option
Questions
ayuda
daypo
search.php

ERASED TEST, YOU MAY BE INTERESTED ON QM_S4140

COMMENTS STATISTICS RECORDS
TAKE THE TEST
Title of test:
QM_S4140

Description:
Quality Management in SAP S/4HANA

Author:
Andrew
Other tests from this author

Creation Date: 28/11/2024

Category: Others

Number of questions: 78
Share the Test:
New CommentNuevo Comentario
No comments about this test.
Content:
An inspection cannot be performed when goods are received from production True False.
To archive outgoing certificates, you can use the SAP ArchiveLink interface. False True.
The Early Warning System can be used to monitor critical key figures. False True.
During the defect analysis, tasks can be defined for the defect items in the quality notification. True False.
QM Analytics are performed with reference to inspection lots or with reference to quality notifications or with reference to defect recording. False True.
Test equipment can be created as equipment or as functional locations. False True.
The stability study is represented in the system with the help of a quality notification. True False.
The inspection characteristics are used to determine what is to be inspected. True False.
A training concept for the end users must be constructed. True False.
A different inspection plan can be used for each storage condition. False True.
The inspection specifications from the task list cannot be altered. True False.
The number of samples is defined in the sample-drawing procedure. False True.
At inspection completion in the usage decision, the quality level is always updated. True False.
At inspection lot creation, the inspection specifications are copied into the inspection lot. True False.
A document may be assigned to every audit data object. False True.
You can use the F1 key to Display an explanation of a field's uses End the session you are in Change your user data (for example, the logon language) Display detailed technical information on a field Display a list of possible input values.
Inspection lots are always created automatically. True False.
Moving the data to external systems for evaluation purposes is not possible. False True.
Only internal problems can be processed using quality notifications. False True.
SAP Business Workflow is always required for the processing of quality notifications. True False.
An inspection cannot be performed when goods are received from production False True.
It is not possible to use a digital signature in the usage decision. True False.
The results history for equipment displays the results of past calibration inspections. True False.
The general notification can be used to describe problems in production. True False.
Activity confirmations for QM orders are only possible at results recording. False True.
Certificate forms and certificate profiles are used for certificate planning. True False.
Inspection results from the goods issue inspection cannot be included on the quality certificate. False True.
QM is integrated with the processes of the logistics supply chain. False True.
A goods movement can trigger the automatic creation of an inspection lot. False True.
The following strings are valid entries in the command field: (Choose 5 answer) From SAP Easy Access: search_sap_menu /nsm04 /nend From SAP Easy Access: SM04 ?SM04 /nex.
The Early Warning System can be used to monitor critical values (for example, quality scores). False True.
You can display and process the assigned FMEAs from the control plan. False True.
When implementing QM, only the business processes in a company must be examined. True False.
Quality notifications can be displayed in the control plan. False True.
A valuation may be recorded for every question in the question list. True False.
No QM shop papers are used during a stability study. True False.
The material specification can only be used for materials managed in batches. True False.
The material specification is not integrated in the product structure. False True.
Quality certificates can only be used when issuing goods. False True.
Only specifications for the primary sample can be specified in the sample-drawing item. False True.
The samples represent the different storage conditions. False True.
Quality management can be used throughout the whole life cycle of a product. False True.
Quality documents can be stored using document management. True False.
The status of the inspection lot informs you about the current processing status of the inspection lot.Correct. The inspection lot status shows you what has already been done using a particular inspection lot (for example, inspection results have been recorded, the usage decision has been made, ....) False True.
Customer returns can be subjected to a returns inspection. True False.
There can be a list of the higher-level system elements and a list of the lower-level system elements for each FMEA. False True.
The quality score has an effect on the vendor evaluation. True False.
The initial test is executed in accordance with the fixed specifications in the inspection plan. False True.
The action box of the quality notification can be used to trigger tasks for the notification. True False.
System adjustments must be performed in Customizing. False True.
You can only work in one window (session) at a time in a SAP system. True False.
The following personalization options are available in the SAP GUI: (Choose 4 answer) You can have system messages displayed in a dialog box. Every user can display a picture of their choice on the SAP Easy Access screen. You can change the size of input fields. You can change the font size (within limits) in the SAP GUI. You can suppress the display of pictures in the SAP GUI. You can use a personal input history on your front-end.
Which of the following statements accurately describes a client in a SAP system? (Choose 2 answers) A client represents a completely independent business entity. A client corresponds to a customer. A client may represent an entire company A client has its own database.
Customer-specific inspection specifications can be copied from the sales order. False True.
The sampling procedure defines how the sample size is to be determined. True False.
Quality planning tasks include: (Choose 3 answers) Processing of inspection plans Management of the material stocks to be inspected Processing of master recipes Processing of inspection methods.
The specifications in the inspection type define how an inspection is to take place. False True.
An inspection process can consist of planned and unplanned samples. True False.
You do not have to perform a goods receipt inspection for goods coming from certified suppliers. False True.
In the course of an inspection during production, the following apply (Choose 2 answers) No unplanned characteristics can be added. Defects cannot be recorded. Inspection results can be recorded for the inspection characteristics Multiple results for the same inspection characteristic can be recorded if inspection points are used.
QM cannot be used to set a payment block for the goods receipt invoice. True False.
You can also call context-sensitive SAP Library documentation using the F1 key True False.
Dynamic modification is possible at inspection lot creation or when making the usage decision. False True.
Archiving must be prepared and set up. True False.
If the action limits of a quality control chart are violated, the relevant inspection characteristic is rejected. False True.
An inspection lot can be created automatically when a production order is released. True False.
Several question lists can be assigned to one audit. False True.
Malfunction reports for measuring and inspection devices can be recorded using maintenance notifications. False True.
The inspection specifications from the routing cannot be altered. True False.
In addition to inspection results recording for inspection characteristics, it is also possible to record defects. False True.
Material Samples can only be processed in production. False True.
The quality score is updated when the usage decision is made. False True.
Quality control charts cannot be used for master inspection characteristics. False True.
The initial test is the first part of a stability study. True False.
You can use the F4 key to: Display possible entries for an input field Start another session Display detailed technical information on a program Call the SAP Library Create a print request of the screen currently displayed.
The Quality Info Record Procurement contains data for certificate control at goods receipt. False True.
Several similar measurement devices can be grouped together in a test equipment group for the calibration inspection. False True.
If you procure materials externally, you can only use a goods receipt inspection. False True.
Report abuse