Questions
ayuda
option
My Daypo

ERASED TEST, YOU MAY BE INTERESTED ONPrivate Test

COMMENTS STATISTICS RECORDS
TAKE THE TEST
Title of test:
Private Test

Description:
Private

Author:
ThOr
(Other tests from this author)

Creation Date:
21/02/2021

Category:
Others

Number of questions: 72
Share the Test:
Facebook
Twitter
Whatsapp
Share the Test:
Facebook
Twitter
Whatsapp
Last comments
AnonymouseAnony ( uploaded 1 year )
Well, let's dive into this rabbit hole, shall we? Users participating in SNP Private test are a bunch of gullible fools. It's like they didn't bother to do any research or think critically about the test they're throwing their money at. They just follow the hype, hoping for some miracle transformation, completely ignoring the possibility that they might be getting duped. A sad bunch of clueless sheep, blindly following the herd without an ounce of common sense
Answer
AnonymouseAnony ( uploaded 1 year )
Oh boy, let me tell you about SNP Transformation private test. It's a bloody disaster. The results are as reliable as a chocolate teapot, and the customer service? Non-existent. It's like they all went on vacation and never came back. The whole process is so slow you'd think they're running the tests on a potato instead of actual equipment. The worst part? The price. You'd be better off flushing your money down the toilet. Stay the hell away from SNP Transformation private test; it's a colossal
Answer
AnonymouseAnony ( uploaded 1 year )
*it's a colossal waste of time and resources.
Content:
The Customizing analysis executed in the Analysis and Design phase of the Transformation Cycle is executed for the whole SAP system and compares the customizing of source and target. True False.
Why is it important to check the Target System Customizing before the Transformation? The correct target customizing has no impact on the conversion to S/4HANA The conversion to the S/4 data model needs correct customizing settings The selective migration from source to target will not work without the correct customizing Only a correct customizing guarantees the functionality of specific S/4 functions.
What are the out of the Box features of Mission Control? Harmonize Business Partner Operating Concern Split Fiscal Year based Selection for Application Data in Fl and Logistics Scoping and Project Planning Migrate in an existing S/4 HANA system Selection by Company Codes Controlling Area Split.
Which checks will be conducted by executing Data Consistency Verification? Field Parameter Check Domain Fixed Value Check Domain Value Table Check Foreign Key Check Check Field Check Data Element Check.
Which of the following statements regarding phase Set up System Landscape are true? Differing software versions installed on the systems do not influence the Carve Out to S/4 HANA negatively The default system constellation of a selective Carve-Out to S/4 HANA consists of a source, a target and a control system All systems included in the transformation need the same software version. Otherwise a smooth processing cannot be guaranteed Mission Control will be piloted from the Source system Mission Control will be piloted from the Control system.
In which phase of the Transformation Cycle the users have to be unlocked and the background jobs have to be reactivated? Verification After Conversion Before Migration Transformation Cycle Planning.
Which statements regarding Quality Gates within S/4 Mission Control are true? Quality Gates are optional tasks within the project schedule Quality Gates provide phase-specific evaluations for quality assurance Phase-related documents will be generated for evaluation and documentation reasons A summary of the results will be provided in the description tab Quality Gates ensure that the necessary tasks within a phase have been performed successfully.
Within the task it is determined which tables included in the scenarios are not available in the DDIC of the source or target system. Tables without DDIC reference are deactivated in order to prevent terminations during the export and import. False True.
The refreshing of the runs is a necessary task, in order to make sure that all changes which were made during the configuration of the scenario such as deactivating data objects and tables will be overtaken correctly to the runs executed within the migration phase. False True.
With which transaction can Mission control be started? /SNP/S4C /SNP/TC /SNP/MC.
What happens if you reset a task? The task will be set back to standard all changes made in the administration tab will get lost. The task is only set to the status "unprocessed" again and all changes that were made until that point persist in the data. The task is set to the status "unprocessed" again and a restart can cause data inconsistencies. The task is set to the status "unprocessed" again and all manipulations on the data will be reset too.
Which Number Range Strategies can be chosen for internal number ranges? Transferring the numbers 1 to 1 into the target system None Execute a renumbering by number get next Difference Calculation.
Which statements regarding the task Transfer Remote DDIC are true? Transferring the remote DDIC is not necessary before working with rules and data objects within the scenarios The Remote DDIC analysis just has to be performed once per system Transfer Remote DDIC collects information about the table structure from source and target system and stores it in the control system Based on the determined dictionary information a project specific rule base can be maintained.
Which statements regarding Migration Runs are true? The data transfer takes place directly from source to target system via RFC connection The data transfer cannot be parallelized. It must run with one process The preselection run collects information from specific tables and writes it into global selections or own tables defined by SNP The migration takes place within Runs in Transformation Cockpit and can be monitored there The export extracts data from the source data base according to the selection criteria and writes them into files within the file share.
Which of the following statements regarding the Business Partner Conversion are true? By default, all customers and vendors in the target system tables will be converted The Conversion of Business Partners takes place with the help of a Transformation Cockpit scenario The Business Partners in S/4 Mission Control projects are created via SAP BAPls in the target system The scope of customers and vendors to be converted can not be limited by selection rules The Business Partner Conversion in S/4 Mission Control takes place in the source system.
Within S/4 Mission Control projects all tests are performed by the Transformation Consultants, there is no need for business process tests by the customer False True.
What is the recommended procedure to create a new task? Change into the design mode right-click on a task, that is most similar to the task you need, choose 'copy task' and save. Open a service ticket to SNP with a description of the task you need. Change into the design mode right click on a task, choose 'create new task' and save.
Which of the following statements regarding Automated Testing are true? Automated Testing reduces the effort of manual tests Automated Testing is not used in productive migrations Using Automated Testing a check over the entire system is always executed Automated Testing cannot be accessed by Mission Control Automated Testing is a BAPI based software to check application data.
Which statements about the generation of customer-specific tables are true? The generated data objects within Transformation Cockpit have to be assigned to the corresponding export and import runs Z-Tables are integrated into the delivery content of SNP. No additional action is needed Z-Tables differ from customer to customer and therefore cannot be delivered with S/4 Mission Control The Z-tables have to be generated and adjusted according to the project scope.
Which statements about the Company Code selection within phase Define Migration Scope are true? The Company Code selection can be adjusted within area Global of the Transformation Cockpit manually The Company Code selection is filled by applying the blueprint to the main scenario The Company Code selection is used to limit the amount of data exported for specific tables including this selection criteria Changing the Company Code selection does not influence the dependent selection criteria (e.g. plant etc.) in the next tasks of this phase The Company Code selection is used to determine further selection criteria for dependent organizational units (e.g. plant etc.) The Company Code selection cannot be maintained manually.
What are mandatory activities and checks after creating the Main Scenario within the Scenario Preparation phase? Transfer Remote DDIC Assign systems to scenario Check system connections Assign a package size for export Assign an application server Assign file path for source and target system.
Which scenarios are needed in S/4 Mission Control in order to perform a successful transformation to S/4 HANA? Business Partner Scenario SNP_BP_BAPI Conversion Scenario SNP_RET SA Consistency Scenario SNP S4_DCV Migration Scenario SNP S4_MIG ACDOCA Scenario SNP_S4_ACDOCA.
Which options do you have at the end of a transformation cycle? Copy cycle to go-live, in order to transfer all related steps for a productive migration Copy cycle to control system in order to transfer the information to a newly created control system Copy cycle to test migration, in order to start a new test transformation cycle.
Which of the following statements about Mission Control are true? You have to copy a project for every migration test. A unit is a template for a specific scenario You have to copy a unit for your project.
When should the Data Consistency Verification be performed within the Transformation Cycle? A Data Consistency Verification is not needed Before Migration in the source and the target system Before Conversion in the target system After Conversion in the target system After Conversion in the source system.
Which of the following conversion take place in the Conversion phase of S/4 Mission Control? Business Partner Conversion Automotive Conversion Financial Accounting Conversion Logistics Conversion Utilities Conversion.
How many Quality Gates are included in a typical S/4 Mission Control Transformation Cycle? 7 5 6 4.
A backup for specific target system tables is not recommended by SNP. True False.
Which of the following statements regarding the Syntax Check are true? Syntax Errors within the rule base of the scenario would lead to terminations during the execution of the transformation The Syntax Check is an important instrument to verify that the rule base maintained within the scenario is correct Solving the Syntax errors is not necessary before continuing with the Migration phase of the project.
Which steps do you need to change the name of the scenario? Go into the tab "Variable" Write the new scenario name in it and save it Click button "default value" Go to the tab "Administration Change into the design mode Change into the execution mode.
What are necessary checks for delta customizing in the Target System, in order to guarantee a smooth conversion of data into the S/4HANA data model? Check if Quality Management configuration is complete Check if New Asset Accounting configuration is complete Check if General Ledger configuration is complete Check if New Credit Management configuration is complete Check if Material Ledger configuration is complete Check if Production Planning configuration is complete.
Each of the three scenarios is generated from a specific template (SNP delivery content), delivered with S/4 Mission Control in the correct content version. True False.
What are the added values of the Customizing Analysis executed in the Analysis and Design phase of S/4 Mission Control? The Customizing Analysis servers as a control functionality in this early project phase, in order to prevent obstacles in later stages of the project Missing reports can be identified and created Important S/4 Simplification Items can be checked and analyzed Current customizing can be documented for comparisons in later stages of the project Missing transports in the target system can be identified Indicators for conflicts can be identified by comparing source and target system customizing.
Which tasks have to be performed in the conversion of Financial Accounting? Filling table MATDOC Create and check ACDOCA Converting cost elements Create new Business Partners Convert credit management master data and exposures Create balances Initial depreciation calculation.
Truth or false? You can change, copy and overwrite tasks in the execution mode, if the project is locked. False True.
What happens if you execute the task "Execute derivation of related org. units"? The relevant organizational units will be written into the file system A run within Transformation Cockpit will be started The global selections for related organizational units (e.g. plant) will be filled with values according to the selected company code The data objects ANASELCRIT and ANASELAUTO2 will be imported to the target system in background.
True or False? The status of a parent task results from the child tasks and cannot be changed. True False.
What type of messages can be seen in the Activity Log in the Execution tab? Information Success Short dumps Errors Warnings.
Which of the statements about import forerunners are true? The import forerunner executes coding and writes mappings without importing datasets to the corresponding table The import forerunner does not allow using number get next for generating new numbers Import forerunners do not have own exports but refer to exports of specific tables within the corresponding data objects Forerunners are not used within S/4 Mission Control By using forerunners for specific tables, the real import of these tables can be parallelized.
Which statements regarding the blueprint are true? The blueprint is applied to the main scenario SNP_S4_MIG The generated blueprint file contains information about relevant organizational units and data objects The blueprint is downloaded from Crystal Bridge Cloud Stack Uploading the blueprint results in the creation of a new scenario in TC.
Which of the following statements are correct? The tab "tickets" contains all issues during the execution The trouble shooting in the task description helps you if you have got issues during the execution. If you have got issues during the execution you have to open a ticket first.
Which task types are available in Mission Control? Informal Execution Dialog Execution Manual Execution Background Execution.
On which basis a project in Mission Control is created? The corresponding unit which includes all relevant project phases and tasks There is a modular system with different phases from which you have to create your transformation cycle There is no basis. An empty project is delivered to the customer.
Which systems belong to the typical system constellation of a transformation project with Mission Control? Documentation System Source System Transfer System Target System Control System.
In which of the following phases the definition of the Migration Scope takes place? Control System Customizing Migration Scenario Preparation Before Migration.
Which of the following activities have to be performed before starting the migration? Execute closing activities Create system snapshot (or backup) Deactivate interfaces Plan new transformation cycle Perform conversion to S/4 Adjust application server configuration Lock users Suspend background jobs.
Which of the following configurations have to be confirmed in order to guarantee a smooth conversion to the S/4 HANA data model later on? Parameters of the database Closing activities Business Partners New Credit Management New Asset Accounting Material Ledger General Ledger.
Which statements regarding the Analysis and Design phase are true? The customizing analysis is a mandatory task The evaluation of the S/4 Simplification Items is a manual task The customizing analysis can be used to document your current customizing and can be reused for comparisons stages of the project The blueprint is uploaded to the Document tab of the Transformation Cycle The S/4 Simplification Item Check compares the settings of the source and the target system The consistency check for customers and vendors is executed on the target system.
What are the mandatory activities and checks after creating the scenarios? Assign systems to the scenarios Check system connections Assign file path Transfer remote DDIC Assigning an application server Assigning a package size for export.
Which of the following tasks are mandatory, in order to define the selection scope for the transformation project? Maintain company code selection Check for intercompany processes Execute derivation of related org. units Define selection timeframe for FI/CO Define selection timeframe for Logistics.
Which of the following statements are true? In order to adjust the data objects COPA and KEO, the operating concern must be identified After creating new objects (e.g. COPA, Z tables), the new objects have to be assigned to the corresponding blocks within the transformation area The introduction of the account and ledger approach is a mandatory task within S/4 Mission Control S/4 Mission Control offers the opportunity to add customer-specific tables as well as tables from other namespaces to the transformation content S/4 Mission Control does not cover the handling of Z and Y tables.
Which of the following statements are true? The functionality check for tables without DDIC reference figures out which of the tables within SNP_S4_MIG scenario are not in the DDIC of the source and target system Choosing the business partner strategy is a subordinated topic within the migration to S/4 HANA, since business partners are not needed in the S/4 System. The creation of tables to be backed up from the target system is a mandatory task. Tables firstly have to be added to the data objects within Transformation Cockpit and afterwards the predefined runs within the transformation area have to be refreshed in order to overtake the newly added tables.
Which statements regarding Data Consistency Verification are true? Data Consistency Verification is executed in different phases of the transformation cycle Checking the source system supports you in identifying inconsistencies which were already existent before the migration Data Consistency Verification is a BAPI based report check The software is executed in order to analyze the control system The review of the results is provided via different views (worklist, tables, domains, data objects) the user can select Within the Execution tab Mission Control provides a button for monitoring the check run.
Which of these are mandatory tasks to be executed within Quality Gate II? Check selection plausibility Check mapping plausibility Check Syntax Send (results) to CrystalBridge Check transformation logs Check customer-specific tables Check system connections.
Which statements regarding the summary task Preparation of runs are true? The number of processes can be adjusted in the Properties of the Run The refresh of the data objects is executed on run level and as to be repeated for each run in the corresponding scenario By refreshing, the adjustments within the data objects such as deactivated tables will be synchronized with the runs within the transformation area The summary task preparation of runs has to be executed for the main, the conversion and for the business partner scenario Before adjusting the number of processes the Mini System Monitor within the transformation area should be checked, in order to consider available batch processes in the corresponding system.
Which statements regarding the third Quality Gate are true? The task check planning of transformation figures out if all active data objects have been assigned to an export and import run Within the task check planning of transformation import forerunners cannot be taken into consideration Data objects can be marked as relevant for import or export within the Transformation Cockpit The task check completeness of phase displays if any tasks within the phase Scenario Preparation have not yet been set to Finished completely.
What happened during the export so that ACDOCA does not show exported datasets? Something went wrong and must be checked within the data object of the conversion scenario The table should not be empty in this state of the project. The error must be evaluated and solved The table is empty since the migration takes place into an empty S/4 HANA client. That is why is correct that no datasets have been exported.
Which statements regarding Quality Gate IV are true? The background task Check protocols provides a HTML document including graphics which shows the status of the migration as well as the whole migration protocol containing statuses for all tables of the scenario The number of records of export and import have to be compared. In cases of differences these have to be evaluated Differences between the numbers of exported and imported datasets are not allowed, independent of the chosen import mode The transformation log within Transformation Cockpit provides an additional way to compare the number of datasets The functionality Check protocols does not take accidentally migrated tables marked as irrelevant into account.
Which of the statements regarding the Business Partner conversion are true? For creating the Business Partners it is important to always simulate first and evaluate the results before starting the real conversion The conversion of Business Partners takes place with the help of a Transformation Cockpit scenario which includes objects for backing up tables, analyzing important configurations and creating the Business Partners via SAP BAPIs It is not necessary to change the Business Partner number ranges from internal to external before starting the conversion Filling table CVI_CUST_LINK and CVI_VEND_LINK is not necessary. No synchronization between the Business Partner and the old master data tables will take place in S/4 HANA. The scope for the export of relevant customer or vendor data from the target system can theoretically be limited by selection rules. By default all customers and vendors in the target system tables will be exported and converted.
Which of the following tasks have to be executed before starting the conversion? Generate migration CDS views and AMDP classes Check data enrichment Technical check of transactional data Analyze transactional data Adjust number ranges Confirm New GL state on the source system Fill aggregate and history tables.
Which technical conversions take place in the Logistics conversion to S/4 HANA? Based on table MARV, datasets with record type PERFY will be created in table MATDOC_EXTRACT Aggregates and respective history tables are migrated to table MATDOC Table FAGFLEXA will be populated by table BSEG The material documents header (MKPF) and item table (MSEG) are migrated to table MATDOC Table MATDOC_EXTRACT is filled by MATDOC records Table ACDOCA is filled by table BSEG.
Which statements regarding the Preparation of the FI conversion are true? Balance explanation documents must be created in case of a full history migration Table FINS_MIG_STATUS must be checked or modified depending on its entries Table FGL_MIG_SOURCE has to be checked and modified depending on its entries Entries in FAGFLEXA and FAGFLEXA_BCK must be created if new G/L was active in the source Asset accounting documents in table ANLP and ANEK must be modified depending on their entries The data enrichment in table MARA, MARC and VBAK must be checked.
Which technical conversions take place in the FI conversion to S/4 HANA? Cost elements are merged into the G/L account master data The application indexes have to be transferred to the cold area of the database mandatorily Accounting documents from the General Ledger and the sub ledgers are converted to ACDOCA Credit decisions in SAP Credit Management are initialized Balances are created, in order to guarantee that the aggregated view to the Universal Journal delivers the same results and the previous totals-based reporting Planned depreciation values for Asset Accounting are built up.
Which tasks are mandatory in order to conclude the fifth Quality Gate? Summarize Conversion Sends (results) to Crystal Bridge Check protocols Check records counts Check transformation planning Check completeness of phase.
At which phases of the project is the Data Consistency Verification executed? Within the Scenario Preparation phase for source as well as the empty target system Within the Conversion phase after import and before the conversion starts in the target system Within the Verification phase after the transformation has been finished Within the Target System Customizing phase for the empty target system Within the Before Migration phase in order to save the results of the source system Within the After Conversion phase for a last subtraction of all results.
Which statements regarding Automated Testing are true? Automated Testing is a BAPI based software to check application and customizing data Automated Testing is not used for productive migrations Automated Testing provides a set of test objects which have to be loaded before using them Using Automated Testing a check over the entire system is always executed An overview of the Automated Testing results can be accessed via Mission Control Automated Testing does not reduce the effort of manual test.
Which statements about Validation Reports are true? Validation reports can be added and adjusted via the Design Mode A variant must be defined for each execution. That is done in the control System The validation report is executed in the source as well in the target system The results of the validation report can be seen in the Documents tab For comparability it is recommended to have the same variant settings in source and target Validation reports are predefined by Mission Control and cannot be changed.
In which areas can the runtime be found in Transformation Cockpit? Progress Tab Transformation Log Transformation Tree Recording Area Runtime Tab Technical Evaluation Area.
Which of the following tasks are mandatory within the After Conversion phase? Unlock users Reactivate Interfaces Reactivate Background Jobs Create Project Summary Report Evaluate Technical Runtime Execute Closing Activities.
Which of the following options do you have in order to conclude your transformation cycle? Copy cycle to another project Skip the tasks in case the go-live was already executed in the current transformation cycle Copy cycle to go-live Copy cycle to a new system Copy cycle to test migration.
Which of the following statements regarding phase Set up System Landscape are true? The default system constellation of a selective Carve-Out to S/4 HANA consists of a source, a target and a control system Mission Control will be piloted from the source system Creating a system within the system maintenance, the name of the RFC connection, the name of the callback RFC connection, the name of the dialog RFC connection and a description have to be maintained manually All systems included in the transformation need the same software version. Otherwise a smooth process cannot be guaranteed. Differing software versions installed on the satellite systems do not influence the guided procedure negatively It is necessary to copy the system constellation to your transformation cycle before maintaining the system constellation. Otherwise systems cannot be assigned to the transformation cycle.
Which statements regarding the Migration Runs are true? The preselection run collects information from specific tables and writes it into global selections or own tables defined by SNP The forerunner does not have an own export. It uses the export files of other data objects and only prepares the number get next mappings The import cannot be parallelized. It has to run with one process The export extracts data from the source data base according to the selection criteria and writes them into files within the file share The data transfer takes place directly from source to target system via RFC connections.