21. Which of the following elements does MRP take into account during net requirement calculation? Note: There are 2 correct answers to this question. A. Forecast key figures. B. Safety stock. C. Purchase orders. D. Maximum stock level. 22. You want to schedule an operation finitely, without moving other operations. Which scheduling strategy do you select?. A. Squeeze in. B. Insert operation. C. Find slot. D. Schedule in working time only. 23. You use planning strategy Finite Scheduling – with Reverse and want to allow scheduling in the past. How can you parameterize this in the strategy profile?. A. Specify a positive planning horizon. B. Specify a negative planning horizon. C. Specify a negative offset time. D. Specify a positive offset time. 24. If the stock level drops below the reorder stock in reorder point planning, what logic would the system use to trigger procurement?. A. Fill up to the safety stock level. B. Fill up based on the lot size procedure. C. Fill up to the reorder stock level. D. Fill up to the maximum stock level. 25. What can you use heuristics in Advanced Planning (PP/DS) for?. A. To automate material movements in material staging. B. To set default values in production master data. C. To optimize costs and times in production plans. D. To solve planning problems for defined objects. |