Why would you use phantom assemblies? (3 Correct). To reduce the number of materials masters. To make the assignment of components easier. To increase the number of planning levels. To simplify the structure of bills of materials. To reduce the number of changes required in bills of materials To reduce the number of material masters.

With which SAP Fiori app can you access the Guided Configuration environment for an SAP S/4HANA Cloud implementation?. Manage Your Solution. Manage Licenses. Maintain Business Catalogs. Configure Your Solution.

You are creating a production order manually. What activities are involved in this process? (3 Correct). Order type determination. Master data selection. Planning selection. Capacity requirements determination. Actual cost calculation.

You are transferring data from SAP S/4HANAlo embedded PP/OS. What master data objects are mapped to a location? (3 Correct). Plant. Work center. Customer. Warehouse number. Supplier.

You are using heuristic SAP_ERP_001. Which of the following criteria are included in the automatic source determination logic when a planned order is created?. Costs. Vendor rating. Component availability. Delivery date. Quota arrangement.

You are using the document management system (DMS) . Where should the DMS document links be assigned, to have them automatically copied to production orders? (2 Correct). Work center. Routing header. Material master. Bill of material.

You are working with planning strategy 40 (Planning-with-final assembly). When does consumption of planned independent requirements take place?. When the MRP results are saved. When you create a planned order. When you create a sales order. When you deliver a sales order.

You define forecast consumption as an integral part of your Production Planning and Detailed Scheduling process. Which of the following order types consume the forecast? (2 Correct). Dependent demand. Sales order. Planned order. Purchase order.

You have a quality control check to avoid using a high-value component tin faulty materials in subsequent assembly operations. How do you account for potentials crap of the high-value material?. Enter the operation scrap and set the net indicator in the component of the bill of mater al of the assembly. Enter the assembly scrap in the material master of the component and set the net indicator in the component of the bill of material of the assembly. Enter the component scrap in the component of the bill of material of the assembly and leave the net indicator initial in the bill of material. master of the assembly and set the net indicator in the routing operation where the component is used. Enter the component scrap in the material.

You have a scheduling agreement with a vendor. You want classic MRP to automatically create schedule lines in case of material shortage. What must you do? (2 Correct). Add the agreement to the source list and mark it for MRP relevance. Set the creation indicator for delivery schedule lines on the initial screen of the MRP run. Add the agreement to the quota arrangement and mark it for MRP relevance. Set the creation indicator for purchase requisitions on the initial screen of the MRP run.

You have maintained the parameters for simple discontinuation in the material master of a component. Which business process will be affected if the available stock is zero and the discontinuation date is in the past?. Production order release. Backflushing. Material requirements planning. Kanban.

You need to model goods receipt processing time in Detailed Scheduling. Which modelling options do you have? (2 Correct). Model a handling resource in the location master and goods receipt time in the mater all master. Model a handling resource in the location master and goods receipt time in the mater all master. Model a transportation resource in the location master. Model a resource inbound in the location master.

You produce your material based on a forecast derived from historical sales and expect it to be in inventory when your customer orders. If customers order more that the forecasted quantity, you want to increase production to try to meet the extra demand. Which is the appropriate planning strategy to use?. 50 - Planning without final assembly. 20 - Make to order production. 40 - Planning with-final-assembly. 10 - Anonymous make-to-stock.

You use planning strategy Finite Scheduling - with Reverse and want to allow scheduling in the past. How can you achieve this?. Specify a negative planning horizon in the strategy profile. Specify a positive offset time in the strategy profile. Specify a positive planning horizon in the strategy profile. Specify a negative offset time in the strategy profile.

You want to create a production order from a planned order. What methods could you use? (2 Correct). Full conversion. Individual conversion. Order release. Partial conversion.

You want to insert an operation at a certain t me on a work center. The planning direction is forward. The desired dispatching time coincides with an operation that has previously been dispatched. How does the insertion take place?. The new operation is inserted at the desired time the previously dispatched operation is moved backward. The new operation is inserted at the desired time; the previously dispatched operation is moved forward. The previously dispatched operation stays assist the new operation is inserted before the dispatched operation. The previously dispatched operation stays as is the new operation is inserted after the dispatched operation.

You want to integrate an existing planned order into Advanced Production Planning. Which report do you use?. /SAPAPO/PPDS_DELTA_ORD_TRANS. /SAPAPO/CURTO_CREATE. /SAPAPO/UPD_LOC_SP_PL. /SAPAPO/CREATE_LOCATION.

You want to perform capacity availability checks on your production orders. What must be set for this to occur? (2 Correct). Checking rule and group must be assigned. Checking control must have an overall profile assigned in customizing. PRT Availability check must be set. Indicator Relevant for finite scheduling must be set.

You want to reduce planning efforts for B/C materials. Which planning procedure do you recommend?. Forecast planning. Manual planning without check. Material requirements planning. Consumption-based planning.

You want to represent setup time as a graphical object in the Detailed Scheduling Planning Board. Which actions are needed? (2 Correct). Create and assign a setup matrix with setup transition time to the resource. Create and assign a new graphical object for setup time in the planning board. Create and assign setup group/setup keys in the production data structure. Run setup minimization heuristics or optimizer.

You want to schedule an operation finitely, without moving other operations. Which scheduling strategy do you select?. Scheduling working time only. Find slot. Insert operation. Squeezing.

You want to schedule an order in the graphical planning board. What are valid planning directions? (2 Correct). Infinite sequencing. Squeezing in. Backwards. Forward with reverse.

You want to set up a make-to-order planning scenario for a finished material. Some components from the bill of materials (BOM) should be procured per sales order, other components should be procured for various requirements. Fore casting is NOT possible. Which settings do you make to achieve this?. Planning strategy 20 (Make-to-Order) and the corresponding Mixed MRP indicator. Planning strategy 50 (Planning without final assembly) and the corresponding individual Collective indicator. Planning strategy 50 (Planning without fnal assembly) and the corresponding Mixed MRP indicator. Planning strategy 20 (Make-to-Order) and the corresponding individual Collective indicator.

You want to triggering-house production of a semi-finished mater al before a sales order for the corresponding finished good is received. Which planning strategy supports the consumption of planned independent requirements for the semi-finished material?. Planning at assembly level (70). Make-to-order production (20). Planning without final assembly (50). Planning with final assembly (40).

You want to use finite scheduling. Which conditions must you meet? (3 Correct). Use a resource that is over loaded. Set the scheduling direction to backward only. Use the finite resource indicator. Use a scheduling heuristic that is finite.

Your client is asking for your advice on material master numbering in SAP S/4HANA. What do you need to consider? (2 Correct). The display template for material numbers applies to all clients. In Customizing you can decide by material type whether to use the long material number. The maximum mater all number length is 40 for external numbers and 18 for internal numbers. The number of leading zeros for internal numbers is client-specific.

Your company produces a finished good based on a forecast and expects it to being stock when customers order it. If customers order more than the forecasted quantity, the production quantity should be increased to try to meet the extra demand. Which planning strategy do you use?. Planning without final assembly (50). Planning with final assembly (40). Make-to-stock production (10). Make-to-order production (20).

Your customer is using storage location is in SAP ECC and wants to switch to SAP S/4HANA. What do you have to consider?. MRP Live does NOT support storage locations, but classic MRP still does. Storage location MRP is replaced by MRP area functionality. You have to set one MRP area for every storage location. Storage locations are NO longer supported.

Your customer wants to include restricted-use stock as a potential receipt in the existing ATP check for component availability. Which information is required to implement this change request in the scope of check? (2 Correct). The checking group from the material master. The checking rule from the business application. The checking control for the order type. The ATP category for restricted-use stock.

Your production planners must execute planning only for specific resources. How can you achieve this in Advanced Planning (P"/OS)?. Use a heuristic. Use a propagation range. Use a planning group. Use a resource group.

Your project team decides to use a make-to-order planning strategy for a strategic material in discrete manufacturing. What is the impact of this decision? (3 Correct). Storage location MRP areas are required. Production orders are created with sales order reference. Net requirements calculation is sales order-specific. Sales order-specific planning run is required. Sales order-specific stock is created.

Your project uses process orders for the production of liquid chemicals. What can you deêne to ensure that the production ëow happens only in physically connected tanks?. Operation network. Work center hierarchy. Setup matrix. Resource network.

Your quality department detects a deviation in a raw material batch. Unfortunately, this batch has already been used in production. How can you identify all affected finished goods stocks?. Use the material where-used report. Use the material staging report. Use batch determination. Use the batch information cockpit.