Title of test:
SAP Activate Project Manager

Description:
SAP Activate Project Manager

Creation Date: 2019/08/10

Category: Others

Number of questions: 122

Rating:(51)
Share the Test:
Nuevo ComentarioNuevo Comentario
New Comment
Report comment
This exam does not help. Very different questions in the actual exam. I just got my certification and it was only because I studied and I have been involved with the Agile methodology, not because of these questions.
Answer
Report comment
Hello, could you tell me which code of exam these questions of? is it C_ACTIVATE 12? Thanks!
Answer
END OF LIST
Content:

What is a benefit of using Guided Configuration instead of the Implementation Guide? Please choose the correct answer. It ensures configuration is done using SAP Solution Manager. It eliminates the need for Content Lifecycle Management. It eliminates the need to generate transport requests for configuration settings. It ensures SAP updates do NOT conflict with customer configurations.

What do you do during post cutover? Please choose the correct answer. Conduct Organizational Readiness Check. Perform the Verification Session of the SAP Going Live Check. Perform Technical System Test. Setup Operational Support.

In what respect is SAP Activate Methodology different from the ASAP Methodology? Please choose the correct answer. Leverages iterative incremental build. Supports only new implementations. Supports cloud deployments. Includes Fit/Gap analysis instead of Blueprint.

Your project is performing some high-level planning for a System Conversion journey from SAP Business Suite to SAP S/4HANA on-premise edition. What is the correct sequence of selected key deliverables across the project phases? Please choose the correct answer. a. Detailed system Assessment b. Production Readiness Check c. Code Adjustment d. Validation of Migration. a. Detailed system Assessment b. Code Adjustment c. Validation of Migration d. Production Readiness Check. a. Production Readiness Check b. Detailed system Assessment c. Code Adjustment d. Validation of Migration. a. Code adjustment b. Detailed System Assessment c. Production Readiness Check d. Validation of Migration.

Who determines the tasks that are required to complete the committed backlog items in a sprint? Please choose the correct answer. SCRUM Master. Project Team. Project Manager. Product Owner.

When do you perform User Acceptance Testing during the Agile Build? Please choose the correct answer. After each Sprint. During each Firm-up Sprint. Before Integration Testing. After Integration Testing.

Which component of SAP Activate offers customers a reference solution in the cloud for a quick start? Please choose the correct answer. SAP Best Practices. Guided Configuration. SAP Implementation Assistant. SAP Activate Methodology.

What is the purpose of the scrumboard? Please choose the correct answer. To manage the resource load. To document the results of integration testing. To show the functional breakdown of the solution scope. To visualize team progress.

In which phase of the SAP Activate Methodology does the team complete the System Assessment? Please choose the correct answer. Explore. Prepare. Deploy. Realize.

Which tool can you use to collaborate with other SAP Activate methodology practitioners? Please choose the correct answer. Roadmap Viewer. SAP Solution Manager. SAP Jam. SAP Implementation Assistant.

In which phase of the SAP Activate methodology does the team complete the Transformation Planning? Please choose the correct answer. Deploy. Explore. Prepare. Realize.

What is a difference between the SAP Activate methodology for a new implementation of SAP S/4HANA cloud edition and a new implementation of SAP S/4HANA on-premise? Please choose the correct answer. For on-premise, there is an additional Q-Gate for system installation. For the cloud edition, there is an additional Q-Gate for integration with on-premise systems. For the cloud edition, there is an additional work stream for integration with on-premise systems. For on-premise, there are additional deliverables for the system setup.

Which of the following statements about Scrum is correct? Please choose the correct answer. In Scrum, the team is Self-organized, define all task necessary for all project life cycle. The three ceremonies are sprint planning, daily scrum, sprint review (retrospective). In Scrum, as best practices, we have three main roles, and three artifacts or three ceremonies. Scrum Master defines and prioritizes features and gathers requirements.

What is the objective of a sprint retrospective meeting? Please choose the correct answer. Review and prioritize the backlog. Provide formal feedback to the project manager. Improve the SCRUM process. Define the stakeholder management approach.

What do you do during an iterative approach to build a solution? Please choose the correct answer. Build the solution module by module. Provide a working solution only at the end of the release. Deliver a prototype of the solution. Include frequent inspection check-points.

Which of the following content best outlines the scope of the Integration Test? Please choose the correct answer. a. Solution baseline b. Delta/gap solutions c. Data flows with non-SAP application. a. Solution baseline b. Delta configuration c. Data flows between SAP solutions. a. Prototype b. Delta configuration c. Data flows between SAP solutions. a. Prototype b. Delta/gap solutions c. Data flows with non-SAP application.

What tool do you use to configure an SAP Business Suite on-premise solution? Please choose the correct answer. Configuration Composer. Expert Configuration. ABAP Workbench. SAP Implementation Guide.

In which phase you execute the User Acceptance Test? Please choose the correct answer. Final Preparation. Realize. Build and Test. Deploy.

Which of the following is not a characteristic that the quality principles are based on? Please choose the correct answer. SAP Quality Award example winners. Experience of Typical Pitfalls. Best Practices. International standard.

Your project is preparing for the Fit/Gap analysis workshops. If you use the Agile approach, what sequence of activities do you perform in the Explore Phase? Please choose the correct answer. a. Set reference value b. Conduct Solution Validation workshops c. Prioritize initial backlog d. Conduct Delta Design workshops. a. Conduct Solution Validation workshops b. Conduct Delta Design workshops c. Set reference value d. Prioritize initial backlog. a. Set reference value b. Prioritize initial backlog c. Conduct Delta Design workshops d. Conduct Solution Validation workshops. a. Conduct Solution Validation workshops b. Set reference value c. Prioritize initial backlog d. Conduct Delta Design workshops.

In which SAP Activate methodology phase does the team identify and design functional quick wins in scope of the conversion project? Please choose the correct answer. Prepare. Realize. Explore. Deploy.

Which of the following is a Key Deliverable of the Prepare phase? Please choose the correct answer. Change Impact Analysis and Communication Plan. Baseline Build. Release and Sprint Plan. Solution Scope and Value Determination.

What is the minimum number of quality gates mandated by the SAP Activate methodology? Please choose the correct answer. 3. 5. 4. 0.

What is the best target environment for a System Conversion journey is as described in the SAP Activate methodology? Please choose the correct answer. SAP S/4HANA Cloud Edition. SAP Hybris. SAP S/4HANA On-Premise Edition. Hybrid of SAP S/4HANA Cloud Edition and SAP S/4HANA On-Premise Edition.

What is the key characteristic of Agile project delivery? Please choose the correct answer. Iterative build with frequent inspections. Formal and detailed documentation. Frequent Quality Gates. Frequent and detailed project scheduling.

Which deliverable is specific to on-premise and NOT for the cloud? Please choose the correct answer. Learning Needs Analysis. Knowledge Transfer. Technical Design Solution. Adaptation Specification.

What is the most granular level of the methodology you can view in the Roadmap Viewer? Please choose the correct answer. Scenario. Deliverables. Phase. Task.

What must you do when you implement SAP Business Suite On-Premise with SAP Best Practices? Please choose the correct answer. Assemble and apply SAP Best Practices to the system. Activate and apply SAP Best Practices with SAP Solution Manager. Apply SAP Best Practices with the Configure your Solution application. Activate and apply SAP Best Practices content with the self-service configuration UI.

Which navigation option do you use in the Roadmap Viewer to access the SAP Activate Methodology content? Please choose the correct answer. Navigate by Project Team Member Role. Navigate by assigned Delivery Mode. Navigate by RACI matrix accountability. Navigate by work stream.

How many deliverables are a part of the Key Deliverable 'Project Initiation'? Please choose the correct answer. Three. Two. Four. One.

According to the Definition of Done, which activity must be completed for each sprint? Please choose the correct answer. End user training must be delivered. Solution must be built and configured in the development system (DEV). Functionality must be tested in the Quality system (QAS). Functionality must be released to the business.

What is the final activity in the Realize phase of a new implementation of SAP S/4HANA cloud edition? Please choose the correct answer. Readiness check. End-to-End walkthrough. Solution validation. Data migration.

What is the hierarchy level under Phase in the SAP Jam space for SAP Activate on-premise?. Key Deliverable. Task. Work Stream. Scenario.

Which of the following tools is used to install SAP S/4HANA. Please choose the correct answer. Data Migration server. SAP Solution Manager. SWPM (Software Provisioning Manager). Cloud Application Library.

Arrange the following in the correct sequence of steps followed for a 'Fit to Standard' workshop. Please choose the correct answer. Discuss how the process fit with customer requirements, Review Best Practice Process Flow, Demonstrate Business Scenarios and Concepts, Identify required configuration, Enable customer on execution of scenarios, Identify gaps. Review Best Practice Process Flow, Demonstrate Business Scenarios and Concepts, Discuss how the process fit with customer requirements, Identify gaps, Identify required configuration, Enable customer on execution of scenarios. Review Best Practice Process Flow, Demonstrate Business Scenarios and Concepts, Identify required configuration, Discuss how the process fit with customer requirements, Enable customer on execution of scenarios, Identify gaps. Demonstrate Business Scenarios and Concepts, Review Best Practice Process Flow, Identify required configuration, Discuss how the process fit with customer requirements, Enable customer on execution of scenarios, Identify gaps.

What is a deliverable of the Application. Customer Team Enablement work stream in the Prepare phase of SAP Activate?. Knowledge transfer to end users. Project Documentation. Learning plan. Project Charter.

What do you do during Sprint Execution? Please choose the correct answer. Present status of selected user stories in the sprint scope on a scrumboard. Measure the sprint progress with a percentage complete report. Hold a retrospective at the end of each week. End a sprint when the sprint backlog items are all complete.

In which SAP Activate methodology phase does the team complete the Transformation Strategy? Please choose the correct answer. Deploy. Prepare. Explore. Realize.

How are the build and test tasks planned and executed in the Realize phase? Please choose the correct answer. By using incremental build in fixed-scope iteration. By using the sprint backlog list as input for each iteration. By executing regression tests after each iteration. With Q-Gates for sign off after each iteration.

How do you gain access to the SAP Activate Methodology Jam site? Please choose the correct answer. Register on SAP Service Marketplace. Join SAP S/4HANA group on SAP Community Network. Submit e-mail address via on-line form. Send e-mail to SAP contact address.

Which accelerator can help you document the detailed design of solution extensions? Please choose the correct answer. Product Backlog Template. Sprint Backlog Template. Change Request Template. RICEF Specification Template.

What structure level do you see when you access the Roadmap Viewer and chose work stream navigation? Please choose the correct answer. Scope Item. Scenario. Task. Deliverable.

What does a project jump-start include for a new implementation of SAP S/4HANA on-premise edition? Please choose the correct answer. Rapid prototyping. Full project SCRUM. SAP Best Practices. Project team training.

When does the project team receive formal confirmation that the user stories are completed to the satisfaction of the product owner? Please choose the correct answer. During user acceptance testing. During the sprint review. During the sprint retrospective. During the daily SCRUM meeting.

Which activity is part of the SAP Activate Methodology for a new implementation of SAP S/4HANA on-premise edition but NOT of the cloud edition? Please choose the correct answer. User Acceptance Test. Technical System Test. End-to-End Integration Test. Unit Test.

Which key deliverable includes the development of RICEFW objects? Please choose the correct answer. Development Build. Custom Extensions Management. Enhancement Delivery. Sprint Execution.

What technique helps agile project teams to prioritize a large, flat backlog? Please choose the correct answer. Retrospective. User Story Mapping. Fit/Gap Analysis. Planning Poker.

In which of the following project phases is it important to plan and schedule data loads followed by load validation activities?. Deploy. Realize. Prepare. Explore.

What information does the product team need so that they can estimate the relative size of backlog user story correctly? Please choose the correct answer. Test strategy. Overall project schedule. Definition of Done. Available project resources.

What are the benefits of the SAP best practices? There are 3 correct answers to this question. Predictable results. Simple on-boarding to cloud. Fixed organizational structure. Fast time to value. Reduced functional scope.

Which accelerations can you use during the Scope Validation/Fit-Gap Analysis activity in the Explore Phase? There are 2 correct answers to this question. RICEF Specification Template. Sprint Backlog Template. Quality Gate Checklist. Solution Validation Workshop.

Which tools does SAP Activate provide to support Guided Configuration? There are 3 correct answers to this question. Self Service Configuration. Model Company. Solution Builder. SAP Solution Composer. Expert Configuration.

Which of the following activities are part of the Realize Phase of a System Conversion journey to SAP S/4HANA On-Premise Edition? There are 3 correct answers to this question. Custom code adjustment. Operations impact analysis. Development system migration. Delta configuration. Sandbox system migration.

Which new project roles are introduced with the SAP Activate Agile methodology? There are 2 correct answers to this question. SCRUM Master. Product Owner. Design Thinking Coach. Integration Lead.

What are the responsibilities of the Product Owner in release and sprint planning? There are 2 correct answers to this question. Analyze the functional and technical dependencies between the user stories. Define objectives for each release. Estimate the backlog user stories. Prioritize backlog user stories by business priority.

Which activities are part of the Design and Configuration application of the SAP Activate methodology? There are 2 correct answers to this question. Confirm Integration prerequisites. Schedule kick-off workshop. Conduct Scope Validation. Perform Fit/Gap Analysis.

Which of the following Key Deliverables do you complete in the Solution Design work stream in the Explore phase? There are 3 correct answers to this question. Data Migration Approach. Design for the Gaps and Deltas. Solution Scope and Value Determination. Baseline Build. Validation Workshops.

Which content is made available after you activate SAP Best Practices for a new financial implementation? There are 2 correct answers to this question. Pre-configured business processes. Online help. Standard chart of accounts. Implementation Guide.

Which of the following activities support the Realize Phase of a System Conversion journey to SAP S/4HANA On-Premise Edition? There are 2 correct answers to this question. Non-production systems migration. Value determination. Custom code Adjustment planning. Data aging configuration.

Which key activities does the Guided Configuration support you with? There are 3 correct answers to this question. View solution scope. Test configured processes. Train new users. Create test data. Manage roles of configuration users.

Which of the following are the key responsibilities of the Scrum Master? There are 3 correct answers to this question. Leadership skill. Team protection. Team support. Responsible for the project delivery. Task initiator.

How can the project manager help to keep momentum in the project and help to keep the customer involved?. Leverage agile cycles to build and test the solution. Add customer resources to the project to reduce the need for formal training. Increase the number of Q-Gates. Walk through the solution processes with the stakeholders.

Which of the following building blocks are part of the SAP S/4HANA platform? There are 2 correct answers to this question. SAP Fiori UX. SAP Solution Manager. SAP HANA in-memory database. LOB Cloud Solution.

What are deliverables of the Application: Integration work stream in the prepare phase? There are 3 correct answers to this question. Fit/Gap Analysis. Security Checks. Adaptation Specifications. Data Cleansing. Network Connectivity Checks.

Which collaboration features can SAP Activate Jam users access? There are 2 correct answers to this question. Ask questions. Update Key Deliverable wikis. Comment on documents. Tweet questions.

Which of the following are the benefits of SAP JAM? There are 2 correct answers to this question. Highly available. Reduced Recovery Time. User collaboration. Easy to use.

Which of the following tasks are required in the Prepare Phase? There are 3 correct answers to this question. Define the communication plan. Approve the test strategy. Set up the infrastructure to support the project. Train the project team. Identify relevant SAP Best Practices.

Which of the following is not correct about the REALIZE phase? There are 2 correct answers to this question. The project team ensures that the build is meeting the business requirements. Detailed design workshops are held. The beginning of the Realize phase the team prepares a list of all the requirements in a backlog. The team prepares for operations so that the functionality can be brought live.

Which of the following are the pillars of SAP Activate? There are 3 correct answers to this question. SAP ASAP Methodology. SAP Activate Methodology. Guided Configuration. SAP Launch Methodology. SAP Best Practices.

In which tools can the project team across the SAP Activate Methodology content including accelerators?. SAP Community Network. Roadmap Viewer. SAP Service Marketplace. SAP Jam.

Which of the following is not correct about Fit/Gap Analysis? There are 2 correct answers to this question. Prioritize delta requirement and gaps. Drive towards adopting customers processes. Minimize the needs for rework during realization. Validate pre-activate and pre-assembled solution in the development system.

Which activities are part of the Application: Solution Adaption work stream of SAP Activate for new implementations? There are 3 correct answers to this question. Value Audits. Change Management Plan. Production Support Plan. Scope Validation. Value Determination.

Which of the following are not phases of the SAP Activate methodology? There are 2 correct answers to this question. Preparation. Go-Live & Support. Realize. Prepare.

Which of the following are available in the initial SAP Methodologies JAM Page? There are 2 correct answers to this question. Summary. Task description. Roadmaps. Accelerators.

Which of the following activities are part of the Deploy Phase of a Landscape Transformation journey to SAP S/4HANA On-Premise Edition? There are 2 correct answers to this question. Training delivery. Access organizational and production readiness. Solution Activation. Optimize software Change Control Management.

Which of the following is true about a cloud implementation project? There are 2 correct answers to this question. The Starter System is specific to SAP S/4HANA Cloud. The entire transport system is kept intact and up and running. In the prepare phase of a cloud implementation project the project team provide the customer with materials to review as self-enablement. Starter Systems are not required to be in place for the 'Fit to Standard' workshops.

What is the purpose of the Solution Validation activity in the Explore phase? There are 3 correct answers to this question. To log additional scope items. To educate project participants. To challenge changes to standard. To identify gaps. To verify technical installation.

Which of the following can be used to navigate through the roadmap? There are 2 correct answers to this question. Tasks. Phases. Workstreams. Deliverables.

What are the responsibilities of the Project Team on level 4 in the picture below? 2 correct answers. Set business priorities, goals and objectives. Perform status reporting and communication. Set Project policy, standards and oversight. Identify and resolve issues and risks.

In which SAP Activate methodology phase does the team complete the integration validation? Please choose the correct answer. Explore. Deploy. Prepare. Realize.

Which estimation technique can be used in Agile project delivery to size the user stories during sprint planning? Please choose the correct answer. Detailed bottom-up effort estimate the breaks each user story up into hours or shorter tasks. Relative estimate in ideal person days that reflects the best estimate provided by the project team. Product Owner's relative estimate of the effort that will be needed to implement the user story. Detailed bottom-up effort estimate by the SCRUM Master in story points based on the user story complexity.

What is the purpose of a firm-up sprint? Please choose the correct answer. To demonstrate functionality from previous sprint. To run end-to-end integration test. To revise a release plan and sprint plan. To perform sprint testing.

What is SAP Activate? Please choose the correct answer. A methodology for each of the deployment modes (cloud , on-premise, hybrid). A step-by-step instruction on how to remove from SAP best practices to your custom solution. A combination of SAP best practices , methodology, and guided configuration. A bundle of ASAP , SAP Launch , and Rapid Deployment Solutions.

In SAP Activate, what replaces the detailed Blueprint from ASAP? Please choose the correct answer. Fit/Gap Workshops. Custom Extension management. Business Process Mapping. Value Determination.

How can SRCUM teams be organized? Please choose the correct answer. By work stream. By project governance level. By project phase. By job title.

Which of the following SAP S/4HANA Landscape Transformation options are enabled? There are 3 correct answers to this question. System Upgrade. Security Migration. Migration of business unit. System consolidation. Migration of selected applications.

In the System conversion to SAP S/4 HANA Deploy phase, which of the following tasks are included? Please choose the correct answer. Final testing. Hyper care support. Scheduling project plan. Interface setup.

What is the purpose of the Solution Builder tool in the SAP Activate Guided Configuration? Please choose the correct answer. To activate the Best Practices content. To create customer-specific scope items. To personalize activated, ready-to run business processes. To create delta building blocks for complementary content.

In which phase do you create a prioritized list of user requirements?. Deploy. Explore. Prepare. Realize.

Which of the following is not correct about workstreams? There are 2 correct answers to this question. It can span phases. It is assigned as an attribute to phases, deliverables and tasks. workstreams are dependent on phase start and end. It is a collection of related deliverables.

In which phase do you verify that the SAP Best Practice solution scenarios meet the business needs of the customer? Please choose the correct answer. Realize. Prepare. Explore. Deploy.

Which activities are critical for delivering Agile projects? There are 2 correct answers to this question. Release planning. Blueprint scheduling. Retrospective agenda creation. Sprint planning.

Which criterion does the Product Owner use to sequence the product backlog? Please choose the correct answer. Complexity. Business priority. Resource availability. Relative efforts.

In Which phase does the Transition to Operations work stream start? Please choose the correct answer. Deploy. Explore. Prepare. Realize.

SAP now offers the ability to deploy and manage solutions in which of the following environments? Please choose the correct answer. On-premise. Cloud, on premise & hybrid. Cloud and On-premise. Cloud.

What is a key characteristic of SAP Activate for new implementations of S/4HANA cloud edition? Please choose the correct answer. Design-based. Limited involvement of business stakeholders. Start with executable content. Waterfall approach.

In which phase of the SAP Activate methodology does the team complete the Cutover Rehearsal? Please choose the correct answer. Prepare. Realize. Explore. Deploy.

What are key characteristics of the implementation approach in SAP Activate Methodology? There are 3 correct answers to this question. On-premise only. Validate solution. Fixed scope. Premium engagement ready. Start with SAP best practices.

What is the purpose of the SAP Activate Methodology? Please choose the correct answer. To enable access to the SAP ecosystem. To accelerate the initial implementation of SAP S/4HANA. To provide end-to-end integrated application lifecycle management. To manage project and solution documentation.

What are SCRUM of SCRUMS? Please choose the correct answer. Integration meeting between the various project teams. Alternative to regular SCRUM process for smaller teams. Mechanism for gathering and validating requirements. Frequent inspection of code and configuration prior to quality gates.

The tasks associated with Landscape transportation are in which workstream? Please choose the correct answer. Application Solution Adoption. System & data migration. Technical Architecture and Infrastructure. Transition to Operations.

What can users do in the Roadmap Viewer tool? Please choose the correct answer. Display and navigate detailed SAP Activate methodology WBS. Create a customer-specific version of SAP Activate Methodology. Upload SAP Activate WBS into SAP Solution Manager7.1. Download full SAP Activate methodology content for use off-line.

Which of the following tasks are part of the Production support after the Go Live key deliverable? There are 2 correct answers to this question. Set up the Operations Control Center. Resolve issues identified during the hyper care period. Provide further training to customer end users. Perform a Technical systems test.

Which content packages are available in the SAP Package Library? There are 2 correct answers to this question. Solution Builder. SAP Best Practices. SAP Activate Methodology. Rapid deployment solutions.

Which of the following activities are performed in the Explore phase of SAP Activate in SAP S/4HANA Implementation? There are 3 correct answers to this question. Organizational structure. Creating transnational data. Changing master data. Implementing best practices. Adjusting custom code objects.

Which of the following tools are used for rapid database migration? There are 2 correct answers to this question. Software Update Manager (SUM). SWPM (software provisioning manager). Database migration option (DMO). SAP Solution Manager.

What does SAP Activate recommend to keep team members informed and aligned? Please choose the correct answer. Daily e-mail status updates to project manager. Daily team stand-up meeting. Daily progress review meeting with sponsor. Daily status meeting with project manager.

Which estimation technique can be used in Agile project delivery to size the user stories during sprint planning? Please choose the correct answer. Detailed bottom-up effort estimate by the SCRUM Master in story points based on the user story complexity. Product Owner's relative estimate of the effort that will be needed to implement the user story. Relative estimate in ideal person days that reflects the best estimate provided by the project team. Detailed bottom-up effort estimate the breaks each user story up into hours or shorter tasks.

What is a key characteristic of SAP Activate for new implementations of S/4HANA cloud edition? Please choose the correct answer. Start with executable content. Waterfall approach. Design-based. Limited involvement of business stakeholders.

Which of the following Key Deliverables do you complete in the Solution Design work stream in the Explore phase? There are 3 correct answers to this question. Validation Workshops. Baseline Build. Design for the gaps and deltas. Solution Scope and Value Determination. Data migration approach.

Identify the two landscape transformation specific tasks in the explore phase. There are 2 correct answers to this question. Setup Landscape Transformation Software. Define the Data Migration Architecture. Run a landscape transformation assessment. Perform Client transfer.

Which criterion does the Product Owner use to sequence the product backlog? Please choose the correct answer. Relative effort. Resource availability. Complexity. Business priority.

What is the purpose of a firm-up sprint? Please choose the correct answer. To revise a release plan and sprint plan. To run end-to-end integration test. To perform sprint testing. To demonstrate functionality from previous sprint.

Which activity helps the project team to add the user stories to the product backlog? Please choose the correct answer. Preparing a Project Schedule. Planning the User Acceptance Test. Conducting the Solution Validation. Assessing Project Risks.

In which phase of the SAP Activate methodology does the team complete the Cutover Rehearsal? Please choose the correct answer. Prepare. Realize. Deploy. Explore.

In the System conversion to SAP S/4 HANA Deploy phase, which of the following tasks are included? Please choose the correct answer. Scheduling project plan. Final Testing. Hyper care support. Interface setup.

Which content packages are available in the SAP Package Library? There are 2 correct answers to this question. Rapid Deployment Solutions. SAP best practice. Solution builder. SAP activate methodology.

How can SRCUM teams be organized? Please choose the correct answer. By work stream. By job title. By project phase. By project governance level.

In Which phase does the Transition to Operations work stream start? Please choose the correct answer. Prepare. Realize. Deploy. Explore.

Which of the following is not correct about workstreams? There are 2 correct answers to this question. Workstreams are dependent on phase start and end. It can span phases. It is assigned as attribute to phases, deliverables and tasks. It is a collection of related deliverables.

Who determines the priority of user stories in the backlog of an Agile project? Please choose the correct answer. SCRUM Master. Product owner. Project manager. Project team.

What is the focus of a SCRUM of SCRUMS in an Agile Context?. Integration Topics. Best Practice adoption. Backlog Management. Communication to the Project Management Office.