You use the Finite Scheduling - with Reverse planning strategy and want to allow scheduling in the past. How can you parameterize this in the strategy profile?. Specify a negative planning horizon. Specify a negative opening period. Specify a negative offset me. Specify a negative PP/DS horizon.

You want to trigger in-house product of semi-finished material before a sales order for the corresponding finished goods is received. Which planning strategy supports the consume on of planned independent requirements by dependent requirements for the semi-finished material?. Assembly processing with product on orders (82). Planning with final assembly (40). Planning at assembly level (70). Production by lot size (30).

You want to set up a make-to-order planning scenario for a finished product. The bill of material contains two components: one should be procured for each sales order individually, and the other should be procured jointly for all independent requirements. Forecasting the finished product is NOT possible. Which settings do you make to achieve this?. Choose planning strategy 20 (Make-to-Order) and select the corresponding Individual/Collective indicator. Choose planning strategy 20 (Make-to-Order) and select the corresponding Mixed MRP indicator. Choose planning strategy 50 (Planning without final assembly) and select the corresponding Mixed MRP indicator. Choose planning strategy 50 (Planning without final assembly) and select the corresponding Individual/Collective indicator.

Your project team decides to use a make-to-order planning strategy for strategic material in discrete manufacturing. What are the impacts of this decision? Note: There are 3 correct answers to this question. Storage local on MRP areas are required to manage sales-order-specific stock. Production and procurement costs are managed on the sales order item level. Net requirements calculate on is carried out for every sales order individually. Planned orders are created in MRP with reference to sales orders. Sales orders have to be ATP-confirmed (available-to-promise) to be saved.

In the bucket planning mode of the capacity scheduling table, what happens if the sum of the requirements of all operations exceeds the available capacity of the bucket?. The operation is rescheduled backwards. The operation CANNOT be dispatched. The operation is rescheduled in the planning direction. The operation is rescheduled to an Alternative work center.

Which of the following replenishment strategies for Kanban containers? Note: There are 2 correct answers to this question. Replenishment using reservations. Replenishment using direct transfer posting. Replenishment using planned independent requirements. Replenishment using process orders.

What data can you maintain in the items detail screen of a bill of material (BOM)? Note: There are 2 correct answers to this question. Change number. Alternative item group. Lot size. Co-product.

What are some advantages of using Kanban for material supply? Note: There are 2 correct answers to this question. Replenishment is always triggered on a regular basis. Replenishment is only triggered when components are required. Material is only kept available in small quantities in production. Material stock is built up for a long period of me in production.

What are prerequisites for a production version to be selected for a production order? Note: There are 3 correct answers to this question. The basic end date of the order must lie within the validity period of the production version. The production quantity must only lie within the lot-size range of the routing in the production version. The production version must NOT be deleted. The production quantity must lie within the lot-size range of the production version. The basic start date of the order must lie within the validity period of the production version.

Which of the following is a scheduling method for a production order?. Key date scheduling. Determination of basic dates. Lead time scheduling. Determination of delivery date.

What is the purpose of using a low-level code? Note: There are 2 correct answers to this question. To determine the sequence in which materials are planned in MRP. To determine the priority of alternative components inside the material BOM (bill of material). To determine the use of sub items inside the material BOM (bill of material). To determine the lowest explosion level at which a material occurs in all the product structures.

What is the difference between co-products and by-products? Note: There are 2 correct answers to this question. Only co-products have movement type 101. Only co-products have a non-zero inventory valuation. Only co-products have movement type 531. Only co-products appear in the process or production order settlement rule.

What are some options for creating a production order? Note: There are 2 correct answers to this question. By partially converting a planned order. By setting a Kanban container to full. By setting a Kanban container to empty. By converting a purchase requisition.

What does forecasting in the demand planning cycle include? Note: There are 3 correct answers to this question. Past production planning quantities. One-off events. Past sales order quantities. Market intelligence. Past quota on quantities.

In which master data objects do you maintain data to determine the duration of an operation for production? Note: There are 2 correct answers to this question. Routing. Production version. Work center. Material master.

Which me elements are relevant for lead me scheduling of a production order? Note: There are 2 correct answers to this question. Setup time. Float after production. Opening period. Total replenishment lead me.

Which options do you have to post goods receipt for a process order? Note: There are 2 correct answers to this question. You post the entire manufactured quantity to one batch if the product quality remains consistent during production. You post the entire manufactured quantity to multiple batches if the product quality remains consistent during production. You post the entire manufactured quantity to multiple batches if the product quality changes during production. You post the entire manufactured quantity to one batch if the product quality changes during production.

For a production version to be valid and consistent, what requirements must be fulfilled? Note: There are 3 correct answers to this question. The lot size range must be within the lot size range of the assigned routing. The assigned routing and bill of material (BOM) must have the same validity period. The assigned routing and bill of material (BOM) must be valid in the entire validity period. The consistency check must be performed. The deletion flag must NOT be set for the bill of material (BOM) or the routing.

Which chart types does the tabular planning table for capacity planning provide in SAP S/4HANA Cloud Private Edition? Note: There are 2 correct answers to this question. Capacity requirements chart. Order (pool) chart. Order (dispatched) chart. Work center capacities chart.

Your company manufactures materials whose characteristics differ for each manufacturing process. Which application do you choose in SAP S/4HANA to track and use this information in all areas of logistics?. Quality management. Engineering change management. Process order management. Batch management.

You want to create a production order. What methods can you use? Note: There are 2 correct answers to this question. Convert a purchase requisition. Create by order release. Create without material. Create in Kanban process.

Which settings can you make in a production scheduling profile? Note: There are 3 correct answers to this question. Automatic print on order creation. Automatic goods receipt on confirmation. Automatic release on order creation. Default order types. Automatic goods issue on confirmation.

Which options do you have to exclude Advanced Planning materials from the standard MRP run in SAP S/4HANA? Note: There are 2 correct answers to this question. Use the special MRP type XO. Use the material number for selection. Use a propagation range. Use a different MRP planner for PP/DS materials.

What are some SAP recommended guiding principles to achieve clean core operations? Note: There are 3 correct answers to this question. Establish regular housekeeping tasks and procedures. Define roles and responsibility es as part of a process transformation office. Integrate clean core practices in the end-to-end value process chain. Establish an organizational structure, technical foundation, and transformation methodology for clean core. Establish release management.

Which planning strategies can you use in the capacity scheduling table? Note: There are 2 correct answers to this question. Planning mode > Bucket. Scheduling control > Close gap. Planning mode > Order priority. Scheduling control > Find slot.

How do you assign resources in a master recipe with operations and phases?. You assign resources to the sub-operations. You assign resources to the phases. You assign resources to the header of the master recipe. You assign resources to the operations.

How are dependent requirements for assemblies created? Note: There are 2 correct answers to this question. They are created together with the independent requirement for the finished product. They are only created for multi-level bill of material (BOM) structures. They are created on the assembly level during the planning run. They are created with exact times in Advanced Planning.

How can a material availability check be triggered automatically for a production order? Note: There are 2 correct answers to this question. By order confirmation. By order release. By mass processing. By capacity planning.

During production order creation, several valid production versions are found. How does the system choose the production version?. Alphanumeric or quota arrangement. Planned order or material number. Validity period or sales order. Lot size or material cost.

What are the possible results of a production planning run in Advanced Planning (PP/DS)? Note: There are 2 correct answers to this question. Planned order. Purchase order. Scheduling agreement schedule line. Production order.

You are trying to create a production order and no valid production version can be selected. What could be the reasons? Note: There are 2 correct answers to this question. No production lines are assigned to the production versions. No bills of material (BOMs) are assigned to the production versions. The basic start date is NOT within the validity period of the production version. The order lot size is NOT within the validity range of a production version.

Which of the following would you recommend as SAP's strategic Sales and Operations planning tool?. Integrated Business Planning. Standard Sales and Operations Planning. Advanced Planning. Flexible Planning.

When do you use variant bills of material (BOMs)?. When a material has multiple BOMs. When a material has a configurable BOM. When multiple materials have similar BOMS. When multiple materials have multiple BOMS.

What are some benefits of planning with planned independent requirements for finished materials? Note: There are 2 correct answers to this question. You have the option to use make-to-order production. The delivery me is reduced. Manufacturing me for final assembly is reduced. You have the option to use forecast planning.

You have a scheduling agreement with a vendor. You want classic MRP to automatically create schedule lines in case of a material shortage. What must you do? Note: There are 2 correct answers to this question. Add the agreement to the source list and mark it for MRP relevance. Add the agreement to the quota arrangement and mark it for MRP relevance. Set the creation indicator for purchase requisitions on the initial screen of the MRP run. Set the creation indicator for delivery schedule lines on the initial screen of the MRP run.

How can you achieve a feasible production plan when there are capacity constraints? Note: There are 3 correct answers to this question. Reduce the planning me interval. Increase the capacity supply in a me-phased interval. Form optimum sequences to reduce setup times. Determine a time period with available capacity on the planning board. Execute an infinite production planning run for the critical resources.

What determines whether the planned independent requirements in demand management are consumed by other requirements? Note: There are 2 correct answers to this question. Order type. Planning strategy. Requirements profile. Requirements type.

Which of the following are scheduling me elements for a production order? Note: There are 3 correct answers to this question. Transit time. Queue time. Setup time. Load time. Float before production.

Which me elements does MRP consider in backward scheduling to determine the basic dates for components from dependent requirements? Note: There are 2 correct answers to this question. Operation duration. In-house production time. Total replenishment lead time. Planned delivery time.

What options are available inside a document? Note: There are 2 correct answers to this question. Storage locations. Plant links. Versioning. Object links.