, in the component allocation. Material master of the finished product.

In your plant, MRP is activated. Which options do you have to exclude a material from the MRP run? There are 2 correct answers to this question. Use a specific MRP controller. Use a specific material status. Use a specific material group. Use a specific MRP type.

In your project, you have several materials that are planned by different people. How can you assign the planning responsibility? Please choose the correct answer. MRP controller. MRP planning file. MRP type. MRP group.

Mode selection is one of the scheduling options available in Advanced Planning in SAP S/4HANA. When can you use mode selection? Please choose the correct answer. When alternate resources are used within one operation. When multiple operations are maintained for one product. When multiple planned orders exist on one resource. When multiple production versions are maintained for one product.

MRP created a planned order for a material that has one single material from stock as a component. What happens to this dependent requirement when you convert the planned order into a production order? Please choose the correct answer. It is converted into a reservation. It is converted into a production order. It is converted into a schedule line. It is converted into a schedule line.

On which of the following levels can you influence the availability check for the components of production orders? There are 2 correct answers to this question. Production order type. Material master. Production controller. MRP controller.

Production orders are used for what production type? Please choose the correct answer. Discrete manufacturing processes. Process manufacturing processes. Period and quantity-oriented production. Replenishment controlled by control cycles.

The material master of your finished product contains MRP type “PD”. You set a manual firming date in the stock requirements list. Which of the following will firm planned orders” There are 2 correct answers to this question. Manually changing the quantity of a planned order. Creating a planned order within the planning time fence. Setting a planning time fence in the Material Master Record. Assigning a production scheduling profile.

The method in which a production order is credited or debited depends on the variant of cost object controlling (COC). What basis can be used to carry this out? There are 2 correct answers to this question. Product-related. Order-related. Milestone-related. Cost-related.

The MRP run detected a shortage of a material that you source from an external supplier in full pallets. How can you make sure you will only receive full pallets? Please choose the correct answer. Use the fixed lot size procedure. Use the MRP type for vendor managed inventory. Use the reorder point. Use the minimum order quantity.

The pegging situation was changed because of an MRP heuristic run. What is a capability of dynamic pegging? Please choose the correct answer. It links receipts from an alternative location in case of a shortage in the default location. It propagates changed sales order priorities to the pegged planned orders. It enables the propagation of network alerts across the bill of materials structure. It replaces fixed pegging relationships unless they have been created for stock.

The planning strategy requires the entry of planned independent requirements at the subassembly level, so the in-house production of this component can be triggered before a finished goods sales order is received? Please choose the correct answer. Planning at assembly level. Planning with final assembly. Gross requirements planning. Planning without final assembly.

The procurement type of your material is set to "E" for In-house production. Which of the following is valid to determine a source of supply in SAP S/4HANA? Please choose the correct answer. Production Version. Selection Method. Purchasing Info Record. Should have chosen.

The production plan is being disrupted by last minute demands that are entered in the system. Which is the most efficient way to handle last minute demands and protect the current production plan? There are 2 correct answers to this question. Manually firm all planned orders for materials within the replenishment lead time of the material. In the stock requirements list, set a manual firming fence for a date based on the replenishment lead time of the material. In the material master record, set MRP type to P4 and a planning time fence on the replenishment lead time of the material. In the material master record, set MRP type to P1 and a planning time fence on the replenishment lead time of the material.

The SAP Kanban procedure could be used to trigger which of the following kinds of replenishment? There are 2 correct answers to this question. In-house production. Stock transfer. Subcontracting. Vendor consignment.

The settings for MRP can be maintained at different levels. If settings have been maintained in different places, in which sequence does the system search for the MRP settings? Please choose the correct answer. Material Master –> MRP Group –> Plant Settings. Material Master –> Plant Settings –> MRP Group. MRP Group –> Material Master –> Plant Settings. Plant Settings –> MRP Group –> Material Master.

The setup time on the production line to produce a material is extensive. You would like to avoid multiple setups and limit the production of the material based on a planning calendar. Which type of lot size procedure should you use to accomplish this? Please choose the correct answer. Periodic lot sizing. Exact lot sizing. Fixed lot sizing. Minimum lot sizing.

To ensure that the warehouse operator only stages large components in the exact required quality for each production order, which warehouse material staging method would you recommend? Please choose the correct answer. Pick parts. Kanban. Crate parts. Release order parts.

What are attributes of the SAP S/4HANA Simplification list? There are 3 correct answers to this question. It was created for better planning and estimation of your way to S/4HANA. It details transaction and solution capabilities at a functional level. It can have a business and a technical impact. It contains references to the relevant training material. It is only a grouping of related technical simplifications.

What are benefits of the Engineering Workbench? There are 2 correct answers to this question. Simultaneous processing of different bill of materials (BOM) items and operations. Detailed selection of bill of materials (BOM)items and operations. Simulation of planned changes for costing and mater all requirements planning. Undo/redo functionality of planned changes.

What are drawbacks of the separation of OLTP and OLAP? There are 4 correct answers to this question. Batch process are required to keep OLTP and OLAP in sync. Multiple copies of the data exist. Only the OLAP system has a predefined subset of the data. The OLAP system needs to write back the data to the OLTP system. Only the OLAP system has the latest data.

What are examples of assignment objects you can maintain in the Engineering Workbench? There are 3 correct answers to this question. Component assignment. Material to routing assignment. Material to bill of materials (BOM) assignment. Routing to sequence assignment. Material to production version assignment.

What are main innovations in manufacturing in SAP S/4HANA? There are 3 correct answers to this question. Lock-free inventory movements. Monitor Production Orders Fiori app. Material Coverage Fiori app. Rough-cut capacity planning. Flow manufacturing.

What are pillars of SAP Activate? There are 2 correct answers to this question. SAP Best Practices. Guided Configuration. Premium engagement. SAP MaxAttention.

What are possible configuration steps when setting up the alert monitor in Advanced Planning? There are 3 correct answers to this question. Create object selection variant for resource-related alerts. Assign the alert profile to the overall profile. Create object selection variant for product-related alerts. Create object selection variant for transportation lane-related alerts. Assign the overall profile to the authorization profile.

What are prerequisites for using batch derivation? There are 2 correct answers to this question. Batch where-used list. Receiver-sender relationships. Batch determination selection conditions. Process instructions.

What are properties of MRP Live? There are 2 correct answers to this question. It is executed on the database server. The code is written in SQL Script. It uses the same BAdis as classic MRP. Data is read sequentially from the database tables.

What are some of the advantages of using Kanban? There are 2 correct answers to this question. Replenishments are created close to the actual need. It is a simplified form of production control. It is mostly accomplished by manual postings. Replenishments are based on centralized planning.

What are some of the SAP Fiori user types? There are 3 correct answers to this question. Developer. Occasional. Expert. Employee. Business partner.

What are some uses for the low-level code assigned to each material? There are 2 correct answers to this question. It is used in MRP to determine the sequence in which materials are planned. It is used by product costing to determine how costs are rolled up. It is used by ATP to determine the priority of alternative components. It is used by engineering to identify sub items in an engineering bill of material (BOM).

What are the advantages of the new MRP Live in SAP S/4HANA compared to the classic MRP from SAP ECC? There are 2 correct answers to this question. The MRP Live planning scope is more flexible. MRP Live reads and writes data in parallel threads. MRP Live optimizes multi-level make-to-order planning. MRP Live writes MRP lists during the run.

What are the consequences if operation status Dispatched is set for a production order operation? Please choose the correct answer. You can reschedule the operation using finite Scheduling in a planning board. You can reschedule the order using material requirements planning. You can reschedule the order using lead time scheduling. You can reschedule the operation using lead the scheduling.

What are the consequences when you assign a planned order to a production line manually, using the planning table in repetitive manufacturing? Please choose the correct answer. The planned order generates capacity requirements. The planned order's components are copied o the picking list. The planned order's component availability is checked. The planned order is converted a production order.

What are the key aspects of SAP S/4HANA? There are 2 correct answers to this question. SAP S/4HANA is built on SAP HANA. SAP S/4HANA can be deployed on-premise, in the cloud, or a combination of both. SAP S/4HANA has minor changes on data model. SAP S/4HANA increases the data footprint.

What are the main processes of the embedded PP/OS in SAP S/4HANA? There are 2 correct answers to this question. Optimization of the production plan. Source determination for external procurement. Calculation of inventory buffer size. Long-term production planning.

What are the options for transferring data to SAP S/4HANA with the SAP S/4HANA Migration Cockpit? There are 2 correct answers to this question. XML files. Staging tables. CSV files. Temporary tables.

What are the possible categories for the Business Partner master data object in SAP S/4HANA? There are 3 correct answers to this question. Organization. Group. Person. Customer. Vendor.

What are the possible results of a production planning run in Advanced Planning (PP/OS)? There are 3 correct answers to this question. Purchase requisition. Scheduling agreement schedule line. Planned order. Stock transport order. Production order.

Report abuse