Questions
ayuda
option
My Daypo

ERASED TEST, YOU MAY BE INTERESTED ONSAP PP 2020 S4 Hana

COMMENTS STATISTICS RECORDS
TAKE THE TEST
Title of test:
SAP PP 2020 S4 Hana

Description:
SAP PP 2020 S4 Hana

Author:
Khandoba
(Other tests from this author)

Creation Date:
02/12/2022

Category:
Personal

Number of questions: 80
Share the Test:
Facebook
Twitter
Whatsapp
Share the Test:
Facebook
Twitter
Whatsapp
Last comments
No comments about this test.
Content:
How can you set up the supply source for the Kanban process in SAP S/4HANA? Note: There are 3 correct answers to this question. Use quotations for internal and external procurement. Use stock transfer reservations for stock transfer. Use purchasing costs for automated source prioritization. Use purchase orders for external procurement. Use run schedule quantities for in-house production.
When can the automatic material availability check occur in a production order? Note: There are 2 correct answers to this question. At order release At order settlement At order creation At order confirmation.
Which business processes are affected by settings in the order type- dependent parameters? Note: There are 2 correct answers to this question. Implement engineering changes. Initiate quality inspections. Select master data. Define integration to cost accounting.
You want to trigger in-house production of a semi-finished material before a sales order for the corresponding finished good is received. Which planning strategy supports the consumption of planned independent requirements for the semi-finished material? Planning without final assembly (50) Make-to-order production (20) Planning with final assembly (40) Planning at assembly level (70).
How can you carry out cost object controlling for production orders? Note: There are 2 correct answers to this question. Order-related Cost-related Milestone-related Product-related.
Which materials have a negative quantity in a bill of material or in a recipe? Note: There are 3 correct answers to this question. Bulk materials Waste products Co-products By-products Continuous flow materials.
What is a work center hierarchy in capacity planning in SAP S/4HANA? A group of work centers in a production line being used in sequence for production A group of alternative work centers providing a cumulative available capacity for production A group of work centers in a parallel sequence that is used to split production quantities and work on them in parallel A group of alternative work centers for production, structured in hierarchy levels by priorities.
Mode selection is one of the scheduling options available in Advanced Planning in SAP S/4HANA. When can you use mode selection? When multiple operations are maintained for one product When multiple production versions are maintained for one product When alternative resources are used within one operation When multiple planned orders exist on one resource.
Which chart types does the tabular planning table provide in SAP S/4HANA? Note: There are 2 correct answers to this question. Order (pool) chart Capacity requirements chart Orders (dispatched) chart Work center capacities chart.
Which options do you have to plan both quantities and capacities during line loading in repetitive manufacturing? Note: There are 2 correct answers to this question. Run PP/DS heuristics for repetitive manufacturing. Assign planned orders manually in the planning table. Run MRP with quota arrangement. Run MRP with automatic selection of production version.
Which time elements are relevant for lead time scheduling of a production order? Note: There are 2 correct answers to this question. Planned delivery time Float after production Total replenishment lead time Setup time.
Your project uses process orders for the production of liquid chemicals. What can you define to ensure that the production flow happens only in physically connected tanks? Setup matrix Work center hierarchy Resource network Operation network.
You want to reduce planning efforts for B/C materials. Which planning procedure do you recommend? Material requirements planning Manual planning without check Consumption-based planning Forecast planning.
Which master data object governs the relationship between supply source and demand source in the Kanban process? Control cycle Production supply area Rate routing Replenishment strategy.
In the Schedule Production app, which settings can you make for the planning strategy? Note: There are 3 correct answers to this question. Finiteness level Fixed pegging Direction Planning mode Scheduling control.
What does it mean for the production planner when MRP schedules with infinite capacities? MRP creates capacity requirements without checking the capacity of a work center. MRP assigns capacity requirements automatically to work centers with the earliest available capacity. MRP creates capacity requirements only if the work center has sufficient capacity. MRP assigns capacity requirements automatically after the last scheduled order on a work center.
Which alternative item strategies are available in bills of material (BOM) in SAP S/4HANA? Note: There are 2 correct answers to this question. 100% check First in first out (FIFO) Simultaneous By usage probability.
In your project, you have several materials that are planned by different people. How can you assign the planning responsibility? MRP planning file MRP controller MRP type MRP group.
Which SAP solutions support the supplier area in the portfolio of the digital value network? Note: There are 3 correct answers to this question. SAP Fieldglass SAP Ariba SAP Concur SAP SuccessFactors SAP Hybris.
What are the consequences if the Dispatched operation status is set for a production order operation? Note: There are 2 correct answers to this question. You can reschedule the operation using midpoint scheduling in a planning table. You can reschedule the order using infinite scheduling in a planning table. You can reschedule the operation using lead time scheduling in a planning table. You can reschedule the operation using finite scheduling in a planning table.
What are the possible results of a production planning run in Advanced Planning (PP/DS)? Note: There are 3 correct answers to this question. Scheduling agreement schedule line Planned order Purchase requisition Stock transport order Production order.
Which of the following processes lead to an entry in the MRP planning file? Note: There are 3 correct answers to this question. Creation of a purchasing contract Creation of dependent requirements Creation of a sales order Change of the storage bin Change of the materials procurement type.
The MRP run detected a shortage of a material that you source from an external supplier in full pallets. How can you make sure you will only receive full pallets? Use the MRP type for vendor managed inventory. Use the reorder point. Use the minimum order quantity. Use the fixed lot size procedure.
Which of the following is a valid sequence of the main activities in production order processing? Note: There are 2 correct answers to this question. Creation, release, settlement, goods issue, confirmation, goods receipt Creation, printing, release, goods issue, confirmation, goods receipt Creation, availability checks, release, material withdrawal, confirmation Creation, release, printing, goods issue, confirmation, goods receipt.
Which time elements does MRP consider in backward scheduling to determine the order dates for components from dependent requirements? Note: There are 2 correct answers to this question. Planned delivery time Operation duration Total replenishment lead time In-house production time.
How can you limit the validity of a bill of material (BOM)? Note: There are 2 correct answers to this question. By plant By period By industry By material type.
You have a scheduling agreement with a vendor. You want classic MRP to automatically create schedule lines in case of material shortage. What must you do? Note: There are 2 correct answers to this question. Add the agreement to the quota arrangement and mark it for MRP relevance. Set the creation indicator for purchase requisitions on the initial screen of the MRP run. Set the creation indicator for delivery schedule lines on the initial screen of the MRP run. Add the agreement to the source list and mark it for MRP relevance.
Advanced Planning uses master data and transaction data from SAP S/4HANA. In which data objects can you set the Advanced Planning flag? Note: There are 2 correct answers to this question. Work center Plant Production version Material.
You want to set up a make-to-order planning scenario for a finished material. The bill of material contains two components: one should be procured for each sales order individually, the other one should be procured jointly for all independent requirements. Forecasting for the finished product is NOT possible. Which settings do you make to achieve this? Choose planning strategy 20 (Make-to-Order) and select the corresponding Individual/Collective indicator. Choose planning strategy 50 (Planning without final assembly) and select the corresponding Mixed MRP indicator. Choose planning strategy 20 (Make-to-Order) and select the corresponding Mixed MRP indicator. Choose planning strategy 50 (Planning without final assembly) and select the corresponding Individual/Collective indicator.
Which of the following are possible configuration steps when setting up the alert monitor in Advanced Planning? Note: There are 2 correct answers to this question. Create an object selection variant for product-related alerts. Create an object selection variant for transportation lane-related alerts. Assign the overall profile to the authorization profile. Assign the alert profile to the overall profile.
What does forecasting in the demand planning cycle include? Note: There are 3 correct answers to this question. One-off events Past quotation quantities Past procurement quantities Market intelligence Past sales order quantities.
Your production planners must execute planning only for specific resources. How can you achieve this in Advanced Planning (PP/DS)? Use a propagation range. Use a heuristic. Use a planning group. Use a resource group.
You need to model goods receipt processing time in detailed scheduling. Which modeling options do you have? Note: There are 2 correct answers to this question. Model a handling resource in the location master and goods receipt time in the material master. Model a separate resource in the production data structure. Model a resource inbound in the location master. Model a transportation resource in the location master.
Which of the following questions do you have to answer before you start creating a BOM? Note: There are 2 correct answers to this question. What status does the BOM have? In which storage location is the BOM required? Which Valid To information is necessary? Is the material type allowed in the BOM?.
How can SAP S/4HANA support a GMP-compliant production process? Note: There are 2 correct answers to this question. GMP-compliant flag Recipe approval Batch record Digital signature Approved resources.
An issue storage location was NOT found through the work center, bill of material (BOM) item, or material master. What determines whether the storage location can be derived from the production version? MRP profile MRP group Plant parameters MRP controller.
What determines whether the planned independent requirements in MRP are consumed by other requirements? Requirements profile Consumption sequence procedure Order type Requirements type.
When working with both cross-plant and plant-specific material statuses in the material master, which status has the highest priority? The least restrictive status The most restrictive status The cross-plant status The plant-specific status.
What type of time element can be reduced by strategy settings while dispatching? Note: There are 3 correct answers to this question. Setup time Wait time Transport time Queue time Move Time.
What are some uses for the low-level code assigned to each material? Note: There are 2 correct answers to this question. It is used by product costing to determine how costs are rolled up. It is used by engineering to identify subitems in an engineering bill of material (BOM). It is used by ATP to determine the priority of alternative components. t is used in MRP to determine the sequence in which materials are planned.
Which methods are available for goods issue posting of material components for process orders? Note: There are 2 correct answers to this question. Transfer order Kanban Picking list Backflushing.
You want to insert an operation at a certain time on a work center. The planning direction is forward. The desired dispatching time coincides with an operation that has previously been dispatched. How does the insertion take place? The previously dispatched operation stays as is; the new operation is inserted after the dispatched operation. The new operation is inserted at the desired time; the previously dispatched operation is moved forward. The new operation is inserted at the desired time; the previously dispatched operation is moved backward. The previously dispatched operation stays as is; the new operation is inserted before the dispatched operation.
You set up a material as a phantom assembly by entering the special procurement key in the material master. How can you switch off the phantom assembly in a specific bill of material (BOM)? Change the special procurement key of the phantom assembly in the BOM. Change the item category of the phantom assembly in the BOM. Change the Phantom Item indicator for the phantom assembly in the BOM. Change the explosion type of the phantom assembly in the BOM.
You want to use capacity availability checks for production orders. Which settings have to be made for this? Note: There are 2 correct answers to this question. The Relevant for Finite Scheduling indicator must be set. The PRT Availability Check must be set in the checking control. An overall profile must be assigned in the checking control. A checking rule must be assigned in the checking control.
If the stock level drops below the reorder stock in reorder point planning, what logic would the system use to trigger procurement? Fill up to the maximum stock level. Fill up based on the lot size procedure. Fill up to the safety stock level. Fill up to the reorder stock level.
What do you use to dispatch operations from planned orders so that the production plan can be fulfilled? Material Requirements Planning (MRP) Demand Planning (DP) Capacity Requirements Planning (CRP) Supply Network Planning (SNP).
Which SAP applications can be used for forecasting in Supply Chain Planning? Note: There are 2 correct answers to this question. Supply Chain Management (SCM) Capacity Requirements Planning (CRP) Integrated Business Planning (IBP) Material Requirements Planning (MRP).
Which time elements are part of a routing operation? Note: There are 3 correct answers to this question. Move time Float before production Wait time Pick/pack time Queue time.
What is the purpose of a reporting point confirmation in repetitive manufacturing? Note: There are 2 correct answers to this question. To reduce the total production lead time for a long production line To determine the work in progress along the production line To provide timely updates of inventory management for the staged components To stage different components for a production line simultaneously.
What happens to dependent requirements of a planned order when you convert the planned order into a production order? They are converted into production orders. They are converted into planned orders. They are converted into schedule lines. They are converted into reservations.
Why would you use phantom assemblies? Note: There are 3 correct answers to this question. To simplify the structure of bills of material To increase the number of planning levels To make the assignment of components easier To reduce the number of material masters To reduce the number of changes required in bills of material.
In your plant, MRP is activated. Which options do you have to exclude a material from the MRP run? Note: There are 2 correct answers to this question. Use a specific material group. Use a specific MRP type. Use a specific MRP controller. Use a specific material status.
Where do you maintain data to determine the duration of an operation for production? Note: There are 2 correct answers to this question. Routing Bill of material (BOM) Material master Work center.
During production order creation, several valid production versions are found. How does the system choose the production version? Validity period or sales order Alphanumeric or quota arrangement Lot size or material cost Planned order or material number.
For a production version to be valid and consistent, what requirements must be fulfilled? Note: There are 3 correct answers to this question. The assigned routing and bill of material (BOM) must be valid in the entire validity period. The assigned routing must be a rate routing. The deletion flag must NOT be set for the bill of material (BOM) or the routing. The lot size range must be within the lot size range of the assigned routing. The assigned routing must NOT have alternative sequences.
For which categories can you define BOMs in SAP S/4HANA? Note: There are 2 correct answers to this question. Work Center Sales Order Class Document Structure.
You have maintained the parameters for simple discontinuation in the material master of a component. Which business process will be affected if the available stock is zero and the discontinuation date is in the past? Backflushing Production order release Kanban Material requirements planning.
Which actions does the system perform by default when you save a confirmation for a finished product in repetitive manufacturing? Note: There are 3 correct answers to this question. Material staging for next order in sequence Archiving of documents for assembly scrap Posting of production costs to the production cost collector Posting of goods receipt for the product Reduction of associated capacity requirements.
How can you achieve a feasible production plan in case of capacity constraints? Note: There are 3 correct answers to this question. Select an alternative mode on a resource. Adjust the available capacity. Form optimum sequences to reduce setup times. Reduce the planning window. Execute an infinite production planning run.
For what production type are production orders used? Period and quantity-oriented production Replenishment controlled by control cycles Discrete manufacturing processes Process manufacturing processes.
You use planning strategy Finite Scheduling – with Reverse and want to allow scheduling in the past. How can you achieve this? Specify a positive offset time in the strategy profile. Specify a negative planning horizon in the strategy profile. Specify a positive planning horizon in the strategy profile. Specify a negative offset time in the strategy profile.
Which of the following elements does MRP take into account during net requirement calculation? Note: There are 2 correct answers to this question. Lot size Purchase orders Safety stock Maximum stock level.
You want to create a production order from a planned order. What methods could you use? Note: There are 2 correct answers to this question. Order release Collective conversion Combined conversion Partial conversion.
Which item statuses can you select inside a material BOM? Note: There are 2 correct answers to this question. Quality management Service Sales Engineering.
What does the material type influence? Note: There are 2 correct answers to this question. Which plant specific status is allowed Whether the material is produced in-house, procured externally or both Which material master views can be maintained Which document types are allowed.
Where do you maintain the work center that represents the production line for repetitive manufacturing? Note: There are 2 correct answers to this question. Production version Production cost collector Routing Repetitive manufacturing profile.
What are the consequences when you assign a planned order to a production line manually, using the planning table in repetitive manufacturing? The planned orders components are copied to the picking list. The planned orders component availability is checked. The planned order generates capacity requirements. The planned order is converted to a production order.
How would you define pegging in the context of Advanced Planning? An evaluation that is ordered according to the network structure of all related products and represents the coverage of issue elements with receipt elements An evaluation to verify if there are overstock situations in the balance between receipt and issue elements after the production planning run An evaluation to verify if there are material or capacity shortages in the network after the production planning run An evaluation that is ordered according to the bill-of-material structure of all related products and represents the relationship between the receipt and the issue elements.
What does a line hierarchy in repetitive manufacturing represent? A production line with prioritized alternative work centers A production line with an alternative sequence in the routing A production line with more than one work center A production line with a parallel sequence in the routing.
Your project team decides to use a make-to-order planning strategy for a strategic material in discrete manufacturing. What is the impact of this decision? Note: There are 3 correct answers to this question. Sales-order-specific stock is created. A sales-order-specific planning run is required. Storage location MRP areas are required. Net requirement calculation is sales-order-specific. Production orders are created with sales order reference.
What is the difference between co-products and by-products? Only co-products can be manufactured in isolation from the main product. Only co-products are identified by a special item category in the bill of material (BOM). Only by-products have a zero inventory valuation. Only co-products appear in the process or production order settlement rule.
Your quality department detects a deviation in a raw material batch. Unfortunately, this batch has already been used in production. How can you identify all affected finished goods stocks? Use the batch information cockpit. Use the material where-used report. Use batch determination. Use the material staging report.
Your company produces a finished good based on a forecast and expects it to be in stock when customers order it. If customers order more than the forecasted quantity, the production quantity should be increased to try to meet the extra demand. Which planning strategy do you use? Planning without final assembly (50) Make-to-stock production (10) Make-to-order production (20) Planning with final assembly (40).
Your client is asking for your advice on material master numbering in SAP S/4HANA. What do you need to consider? Note: There are 2 correct answers to this question. The display template for material numbers applies to all clients. The maximum material number length is 40 for external numbers and 18 for internal numbers. In Customizing you can decide by material type whether to use the long material number. The number of leading zeros for internal numbers is client- specific.
What is the purpose of collective orders? To combine order management of co-products and by-products with the main product To manage production orders for an entire finished product on multiple levels To post production costs on a cost collector instead of the production order To post any component withdrawal as single backflush with order confirmation.
Which information is required when you create a product master in SAP S/4HANA? Note: There are 2 correct answers to this question. Product type Selection screen for views Base unit of measure Industry sector.
What could be the reason for multiple commitment of individual capacities, where several operations have the same scheduled dates on a work center (or resource) after capacity planning? Note: There are 2 correct answers to this question. The Change Planning Direction indicator is set in the strategy profile. The Finite Scheduling indicator is NOT set in the strategy profile. The work center has several individual capacities. Alternative work centers are fully occupied.
You are working with planning strategy 40 (Planning-with-final assembly). When does consumption of planned independent requirements take place? When the MRP results are saved When you deliver a sales order When you create a sales order When you create a planned order.
You want to schedule an operation finitely, without moving other operations. Which scheduling strategy do you select? Schedule in working time only Squeeze in Insert operation Find slot.
When do you use variant bills of material (BOMs)? When a material has multiple BOMs When multiple materials have multiple BOMs When a material has a configurable BOM When multiple materials have similar BOMs.