SAP PP 2025 12
|
|
Title of test:
![]() SAP PP 2025 12 Description: SAP PP 2025 12 |



| New Comment |
|---|
NO RECORDS |
|
What is the purpose of using a low-level code? Note: There are 2 correct answers to this question. To determine the sequence in which materials are planned in MRP. To determine the priority of alternative components inside the material BOM (bill of material). To determine the use of sub items inside the material BOM (bill of material). To determine the lowest explosion level at which a material occurs in all the product structures. What is the difference between co-products and by-products? Note: There are 2 correct answers to this question. Only co-products have movement type 101. Only co-products have a non-zero inventory valuation. Only co-products have movement type 531. Only co-products appear in the process or production order settlement rule. What are some options for creating a production order? Note: There are 2 correct answers to this question. By partially converting a planned order. By setting a Kanban container to full. By setting a Kanban container to empty. By converting a purchase requisition. What does forecasting in the demand planning cycle include? Note: There are 3 correct answers to this question. Past production planning quantities. One-off events. Past sales order quantities. Market intelligence. Past quota on quantities. In which master data objects do you maintain data to determine the duration of an operation for production? Note: There are 2 correct answers to this question. Routing. Production version. Work center. Material master. Which me elements are relevant for lead me scheduling of a production order? Note: There are 2 correct answers to this question. Setup time. Float after production. Opening period. Total replenishment lead me. Which options do you have to post goods receipt for a process order? Note: There are 2 correct answers to this question. You post the entire manufactured quantity to one batch if the product quality remains consistent during production. You post the entire manufactured quantity to multiple batches if the product quality remains consistent during production. You post the entire manufactured quantity to multiple batches if the product quality changes during production. You post the entire manufactured quantity to one batch if the product quality changes during production. For a production version to be valid and consistent, what requirements must be fulfilled? Note: There are 3 correct answers to this question. The lot size range must be within the lot size range of the assigned routing. The assigned routing and bill of material (BOM) must have the same validity period. The assigned routing and bill of material (BOM) must be valid in the entire validity period. The consistency check must be performed. The deletion flag must NOT be set for the bill of material (BOM) or the routing. Which chart types does the tabular planning table for capacity planning provide in SAP S/4HANA Cloud Private Edition? Note: There are 2 correct answers to this question. Capacity requirements chart. Order (pool) chart. Order (dispatched) chart. Work center capacities chart. Your company manufactures materials whose characteristics differ for each manufacturing process. Which application do you choose in SAP S/4HANA to track and use this information in all areas of logistics?. Quality management. Engineering change management. Process order management. Batch management. |




