You use the Finite Scheduling - with Reverse planning strategy and want to allow scheduling in the past. How can you parameterize this in the strategy profile?. Specify a negative planning horizon. Specify a negative opening period. Specify a negative offset me. Specify a negative PP/DS horizon.

You want to trigger in-house product of semi-finished material before a sales order for the corresponding finished goods is received. Which planning strategy supports the consume on of planned independent requirements by dependent requirements for the semi-finished material?. Assembly processing with product on orders (82). Planning with final assembly (40). Planning at assembly level (70). Production by lot size (30).

You want to set up a make-to-order planning scenario for a finished product. The bill of material contains two components: one should be procured for each sales order individually, and the other should be procured jointly for all independent requirements. Forecasting the finished product is NOT possible. Which settings do you make to achieve this?. Choose planning strategy 20 (Make-to-Order) and select the corresponding Individual/Collective indicator. Choose planning strategy 20 (Make-to-Order) and select the corresponding Mixed MRP indicator. Choose planning strategy 50 (Planning without final assembly) and select the corresponding Mixed MRP indicator. Choose planning strategy 50 (Planning without final assembly) and select the corresponding Individual/Collective indicator.

Your project team decides to use a make-to-order planning strategy for strategic material in discrete manufacturing. What are the impacts of this decision? Note: There are 3 correct answers to this question. Storage local on MRP areas are required to manage sales-order-specific stock. Production and procurement costs are managed on the sales order item level. Net requirements calculate on is carried out for every sales order individually. Planned orders are created in MRP with reference to sales orders. Sales orders have to be ATP-confirmed (available-to-promise) to be saved.

In the bucket planning mode of the capacity scheduling table, what happens if the sum of the requirements of all operations exceeds the available capacity of the bucket?. The operation is rescheduled backwards. The operation CANNOT be dispatched. The operation is rescheduled in the planning direction. The operation is rescheduled to an Alternative work center.

Which of the following replenishment strategies for Kanban containers? Note: There are 2 correct answers to this question. Replenishment using reservations. Replenishment using direct transfer posting. Replenishment using planned independent requirements. Replenishment using process orders.

What data can you maintain in the items detail screen of a bill of material (BOM)? Note: There are 2 correct answers to this question. Change number. Alternative item group. Lot size. Co-product.

What are some advantages of using Kanban for material supply? Note: There are 2 correct answers to this question. Replenishment is always triggered on a regular basis. Replenishment is only triggered when components are required. Material is only kept available in small quantities in production. Material stock is built up for a long period of me in production.

What are prerequisites for a production version to be selected for a production order? Note: There are 3 correct answers to this question. The basic end date of the order must lie within the validity period of the production version. The production quantity must only lie within the lot-size range of the routing in the production version. The production version must NOT be deleted. The production quantity must lie within the lot-size range of the production version. The basic start date of the order must lie within the validity period of the production version.

Which of the following is a scheduling method for a production order?. Key date scheduling. Determination of basic dates. Lead time scheduling. Determination of delivery date.