Content:

Which MRP elements can be created for a material procured externally by a requirements planning run? Choose the correct answer(s). Production order. Planned order. Sales order. Purchase requisition. Purchase order. Outline agreement.

The consumption-based planning procedures are normally only based on the previous consumption of the material. Determine whether this statement is true or false. True. False.

In forecast-based planning, you can consider external requirements. Determine whether this statement is true or false. True. False.

The safety stock should clear errors made by the MRP controllers. Determine whether this statement is true or false. True. False.

During net requirements calculation of a material planned with reorder point planning, the warehouse stock available for MRP results from the plant stock and the on-order stock. Which of the documents below belong to on-order stock? Choose the correct answer(s). Purchase requisitions. Purchase orders. Sales orders. Firm planned orders. Fixed purchase requisitions. Planned orders.

The low-level code is the lowest level in which a material appears in all BOMs. Determine whether this statement is true or false. True. False.

The plant parameters have higher priority than the MRP groups. Determine whether this statement is true or false. True. False.

In which screen areas can you break down a MRP list? Choose the correct answer(s). Header. Footer. Items with information about the MRP elements. Material tree. Favorites. Help area.

Changes made after the planning date are not considered in the MRP list. Determine whether this statement is true or false. True. False.

Which of the following procedures belong to the static lot-sizing procedure? Choose the correct answer(s). Replenish to maximum stock level. Monthly lot size. Daily lot size. Lot-for-lot order quantity. Fixed lot size. Least unit cost procedure.

You can execute the forecast for a material without the material master record. Determine whether this statement is true or false. True. False.

A constant model exists if the consumption flow rises or falls in a trend over a long period of time. Determine whether this statement is true or false. True. False.

Which of the following forecast models exist? Choose the correct answer(s). Seasonal model. Summer model. Trend model. Seasonal trend model. Constant model. Year model.

What are the options for executing a forecast in the SAP system? Choose the correct answer(s). Total forecast online. Individual forecast. Individual forecast for a material without a material master record. Total forecast in background processing. Individual forecast in the material master record. Interim forecast.

Which of the following values in the SAP system can help monitor the selected forecast model and count towards the error measures of a forecast? Choose the correct answer(s). Traffic light signal. Error total. Mean absolute deviation. Average forecast times for each material. Forecast runtimes. Tracking signal.

For a material planned with forecast-based planning, forward scheduling is always used. Determine whether this statement is true or false. True. False.

The values that are forecast for a material planned with forecast-based planning, form the forecast for the requirements planning run. Determine whether this statement is true or false. True. False.

Based on the historical values, the forecast program determines forecast values for the future requirements for a material planned with reorder point planning. The forecasted values are considered in requirements planning as the forecast requirements. Determine whether this statement is true or false. True. False.

You determine the type of procurement for a separately planned storage location with the special procurement key in the material master record on the MRP 4 view in the Storage location MRP area. Determine whether this statement is true or false. True. False.

What are the possible types of MRP area in the SAP system? Choose the correct answer(s). MRP areas for company codes. Plant MRP areas. MRP areas for subcontractors. MRP areas for purchasing organizations. Storage location MRP areas. Client MRP areas.