Title of test:
SAP PM CERTIFICATION TEST

Description:
PLM - Maintenance& Repair

Author:
psixalos
(Other tests from this author)

Creation Date:
08/05/2012

Category:
Others

Number of questions: 19
Share the Test:
Facebook
Twitter
Whatsapp
Share the Test:
Facebook
Twitter
Whatsapp
Last comments
gozie ( uploaded 10 years )
It is a nice one
Answer
Content:
Which of the following is true about Transfer of Mesurement and Counter Reading? Note:There are 2 correct answers to this question Both measuring points must have the same characteristic It is assumed that both measuring points are in tha same hierarchy A transfer of Measurement and Counter Readings will always create interval documents Measurement and Counter Readings can be transferred from another,external structure.
Which of the following statements on the relationship between the notification and naintenance order is correct? Note:There are 3 correct answers to this question You can combine several notifications in an order An notification can be created from an order until the order is technically completed The assignment of a notification to an order can be deleted if the notification is only assigned at order's header level Several maintenance orders can be generated from a notification A notification can be assigned to an order if it has the status: "Outstanding","Postponed", "In Process".
Under which circumnstances should serial numbers be used? Note:There are 2 correct answers to this question If the objects involved carry a brand marking from the manufacturer with the serial number on them. If you want to manage individual objects based on stock If you want toindividualize materials,because they might need to be managed as seperate technical objects If you want to build up bills of material for pieces of equipment If pieces of equipment should be classified.
You can assign a catalog profile to a piece of equipment,functional location or notification type.Which of the following is correct? Note:There are 2 correct answers to this question The system assigns a catalog profile to the notification in the sequence:Equipment-Functional Location-Notification Type. You can assign any catalog profile to the notification individually. The system assigns a catalog profile to the notification in the sequence:Functional Location-Equipment-Notification Type. The system assigns a catalog profile to the notification in the sequence:Notification Type-Functional Location-Equipment. The sequence in which the system assigns the catalog profile to the notification is defined in Customizing.
A functional location K1-04 has a functional location BOM.The equipment P-1000 which itself has an equipment BOM,installed at functional location K1-04.We want to create a material BOM for the equipment above.Choose the correct answer. You can only create a material BOM for P-1000 if the equipment BOM is a group BOM. You can create a material BOM for P-1000,but must note that it is in the same plant as the equipment and the functional location BOM. You can create a material BOM for P-1000.In the order both the equipment BOM and the material BOM can be used. You cannot create a material BOM for P-1000,for if a piece of equipment has an equipment BOM then the field"Construction Type" in equipment master is filled and as a result it is not possible for a material BOM to exist there.
For interval document postings,which of the following statements is correct? Note:There are 3 correct answers to this question Interval documents are created during the execution of preventive maintenance orders Posting of interval documents must be activated in Customizing Interval documents will only be created during the shutdown of industrial assets Interval documents can be created during transfer of measurement and counter readings.
The material planning on the maintenance order can be based on Note:There are 3 correct answers to this question From a Purchase Order Internet Catalogs From a BOM attached to the technical object Material assigned to the Notification Direct Material assignment.
Which activities can you still perform using a historical order? Note:There are 2 correct answers to this question You can subsequently make automatic material withdrawals You can subsequently maintain the settlement rule if you have confugured thus in Customizing You can subsequently use the actual prices (costing) to assing values to the resources You can subsequently specify the actual costs that arose manually.
What is the function of the maintenance activity type It can be specified in the completion confirmation for an order and influence the costing control of the order It has an outline function for costs in the Plant Maintenance/Service Information System(PMIS) It is used to define the charge rate of the cost center for the performing activities Together with the order type,it influences the settlement profile for the order.
Which of the following prerequisites must be fullfiled so that you can configure a refurbishment order? Note:There are 2 correct answers to this question A maintenance activity type that is flagged as"Refurbishment" The indicator "Refurbishment allowed" must be set in the material master The indicator "Refurbishment" must be set in the control key for the operations Your own order type with the indicator"Refurbishment" A material master record that has a valuation category and at least two valuation types must exist for the material.
You define priorities for notification processing in Customizing.Which of the following statements is correct? Note:There are 3 correct answers to this question For each priority,you specify a value for automatic calculation of the end date of the requested maintenance order For each priority,you specify a value for automatic calculation of the start date of the requested maintenance order You link the priority directly to one or more notification types The priorities are grouped by priority type.You link the priority type to the notification type You use the relative start date to link the priority to the response profile.
What are the prerequisites for executing the maintenance plan cost estimate function? Note:There are 4 correct answers to this question Orders must have been called up for the maintenance plan.The system can only determine the costs for created orders You must have defined the maintenance call object 'Maintenance Orders' for the maintenance plan category in Customizing. The maintenance plan must be active in the specified time interval. You must have maintained the times for the operations in the task list and/or asssign materials for the operations You must have scheduled the maintenance plan.The system can only determine costs for scheduled calls.
How is the external service processed from within an order? Note:There are 3 correct answers to this question Service Items specifying the service specifications,automatically creating a Purchase Requisition An external company work center assigned to operation in the order An automatically created Purchase requisition from an operation within the order,then conver the requisition to purchase order An individual purchase order is created for an operation with the order You can not order an external service within an.You must create a purchage order and use the maintenance order as account assignment.
Which of the statements are valid for change documents in the content of preventive maintenance Note:There are 2 correct answers to this question The system can create change documents for fields in the maintenance plan header and item but not for changes at maintenance calls. The system can create change documents for fields in the maintenance plan header and calls but not for changes at maintenance items Change documents can be activated for every maintenance plan category The system can create change documents for fields in the maintenance plan header and item and maintenance calls. Change documents are activated globaly for all maintenance plans irrespective of the category.
What happenswhen you put an order "In process"? Note:There are 2 correct answers to this question You can now implement material planning for this order,that is,reserve materials,withdraw materials You can print out the order papers immediately Completion Confirmations can now be entered for this order The order is released immediately without saving The order is released.However,you must save the order explicitly in order to take effect the release.
When an order is released Note:There are 2 correct answers to this question Material is withdrawn for the relevant operations Business functions are allowed or prohibited Vendors are assigned to the purchase requisitions The worker receives a message on their pager that he/she has received a call for a maintenance task to execute Goods movement can be performed.
Your order 89000444 has the system status REL,PRT,SETC,PRC.A technician realises that for the execution of this order ot will be needed a new material in an operation.Which of the following statements are correct about the availability check? Note:There are 2 correct answers to this question The automatic availability check is also performed for an order already released,as many times as we want every time we save the order An availability check can be performed any number of times manually after the release Since the order has already been released no further materials may be planned. You can define per order type in Customizing for each plant whether an availability check is possible after the order has been precosted.
Which settings can you make in the Customizing activity "Define Notification Types" for a notification type? Note:There are 3 correct answers to this question You define whether notifications of tis notification type are updated in the information system You use the early number assignment to define the number range for notification You create different notification categories for PM and CS You create a catalog profile for particular technical objects(for example equipment,serial number) You use the reference time to define which date and time are proposed by the system at basic start date notification field.
You can assign a catalog profile to a piece of equipment,functional locationor notification type.Which of the following is correct? Note:There are 2 correct answers to this question The system assigns a catalog profile to the notification in the sequence Equipment-Functional Location-Notification type You can assign any catalog profile to the notification individualy The system assigns a catalog profile to the notification in the sequence Functional Location-Equipment-Notification type The system assigns a catalog profile to the notification in the sequence Notification type -Equipment-Functional Location The sequence in which the system assignes the catalog profile to the notification is defined in Customizing.