S/4 HANA PP 106

Description:
S/4 HANA PP

Author:
khandoba
(Other tests from this author)

Creation Date:
01/12/2021

Category:
Personal

Number of questions: 80
Share the Test:
Facebook
Twitter
Whatsapp
Share the Test:
Facebook
Twitter
Whatsapp
Last comments
SAPdata ( uploaded 1 month )
its for which version of certification please ?
Answer
khandoba ( uploaded 1 month )
2020
Content:
Which Kanban master data object controls the relationship between the supply and demand source? Production supply area Kanban container Control cycle Rate routing.
What Kanban status automatically posts goods receipt with reference to the procurement element? Empty Full Wait In use.
What are pillars of SAP Activate? There are 2 correct answers to this question. SAP Best Practices SAP MaxAttention Guided Configuration Premium engagement.
Which of the following elements does the MRP run take into account? There are 2 correct answers to this question. Shipments Sales orders Material documents Planned independent requirements.
What data processing steps are obsolete if you use SAP S/4HANA Analytics? There are 2 correct answers to this question. Online analytical processing (OLAP) Pre computed aggregation views Online transaction processing (OLTP) Extract on, transformation, and loading (ETL).
What does the bill of material usage (BOM usage) control at the BOM item level? There are 2 correct answers to this question. Allowed material type Default unit of measure Maximum allowed low-level code Default values for the item status.
Which transaction code can you use in SAP S/4HANA to enter and display goods movements? MB02 MIGO MMBE MBNL.
How Is the bill of material (BOM) exploded when you use a BOM explosion number? With respect to a common key date for product and each assembly With respect to a defined separate change status for product and each assembly With respect to defined separate key dates for product and each assembly With respect to a common change status for product and each assembly.
When a developer creates a new SAP Fiori app, they begin by selecting a template to ensure the application has a consistent look-and-feel. What types of templates can a developer choose? There are 3 correct answers to this question Factsheet Maintenance view Web Dynpro Transactional Analytical.
Which of the following is used by the MRP Live planning run in SAP S/4HANA? Net change planning Parallel processing across servers MRP list Planning horizon.
With which SAP Fiori app can you access the Guided Configuration environment for an SAP S/4HANA Cloud implementation? Maintain Business Catalogs Configure Your Solution Manage Licenses Manage Your Solution.
A planner updated a production order status from partially confirmed “PCNF” to technically completed “TECO” by mistake. What impact would this have to other users for this specific production order? The warehouse clerk still carry out goods issue transactions The production operator cannot enter additional confirmations The buyer can still see component reservations The production manager can still see the capacity requirements.
Why would you use phantom assemblies? There are 3 correct answers to this question. To increase the number of planning levels To reduce the number of changes required in bills of materials To simplify the structure of bills of materials To reduce the number of material masters To make the assignment of components easier.
What capabilities does SAP S/4HANA embedded analytics provide? There are 2 correct answers to this question. Automatic update of story boards Real time decision support Strategic analysis Comparison of current data with historical data to identify trends.
In a first step you have created master recipes. In which sequence are the additional objects created? Control recipe Process order PI sheet Process message Process order Control recipe Process message PI sheet Control recipe Process order Process message PI sheet Process order Control recipe PI sheet Process message.
An issue storage location was NOT found through the work center, bill of material (BOM) item, or material master. What determines whether the storage location can be derived from the production version? Plant Data MRP Group MRP Profile MRP Controller.
A material in your company is planned with planning strategy 70 (Planning at assembly level). The consumption mode has been set to backwards with a consumption period of 12 days. Starting from when are the 12 days counted backwards? From the dependent requirement date of the material From the availability date of the related finished good From the requested delivery date of the related finished good From the planned independent requirement date of the material.
What are main innovations in manufacturing in SAP S/4HANA? There are 3 correct answers to this question. Monitor Production Orders Fiori app Material Coverage Fiori app Lock-free inventory movements Rough-cut capacity planning Flow manufacturing.
Mode selection is one of the scheduling options available in Advanced Planning in SAP S/4HANA. When can you use mode selection? When multiple planned orders exist on one resource When alternate resources are used within one operation When multiple operations are maintained for one product When multiple production versions are maintained for one product.
The pegging situation was changed because of an MRP heuristic run. What is a capability of dynamic pegging? It replaces fixed pegging relationships unless they have been created for stock It propagates changed sales order priorities to the pegged planned orders It enables the propagation of network alerts across the bill of materials structure It links receipts from an alternative location in case of a shortage in the default location.
Which time elements are part of a routing operation? There are 3 correct answers to this question. Float before production Pick/pack time Move time Queue time Wait time.
When working with both cross-plant and plant-specific material statuses in the mater al master, which status has the highest priority? The cross-plant status The least restrictive status The plant-specific status The most restrictive status.
To ensure that the warehouse operator only stages large components in the exact required quality for each production order, which warehouse material staging method would you recommend? Crate parts Kanban Pick parts Release order parts.
What are uses of the low- level code assigned to each material? There are 2 correct answers to this question. It is used by engineering to identify sub items in engineering bill of materials (BOMs). It is used by product costing to determine how costs are rolled up It is used in MRP to determine the sequence in which materials are planned. It is used by ATP to determine the priority of alternative components.
You want to schedule an operation finitely, without moving other operations. Which scheduling strategy do you select? Squeezing Scheduling working time only Find slot Insert operation.
Your company produces a finished good based on a forecast and expects it to being stock when customers order it. If customers order more than the forecasted quantity, the production quantity should be increased to try to meet the extra demand. Which planning strategy do you use? Make-to-order production (20) Make-to-stock production (10) Planning with final assembly (40) Planning without final assembly (50).
What is the correct sequence of the following Activate methodology phases? Prepare, Explore, Realize, Deploy Validate, Realize, Test , Deploy Prepare, Validate, Test, Go-Live Prepare, Realize, Iterate, Continuous Improvement.
You produce your material based on a forecast derived from historical sales and expect it to be in inventory when your customer orders. If customers order more that the forecasted quantity, you want to increase production to try to meet the extra demand. Which is the appropriate planning strategy to use? 10 – Anonymous make-to-stock 50 – Planning without final assembly 40 – Planning with-final-assembly 20 – Make to order production.
Production orders are used for what production type? Period and quantity-oriented production Replenishment controlled by control cycles Discrete manufacturing processes Process manufacturing processes.
Your project uses process orders for the production of liquid chemicals. What can you define to ensure that the production flow happens only in physically connected tanks? Setup matrix Resource network Operation network Work center hierarchy.
Which SAP solutions support the supplier area in the portfolio of the Digital Value Network? There are 3 correct answers to this question. SAP S/4HANA SAP SuccessFactors SAP Field glass SAP Ariba SAP Concur.
You want to schedule an order in the graphical planning board. What are valid planning directions? There are 2 correct answers to this question. Squeezing in Infinite sequencing Forward with reverse Backwards.
Advanced Planning uses master data and transaction data from SAP S/4HANA. In which data objects can you set the advanced planning flag? There are 2 correct answers to this question. Work center Material Plant Production version.
You want to perform capacity availability checks on your production orders. What must be set for this to occur? There are 2 correct answers to this question. Indicator Relevant for finite scheduling must be set PRT Availability check must be set. Checking rule and group must be assigned. Checking control must have an overall profile assigned in customizing.
What are possible configuration steps when setting up the alert monitor in Advanced Planning? There are 3 correct answers to this question. Create object selection variant for product-related alerts. Assign the alert profile to the overall profile. Create object selection variant for resource-related alerts Create object selection variant for transportation lane-related alerts. Assign the overall profile to the authorization profile.
Which of the following are included as SAP S/4HANA Sales Simplifications? There are 3 correct answers to this question. SAP Revenue Accounting replaces ERP SD Revenue Recognition SAP order Fulfillment replaces ERP SD Availability Checking SAP GTS replaces ERP SD Foreign Trade SAP Sales Support replaces SAP CRM Settlement Management replaces ERP SD Rebates.
What are the key aspects of SAP S/4HANA? There are 2 correct answers to this question SAP S/4HANA is built on SAP HANA SAP S/4HANA increases the data footprint SAP S/4HANA can be deployed on-premise, in the cloud, or a combination of both. SAP S/4HANA has minor changes on data model.
Which of the following time elements does MRP use during backward scheduling for in-house production? There are 2 correct answers to this question. Opening period Planned delivery time Planning time fence Goods receipt processing time.
The method in which a production order is credited or debited depends on the variant of cost object controlling (COC). What basis can be used to carry this out? There are 2 correct answers to this question Cost-related Order-related Product-related Milestone-related.
Which materials have a negative quantity in a bill of materials or in a recipe? There are 3 correct answers to this question Bulk materials By-products Continuous flow materials Waste products Co-products.
Which of the following is an advantage of MRP Live and NOT available in classical MRP? There are 2 correct answers to this question MRP Live can create production orders automatically MRP Live can propose alternative solutions MRP Live can priorities demand from sales orders MRP Live can plan materials with recursive BOMs.
What must be used in the system to plan the requirements for different subcontractors separately? Production versions Planning plant Storage locations MRP areas.
Which actions does the system perform by default when you save a confirmation for a finished product in repetitive manufacturing? There are 3 correct answers to this question. Material staging for next order in sequence Posting of production costs to the production cost collector Reduction of associated capacity requirements Posting of goods receipt for the product Archiving of documents for assembly scrap.
You need to model goods receipt processing time in Detailed Scheduling. Which modelling options do you have? There are 2 correct answers to this question. Model a separate resource in the production data structure. Model a transportation resource in the location master. Model a resource inbound in the location master Model a handling resource in the location master and goods receipt time in the material master.
You have maintained the parameters for simple discontinuation in the material master of a component. Which business process will be affected if the available stock is zero and the discontinuation date is in the past? Kanban Backflushing Material requirements planning Production order release.
A planner wants to interactively resolve an overload situation on a resource using advanced planning tools without any automatic rescheduling activity by the system. Which combination of settings for resource and detailed scheduling strategy are required to receive related alerts? Infinite resource and infinite strategy Infinite resource and finite strategy Finite resource and infinite strategy Finite resource and finite strategy.
Which of these are layers in SAP Best Practice content? There are 3 correct answers to this question. Scope items Configuration guides Solution packages Building blocks Process diagrams.
Your project team decides to use a make-to-order planning strategy for a strategic material in discrete manufacturing. What is the impact of this decision? There are 3 correct answers to this question. Net requirements calculation is sales order-specific. Production orders are created with sales order reference Sales order-specific planning run is required Storage location MRP areas are required Sales order-specific stock is created.
What steps are possible in a PP/DS production planning run? There are 3 correct answers to this question. Demand consumption Backorder processing Optimization Detailed scheduling functions Heuristics.
You are using heuristic SAP_ERP_001. Which of the following criteria are included in the automatic source determination logic when a planned order is created? Costs Quota arrangement Component availability Vendor rating Delivery date.
The SAP Kanban procedure could be used to trigger which of the following kinds of replenishment? There are 2 correct answers to this question Stock transfer In-house production Subcontracting Vendor consignment.
What are properties of MRP Live? There are 2 correct answers to this question It is executed on the database server The code is written in SQL Script Data is read sequentially from the database tables It uses the same BAdis as classic MRP.
What are some of the advantages of using Kanban? There are 2 correct answers to this question. Replenishments are created close to the actual need It is a simplified form of production control It is mostly accomplished by manual postings Replenishments are based on centralized planning.
In which of the following master data objects can you define the production order default storage location for a material component? There are 2 correct answers to this question. BOM, in the item for the material Routing, in the component allocation Work center, in the production supply area Material master of the finished product.
Which of the following data objects are updated when a user confirms an operation? Production order total order quantity Warehouse transfer order status Shop floor information system Production order header status.
When do you recommend the use of repetitive manufacturing? There are 2 correct answers to this question Low product stability High product stability Low product complexity High product complexity.
Which functional capabilities does the Detailed Scheduling Board have? There are 2 correct answers to this question. Enter time-ticket confirmation for production orders Change sales order quantities Undo for drag & Drop planning activities Change planned order quantities.
Which of the following business processes are controlled by production order type-dependent parameters? There are 2 correct answers to this question Planning Engineering change management Inspection during production Implementation.
A resource was created in SAP S/4HANA PP/DS through the internal CIF integration and named “W1904_1000_001”. What does the suffix 001 in the resource name represent? Work center category Number of individual capacities Capacity category Available capacity version.
The procurement type of your material is set to "E" for In-house production. Which of the following is valid to determine a source of supply in SAP S/4HANA? Selection Method Contract Production Version Purchasing Info Record.
Which material master data can you copy when you use the Copy Material program (transaction MMCC, Material Master Copier) to create new materials? There are 2 correct answers to this question. Warehouse number data MRP area data Production version data Storage location data.
What are drawbacks of the separation of OLTP and OLAP? There are 4 correct answers to this question. Batch process are required to keep OLTP and OLAP in sync Only the OLAP system has the latest data The OLAP system needs to write back the data to the OLTP system Multiple copies of the data exist Only the OLAP system has a predefined subset of the data.
When would you use reporting point backflush in repetitive manufacturing? There are 2 correct answers to this question You require an up-to-date inventory for components When goods issues can wait for final confirmation For production lines with short lead times When you need to determine the work in progress.
Which process order function uses a resource network? Capacity planning Resource selection Capacity leveling Resource scheduling.
When can the material availability check occur automatically in a production order? At order release At order settlement At order confirmation At order creation.
MRP created a planned order for a material that has one single material from stock as a component. What happens to this dependent requirement when you convert the planned order into a production order? It is converted into a schedule line It is converted into a production order. It is converted into a reservation It is converted into a planned order.
Which characteristics should a material have for re-order point planning? There are 2 correct answers to this question Demand remains relatively constant Replenishment lead time is known and relatively constant Seasonal demand is relatively volatile Material replenishment is managed by the vendor (VMI).
What are the advantages of the new MRP Live in SAP S/4HANA compared to the classic MRP from SAP ECC? There are 2 correct answers to this question. The MRP Live planning scope is more flexible. MRP Live optimizes multi-level make-to-order planning. MRP Live reads and writes data in parallel threads MRP Live writes MRP lists during the run.
What is the purpose of a reporting point confirmation in repetitive manufacturing? There are 2 correct answers to this question. To stage different components for a production line simultaneously To determine the work in progress along the production line To reduce the total production lead time for along production line To provide timely updates of inventory management for the staged components.
What is SAP’s strategic solution to perform Sales and Operations planning when you use SAP S/4HANA Manufacturing? PP Standard Sales and Operations Planning Flexible Planning APO Demand Planning Integrated Business Planning.
When do you use variant bills of materials (BOMs)? When multiple mater also have similar BOMs When a material has a configurable BOM When multiple master also have the same BOM When a material has multiple BOMs.
Which technological advances enabled the development of SAP S/4HANA as the digital core? There are 3 correct answers to this question. Big and affordable memory Capability to add to server landscape and scale Advances in the three-tier architecture approach Wide adoption of web standards such as Service oriented architecture Multi core processors enabling parallelism of tasks.
You want to integrate an existing planned order into Advanced Production Planning. Which report do you use? /SAPAPO/UPD_LOC_SP_PL /SAPAPO/CREATE_LOCATION /SAPAPO/CURTO_CREATE /SAPAPO/PPDS_DELTA_ORD_TRANS.
You define forecast consumption as an integral part of your Production Planning and Detailed Scheduling process. Which of the following order types consume the forecast? There are 2 correct answers to this question Sales order Dependent demand Planned order Purchase order.
The production plan is being disrupted by last minute demands that are entered in the system. Which is the most efficient way to handle last minute demands and protect the current production plan? There are 2 correct answers to this question In the material master record, set MRP type to P4 and a planning time fence on the replenishment lead time of the material Manually firm all planned orders for materials within the replenishment lead time of the material In the material master record, set MRP type to P1 and a planning time fence on the replenishment lead time of the material In the stock requirements list, set a manual firming fence for a date based on the replenishment lead time of the material.
What are the possible categories for the Business Partner master data object in SAP S/4HANA? There are 3 correct answers to this question. Person Group Organization Vendor Customer.
Which task list types can have parallel sequences? There are 2 correct answers to this question. Reference operation sets (S) Rate routings (R) Routings (N) Master recipes (2).
What are benefits of the Engineering Workbench? There are 2 correct answers to this question. Undo/redo functionality of planned changes Simulation of planned changes for costing and mater all requirements planning Simultaneous processing of different bill of materials (BOM) items and operations Detailed selection of bill of materials (BOM)items and operations.
Which time elements can be reduced by a reduction strategy? There are 3 correct answers to this question. Queue time Wait time Float after production Move time Goods receipt processing time.
Which methods can you use achieve a feasible production planning case of capacity constraints? There are 3 correct answers to this question. Select an alternative mode on a resource. Reduce the planning window Execute a new production planning run Adjust the available capacity Form optimal sequences to reduce setup times.