SAP PP 2025 14
|
|
Title of test:
![]() SAP PP 2025 14 Description: SAP PP 2025 14 |



| New Comment |
|---|
NO RECORDS |
|
You are trying to create a production order and no valid production version can be selected. What could be the reasons? Note: There are 2 correct answers to this question. No production lines are assigned to the production versions. No bills of material (BOMs) are assigned to the production versions. The basic start date is NOT within the validity period of the production version. The order lot size is NOT within the validity range of a production version. Which of the following would you recommend as SAP's strategic Sales and Operations planning tool?. Integrated Business Planning. Standard Sales and Operations Planning. Advanced Planning. Flexible Planning. When do you use variant bills of material (BOMs)?. When a material has multiple BOMs. When a material has a configurable BOM. When multiple materials have similar BOMS. When multiple materials have multiple BOMS. What are some benefits of planning with planned independent requirements for finished materials? Note: There are 2 correct answers to this question. You have the option to use make-to-order production. The delivery me is reduced. Manufacturing me for final assembly is reduced. You have the option to use forecast planning. You have a scheduling agreement with a vendor. You want classic MRP to automatically create schedule lines in case of a material shortage. What must you do? Note: There are 2 correct answers to this question. Add the agreement to the source list and mark it for MRP relevance. Add the agreement to the quota arrangement and mark it for MRP relevance. Set the creation indicator for purchase requisitions on the initial screen of the MRP run. Set the creation indicator for delivery schedule lines on the initial screen of the MRP run. How can you achieve a feasible production plan when there are capacity constraints? Note: There are 3 correct answers to this question. Reduce the planning me interval. Increase the capacity supply in a me-phased interval. Form optimum sequences to reduce setup times. Determine a time period with available capacity on the planning board. Execute an infinite production planning run for the critical resources. What determines whether the planned independent requirements in demand management are consumed by other requirements? Note: There are 2 correct answers to this question. Order type. Planning strategy. Requirements profile. Requirements type. Which of the following are scheduling me elements for a production order? Note: There are 3 correct answers to this question. Transit time. Queue time. Setup time. Load time. Float before production. Which me elements does MRP consider in backward scheduling to determine the basic dates for components from dependent requirements? Note: There are 2 correct answers to this question. Operation duration. In-house production time. Total replenishment lead time. Planned delivery time. What options are available inside a document? Note: There are 2 correct answers to this question. Storage locations. Plant links. Versioning. Object links. |




