What are the three layers in the SAP Best Practices Content for SAP S/4HANA?
There are 3 correct answers to this question.
Building Blocks
Solution Package
Scope Items
Test Scripts
Process Flows
. What are the three transition scenarios for an S/4HANA implementation?
There are 3 correct answers to this question.
System conversion
New implementation
Landscape transformation
System upgrade
System activation
. What are uses of the low- level code assigned to each material?
There are 2 correct answers to this question.
It is used in MRP to determine the sequence in which materials are planned.
It is used by product costing to determine how costs are rolled up
It is used by engineering to identify sub items in engineering bill of materials (BOMs).
It is used by ATP to determine the priority of alternative components.
. What capabilities does SAP S/4HANA embedded analytics provide?
There are 2 correct answers to this question.
Strategic analysis
Real time decision support
Comparison of current data with historical data to identify trends
Automatic update of story boards
. What could be the reason for multiple commitment of individual capacities, where several operations have the same scheduled dates on a resource after capacity planning?
There are 2 correct answers to this question.
The work center has several individual capacities.
The planning strategy is infinite.
Alternative resources are fully occupied.
The Change Planning Direct on indicator is set.
. What data can you maintain in the sub items of a bill of material (BOM)?
There are 2 correct answers to this question.
Quantity
Installation point
Item type
Scrap percentage
. What data processing steps are obsolete if you use SAP S/4HANA Analytics?
There are 2 correct answers to this question.
Extract on, transformation, and loading (ETL)
Pre computed aggregation views
Online transaction processing (OLTP)
Online analytical processing (OLAP)
. What determines whether the planned independent requirements in MRP consume other requirements?
Please choose the correct answer.
Requirements type
Order type
Requirements profile
Consumption sequence procedure
. What do you use to schedule operations from planned orders so that the production plan can be fulfilled?
Please choose the correct answer.
Material Requirements Planning (MRP)
Capacity Requirements Planning (CRP)
Demand Planning (DP)
Supply Network Planning (SNP)
. What does a line hierarchy in repetitive manufacturing represent?
Please choose the correct answer.
A production line with more than one work center
A production line with an alternative sequence in the routing
A production line with a parallel sequence in the routing
A production line with prioritized alternative work centers
. What does forecasting in the demand planning cycle include?
There are 3 correct answers to this question.
Past sales order quantities
Market intelligence
One-off events
Past quotation quantities
Past procurement quantities
. What does it mean for the production planner when MRP works with infinite capacities?
Please choose the correct answer.
MRP creates capacity requirements without checking the capacity of a work center.
MRP assigns capacity requirements automatically to work center is with the earliest available capacity.
MRP assigns capacity requirements automatically after the last scheduled order on a work center.
MRP creates capacity requirements only if the work center has sufficient capacity.
. What does the bill of material usage (BOM usage) control at the BOM item level?
There are 2 correct answers to this question.
Allowed material type
Default values for the item status
Default unit of measure
Maximum allowed low-level code
. What does the industry sector determine?
There are 2 correct answers to this question.
Whether a material master field is required, changeable, displayed, or hidden
Which material master views can be maintained
Which transaction you can use to create a new material
Whether material numbers are assigned internally or externally
. What generates capacity requirements in a process order?
Please choose the correct answer.
Phases
Operations
Resources
Activities
. What information is included in the SAP Readiness Check result for SAP S/4HANA?
There are 3 correct answers to this question.
Relevant simplification items
Recommended SAP Fiori apps
Custom code analysis
Recommended SAP Best Practices
Inconsistent data tables
. What is a typical transportation processing SAP Transportation Management?
Please choose the correct answer.
Order Management, Transportation Planning, Transportation Execution, Freight Costing and Settlement, Analytics and Reporting
Order Management, Transportation Planning, Freight Costing and Settlement, Transportation Execution, Analytics and Reporting
Transportation Planning, Order Management, Transportation Execution, Freight Costing and Settlement, Analytics and Reporting
Transportation Planning, Transportation Execution, Order Management, Freight Costing and Settlement, Analytics and Reporting
. What is a work center hierarchy in SAP S/4HANA capacity planning?
Please choose the correct answer.
A group of alternative work centers providing a cumulative available capacity for production
A group of alternative work centers for production, structured in hierarchy levels by priorities
A group of work centers in a parallel sequence that is used to split product on quantities and work on them in parallel
A group of work centers in a production line being used in sequence for production
. What is SAP’s strategic solution to perform Sales and Operations planning when you use SAP S/4HANA Manufacturing?
Please choose the correct answer.
Integrated Business Planning
APO Demand Planning
Flexible Planning
PP Standard Sales and Operations Planning
. What is the correct sequence of the following Activate methodology phases?
Please choose the correct answer.
Prepare, Explore, Realize, Deploy
Prepare, Validate, Test, Go-Live
Validate, Realize, Test , Deploy
Prepare, Realize, Iterate, Continuous Improvement
. What is the difference between co-products and by-products?
Please choose the correct answer.
Only co-products appear in the process or production order settlement rule.
Only co-products are identified by a special item category in the bill of material (BOM).
Only co-products can be manufactured in isolation from the main product.
Only by-products have a zero inventory valuation.
. What is the equivalent in SAP S/4HANA of the Production Data Structure in PP/DS?
There are 3 correct answers to this question.
Bill of Material
Production Version
Routing
Engineering Change Record
. What is the first step in the MRP run?
Please choose the correct answer.
Net requirements calculation
BOM explosion
Source determination
Lot size calculation
. What is the purpose of a reporting point confirmation in repetitive manufacturing?
There are 2 correct answers to this question.
To provide timely updates of inventory management for the staged components
To determine the work in progress along the production line
To stage different components for a production line simultaneously
To reduce the total production lead time for along production line
. What is the purpose of collective orders?
Please choose the correct answer.
To manage production orders for an entire finished production multiple levels
To post any component withdrawals single back flush with order confirmation
To post production costs on a cost collector instead of the production order
To combine order management of co-products and by-products with the main product
. What is the sequence of the five steps of Demand-Driven Replenishment in SAP S/4HANA?
Please choose the correct answer.
Analytics, buffer positioning, buffer sizing, replenishment planning, replenishment execution
Analytics, buffer positioning, replenishment planning, replenishment execution, buffer sizing
Analytics, replenishment planning, replenishment execution, buffer positioning, buffer sizing
Analytics, buffer positioning, replenishment planning, buffer sizing, replenishment execution
. What is the valid sequence of key activities in production order processing?
Please choose the correct answer.
Creation, scheduling, release, material withdrawal, confirmation
Creation, scheduling, release, variance calculation, confirmation
Creation, staging, release, material withdrawal, confirmation
Creation, release, scheduling, material withdrawal, confirmation
. What Kanban status automatically posts goods receipt with reference to the procurement element?
Please choose the correct answer.
Full
Empty
In use
Wait
. What must be used in the system to plan the requirements for different subcontractors separately?
Please choose the correct answer.
MRP areas
Planning plant
Storage locations
Production versions
. What new technology is used in SAP S/4HANA Embedded Analytics?
Please choose the correct answer.
ABAP Managed Core Data Services (CDS)
Smart Business Cockpit
Multidimensional Reporting client (MDRC)
HANA Live
. What steps are possible in a PP/DS production planning run?
There are 3 correct answers to this question.
Optimization
Heuristics
Detailed scheduling functions
Backorder processing
Demand consumption
. When a developer creates a new SAP Fiori app, they begin by selecting a template to ensure the application has a consistent look-and-feel.
What types of templates can a developer choose?
There are 3 correct answers to this question.
Factsheet
Analytical
Transactional
Web Dynpro
Maintenance view
. When can the material availability check occur automatically in a production order?
There are 2 correct answers to this question.
At order release
At order creation
At order settlement
At order confirmation
. When do you recommend the use of repetitive manufacturing?
There are 2 correct answers to this question.
Low product complexity
High product stability
High product complexity
Low product stability
. When do you use variant bills of materials (BOMs)?
Please choose the correct answer.
When multiple material also have the same BOM
When multiple material is have similar BOMs
When a material has multiple BOMs
When a material has a configurable BOM
. When the goods receipt for a finished product is posted during confirmation on a manufacturing environment, which of the following actions are also performed by default?
There are 2 correct answers to this question.
Posting of production costs to cost collector
Reduction of the capacity requirements
Staging of components for the next order in the sequence
Archiving of backflush documents
. When working with both cross-plant and plant-specific material statuses in the material master, which status has the highest priority?
Please choose the correct answer.
The most restrictive status
The plant-specific status
The cross-plant status
The least restrictive status
. When would you use reporting point backflush in repetitive manufacturing?
There are 2 correct answers to this question.
You require an up-to-date inventory for components
When you need to determine the work in progress
When goods issues can wait for final confirmation
For production lines with short lead times
. Where can you find the latest in version of the Simplification List for SAP S/4HANA?
Please choose the correct answer.
SAP Help Portal
SAP Solution Manager 7.2
SAP Best Practices Explorer
SAP Support Portal
. Where can you maintain consumption mode and consumption periods for planning strategies?
There are 2 correct answers to this question.
In the MRP group
In the material master
In the plant parameters
In the requirements class
. Where do you maintain the duration of a production operation?
Please choose the correct answer.
Routing
Bill of material (BOM)
Material master
Work instructions
. Where does the system check master data selection settings during the creation of planned orders and production orders?
There are 3 correct answers to this question.
In the routing
In the production version
In the bill of materials (BOM)
In the production order type
In the MRP controller
. Which actions does the system perform by default when you save a confirmation for a finished product in repetitive manufacturing?
There are 3 correct answers to this question.
Posting of production costs to the production cost collector
Posting of goods receipt for the product
Reduction of associated capacity requirements
Material staging for next order in sequence
Archiving of documents for assembly scrap
. Which advanced functionality has been embedded in SAP S/4HANA?
There are 3 correct answers to this question.
Capacity planning
Available-to-promise
Backorder processing
Supply Network Planning
Demand planning
. Which alternative item strategies are available in bills of materials (BOM) in SAP S/4HANA?
There are 2 correct answers to this question.
100% check
By usage probability
Simultaneous
First in first out (FIFO)
. Which automotive-specific functionality is embedded in SAP S/4HANA?
There are 3 correct answers to this question.
Packaging Logistics
Enhanced Kanban Processing
Parts interchangeability
Enhanced characteristics based processes
Equipment and Tools Management
. Which bill of material (BOM) categories can you define in SAP S/4HANA?
There are 2 correct answers to this question.
Sales Order BOM
Functional Location BOM
Work Center BOM
Class BOM
. Which capabilities does the Alert monitor have?
There are 3 correct answers to this question.
Nominate time-dependent substitutes for a planner
Generate alerts based on defined threshold values
Automatically send alerts with Alert Notification Engine
Automatically reschedule in case of overload alerts
Automatically predict alerts in future planning cycles
. Which characteristics should a material have for re-order point planning?
There are 2 correct answers to this question.
Demand remains relatively constant.
Replenishment lead time is known and relatively constant.
Material replenishment is managed by the vendor (VMI).
Seasonal demand is relatively volatile
. Which chart types does the tabular planning table provide in SAP S/4HANA?
There are 2 correct answers to this question.
Work center capacities chart
Capacity requirements chart
Orders (dispatched) chart
Order (pool) chart
. Which data model changes have been implemented in Sales and Distribution?
There are 3 correct answers to this question.
Elimination of status tables
Elimination of document index tables
Elimination of customer master tables
Elimination of output condition tables
Elimination of LIS tables for rebates
. Which data object can be updated with the scheduling results of a routing?
Please choose the correct answer.
Material master
MRP profile
Production scheduling profile
Production version
. Which document is skipped when SAP EWM is embedded in SAP S/4HANA?
Please choose the correct answer.
Outbound delivery request
Outbound delivery order
Warehouse task
Warehouse order
. Which elements are included in the structure of the batch where-used list?
There are 3 correct answers to this question.
Stock transfers
Transfers from batch to batch
Purchase orders
Planned orders
Collective orders
. Which functional capabilities does the Detailed Scheduling Board have?
There are 2 correct answers to this question.
Undo for drag & Drop planning activities
Change planned order quantities
Enter time-ticket confirmation for production orders
Change sales order quantities
. Which Kanban master data object controls the relationship between the supply and demand source?
Please choose the correct answer.
Control cycle
Kanban container
Rate routing
Production supply area
. Which master data object governs the relationship between supply source and demand source in the Kanban process?
Please choose the correct answer.
Control cycle
Replenishment strategy
Rate routing
Production supply area
. Which material master data can you copy when you use the Copy Material program (transaction MMCC, Material Master Copier) to create new materials?
There are 2 correct answers to this question.
Warehouse number data
Storage location data
MRP area data
Production version data
. Which material master setting is required to use the repetitive planning table for production with production orders?
Please choose the correct answer.
A repetitive manufacturing profile must be assigned on the MRP4 view
The Selection Method must be set to “2 Selection by production version”.
At least one valid production version must exist on the MRP4 view
An overall profile be assigned on the Work Scheduling view
. Which materials have a negative quantity in a bill of materials or in a recipe?
There are 3 correct answers to this question.
By-products
Waste products
Co-products
Bulk materials
Continuous flow materials
. Which material-specific information can be transferred to a transportation lane in PP/DS?
There are 3 correct answers to this question.
Purchasing info records
Outline agreement
Special procurement keys
Quota arrangements
Production versions
. Which of the following apply to MRP Live?
There are 2 correct answers to this question.
The definition of the planning scope is more flexible.
The sequence of planning materials is calculated across plants.
Planned orders need to be converted to purchase requisitions for externally procured materials.
The BAdIs for classical MRP also apply to MRP Live.
. Which methods can you use achieve a feasible production planning case of capacity constraints?
There are 3 correct answers to this question.
Select an alternative mode on a resource.
Form optimal sequences to reduce setup times.
Adjust the available capacity.
Execute a new production planning run.
Reduce the planning window.
. Which of the following are capabilities of multidimensional reporting in SAP S/4HANA embedded analytics?
There are 3 correct answers to this question.
Drilldown
Filters
Sort
Scheduling
Forecast
. Which of the following elements does MRP take into account during net requirement calculation?
There are 2 correct answers to this question.
Safety stock
Purchase orders
Lot size
Maximum stock level
. Which of the following are included as SAP S/4HANA Sales Simplifications?
There are 3 correct answers to this question.
SAP Revenue Accounting replaces ERP SD Revenue Recognition
Settlement Management replaces ERP SD Rebates
SAP GTS replaces ERP SD Foreign Trade
SAP Sales Support replaces SAP CRM
SAP order Fulfillment replaces ERP SD Availability Checking
. Which of the following business processes are controlled by production order type-dependent parameters?
There are 2 correct answers to this question.
Implementation
Planning
Inspection during production
Engineering change management
. Which of the following data objects are updated when a user confirms an operation?
Please choose the correct answer.
Shop floor information system
Production order header status
Production order total order quantity
Warehouse transfer order status
. Which of the following elements does the MRP run take into account?
There are 2 correct answers to this question.
Sales orders
Planned independent requirements
Shipments
Material documents
. Which of the following functions can be performed when the production order has the status “Created” (CRTD)?
Please choose the correct answer.
A user can trigger material staging via mass processing (transaction COHV).
A user trigger material availability check via mass processing (transaction COHV)
A user can schedule a background job to release production orders (transaction COOIS).
A user trigger printing of shop floor paper manually (transaction CO02).
.
|