What will happen in the MRP run if you have created a new MRP-relevant material that supports both in-house production and external procurement?. The MRP run starts with in-house production. The MRP run plans the material only if a quotation has been maintained. The MRP run starts with external procurement. The MRP run does NOT consider the material; it has to be planned interactively. You are a consultant on an SAP S/4HANA Cloud brownfield project. Several mission criti have been successfully remodeled in accordance with clean core principles. You must no workflows. Which of the following SAP Signavio solutions can be used to create the workflows?. SAP Signavio Process Intelligence. SAP Signavio Process Manager. SAP Signavio Process Insights. SAP Signavio Process Governance. You are a consultant on an SAP S/4HANA Cloud brownfield project. In a meeting the customer decides to remodel an existing business process in accordance with clean core principles. Which of the following SAP Signavio solutions can be used for the remodeling?. SAP Signavio Process Governance. SAP Signavio Process Insights. SAP Signavio Process Manager. SAP Signavio Process Intelligence. Which of the following elements does MRP take into account during net requirement calculation? Note: There are 2 correct answers to this question. Planned orders (firmed). Production orders. Planned orders (unfirmed). ATP quantities. Your project team decides to use a make-to-order planning strategy for a strategic material in discrete manufacturing. What are the impacts of this decision? Note: There are 3 correct answers to this question. Storage location MRP areas are required to manage sales-order-specific stock. Planned orders are created in MRP with reference to sales orders. Production and procurement costs are managed on the sales order item level. Net requirements calculation is carried out for every sales ceder individually. Sales orders have to be ATP-confirmed (available-to-promise) to be saved. What does the material type influence? Note: There are 2 correct answers to this question. Whether value changes to financial accounting stock accounts are updated. Which document types and class categories are allowed. Which plant-specific and plant-independent statuses are allowed. Which number range interval the material number comes from. Which options do you have to exclude Advanced Planning materials from the standard MRP run in SAP S/4HANA? Note: There are 2 correct answers to this question. Use a different MRP planner for PP/DS materials. Use the material number for selection. Use a propagation range. Use the special MRP tvpe XO. What are some SAP recommended guiding principles to achieve clean core operations? Note: There are 3 correct answers to this question. Establish regular housekeeping tasks and procedures. Establish release management. Establish an organizational structure, technical foundation, and transformation methodology for clean core. Integrate clean core practices in the end-to-end value process chain. Define roles and responsibilities as part of a process transformation office. When can you maintain the batch characteristic values in SAP S/4HANA? Note: There are 2 correct answers to this question. When you release the batch. When you record inspection results. When you execute batch determination. When you post the goods receipt. How can a material availability check be triggered automatically for a production order? Note: There are 2 correct answers to this question. By order release. By order confirmation. By mass processing. By capacity planning. Which time elements does MRP consider in backward scheduling to determine the basic dates for components from dependent requirements? Note: There are 2 correct answers to this question. Operation duration. Planned delivery time. In-house production time. Total replenishment lead time. When does the system trigger replenishment for a Kanban container?. When you set the container to Empty. When you set the container to Full. When you set the container to Waiting. When you set the container to In transit. You are a consultant on an SAP S/4HANA Cloud greenfield project. Which of the following aspects should you focus on to achieve and maintain clean core data quality? Note: There are 2 correct answers to this question. Timeliness. Accuracy. Stability. Efficiency. Which order type is used for repetitive manufacturing?. Kanban order. Production order. Process order. Planned order. Which objects can you change with a change number? Note: There are 2 correct answers to this question. Bill of material. Production order. Routings. Work center. You want to create a production order. What methods can you use? Note: There are 2 correct answers to this question. Create without material. Convert a purchase requisition. Create by order release. Create in Kanban process. You are trying to create a production order and no valid production version can be selected. What could be the reasons? Note: There are 2 correct answers to this question. The order lot size is NOT within the validity range of a production version. No production lines are assigned to the production versions. No bills of material (BOMs) are assigned to the production versions. The basic start date is NOT within the validity period of the production version. Which chart types does the tabular planning table for capacity planning provide in SAP S/4HANA Cloud Private Edition? Note: There are 2 correct answers to this question. Order (pool) chart. Capacity requirements chart. Order (dispatched) chart. Work center capacities chart. What are the possible results of a production planning run in Advanced Planning (PP/DS)? Note: There are 2 correct answers to this question. Planned order. Purchase order. Production order. Scheduling agreement schedule line. Which options do you have to post goods receipt for a process order? Note: There are 2 correct answers to this question. You post the entire manufactured quantity to multiple batches if the product quality remains consistent during production. You post the entire manufactured quantity to multiple batches if the product quality changes during production. You post the entire manufactured quantity to one batch if the product quality changes during production. You post the entire manufactured quantity to one batch if taproduct quality remains caasistent during production. Which standard item categories can you select inside a bill of material (BOM)? Note: There are 2 correct answers to this question. Work item. WBS item. Non-plant item. Class item. How are dependent requirements for assemblies created? Note: There are 2 correct answers to this question. They are only created for multilevel bill of material (BOM) structures. They are created together with the independent requirement for the finished product. They are created on the assembly level during the planning run. They are created with exact times in Advanced Planning. Your company manufactures materials whose characteristics differ for each manufacturing process. Which application do you choose in SAP S/4HANA to track and use this information in all areas of logistics?. Engineering change management. Process order management. Quality management. Batch management. You have a scheduling agreement with a vendor. You want classic MRP to automatically create schedule lines in case of a material shortage. What must you do? Note: There are 2 correct answers to this question. Set the creation indicator for purchase requisitions on the initial screen of the MRP run. Add the agreement to the quota arrangement and mark it for MRP relevance. Add the agreement to the source list and mark it for MRP relevance. Set the creation indicator for delivery schedule lines on the initial screen of the MRP run. What is a prerequisite for the consumption of planned independent requirements to take place for planning strategy 40 (Planning with final assembly)?. MRP creates a planned order. A sales order is created. A sales order is delivered. MRP creates a dependent requirement. What determines whether the planned independent requirements in demand management are consumed by other requirements? Note: There are 2 correct answers to this question. Requirements profile. Order type. Planning strategy. Requirements type. What are the selection criteria of a bill of material (BOM) alternative? Note: There are 2 correct answers to this question. Lot size. Date. Material BOM usage. Change number. You use the Finite Scheduling - with Reverse planning strategy and want to allow scheduling in the past. How can you parameterize this in the strategy profile?. Specify a negative planning horizon. Specify a negative PP/DS horizon. Specify a negative offset time. Specify a negative opening period. Which of the following questions do you have to answer before you start creating a bill of material (BOM)? Note: There are 2 correct answers to this question. Which base unit of measure must the BOM have?. When does the BOM need to become effective?. In which storage location is the BOM required?. For which plant can the BOM be defined?. Mode selection is one of the scheduling options available with Advanced Planning in SAP S/4HANA Cloud Private Edition. When can you use mode selection?. When several operations are maintained for one product. When alternative resources are used within one operation. When several production versions are maintained for one product. When multiple planned orders are scheduled in parallel on one resource. Which settings can you make in a production scheduling profile? Note: There are 3 correct answers to this question. Automatic goods receipt on confirmation. Default order types. Automatic goods issue on confirmation. Automatic release on order creation. Automatic print on order creation. Advanced Planning uses data from SAP S/4HANA Cloud Private Edition. In which master data objects can you set the Advanced Planning flag? Note: There are 2 correct answers to this question. Work center. Production version. Material. Plant. What are some advantages of using Kanban for material supply? Note: There are 2 correct answers to this question. Material is only kept available in small quantities in production. Replenishment is only triggered when components are required. Replenishment is always triggered on a regular basis. Material stock is built up for a long period of time in production. What happens when you set up detailed scheduling with the finite scheduling mode Insert Operation?. An operation is scheduled as close as possible to the desired date. Sequencing on multi-activity resources is automatically updated during planning. To create a slot, neighboring operations are moved in both planning directions. Operations on multi-resources are planned finitely in a sequence. You want to set up a make-to-order planning scenario for a finished product. The bill of material contains two components: one should be procured for each sales order individually, and the other should be procured jointly for all independent requirements. Forecasting for the finished product is NOT possible. Which settings do you make to achieve this?. Choose planning strategy 50 (Planning without final assembly) and select the corresponding Mixed MRP indicator. Choose planning strategy 20 (Make-to-Order) and select the corresponding Mixed MRP indicator. Choose planning strategy 50 (Planning without final assembly) and select the corresponding Individual/ Collective indicator. Choose planning strategy 20 (Make-to-Order) and select the corresponding Individual/Collective indicator. During production order creation, several valid production versions are found. How does the system choose the production version?. Alphanumeric or quota arrangement. Planned order or material number. Lot size or material cos. Validity period or sales order. What is the difference between co-products and by-products? Note: There are 2 correct answers to this question. Only co-products have movement type 531. Only co-products appear in the process or production order settlement rule. Only co-products have a non-zero inventory valuation. Only co-products have movement type 101. In the bucket planning mode of the capacity scheduling table, what happens if the sum of the requirements of all operations exceeds the available capacity of the bucket?. The operation is rescheduled in the planning direction. The operation is rescheduled backwards. The operation CANNOT be dispatched. The operation is rescheduled to an alternative work center. What does Consumption-based Planning use to determine requirements in the future? Note: There are 3 correct answers to this question. Dependent requirements. Statistical procedures. Forecasting. Planning file entries. Historical values. Your production planners are supposed to execute planning only for specific resources. What do you use to achieve this in Advanced Planning (PP/DS)?. A planning area. A propagation range. A planning group. A work center hierarchy. You want to trigger in-house production of a semi-finished material before a sales order for the corresponding finished good is received. Which planning strategy supports the consumption of planned independent requirements by dependent requirements for the semi-finished material?. Production by lot size (30). Planning at assembly level (70). Planning with final assembly (40). Assembly processing with production orders (82). What is the purpose of the pull list in material staging?. To control the flow of material from the central storage location to the production storage location. To control the flow of material from the supplier to the central storage location. To control the flow of material from the production storage location to the central storage location. To control the flow of material from the supplier to the production storage location. In SAP documentation for MRP in Advanced Planning, you read that the MRP creates new planned orders through infinite scheduling. What does this mean for the capacity requirements of the new planned order?. MRP creates the capacity requirements without considering existing load on the resources. MRP automatically assigns the capacity requirements after the last scheduled operation for each resource. MRP automatically assigns the capacity requirements to resources with the earliest available capacity. MRP creates the capacity requirements on resources at the earliest possible production time. Which of the following are scheduling time elements for a production order? Note: There are 3 correct answers to this question. Setup time. Queue time. Load time. Float before production. Transit time. In the context of the capacity scheduling table, how do you define a pacemaker work center?. By assigning it to the bottleneck operation. By assigning it to the first operation of a routing. By assigning it to the capacity scheduling table. By assigning it to the production version. For a production version to be valid and consistent, what requirements must be fulfilled? Note: There are 3 correct answers to this question. The assigned routing and bill of material (BOM) must be valid in the entire validity period. The consistency check must be performed. The lot size range must be within the lot size range of the assigned routing. The assigned routing and bill of material (BOM) must have the same validity period. The deletion flag must NOT be set for the bill of material (Bor) or the routing. Which alternative item strategies are available in bills of material (BOMs)? Note: There are 2 correct answers to this question. Manual maintenance. 100% check. Simultaneous. Ranking. How can you achieve a feasible production plan when there are capacity constraints? Note: There are 3 correct answers to this question. Execute an infinite production planning run for the critical resources. Increase the capacity supply in a time-phased interval. Form optimum sequences to reduce setup times. Determine a time period with available capacity on the planning board. Reduce the planning time interval. Which planning strategies can you use in the capacity scheduling table? Note: There are 2 correct answers to this question. Scheduling control > Close gap. Planning mode > Order priority. Planning mode > Bucket. Scheduling control > Find slot. How do you assign resources in a master recipe with operations and phases?. You assign resources to the phases. You assign resources to the operations. You assign resources to the sub-operations. You assign resources to the header of the master recipe. In which master data objects do you maintain data to determine the duration of an operation for production? Note: There are 2 correct answers to this question. Material master. Production version. Work center. Routing. Your company produces a finished good based on a forecast and expects it to be in stock when customers order it. If customers order more than the forecasted quantity, this must NOT have any impact on the production program. Which planning strategy do you use?. Assembly processing with production orders (82). Planning without final assembly (50). Make-to-stock production (10). Planning with final assembly (40). What data can you maintain in the items detail screen of a bill of material (BOM)? Note: There are 2 correct answers to this question. Change number. Alternative item group. Co-product. Lot size. What are prerequisites for a production version to be selected for a production order? Note: There are 3 correct answers to this question. The production quantity must lie within the lot-size range of the production version. The basic end date of the order must lie within the validity period of the production version. The production version must NOT be deleted. The basic start date of the order must lie within the validity period of the production version. The production quantity must only lie within the lot-size rarige of the routing in the prodEtion version. What is the focus of repetitive manufacturing?. Period and quantity-oriented production. Low volume production. Production of lot size one. Detailed tracking of production orders. What are some options for creating production orders without using trigger points? Note: There are 2 correct answers to this question. In make-to-stock production, you can manually create production orders. In make-to-stock production, confirmation of yield for sub-assembly triggers the creation of a production order. In assembly production, a sales order triggers the creation of a production order. In assembly production, confirmation of scrap triggers the creation of a production order. Which master data fields can have an impact on whether MRP creates planned orders or purchase requisitions for a material? Note: There are 2 correct answers to this question. Material type. Procurement type. MRP type. MRP group. Which time elements are relevant for lead time scheduling of a production order? Note: There are 2 correct answers to this question. Float after production. Opening period. Total replenishment lead time. Setup time. What can you use standard heuristics in Advanced Planning (PP/DS) for?. To set default values in production master data. To optimize costs and times in production plans. To automate material movements in material staging. To solve planning problems for defined objects. You want to verify that the properties of a component batch align with the required properties of the raw material intended for a specific process order. What function do you use to accomplish this?. Batch determination. Batch number assignment. Batch information cockpit. Batch where-used list. When working with the material status, for which business areas can you set a warning message? Note: There are 2 correct answers to this question. Purchasing. Plant Maintenance. Classification. Sales. Which of the following would you recommend as SAP's strategic Sales and Operations planning tool?. Integrated Business Planning. Advanced Planning. Standard Sales and Operations Planning. Flexible Planning. How would you define a pegging structure for an order in the context of Advanced Planning?. An evaluation that is ordered according to the low-level codes of all related products and represents the coverage of issue elements with receipt elements and stock. An evaluation to identify overstock situations based on the assignment of receipt and issue elements after the production planning run. An evaluation that is ordered according to the bill-of-material structur wf all related products and represents the relationship between receipt and issue elements. An evaluation to identify material or capacity shortages in the bill-of-material structure after the production planning run. How can you limit the validity of a bill of material (BOM)? Note: There are 2 correct answers to this question. By material type. By change number. By plant. By material status. Which of the following are replenishment strategies for Kanban containers? Note: There are 2 correct answers to this question. Replenishment using direct transfer posting. Replenishment using process orders. Replenishment using reservations. Replenishment using planned independent requirements. What are some options for creating a production order? Note: There are 2 correct answers to this question. By setting a Kanban container to full. By setting a Kanban container to empty. By partially converting a planned order. By converting a purchase requisition. Why would you use phantom assemblies? Note: There are 2 correct answers to this question. To make the procurement easier. To enable simple structuring of BOMs. To reduce the number of material masters. To make the assignment of components easier. Which of the following processes lead to an indicator in the planning file? Note: There are 2 correct answers to this question. Changing a storage bin. Changing a dependent requirement. Changing an operation time. Changing a delivery address. How do you model a production line in repetitive manufacturing?. As a routing. As a work center. As a resource network. As an operation. Which of the following are features of the clean core dashboard? Note: There are 2 correct answers to this question. Customers can grant access to the dashboard to partners. It can be used in all SAP S/4HANA Cloud editions. It can be accessed by using SAP For Me. Customers can use the dashboard in the dev, test, and production tenants. Which of the following are possible configuration steps when setting up the alert monitor in Advanced Planning? Note: There are 2 correct answers to this question. Create an object selection variant for alerts according to the priority of ATP categories. Assign the alert profile to the overall profile. Create an object selection variant for production-planning-related alerts. Assign the overall profile to the authorization profile. When do you use variant bills of material (BOMs)?. When multiple materials have similar BOMS. When a material has multiple BOMs. When multiple materials have multiple BOMS. When a material has a configurable BOM. Which operations are considered in the capacity scheduling table? Note: There are 2 correct answers to this question. Sub-operations. Only bottleneck operations. Operations assigned to a pacemaker work center. All operations. Under what circumstances can you change the material type for a material if stocks, reservations, or purchasing documents exist? Note: There are 2 correct answers to this question. The same batch management level is used. The same account category is used. The quantity and value updates are the same. The same base unit of measure is used. What are some benefits of planning with planned independent requirements for finished materials? Note: There are 2 correct answers to this question. Manufacturing time for final assembly is reduced. You have the option to use make-to-order production. The delivery time is reduced. You have the option to use forecast planning. Which of the following is a scheduling method for a production order?. Determination of basic dates. Lead time scheduling. Determination of delivery date. Key date scheduling. What does forecasting in the demand planning cycle include? Note: There are 3 correct answers to this question. Market intelligence. Past production planning quantities. Past sales order quantities. One-off events. Past quotation quantities. What options are available inside a document? Note: There are 2 correct answers to this question. Plant links. Object links. Storage locations. Versioning. What is the purpose of using a low level code? Note: There are 2 correct answers to this question. To determine the use of subitems inside the material BOM (bill of material). To determine the sequence in which materials are planned in MRP. To determine the priority of alternative components inside the materiar BOM (bill of material). To determine the lowest explosion level at which a material occurs in all the product structures. What is a work center hierarchy?. A group of work centers in a parallel sequence that is used to split production quantities and work on them in parallel. A group of work centers in a production line that is used in sequence for production. A group of alternative work centers for production, structured in hierarchy levels by priorities. A group of alternative work centers providing a cumulative available capacity for production. How can you set up a material as a phantom assembly? Note: There are 2 correct answers to this question. Select a special procurement type inside the material BOM (bill of material). Select a special procurement type inside the material master. Select a special explosion type inside the material master. Select a special explosion type inside the material BOM (bill of material). |