SAP PP Test-01
![]() |
![]() |
![]() |
Title of test:![]() SAP PP Test-01 Description: SAP PP Test-01 |




New Comment | |
---|---|
| |
| |
| |
END OF LIST |
Material Master settings can override settings in the MRP group. YES. NO. The principle of LTP is to simulate different versions of the demand program. YES. NO. Standard SOP is the only functionality provided to support the MRP process. YES. NO. How demand can be entered into SOP tool?. Statistical forecast. Manually entered. Copy from COPA. Copy from Sales info System. Parallel Processing must be active to use scope of planning. YES. NO. If a distribution is used the material must be distributed equally among the individual time periods. YES. NO. At the time of BOM status change, you can define an explosion date for BOM, by entering an explosion number. YES. NO. Identify the Correct statements: PIRs can be transferred to the operative plan. using the current stock level is optional. Dep. reqts for Kanban and bulk materials can be created in the planning scenario. The Planning Time Fence can be deactivated for the LTP. In dependent/parallel discontinuation all materials are replaced when their inventory levels are zero. YES. NO. Choose the Correct statement (s). A strategy group will contain one main planning strategy. The main planning strategy will indicate the .default. Requirement type when entering independent requirements. Strategy groups are only necessary for the materials for which independent demand will be placed. MRP group settings, which in turn can override settings in the plant parameters. YES. NO. What supplies will MRP create to offset shortages?. None of the Below. Planned Orders. Production Orders. Sales Orders. Unrestricted use stock is the only stock considered in the planning run. YES. NO. A material can be inventoried by In House Production and Procured Externally. YES. NO. What criteria planning might use to determine a BOM for a material produced in-house?. LotSize. Explosion Date. Alternative BOM. Production Version. Quota arrangements may be used to split procurement between what types of sources?. External vendors. Other Plants. In house Manufacturing. The MRP is always based on external procurement. YES. NO. The planning time fence is only a function of MPS?. YES. NO. There is only Single version of planned independent requirements. YES. NO. For material planning purposes, what controls the relationship between plants?. Plant Master. GR Processing Time. Schedule Margin Key. Dynamic safety stock shows up as an MRP elements throughout the horizon?. YES. NO. Where would be defined procurement element (delay in days) for rescheduling?. Schedule Margin Key. Safety time. Tolerance value. Min Queue time. Vendor delay factor. Withdrawal period. Item is marked as an MPS item; you cannot plan down to its required raw material. YES. NO. For selecting an alternate BOM, define the procedure to selecting the BOM in the Selection method field of the MRP data. YES. NO. Operative data that is used in the LTP (ex. sales orders, Production orders, firm purchase requisitions and firm planned orders) can be changed in the simulative planning area. YES. NO. ATP check is not limited to sales requirements. YES. NO. Distribution key is entered on what masters?. Material Master. Production Version. BOM Header. Routing. Work center. If one plant produces a component that the other plant needs for their manufacturing process, how could this be modeled in SAP ERP?. Stock transfers between the plants. Trucks and forklifts. Withdrawal from another plant. Set the procurement type to E. If demand fluctuates, but production is always used to full capacity, what planning strategy makes most sense?. Strategy 10 - Make to stock. Strategy 20 - Make to Order. MRP group settings, which in turn can override settings in the plant parameters. YES. NO. Sales orders are dependent demand. YES. NO. Inventory in the quality inspection is available for planning. YES. NO. When a quality check is performed, the results are recorded for a specific Inspection Lot. YES. NO. Explosion dates of BOM and routing are identical. YES. NO. Quotas always determine a source using the cumulative quantities. YES. NO. What are the types of discontinuation?. Aggregate. Parallel. Simple. Disaggregate. How can the number of rescheduling exception messages be reduced or limited?. Net Change planning. Tolerance Values. Planning time fence. Reduce all lead times to 1. Through Distribution Key Non discrete input and output can be controlled. YES. NO. In basic scheduling, you can trigger lead-time scheduling for the planning run by using the scheduling indicator. YES. NO. If MRP Areas are used, materials in the given storage locations are planned at the MRP area level. YES. NO. Requirements for a Raw Materials needed to manufacture Finished Product are dependent demand. YES. NO. One planner may only be responsible for one MRP controller. YES. NO. The low level code is calculated by the system and saved at the client level during BOM maintenance. YES. NO. If you designate backward/forward consumption with a backward period of 10 days and forward period of 5 days, the system will consume past requirements for a period of 10 calendar days before consuming any future requirements. YES. NO. If you do not review the exception messages or capacity prior to planning, than MPS is not a step you need in your planning process?. YES. NO. If a safety time of one week specified, the requirement date is brought forward 1 week. YES. NO. Planned orders always generate production dates?. YES. NO. If a material had to cure for a specific time period before it could be passed to the next operation, what time would be most appropriate to model?. Curing time. Wait time. Sit around time. For BOM explosion in MRP, you must set the BOM status in the BOM header so that it is active for MRP. YES. NO. While customizing MRP settings, you assign the strategy group to MRP group. YES. NO. |