Which order type is used for repetitive manufacturing?. Kanban order. Process order. Planned order. Production order. What is the purpose of the pull list in material staging?. To control the flow of material from the production storage location to the central storage location. To control the flow of material from the supplier to the production storage location. To control the flow of material from the supplier to the central storage location. To control the flow of material from the central storage location to the production storage location. What are some options for creating production orders without using trigger points? Note: There are 2 correct answers to this question. In assembly production, confirmation of scrap triggers the creation of a production order. In make-to-stock production, you can manually create production orders. In make-to-stock production, confirmation of yield for sub-assembly triggers the creation of a production order. In assembly production, a sales order triggers the creation of a production order. Under what circumstances can you change the material type for a material if stocks, reservations, or purchasing documents exist? Note: There are 2 correct answers to this question. The same batch management level is used. The quantity and value updates are the same. The same account category is used. The same base unit of measure is used. Your production planners are supposed to execute planning only for specific resources. What do you use to achieve this in Advanced Planning (PP/DS)?. A planning area. A planning group. A propagation range. A work center hierarchy. Which of the following processes lead to an indicator in the planning file? Note: There are 2 correct answers to this question. Changing a dependent requirement. Changing an opera on time. Changing a storage bin. Changing a delivery address. What happens when you set up detailed scheduling with the finite scheduling mode Insert Opera on?. An operation is scheduled as close as possible to the desired date. Operation on multi-resources are planned finitely in a sequence. To create a slot, neighboring operations are moved in both planning directions. Sequencing on multi-activity resources is automatically updated during planning. Which operations are considered in the capacity scheduling table? Note: There are 2 correct answers to this question. Only bottleneck operations. Operations assigned to a pacemaker work center. Sub-operations. All operations. How do you model a production line in repetitive manufacturing?. As a work center. As an operation. As a resource network. As a routing. What will happen in the MRP run if you have created a new MRP-relevant material that supports both in-house production and external procurement?. The MRP run plans the material only if a quota on has been maintained. The MRP run starts with external procurement. The MRP run starts with in-house production. The MRP run does NOT consider the material; it has to be planned interactively. When can you maintain the batch characteristic values in SAP S/4HANA? Note: There are 2 correct answers to this question. When you record inspection results. When you release the batch. When you execute batch determination. When you post the goods receipt. Advanced Planning uses data from SAP S/4HANA Cloud Private Edition. In which master data objects can you set the Advanced Planning flag? Note: There are 2 correct answers to this question. Material. Work center. Plant. Production version. Corrected. You are a consultant on an SAP S/4HANA Cloud brownfield project. In a meeting the customer decides to remodel an existing business process in accordance with clean core principles. Which of the following SAP Signavio solutions can be used for the remodeling?. SAP Signavio Process Governance. SAP Signavio Process Manager. SAP Signavio Process Insights. SAP Signavio Process Intelligence. You want to verify that the proper es of a component batch align with the required proper es of the raw material intended for a specific process order. What function do you use to accomplish this?. Batch determination. Batch number assignment. Batch information cockpit. Batch where-used list. Why would you use phantom assemblies? Note: There are 2 correct answers to this question. To reduce the number of material masters. To make the assignment of components easier. To make the procurement easier. To enable simple structuring of BOMs. Mode selection is one of the scheduling options available with Advanced Planning in SAP S/4HANA Cloud Private Edition. When can you use mode selection?. When several operations are maintained for one product. When several production versions are maintained for one product. When multiple planned orders are scheduled in parallel on one resource. When alternative resources are used within one operation. Your company produces a finished good based on a forecast and expects it to be in stock when customers order it. If customers order more than the forecasted quantity, this must NOT have any impact on the production program. Which planning strategy do you use?. Planning with final assembly (40). Make-to-stock production (10). Planning without final assembly (50). Assembly processing with production orders (82). When working with the material status, for which business areas can you set a warning message? Note: There are 2 correct answers to this question. Plant Maintenance. Classification. Sales. Purchasing. In SAP document on for MRP in Advanced Planning, you read that the MRP creates new planned orders through infinite scheduling. What does this mean for the capacity requirements of the new planned order?. MRP creates the capacity requirements on resources at the earliest possible production me. MRP automatically assigns the capacity requirements to resources with the earliest available capacity. MRP creates the capacity requirements without considering existing load on the resources. MRP automatically assigns the capacity requirements a er the last scheduled opera on for each Resource. Which standard item categories can you select inside a bill of material (BOM)? Note: There are 2 correct answers to this question. Work item. Class item. Non-plant item. WBS item. Which objects can you change with a change number? Note: There are 2 correct answers to this question. Work center. Routings. Bill of material. Production order. How can you set up a material as a phantom assembly? Note: There are 2 correct answers to this question. Select a special explosion type inside the material BOM (bill of material). Select a special procurement type inside the material BOM (bill of material). Select a special explosion type inside the material master. Select a special procurement type inside the material master. Which of the following questions do you have to answer before you start creating a bill of material (BOM)? Note: There are 2 correct answers to this question. In which storage location is the BOM required?. When does the BOM need to become effective?. For which plant can the BOM be defined?. Which base unit of measure must the BOM have?. What can you use standard heuris cs in Advanced Planning (PP/DS) for?. To optimize costs and mes in production plans. To set default values in production master data. To solve planning problems for defined objects. To automate material movements in material staging. Which of the following are features of the clean core dashboard? Note: There are 2 correct answers to this question. It can be accessed by using SAP For Me. Customers can use the dashboard in the dev, test, and production tenants. Customers can grant access to the dashboard to partners. It can be used in all SAP S/4HANA Cloud editions. What is a work center hierarchy?. A group of work centers in a production line that is used in sequence for production. A group of alternative work centers providing a cumulative available capacity for production. A group of work centers in a parallel sequence that is used to split production quantities and work on them in parallel. A group of alternative work centers for production, structured in hierarchy levels by priorities. When does the system trigger replenishment for a Kanban container?. When you set the container to Empty. When you set the container to In transit. When you set the container to Full. When you set the container to Waiting. Which master data fields can have an impact on whether MRP creates planned orders or purchase requisitions for a material? Note: There are 2 correct answers to this question. Material type. Procurement type. MRP group. MRP type. Which of the following elements does MRP take into account during net requirement calculation? Note: There are 2 correct answers to this question. Production orders. Planned orders (unfirmed). ATP quantities. Planned orders (firmed). What is the focus of repetitive manufacturing?. Period and quantity-oriented production. Detailed tracking of production orders. Low volume production. Production of lot size one. How can you limit the validity of a bill of material (BOM)? Note: There are 2 correct answers to this question. By plant. By change number. By material status. By material type. Which alternative item strategies are available in bills of material (BOMs)? Note: There are 2 correct answers to this question. Ranking. Simultaneous. Manual maintenance. 100% check. What does Consumption-based Planning use to determine requirements in the future? Note: There are 3 correct answers to this question. Statistical procedures. Historical values. Planning file entries. Forecasting. Dependent requirements. In the context of the capacity scheduling table, how do you define a pacemaker work center?. By assigning it to the bottleneck operation. By assigning it to the capacity scheduling table. By assigning it to the production version. By assigning it to the first opera on of a routing. What does the material type influence? Note: There are 2 correct answers to this question. Which number range interval the material number comes from. Whether value changes to financial accounting stock accounts are updated. Which plant-specific and plant-independent statuses are allowed. Which document types and class categories are allowed. Which of the following are possible configuration steps when setting up the alert monitor in Advanced Planning? Note: There are 2 correct answers to this question. Create an object selection variant for production-planning-related alerts. Assign the overall profile to the authorization profile. Create an object selection variant for alerts according to the priority of ATP categories. Assign the alert profile to the overall profile. What are the selection criteria of a bill of material (BOM) alternative? Note: There are 2 correct answers to this question. Material BOM usage. Date. Lot size. Change number. What is a prerequisite for the consumption of planned independent requirements to take place for planning strategy 40 (Planning with final assembly)?. MRP creates a planned order. A sales order is created. MRP creates a dependent requirement. A sales order is delivered. How would you define a pegging structure for an order in the context of Advanced Planning?. An evaluatetion to identify overstock situations based on the assignment of receipt and issue elements a er the product on planning run. An evaluate on to identify material or capacity shortages in the bill-of-material structure a er the production planning run. An evaluand on that is ordered according to the low-level codes of all related products and represents the coverage of issue elements with receipt elements and stock. An evaluand on that is ordered according to the bill-of-material structure of all related products and represents the relationship between receipt and issue elements. You are a consultant on an SAP S/4HANA Cloud greenfield project. Which of the following aspects should you focus on to achieve and maintain clean core data quality? Note: There are 2 correct answers to this question. Timeliness. Accuracy. Efficiency. Stability. |