What data processing steps are obsolete if you use SAP S/4HANA Analytics? There are 2 correct answers to this question Online transaction processing (OLTP) Extract on, transformation, and loading (ETL) Online analytical processing (OLAP) Pre computed aggregation views.
MRP created a planned order for a material that has one single material from stock as a component. What happens to this dependent requirement when you convert the planned order into a production order? It is converted into a production order. It is converted into a schedule line. It is converted into a reservation. It is converted into a planned order.
What are drawbacks of the separation of OLTP and OLAP? There are 4 correct answers to this question. Batch process are required to keep OLTP and OLAP in sync Only the OLAP system has the latest data The OLAP system needs to write back the data to the OLTP system Multiple copies of the data exist Only the OLAP system has a predefined subset of the data.
What are examples of assignment objects you can maintain in the Engineering Workbench? There are 3 correct answers to this question. Material to bill of materials (BOM) assignment Routing to sequence assignment Material to production version assignment Material to routing assignment Component assignment.
When a developer creates a new SAP Fiori app, they begin by selecting a template to ensure the application has a consistent look-and-feel. What types of templates can a developer choose? There are 3 correct answers to this question. Analytical Factsheet Web Dynpro Transactional Maintenance view.
Which task list types can have parallel sequences? There are 2 correct answers to this question. Master recipes (2) Rate routings (R) Routings (N) Reference operation sets (S).
What new technology is used in SAP S/4HANA Embedded Analytics? Please choose the correct answer. Multidimensional Reporting client (MDRC) ABAP Managed Core Data Services (CDS) HANA Live Smart Business Cockpit.
What are main innovations in manufacturing in SAP S/4HANA? There are 3 correct answers to this question. Flow manufacturing Lock-free inventory movements Rough-cut capacity planning Material Coverage Fiori app Monitor Production Orders Fiori app.
You have maintained the parameters for simple discontinuation in the material master of a component. Which business process will be affected if the available stock is zero and the discontinuation date is in the past? Material requirements planning Kanban Backflushing Production order release.
How can you set up the supply source for the SAP Kanban process? There are 3 correct answers to this question Using run schedule quantities for in-house production Using stock transfer reservations for stock transfer Using quotations for internal and external procurement Using purchase orders for external procurement Using purchasing costs for automated source prioritization.
Which alternative item strategies are available in bills of materials (BOM) in SAP S/4HANA? There are 2 correct answers to this question. Simultaneous First in first out (FIFO) By usage probability 100% check.
You want to schedule an order in the graphical planning board. What are valid planning directions? There are 2 correct answers to this question. Infinite sequencing Squeezing in Backwards Forward with reverse.
What are uses of the low- level code assigned to each material? There are 2 correct answers to this question. It is used by product costing to determine how costs are rolled up It is used by engineering to identify sub items in engineering bill of materials (BOMs). It is used in MRP to determine the sequence in which materials are planned. It is used by ATP to determine the priority of alternative components.
What is the valid sequence of key activities in production order processing? Please choose the correct answer. Creation, scheduling, release, variance calculation, confirmation Creation, staging, release, material withdrawal, confirmation Creation, scheduling, release, material withdrawal, confirmation Creation, release, scheduling, material withdrawal, confirmation.
Advanced Planning is delivered with standard out-of-the-box order and resource evaluations. Which evaluations are available? There are 2 correct answers to this question. Order list Resource utilization Production list Resource overview.
You want to integrate an existing planned order into Advanced Production Planning. Which report do you use? Please choose the correct answer. /SAPAPO/UPD_LOC_SP_PL /SAPAPO/PPDS_DELTA_ORD_TRANS /SAPAPO/CREATE_LOCATION /SAPAPO/CURTO_CREATE.
In which customizing activity do you set up automatic routing selection for production orders? Please choose the correct answer. Define production scheduling profile Define order-type-dependent parameter Define scheduling parameters for production orders Define selection profiles.
Where can you find the latest in version of the Simplification List for SAP S/4HANA? Please choose the correct answer. SAP Help Portal SAP Solution Manager 7.2 SAP Support Portal SAP Best Practices Explorer.
The settings for MRP can be maintained at different levels. If settings have been maintained in different places, in which sequence does the system search for the MRP settings? Please choose the correct answer. MRP Group —-> Material Master -> Plant Settings Plant Settings -> MRP Group —-> Material Master Material Master -> Plant Settings -> MRP Group Material Master -> MRP Group -> Plant Settings.
Which advanced functionality has been embedded in SAP S/4HANA? There are 3 correct answers to this question. Demand planning Capacity planning Supply Network Planning Available-to-promise Backorder processing.
In which data object is the production line (Repetitive manufacturing relevant work center) maintained? Production version Repetitive manufacturing profile Bill of material Cost collector.
In which of the following master data objects can you define the production order default storage location for a material component? There are 2 correct answers to this question. BOM, in the item for the material Material master of the finished product Material master of the finished product Work center, in the production supply area.
What are some of the advantages of using Kanban? There are 2 correct answers to this question. It is mostly accomplished by manual postings Replenishments are based on centralized planning It is a simplified form of production control Replenishments are created close to the actual need.
Which SAP solutions support the supplier area in the portfolio of the Digital Value Network? There are 3 correct answers to this question. SAP SuccessFactors SAP Ariba SAP Field glass SAP Concur SAP S/4HANA.
Which of the following functions can be performed when the production order has the status “Created” (CRTD)? Please choose the correct answer. A user can schedule a background job to release production orders (transaction COOIS). A user trigger printing of shop floor paper manually (transaction CO02). A user trigger material availability check via mass processing (transaction COHV) A user can trigger material staging via mass processing (transaction COHV).
You have a scheduling agreement with a vendor. You want classic MRP to automatically create schedule lines in case of material shortage. What must you do? There are 2 correct answers to this question. Set the creation indicator for purchase requisitions on the initial screen of the MRP run. Add the agreement to the source list and mark it for MRP relevance Add the agreement to the quota arrangement and mark it for MRP relevance Set the creation indicator for delivery schedule lines on the initial screen of the MRP run.
In Make-to-order production, which field controls whether the components will be planned as sales order specific stock? The Individual/Collective indicator of the component The Planning Strategy of the finished product The MRP Type of the component The item category of the component in the BOM.
What must be used in the system to plan the requirements for different subcontractors separately? Production versions Storage locations Planning plant MRP areas.
You are creating a production order manually. What activities are involved in this process? There are 3 correct answers to this question. Master data selection Order type determination Planning selection Capacity requirements determination Actual cost calculation.
What are pillars of SAP Activate? There are 2 correct answers to this question. Premium engagement SAP Best Practices SAP MaxAttention Guided Configuration.
At the end of the MRP run you receive the exception message “Reschedule In Operation”. What caused the message to be generated? The requirement no longer exists The requirements date occurs before that of a firmed planned receipt A firmed planned receipt cannot be rescheduled The requirements date occurs that of a firmed planned receipt.
You want to represent setup time as a graphical object in the Detailed Scheduling Planning Board. Which actions are needed? There are 2 correct answers to this question. Create and assign setup group/setup keys in the production data structure. Create and assign a setup matrix with setup transition time to the resource Create and assign a new graphical object for setup time in the planning board. Run setup minimization heuristics or optimizer.
How Is the bill of material (BOM) exploded when you use a BOM explosion number? With respect to a common change status for product and each assembly With respect to defined separate key dates for product and each assembly With respect to a common key date for product and each assembly With respect to a defined separate change status for product and each assembly.
A resource was created in SAP S/4HANA PP/DS through the internal CIF integration and named “W1904_1000_001”. What does the suffix 001 in the resource name represent? Capacity category Available capacity version Number of individual capacities Work center category.
Which materials have a negative quantity in a bill of materials or in a recipe? There are 3 correct answers to this question. Bulk materials Continuous flow materials Waste products Co-products By-products.
You are transferring data from SAP S/4HANAIo embedded PP/OS. What master data objects are mapped to a location? There are 3 correct answers to this question. Workcenter Customer Plant Supplier.
During planning you are facing an overload situation on a resource. Which activities do you consider to create a feasible production plan? There are 3 correct answers to this question. Use rescheduling with an alternative mode Use multilevel MRP run for the products on the resource Use a bucket-oriented capacity check Use optimization with respect to set-up times Use DS heuristic “Schedule Sequence”.
Which of the following time elements does MRP use during backward scheduling for in-house production? There are 2 correct answers to this question. Planning time fence Opening period Planned delivery time Goods receipt processing time.
What is the equivalent in SAP S/4HANA of the Production Data Structure in PP/DS? There are 3 correct answers to this question. Production Version Engineering Change Record Bill of Material Routing.
How would you define pegging in the context of Advanced Planning? An evaluation to verify if there are mater al or capacity shortages in the network after the production planning run. An evaluation that is ordered according to the network structure of all related products and represents the coverage of issue elements with receipt elements. An evaluation that is ordered according to the bill-of-material structure of all related products and represents the relationship between the receipt and the issue elements. An evaluation to verify if there are overstock situations in the balance between receipt and issue elements after the production planning run.
Which material master data can you copy when you use the Copy Material program (transaction MMCC, Material Master Copier) to create new materials? There are 2 correct answers to this question. Production version data Warehouse number data MRP area data Storage location data.
You are using the document management system (DMS) . Where should the DMS document links be assigned, to have them automatically copied to production orders? There are 2 correct answers to this question. Bill of material Work center Routing header Material master.
Your project uses process orders for the production of liquid chemicals. What can you define to ensure that the production flow happens only in physically connected tanks? Setup matrix Work center hierarchy Operation network Resource network.
How can SAP S/4HANA support a GMP compliant production process? There are 3 correct answers to this question. Use of the digital signature function to check and run business processes Use of the GMP compliant flag in relevant master data applications Documentation of quality data with Quality Management Predefined GMP compliant process order types to meet audit requirements Recipe approval with Engineering Change Management.
Which master data object governs the relationship between supply source and demand source in the Kanban process? Production supply area Replenishment strategy Control cycle Rate routing.
Which transaction code can you use in SAP S/4HANA to enter and display goods movements? MBNL MMBE MBO2 MIGO.
In Demand-Driven Replenishment, materials are classified according to several criteria. What criteria can you use? There are 3 correct answers to this question Demand variation Goods issue value Average daily usage Minimum order quantity Usage in bill of materials.
When do you use variant bills of materials (BOMs)? When multiple master also have similar BOMs When a material has multiple BOMs When multiple master also have the same BOM When a material has a configurable BOM.
Which actions does the system perform by default when you save a confirmation for a finished product in repetitive manufacturing? There are 3 correct answers to this question. Reduction of associated capacity requirements Archiving of documents for assembly scrap Posting of goods receipt for the product Material staging for next order in sequence Posting of production costs to the production cost collector.
Before a user can add multiple production versions in a material master, what information should be collected? There are 3 correct answers to this question. Task list group number Lot sizes BOM status Validity dates Work center hierarchy.
Production orders are used for what production type? Replenishment controlled by control cycles Discrete manufacturing processes Period and quantity-oriented production Process manufacturing processes.
You are using heuristic SAP_ERP_001. Which of the following criteria are included in the automatic source determination logic when a planned order is created? Component availability Costs Vendor rating Delivery date Quota arrangement.
What is the purpose of a reporting point confirmation in repetitive manufacturing? There are 2 correct answers to this question. To determine the work in progress along the production line To stage different components for a production line simultaneously To reduce the total production lead time for along production line To provide timely updates of inventory management for the staged components.
In which data objects do you maintain the production in as the work center for repetitive manufacturing? There are 2 correct answers to this question. Repetitive manufacturing profile Routing Production version Production cost collector.
What does the bill of material usage (BOM usage) control at the BOM item level? There are 2 correct answers to this question. Allowed material type Maximum allowed low-level code Default values for the item status Default unit of measure.
You have a quality control check to avoid using a high-value component tin faulty materials in subsequent assembly operations. How do you account for potential scrap of the high-value material? Enter the operation scrap and set the net indicator in the component of the bill of material of the assembly. Enter the component scrap in the material master of the assembly and set the net indicator in the routing operation where the component is used Enter the component scrap in the component of the bill of material of the assembly and leave the net indicator initial in the bill of material. Enter the assembly scrap in the material master of the component and set the net indicator in the component of the bill of material of the assembly.
Which time elements can be reduced by a reduction strategy? There are 3 correct answers to this question. Goods receipt processing time Move time Wait time Queue time Float after production.
What are the three layers in the SAP Best Practices Content for SAP S/4HANA? There are 3 correct answers to this question. Process Flows Building Blocks Scope Items Test Scripts Solution Package.
Which options are available for an SAP S/4HANA deployment? There are 2 correct answers to this question. SAP S/4HANA Professional services cloud SAP S/4HANA private cloud SAP S/4AHANA Enterprise Management cloud SAP S/4HANA on premise.
When working with both cross-plant and plant-specific material statuses in the material master, which status has the highest priority? The least restrictive status The cross-plant status The most restrictive status The plant-specific status.
For which planning-relevant data objects do you set just one indicator to include then in PP/DS? There are 2 correct answers to this question. Production version Work center Material Plant.
What does a line hierarchy in repetitive manufacturing represent? A production line with an alternative sequence in the routing A production line with more than one work center A production line with a parallel sequence in the routing A production line with prioritized alternative work centers.
What capabilities does SAP S/4HANA embedded analytics provide? There are 2 correct answers to this question. Comparison of current data with historical data to identify trends Automatic update of story boards Strategic analysis Real time decision support.
What Kanban status automatically posts goods receipt with reference to the procurement element? In use Full Empty Wait.
How can Production Planning and Detailed Scheduling (PP/DS) enhance the standard planning functionality? By providing cross-plant planning and deployment By providing replenishment proposals with exact times By providing multilevel material requirements planning By providing future demands from demand figures in the past.
Which material master setting is required to use the repetitive planning table for production with production orders? An overall profile be assigned on the Work Scheduling view The Selection Method must be set to “2 Selection by production version”. A repetitive manufacturing profile must be assigned on the MRP4 view At least one valid production version must exist on the MRP4 view.
How can you limit the validity of a bill of material (BOM)? There are 2 correct answers to this question. By period By plant By industry By material type.
The pegging situation was changed because of an MRP heuristic run. What is a capability of dynamic pegging? It replaces fixed pegging relationships unless they have been created for stock It links receipts from an alternative location in case of a shortage in the default location It enables the propagation of network alerts across the bill of materials structure It propagates changed sales order priorities to the pegged planned orders.
Which technological advances enabled the development of SAP S/4HANA as the digital core? There are 3 correct answers to this question. Big and affordable memory Capability to add to server landscape and scale Wide adoption of web standards such as Service oriented architecture Multi core processors enabling parallelism of tasks Advances in the three-tier architecture approach.
What is the first step in the MRP run? BOM explosion Net requirements calculation Lot size calculation Source determination.
What does it mean for the production planner when MRP works with infinite capacities? MRP assigns capacity requirements automatically to work center is with the earliest available capacity. MRP assigns capacity requirements automatically after the last scheduled order on a work center. MRP creates capacity requirements only if the work center has sufficient capacity. MRP creates capacity requirements without checking the capacity of a work center.
You want to schedule an operation finitely, without moving other operations. Which scheduling strategy do you select? Find slot Insert operation Squeezing Scheduling working time only.
Which data model changes have been implemented in Sales and Distribution? There are 3 correct answers to this question. Elimination of document index tables Elimination of status tables Elimination of LIS tables for rebates Elimination of customer master tables Elimination of output condition tables.
What are the possible categories for the Business Partner master data object in SAP S/4HANA? There are 3 correct answers to this question. Person Customer Organization Vendor Group.
In your plant, MRP is activated. Which options do you have to exclude a material from the MRP run? There are 2 correct answers to this question. Use a specific material status. Use a specific MRP controller. Use a specific material group Use a specific MRP type.
What are possible configuration steps when setting up the alert monitor in Advanced Planning? There are 3 correct answers to this question. Create object selection variant for product-related alerts. Assign the alert profile to the overall profile. Create object selection variant for transportation lane-related alerts. Assign the overall profile to the authorization profile. Create object selection variant for resource-related alerts.
Which options do you have to plan both quant ties and capacities during line loading in repetitive manufacturing? There are 2 correct answers to this question. Run MRP with automatic selection of production version. Assign planned orders manual lying the planning table. Run MRP with quota arrangement. Run PP/DS heuristics for repetitive manufacturing.
In a first step you have created master recipes. In which sequence are the additional objects created? Process order Control recipe PI sheet Process message Control recipe Process order Process message PI sheet Process order Control recipe Process message PI sheet Control recipe Process order PI sheet Process message.
What is the purpose of collective orders? To manage production orders for an entire finished product on multiple levels To post production costs on a cost collector instead of the production order To combine order management of co-products and by-products with the main product To post any component withdrawals single back flush with order confirmation.
Your production planners must execute planning only for specific resources. How can you achieve this in Advanced Planning (PP"/OS)? Use a heuristic Use a propagation range. Use a planning group. Use a resource group.