Questions
ayuda
option
My Daypo

ERASED TEST, YOU MAY BE INTERESTED ONProduction planning

COMMENTS STATISTICS RECORDS
TAKE THE TEST
Title of test:
Production planning

Description:
Mock sap

Author:
Neo
(Other tests from this author)

Creation Date:
02/04/2021

Category:
Others

Number of questions: 80
Share the Test:
Facebook
Twitter
Whatsapp
Share the Test:
Facebook
Twitter
Whatsapp
Last comments
Nikhil_Sharma ( uploaded 2 years )
This test is invalid as most of the answers are wrong please check.
Answer
Content:
How can you avoid order proposals for planned independent requirements with dates in the past? Note: There are 2 correct answers to this question. Use a planning strategy with requirements consumption. Reorganize planned independent requirements. Set the requirements reduction indicator in the requirements class. Maintain adjustment parameters in the MRP.
Your customer complains about incorrect duration for production order operations What time elements could cause the issue? Note: There are 3 correct answers to this question. Floating time Processing time Move time Tear down time Queue time.
A warehouse manager likes to streamline the goods receipt (GR) process for production orders. What can you enable the automatic GR? Note: There are 2 correct answers to this question. Production scheduling profile. Confirmation profile. Scheduling margin key. Operation control key.
Which of the following functions can be performed when the production order has the status “created” (CRTD)? A user can trigger printing of shop floor paper manually (transaction CO02). A user can trigger material availability check via mass processing (transaction COHV). A user can trigger material staging via mass processing (transaction COHV). A user can schedule a background job to release production orders (transaction COOIS).
On which of the following levels can you influence the availability check for the components of production orders? Note: There are 2 correct answers to this question. Material master Production order type Production controller MRP controller.
What Kanban status automatically posts goods receipt with reference to the procurement element? Empty Wait In use Full.
In a first step you have created master recipes In which sequence are the additional objects created • Process order • Control recipe • Process message • Pl sheet • Control recipe • Process order • Pl sheet • Process message • Process order • Control recipe • Pl sheet • Process message • Control recipe • Process order • Process message • Pl sheet.
The setup time on the production line to produce a material is extensive. You would like to avoid multiple setups and limit the production of the material based on a planning calendar. Which type of lot size procedure should you use to accomplish this? Minimum lot sizing Periodic lot sizing Exact lot sizing Fixed lot sizing.
The planning strategy requires the entry of planned independent requirements at the subassembly level, so the in-house production of this component can be triggered before a finished goods sales order is received? Planning without final assembly Gross requirements planning Planning at assembly level Planning with final assembly.
How can you release a production order? Note: There are 2 correct answers to this question Manually, in the collective conversion of planned orders Automatically, using the production scheduling profile. Manually, in the missing parts overview of the order Automatically, using collective orders.
Which lot sizing procedure optimize the total costs resulting from ordering costs and storage costs? Note: There are 2 correct answers to this question Replenish up to maximum stock level Groff reorder procedure Part period balancing Daily lot size.
What are the prerequisites for using batch derivation? Note: There are 2 correct answers to this question Receiver -sender relationships Batch where-used list Process instructions Batch determination selection conditions.
You are using the document management system (DMS). Where the DMS document links should be assigned to have them automatically copied to production orders? Note: There are 2 correct answers to this question Bill of material Work center Routing header Material master.
Where can you apply availability checking using the available-to-promise (ATP) logic? Note: There are 3 correct answers to this question. Production order Sales order Purchase order Freight orders Goods movement.
5. which information is required when you set up an order type? Over delivery tolerance limit Production supervisor Settlement profile Automatic actions an order release.
In manual good issues posting with reference to a production order, which component can be considered for a planned consumption of 50 pieces (pcs)? A component being a non-stick material, NOT being a backflush material. A component with 0 stock. Being a backflush material with negative stocks allowed A component with 100 pcs on stock. NOT being a backflush material. A component with 40 pcs on stock, being a backflush material with negative stocks NOT allowed.
which setting needs to be made for the automatic capacity availability check that is performed with production order release? The capacity overall profile needs to be assigned in the checking control. The bottleneck indicator needs to be activated in the relevant work center Finite scheduling needs to be activated in the scope of check The checking group needs to be assigned in the production scheduling profile.
before a user can add multiple production versions in a material master, what information should be collected? Lot sizes Task list group number Work center hierarchy BOM status Validity dates.
which is the correct sequence of steps in the MRP run when a shortage occurs? BOM explosion -> Lot size calculation -> Net requirements calculation -> procurement type -> Scheduling Lot size calculation -> net requirements calculation -> scheduling -> BOM explosion net requirements calculation -> Lot size calculation-> procurement type-> scheduling-> BOM explosion procurement type-> Lot size calculation-> scheduling->net requirements calculation-> BOM explosion.
To ensure that the warehouse operator only stages large components in the exact required quantity for each production order. which warehouse material staging method would you recommend? Kanban Crate parts Release order parts Pick parts.
In a production order scenario, for a certain material component a purchase requisition should be automatically created during order creation. Which BOM item category fulfils this request? Stock item(L) Variable sized item(R) NON-stock item (N) Class item (k).
What does the bill of material usage (BOM usage) control at the BOM item level? Choose 2 ans Default unit of measure Maximum allowed low-level code Allowed material type. Default values for the item status.
Your customer wants to include restricted-use stock as a potential receipt in the existing ATP check for component availability. Which information is required to implement this change request in the scope of check? Note: There are 2 correct answers to this question The checking group from the material master The ATP category for restricted-use stock The checking rule from the business application The checking control for the order type.
When exactly 6 exception messages occur for an order, what does the system display in the MRP list The two highest priority exception messages created. All exception messages that were created. The five highest priority exception messages created. The first two exception messages created.
In which of the following objects can you activate back flushing for production orders? Production scheduling profile Material master (final product) Production version Work center].
Which of the following objects can you release so that the business transactions for process order execution and process management can be executed? Note: There are 2 correct answers to this question Individual phases Individual control recipes Individual process instructions Individual operations.
which Kanban master data object controls the relationship between the supply and demand source? Control cycle Kanban container Rate routing Production supply area.
what user group is SAP Fiori targeted for? Administrative users Technical users Casual users Business users.
what is the first step in the MRP run? Net requirements calculation BOM explosion Source determination Lot size calculation.
Many of your manufacturing workers take vacations during the months of June, July and august so capacity for that time period is about half of normal capacity. Which object do you use to maintain this properly in the ERP system so you always have an accurate depiction of capacity? Planning calendar Number of individual capacities Intervals of available capacity Standard capacity.
what are the requirements for working with a co-product? Note: There are 2 correct answers to this question The indicator in the material MRP data The indicator in the material BOM item. The indicator in the routing header The indicator in the material BOM header.
what is supported by the concept of work centers in SAP solution manager? Note: there are 3 correct answers to this question. Needs three work centers to complete all tasks linked to a business goal. Requires no maintenance beyond initial setup. Makes navigation easy through central role -based access and user environment. Improves collaboration and status reporting Supports task oriented work approach.
what are options for printing production order data? Note: There are 2 correct answers to this question Print of a production order with system status CRTD Original print of previously printed operations of an order Mass print of orders in the background Reprint of a production order for a job ticket.
which of the following are features of the technical operations components within SAP solution manager? Note: There are 3 correct answers to this question. Technical monitoring and alerting. Testing Technical and management reporting Root cause analysis Configuration management.
In which of the following master data objects can you define the production order default storage location for a material component? Note: There are 2 correct answers to this question Work center, in the production supply area Routing in the component allocation BOM, in the line item for the material Material master of the finished product.
which of the following will decrease capacity requirements of production orders? Note: There are 2 correct answers to this question Dispatch an operation Reschedule the order to later time decrease the order quantity Confirm an operation.
you are seeing the risk that there could be insufficient stock available for a backflushed material. How do you address this issue? Note: there are 2 connect answers to this question Post a replacement material instead, Postprocess a backlog list Manually post goods issue of the material Allow negative stock in inventory management.
Which of the following are activities associated with production order processing? Note: there are 3 correct answers to this question Order release Goods receipt Invoice creation Initiate payment Material staging.
How can you enhance system statuses of a production order scenario with user statuses? By activating the user statuses in status and action management. By defining a status profile and assigning it to the order type. By enhancing the system status customizing table with user statuses By creating a user profile and assigning it to the production scheduling profile.
The Kanban procedure could be used to trigger which of the following kinds of replenishment? Note: there are 2 correct answers to this question Subcontracting In-house production Stock transfer Vendor consignment.
when the goods receipt for a finished product is posted during confirmation in a repetitive manufacturing environment, which of the following actions are also performed by default? Note: There are 2 correct answers to this question Staging of components for the next order in sequence Archiving of backflush documents Reduction of the capacity requirements Posting of production costs to cost collector.
In which material master views can you select the batch management checkbox? Note: there are 2 correct answers to this question Purchasing Basic data 1 MRP 4 Work scheduling.
in which data object is the production line (repetitive manufacturing relevant work center) maintained? Bill of material Cost of collector REM profile Production version.
you are using “range of coverage” profile to determine the dynamic safety stock for your material. In which situation does a “range of coverage” become ineffective and unable to adjust the safety stock level? The minimum stock level is exceeded and planned orders are unfirmed. The minimum stock level only is exceeded and all planned orders are firmed. The maximum stock level is exceeded and planned orders are unfirmed. The maximum stock level is exceeded and all planned orders are firmed.
what is influenced by the line item category while maintaining a material BOM? Note: There are 2 correct answers to this question If a change number can be entered If the component quantity can be negative If sub items can be entered If a characteristic can be entered.
where can you maintain consumption mode and consumption periods for planning strategies? Note: there are 2 correct answers to this question In the MRP group In the plant parameters In the material master In the requirements class.
where in the configuration of planning strategies do you set the indicator for consumption? Strategy group Strategy Requirements class Requirements type.
A planner updated a production order status from partially confirmed “PCNF” to technically completed “TECO” by mistake. What impact would this have to other users for this specific production order? The warehouse clerk can still carry out good issue transactions. The production operator cannot enter additional confirmations. The production manager can still see the capacity requirements. The buyer can still see component reservations.
The material master of your finished product contains MRP type” PD”. You set a manual firming date in the stock requirements list Which of the following will firm planned orders? Note: There are 2 correct answers to this question Creating a planned order with the planning time fence Manually changing the quantity of a planned order Assigning a production scheduling profile Setting a planning time fence in the material master record.
At the end of the MRP run you receive the exception message “Reschedule in operation”. What caused the message to be generated? The requirement no longer exists. A firmed planned receipt cannot be rescheduled The requirements data occurs after that of a firmed planned receipt. The requirements date occurs before that of a firmed planned receipt.
when do you recommend the use of repetitive manufacturing? Note: There are 2 correct answers to this question Low product complexity High product complexity High product stabilit Low product stability.
what are some of the advantages of using Kanban? Note: There are 2 correct answers to this question Replenishments are based on centralized planning It is mostly accomplished by manual postings Replenishments are created close to the actual need It is a simplified form of production control.
which of the following order types can you define for the production order category “10”? Note: there are 3 correct answers to this question CO production orders (external number assignment) PP production orders (internal number assignment) PP production orders (special processing) PP production orders (internal number assignment) PP production orders (external number assignment).
in which customizing activity do you set up automatic routing selection for production orders? Define order- type-dependent parameters Define selection profiles Define production scheduling profile Define scheduling parameters for production orders.
what type of planning can consider dependent requirements created for consumption based materials, bulk materials and Kanban materials? ATP – Available -to-promise with MRP areas MRP- material requirements planning MPS- master production scheduling LTP- long term planning.
How is the bill of material (BOM) exploded when you use a BOM explosion number? With respect to a common key date for product and each assembly With respect to define separate key dates for product and each assembly With respect to a common change status for product and each assembly With respect to a defined separate change status for product and each assembly.
In long-term planning which master data objects can either be taken from the operative data or be newly defined? Note: there are 2 correct answers to this question Work center Material master Routing BOM.
Which of the following apply to master production scheduling (MPS)? NOTE: there are 2 answers to this question It uses basic date scheduling only It is used to plan consumption based materials It is set by the MRP type It can also plan MRP items.
when the goods receipt for a production order is posted, what happens with the production order? The production order is deleted in the system. The production order is achieved automatically The production order is deleted from the stock/requirements list. The production order’s quantity is set to 0 in the stock / requirements list.
which of the following data objects are updated when a user confirms an operation? NOTE: there are 2 answers to this question Production order header status Shop floor information system Production order total order quantity Production order total order quantity Warehouse transfer order status.
On which of the following objects can you aggregate actual and planned costs for production orders? NOTE: there are 2 answers to this question Product cost collector Routing Planned order Production order.
which function can you use for capacity levelling in the SAP ERP system? NOTE: there are 2 answers to this question Lead time optimization Sequence planning Detailed scheduling heuristics midpoint scheduling.
An MRP run was executed overnight. The next morning an employee posted a goods receipt. Which transaction will show the stock situation prior to the receipt? The MRP list The stock/requirements list The planning table The order report.
which material master setting is required to use the repetitive planning table for production with production orders? The selection method must be set to “2 selection by production version” An overall profile must be assigned to the work scheduling view At least one valid production version must exist on the MRP 4 view A REM profile must be assigned on the MRP4 view.
when can you set the “Delivery completed” indicator? In the order confirmation In the production scheduling profile In the material master In the production order.
you produce your material based on a forecast derived from historical sales and expect it to be in inventory when your customer orders. If customers order more than the forecasted quantity, you want to increase production to try to meet the extra demand. Which is the appropriate planning strategy to use? Planning without final assembly (50). Make-to-order production (20). Planning with final assembly (40). Anonymous make-to-stock (10).
A routing contains 3 operations. only the last operation is defined as a milestone. You enter a confirmation of the last operation. What happens to the predecessors? An error message is raised requiring confirmations for prior operations. Only the second operation as the direct predecessor is automatically confirmed. The first two operations are automatically confirmed An error message is raised, requiring milestone definitions for prior operations.
a material has been planned in a NETCH (net change) planning run Which planning file entries are created by the system when you change the quantity of a component in the bill of material(BOM) of the header material? The BOM explosion, the NETCH and the NETPL planning indicators only The BOM explosion indicator only The NECTCH and NETPL planning indicators only The BOM explosion and the NETCH indicator only.
which of the following is a pure capacity leveling function? Today scheduling Finite scheduling Basic date scheduling Lead time scheduling.
what are some of the demand elements considered in the MRP run? Note: there are 2 correct answers to this question Purchase orders Safety stock Stock Sales orders.
which times are used for basic date scheduling of manufacturing planned orders in MRP? Note: there are 2 correct answers to this question Good receipt processing time Setup time Opening period Float before and float after production.
which task list types can have parallel sequences? NOTE: there are 2 answers to this question Master recipes (2) Routing (N) Rate routings (R) Reference operation sets (S) rials first.
which data object can be updated with the scheduling results of a routing? Material master MRP profile Production version Production scheduling profile.
a customer needs to support a scenario in which constrained work center capacities are leveled for the critical materials first. Which planning method is a prerequisite to support such a scenario? Master production scheduling Regenerative planning (NEUPL) Material requirements planning Gross requirements planning.
for an in-house scenario what are characteristics of materials requirements planning in classic ERP? Note: there are 2 correct answers to this question It uses infinite planning It generates a feasible solution as output It uses demand elements as input It generates released production orders.
next to the object itself what additional information can be stored in an object management record? Note: there are 2 correct answers to this question. Alternative dates Lock information Parameter effectivity Authorization group.
The production plan is being disrupted by last minute demands that are entered in the system. Which is the most efficient way to handle last minute demands and protect the current production plan? In the stock requirements list set a manual firming fence for a date based on the replenishment time of the material In the material master record, set MRP type to P4 and a planning time fence based on the replenishment lead time of the material. In the material master record, set MRP type to P1 and a planning time fence based on the replenishment lead time of the material. Manually firm all planned orders for materials within the replenishment lead time of the material.
which process order function uses a resource network? Resource selection Resource scheduling Capacity levelling Capacity planning.
which object can be defined as a production resource tool? Note: there are 3 correct answers to the question. Work centers Documents Materials Equipments Functional location.
when would use reporting point backflush in repetitive manufacturing? Note: there are 2 correct answers to this question When you have production lines with short lead times. When you require an up-to-date inventory for components. When you need to determine the work in progress When goods issues can wait for final confirmation.