Content:
Which advanced functionality has been embedded in SAP S/4HANA? There are 3 correct answers to this question. Demand planning Capacity planning Backorder processing Supply Network Planning Available-to-promise.
A customer is considering switching from order-related settlement to productrelated settlement. What are capabilities of cost collectors? There are 2 correct answers to this question. They can be used for manufacturing with collective orders. They can be created automatically during month end process. They can be applied to make-to-stock production order. They can be used for repetitive manufacturing.
You run MRP for a material that was planned using Demand-Driven Replenishment. Towards which buffer level does the MRP run create a replenishment proposal? Top of Green Top of Red Base Top of Yellow Top of Red.
What data processing steps are obsolete if you use SAP S/4HANA Analytics? There are 2 correct answers to this question. Pre computed aggregation views Extract on, transformation, and loading (ETL) Online transaction processing (OLTP) Online analytical processing (OLAP).
A planner wants to interactively resolve an overload situation on a resource using advanced planning tools without any automatic rescheduling activity by the system. Which combination of settings for resource and detailed scheduling strategy are required to receive related alerts? Infinite resource and finite strategy Infinite resource and infinite strategy Finite resource and finite strategy Finite resource and infinite strategy.
You have maintained the parameters for simple discontinuation in the material master of a component. Which business process will be affected if the available stock is zero and the discontinuation date is in the past? Backflushing Material requirements planning Kanban Production order release.
You are using heuristic SAP_ERP_001. Which of the following criteria are included in the automatic source determination logic when a planned order is created? Component availability Delivery date Costs Vendor rating Quota arrangement.
Your customer is using storage location is in SAP ECC and wants to switch to SAP S/4HANA. What do you have to consider? Storage location MRP is replaced by MRP area functionality. You have to set one MRP area for every storage location. Storage locations are NO longer supported. MRP Live does NOT support storage locations, but classic MRP still does.
A material has been set up as a phantom assembly by entering the special procurement key in the material master. How can you switch off the phantom assembly in a specific bill of material (BOM)? Change the special procurement key of the phantom assembly in the BOM. Change the explosion type of the phantom assembly in the BOM. Change the phantom item indicator for the phantom assembly in the BOM. Change the item category of the phantom assembly in the BOM.
Which technological advances enabled the development of SAP S/4HANA as the digital core? There are 3 correct answers to this question. Multi core processors enabling parallelism of tasks Advances in the three-tier architecture approach Capability to add to server landscape and scale Wide adoption of web standards such as Service oriented architecture Big and affordable memory.
Which data model changes have been implemented in Sales and Distribution? There are 3 correct answers to this question. Elimination of LIS tables for rebates Elimination of customer master tables Elimination of document index tables Elimination of status tables Elimination of output condition tables.
You are using the document management system (DMS) . Where should the DMS document links be assigned, to have them automatically copied to production orders? There are 2 correct answers to this question. Material master Work center Bill of material Routing header.
The procurement type of your material is set to "E" for In-house production. Which of the following is valid to determine a source of supply in SAP S/4HANA? Selection Method Production Version Contract Purchasing Info Record.
What are prerequisites for using batch derivation? There are 2 correct answers to this question. Batch where-used list Process instructions Receiver-sender relationships Batch determination selection conditions.
Your customer wants to include restricted-use stock as a potential receipt in the existing ATP check for component availability. Which information is required to implement this change request in the scope of check? There are 2 correct answers to this question. The ATP category for restricted-use stock The checking rule from the business application The checking control for the order type The checking group from the material master.
What are the key aspects of SAP S/4HANA? There are 2 correct answers to this question. SAP S/4HANA has minor changes on data model. SAP S/4HANA is built on SAP HANA SAP S/4HANA increases the data footprint. SAP S/4HANA can be deployed on-premise, in the cloud, or a combination of both.
On which of the following levels can you influence the availability check for the components of production orders? There are 2 correct answers to this question. Production controller Production order type MRP controller Material master.
Which of the following functions can be performed when the production order has the status “Created” (CRTD)? A user can schedule a background job to release production orders (transaction COOIS). A user can trigger material staging via mass processing (transaction COHV). A user trigger printing of shop floor paper manually (transaction CO02). A user trigger material availability check via mass processing (transaction COHV).
Which of the following are included as SAP S/4HANA Sales Simplifications? There are 3 correct answers to this question. Settlement Management replaces ERP SD Rebates SAP order Fulfillment replaces ERP SD Availability Checking SAP Sales Support replaces SAP CRM SAP Revenue Accounting replaces ERP SD Revenue Recognition SAP GTS replaces ERP SD Foreign Trade.
You want to triggering-house production of a semi-finished mater al before a sales order for the corresponding finished good is received. Which planning strategy supports the consumption of planned independent requirements for the semi-finished material? Planning at assembly level (70) Make-to-order production (20) Planning without final assembly (50) Planning with final assembly (40).
What are benefits of the Engineering Workbench? There are 2 correct answers to this question. Simultaneous processing of different bill of materials (BOM) items and operations Detailed selection of bill of materials (BOM) items and operations Simulation of planned changes for costing and mater all requirements planning Undo/redo functionality of planned changes.
Which task list types can have parallel sequences? There are 2 correct answers to this question. Rate routings (R) Master recipes (2) Reference operation sets (S) Routings (N).
Which data object can be updated with the scheduling results of a routing? MRP profile Production scheduling profile Material master Production version.
How can you limit the number of master data objects to be created when the manufacturing process is the same for many different products? By creating routings with alternative sequences By creating routings with parallel sequences By assigning the same production version to different materials By assigning different materials to the same routing.
Which process order function uses a resource network? Resource scheduling Capacity planning Resource selection Capacity leveling.
What is the correct sequence of the following Activate methodology phases? Validate, Realize, Test , Deploy Prepare, Realize, Iterate, Continuous Improvement Prepare, Explore, Realize, Deploy Prepare, Validate, Test, Go-Live.
Which of the following elements does MRP take into account during net requirement calculation? There are 2 correct answers to this question Safety stock Maximum stock level Purchase orders Lot size.
What information is included in the SAP Readiness Check result for SAP S/4HANA? There are 3 correct answers to this question. Recommended SAP Fiori apps Recommended SAP Best Practices Relevant simplification items Custom code analysis Inconsistent data tables.
What are the possible categories for the Business Partner master data object in SAP S/4HANA? There are 3 correct answers to this question. Vendor Customer Person Organization Group.
What is the first step in the MRP run? BOM explosion Net requirements calculation Lot size calculation Source determination.
In your plant, MRP is activated. Which options do you have to exclude a material from the MRP run? There are 2 correct answers to this question. Use a specific MRP type. Use a specific material group Use a specific material status. Use a specific MRP controller.
What is a typical transportation processing SAP Transportation Management? Transportation Planning, Transportation Execution, Order Management, Freight Costing and Settlement, Analytics and Reporting Order Management, Transportation Planning, Transportation Execution, Freight Costing and Settlement, Analytics and Reporting Order Management, Transportation Planning, Freight Costing and Settlement, Transportation Execution, Analytics and Reporting Transportation Planning, Order Management, Transportation Execution, Freight Costing and Settlement, Analytics and Reporting.
A material in your company is planned with planning strategy 70 (Planning at assembly level). The consumption mode has been set to backwards with a consumption period of 12 days. Starting from when are the 12 days counted backwards? From the dependent requirement date of the material From the availability date of the related finished good From the planned independent requirement date of the material From the requested delivery date of the related finished good.
What are the options for transferring data to SAP S/4HANA with the SAP S/4HANA Migration Cockpit? There are 2 correct answers to this question. Temporary tables CSV files XML files Staging tables.
Which of the following is an advantage of MRP Live and NOT available in classical MRP? There are 2 correct answers to this question. MRP Live can propose alternative solutions MRP Live can priorities demand from sales orders MRP Live can create production orders automatically MRP Live can plan materials with recursive BOMs.
Your project uses process orders for the production of liquid chemicals. What can you define to ensure that the production flow happens only in physically connected tanks? Operation network Resource network Work center hierarchy Setup matrix.
What are the three transition scenarios for an S/4HANA implementation? There are 3 correct answers to this question. System conversion System upgrade System activation Landscape transformation New implementation.
What are the three layers in the SAP Best Practices Content for SAP S/4HANA? There are 3 correct answers to this question. Building Blocks Test Scripts Scope Items Process Flows Solution Package.
How would you define pegging in the context of Advanced Planning? An evaluation to verify if there are overstock situations in the balance between receipt and issue elements after the production planning run. An evaluation that is ordered according to the network structure of all related products and represents the coverage of issue elements with receipt elements An evaluation that is ordered according to the bill-of-material structure of all related products and represents the relationship between the receipt and the issue elements. An evaluation to verify if there are material or capacity shortages in the network after the production planning run.
In your project, you have several materials that are planned by different people. How can you assign the planning responsibility? MRP controller MRP group MRP type MRP planning file.
You are creating a production order manually. What activities are involved in this process? There are 3 correct answers to this question. Actual cost calculation Master data selection Planning selection Order type determination Capacity requirements determination.
What are properties of MRP Live? There are 2 correct answers to this question. It uses the same BAdis as classic MRP It is executed on the database server Data is read sequentially from the database tables The code is written in SQL Script.
A planner updated a production order status from partially confirmed “PCNF” to technically completed “TECO” by mistake. What impact would this have to other users for this specific production order? The buyer can still see component reservations The production manager can still see the capacity requirements The warehouse clerk still carry out goods issue transactions The production operator cannot enter additional confirmations.
For a production version to be valid and consistent what requirements must be fulfilled? There are 3 correct answers to this question The assigned routing must NOT have alternative sequences. The lot size range must be within the lot-size range of the assigned routing The deletion flag must NOT be set for the bill of materials (BOM) or the routing The assigned routing and bill of materials (BOM) must be valid in the entire validity period. The assigned routing must be a rate routing.
In a production process, you need a certain amount of liquid as input material. The source tank is directly connected to the reactor. How can you process consumption postings? Backflushing Picking list Transfer order Kanban.
What are some of the SAP Fiori user types? There are 3 correct answers to this question. Occasional Expert Business partner Employee Developer.
What are examples of assignment objects you can maintain in the Engineering Workbench? There are 3 correct answers to this question. Routing to sequence assignment Material to routing assignment Component assignment Material to production version assignment Material to bill of materials (BOM) assignment.
Which material master data can you copy when you use the Copy Material program (transaction MMCC, Material Master Copier) to create new materials? There are 2 correct answers to this question. Warehouse number data Storage location data Production version data MRP area data.
Your quality department detects a deviation in a raw material batch. Unfortunately, this batch has already been used in production. How can you identify all affected finished goods stocks? Use the material where-used report. Use the material staging report. Use batch determination. Use the batch information cockpit.
What are pillars of SAP Activate? There are 2 correct answers to this question. Guided Configuration Premium engagement SAP MaxAttention SAP Best Practices.
You want to schedule an order in the graphical planning board. What are valid planning directions? There are 2 correct answers to this question. Infinite sequencing Backwards Forward with reverse Squeezing in.
You want to procure your material components based on a forecast for the finished material derived from historical sales. When customers order, you produce the finished product and reserve it for that particular order. Which is the appropriate planning strategy to use? 50 Planning without final assembly 30 Production by lot size 40 Planning with final assembly 20 Make to order production.
What are drawbacks of the separation of OLTP and OLAP? There are 4 correct answers to this question. Multiple copies of the data exist Batch process are required to keep OLTP and OLAP in sync Only the OLAP system has the latest data The OLAP system needs to write back the data to the OLTP system Only the OLAP system has a predefined subset of the data.
What are some of the advantages of using Kanban? There are 2 correct answers to this question. Replenishments are created close to the actual need Replenishments are based on centralized planning It is mostly accomplished by manual postings It is a simplified form of production control.
The pegging situation was changed because of an MRP heuristic run. What is a capability of dynamic pegging? It propagates changed sales order priorities to the pegged planned orders It enables the propagation of network alerts across the bill of materials structure It replaces fixed pegging relationships unless they have been created for stock It links receipts from an alternative location in case of a shortage in the default location.
The production plan is being disrupted by last minute demands that are entered in the system. Which is the most efficient way to handle last minute demands and protect the current production plan? There are 2 correct answers to this question. Manually firm all planned orders for materials within the replenishment lead time of the material In the stock requirements list, set a manual firming fence for a date based on the replenishment lead time of the material In the material master record, set MRP type to P4 and a planning time fence on the replenishment lead time of the material In the material master record, set MRP type to P1 and a planning time fence on the replenishment lead time of the material.
Advanced Planning uses master data and transaction data from SAP S/4HANA. In which data objects can you set the advanced planning flag? There are 2 correct answers to this question. Production version Plant Material Work center.
What is the difference between co-products and by-products? Only co-products appear in the process or production order settlement rule. Only by-products have a zero inventory valuation Only co-products are identified by a special item category in the bill of material (BOM). Only co-products can be manufactured in isolation from the main product.
How can you set up the supply source for the SAP Kanban process? There are 3 correct answers to this question. Using purchasing costs for automated source prioritization Using purchase orders for external procurement Using run schedule quantities for in-house production Using quotations for internal and external procurement Using stock transfer reservations for stock transfer.
Which of the following is used by the MRP Live planning run in SAP S/4HANA? Parallel processing across servers Net change planning Planning horizon MRP list.
The setup time on the production line to produce a material is extensive. You would like to avoid multiple setups and limit the production of the material based on a planning calendar. Which type of lot size procedure should you use to accomplish this? Minimum lot sizing Fixed lot sizing Exact lot sizing Periodic lot sizing.
You produce your material based on a forecast derived from historical sales and expect it to be in inventory when your customer orders. If customers order more that the forecasted quantity, you want to increase production to try to meet the extra demand. Which is the appropriate planning strategy to use? 50 – Planning without final assembly 40 – Planning with-final-assembly 10 – Anonymous make-to-stock 20 – Make to order production.
What are the main processes of the embedded PP/OS in SAP S/4HANA? There are 2 correct answers to this question. Calculation of inventory buffer size Long-term production planning Source determination for external procurement Optimization of the production plan.
To trigger a goods receipt posting, which Kanban status do you have to set? In use Empty Wait Full.
What are attributes of the SAP S/4HANA Simplification list? There are 3 correct answers to this question It was created for better planning and estimation of your way to S/4HANA It can have a business and a technical impact It details transaction and solution capabilities at a functional level It is only a grouping of related technical simplifications It contains references to the relevant training material.
Which transaction code can you use in SAP S/4HANA to enter and display goods movements? MB02 MMBE MBNL MIGO.
Which of the following elements does the MRP run take into account? There are 2 correct answers to this question. Material documents Shipments Sales orders Planned independent requirements.
Why would you use phantom assemblies? There are 3 correct answers to this question. To simplify the structure of bills of materials To make the assignment of components easier To reduce the number of changes required in bills of materials To increase the number of planning levels To reduce the number of material masters.
When do you use variant bills of materials (BOMs)? When multiple mater also have similar BOMs When a material has multiple BOMs When a material has a configurable BOM When multiple mater also have the same BOM.
When can the material availability check occur automatically in a production order? There are 2 correct answers to this question. At order creation At order confirmation At order settlement At order release.
What does it mean for the production planner when MRP works with infinite capacities? MRP assigns capacity requirements automatically after the last scheduled order on a work center. MRP creates capacity requirements only if the work center has sufficient capacity. MRP creates capacity requirements without checking the capacity of a work center MRP assigns capacity requirements automatically to work center is with the earliest available capacity.
How can you limit the validity of a bill of material (BOM)? There are 2 correct answers to this question. By material type By plant By period By industry.
What generates capacity requirements in a process order? Operations Phases Activities Resources.
You have a quality control check to avoid using a high-value component tin faulty materials in subsequent assembly operations. How do you account for potentials crap of the high-value material? Enter the assembly scrap in the material master of the component and set the net indicator in the component of the bill of material of the assembly. Enter the component scrap in the material master of the assembly and set the net indicator in the routing operation where the component is used Enter the operation scrap and set the net indicator in the component of the bill of mater al of the assembly. Enter the component scrap in the component of the bill of material of the assembly and leave the net indicator initial in the bill of material.
Which reports can you access via the order and resource reporting transaction in advanced planning? There are 3 correct answers to this question WIP list Planning file entries Production list Operation list Production overview.
You are transferring data from SAP S/4HANAlo embedded PP/OS. What master data objects are mapped to a location? There are 3 correct answers to this question. Customer Supplier Plant Workcenter Warehouse number.
A warehouse manager likes to streamline the goods receipt (GR) process for production orders. Where can you enable the automatic GR? There are 2 correct answers to this question. Production scheduling profile Operation control key Confirmation profile Scheduling margin key.
A production order is created from a planned order. The system should determine a valid production version. What must you doing the system for the selection to occur? Set the customizing setting Manual Selection of Production Version active Change the production version assignment in the production order using the Read Master Data function. Create several production versions with valid dates Set the customizing setting Automatic Selection of Production Version active.
To ensure that the warehouse operator only stages large components in the exact required quality for each production order, which warehouse material staging method would you recommend? Release order parts Pick parts Crate parts Kanban.
Which material master setting is required to use the repetitive planning table for production with production orders? At least one valid production version must exist on the MRP4 view An overall profile be assigned on the Work Scheduling view A repetitive manufacturing profile must be assigned on the MRP4 view The Selection Method must be set to “2 Selection by production version”.